Sie sind auf Seite 1von 8

Wiring diagram - Contact status - Diagnosis

H28TJ+ (HB86TJ+)
1 - Wiring diagram - Frame Part
1

10

11

12

13

14

15

16

17

18

19

20

A
242

High speed

Pressure Sensor

Turret angle

+12V Permanent

SL9
3
2

B8

000

512

204

E
3

10

11

Ground Frame

F
45.2

29.1

E_TOR_(0-12V)

To Turret Part

E_ANA_(0,5-4,5V)

(Power Supply)

To the Turret Part

To the Turret Part

(Power Supply)

(Power Supply)

Electrical Collector

HEAD - A Node
H
To Turret Part
(Power Supply)

S_TOR_(0-12V)

S_TOR_(0-12V)

S_TOR_(0-12V)

S_TOR_(0-12V)

15.6

15.7

15.8

15.9

S_TOR_(0-12V)



+12V EVs

Frame

807A

807B

YV10

Turret

YV12

YV27

Rear Axles Unbrake

Front Axles Unbrake

Differential Lock

YV33

Swing Axle Unlock

YV9

High Speed Translation

306

307

308

201

3,1*8(/<+$8/277(
La Pronnire

BP 9
42152 L'HORME

TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

DESSINE PAR

DATE DE CREATION

B.Pallot

25-04-2006

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

15-05-2006

H28TJ+

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA
BPT

NBRE TOTAL DE FOLIOS

184P277440a
)5$0(3$57

SCHEMAS

01
1

Wiring diagram - Contact status - Diagnosis


H28TJ+ ( HB86TJ+)
2 - Wiring diagram - Turret Part
1

10

11

12

13

14

15

16

17

18

19

20

SB1
215

120

To the Engine Part


(Fusible FU4)

Turret
Emergency Stop

102

KMG
(01-2)

240

Electronical +12V

240

0 : Basket
I : Turret

SA1

FU6

FU5

3A

3A

7.5A

FU8

FU7

FU10

FU9

5A

20A

3A

20A

To the Engine Part

240

FU16

203

216

242

242

Permanent +12V

242

201

+12V EVs

201

212

211

201

242

246



E_TOR
(0-12V)

241

102

215

Shunt

254

241





E_TOR
(0-12V)

-B&

E_TOR
(0-12V)

Alim_+12V





E_TOR
(0-12V)

E_TOR
(0-12V)

G
SA0

To the Basket Part

HEAD - Node A

(Power Supply)

KMG

42152 L'HORME

905
GND

Alim_0V

S_PWM







TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

Thyristor
Fusion FU7



HA1
KA1

HL5
905

DESSINE PAR

DATE DE CREATION

B.Pallot

25-04-2006

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

15-05-2006

+12V Accessory

P1

907

00

(01-12)

905

906

SA16

Beacon

KA1

1000

Horameter

Klaxon

Option

116

To the

Klaxon

Basket
Turret

R120



201



260



Engine Part
(KP1)

905

Ground

3,1*8(/<+$8/277(
BP 9

CAN_Low CAN_High

905

(03-21)

La Pronnire

GND



Shunt

R120



1002

To the Basket Part folio 1

Power Supply



1001

(CAN Bus)

241

CAN_Low CAN_High



(Power Supply)

CNB01 - Beam Connector Basket - Turret

242

(Basket
Emergency Stop)

201

Power

H28TJ+

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA
BPT

NBRE TOTAL DE FOLIOS

184P277450a
7855(73$57

SCHEMAS

01

Wiring diagram - Contact status - Diagnosis


H28TJ+ (HB86TJ+)

Ground

(02-21)

+12V Permanent

242

10

11

12

13

14

15

16

17

18

19

20
(02-1)

Close if over-heating

Thermical over-heating

(mano contact)

Oil pressure

Open if over-heating

Over-heating
To thermical

SA30

engine part
(Alternator)

B2

112

109

B3

111

B4

Signal D+

117A

915

255

SB3

904

SA2

SA19

SB21

605

Output - B

Input - A

hydraulical oil

Starter

Accelerator

Assistance pump

Compensation

Jib telescoping

Jib lifting
Rise - A

SA6

920

Left - A

(03-1)

Turret orientation

Descent - A

Right - A

516

SA15

517

411

SA13

505

Input - A

Output - B

SA8

Rise - B

504

Arrow lifting

Arrow telescoping

(01-21)

510

511

412

Descent - B

F


E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)





E_TOR
(0-12V)

E_TOR
(0-12V)







E_TOR
(0-12V)

E_TOR
(0-12V)

E_TOR
(0-12V)



E_TOR
(0-12V)





E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)

E_TOR
(0-12V)

S_TOR
(0-12V)

S_TOR
(0-12V)

S_TOR
(0-12V)

111A

110A

253










S_TOR
(0-12V)

S_TOR
(0-12V)

S_TOR
(0-12V)

S_TOR
(0-12V)

305

S_TOR
(0-12V)



415

S_TOR
(0-12V)



146

S_TOR
(0-12V)



150

S_TOR
(0-12V)

112A



398

304A

(0-12V)

699

S_TOR



914

S_TOR
(0-12V)

210A





Option

(01-21)

M
(02-21)

+12V Permanent

La Pronnire

BP 9
42152 L'HORME

TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

KA2

KM6

Thermical-cutting

Starter relay

Accelerator relay

engine part

order

order

relay order

Assistance

pump relay

lighting

Only Deutz engine

KP1

HL2
Filling air filter

HL3
Thermical over-heating
order

Lack of thermical

oil pressure lighting

Overload lighting

HL4

KM4

242

Ground

3,1*8(/<+$8/277(

HL16

HL18
Compensation fault

lighting

Radius limitation

HL17

lighting

HL20

HA4

To thermical

(02-1)

242

(03-1)

DESSINE PAR

DATE DE CREATION

B.Pallot

25-04-2006

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

15-05-2006

H28TJ+

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA
BPT

NBRE TOTAL DE FOLIOS

184P277450a
7855(73$57

SCHEMAS

02
3

Wiring diagram - Contact status - Diagnosis


H28TJ+ ( HB86TJ+)

10

11

12

13

14

15

16

17

18

19

20

Ground

(02-21)

(03-1)

SQ1

SL1

1
3

:KLWH

SQ9

SQ11

SQ42

SQ4

SQ13

SQ12

SL2

lenght n2

To frame
part

SL3

SL4

SQ44

SQ41

Boom

Boom
lenght n1

Boom angle n2

Boom angle n1

Orientation detection

Closed if ring tooth

Close if reserve

Fuel reserve

Rupture cable

Rupture chain

Open if rupture

Centered turret

Close if magnet

Telescope detection

Close if in

Boom telescope in

Boom and arm folded up

5HG

Close if machine folded up

Tilt sensor

Open if rupture

+12V Permanent

(02-21)

Close if magnet

%ODFN

807

804

805

611B

222

252

251

218B

250

232

218A

485

205

F




E_TOR
(0-12V)



E_TOR
(0-12V)

E_TOR
(0-12V)





E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_TOR
(0-12V)



E_ANA
(4-20mA)



E_ANA
(4-20mA)



E_ANA
(0-12V)

E_ANA
(0-12V)

HEAD - Node A

S_TOR_
(0-12V)

S_TOR
(0-12V)

S_TOR
(0-12V)

310A

311A





S_ANA_(3V-6V-9V)

S_ANA_(3V-6V-9V)

S_ANA_(3V-6V-9V)









612A



S_TOR
(0-12V)



512A

S_TOR
(0-12V)



506A

S_TOR_
(0-12V)

408A



401A

S_TOR_
(0-12V)

306A



263

S_PWM



414A

S_PWM

417A

J
Option

YV34

YV36

YV28

YV21B

YV21A

(03-21)

Ground

YV4
3

YV5

Boom raising

Right direction

Left direction

Selection
201

Boom telescoping

+12V Electrovalves

steering / Basket mvts

(01-21)

Lifting security

Orientation security

Generator

Rear translation

Front translation

YV7

201

YV1

LS Valve

YV24

Turret orientation

YV30B

YV30A

302

(01-21)

To frame part

M
0

(01-1)
To frame part

3,1*8(/<+$8/277(
La Pronnire

BP 9
42152 L'HORME

TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

DESSINE PAR

DATE DE CREATION

B.Pallot

25-04-2006

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

15-05-2006

H28TJ+

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA

NBRE TOTAL DE FOLIOS

184P277450a
7855(73$57

SCHEMAS

03

Wiring diagram - Contact status - Diagnosis


H28TJ+ (HB86TJ+)
3 - Wiring diagram - Basket Part
1

10

11

12

13

14

15

16

17

18

19

20

CNB01 - Basket turret bundle connector



Down - A3





Option

Option

Generator
A2

pedal

bundle connector

CNB02 - Spider

Compensation
A2



B115

Right - A1
B123

A3

A1

Left - A3
B124



SWB12
B122



SWB15
B127

A3

B143

A1

SWB19

B107

A3

SWB07

B111

Black

Black

SWB05

B106

215

SWB08

B129

Black

B128

E
2

SWB17

SWB03
Up - A1

SWB13

D
SWB16

A2

A2

Basket rotation

Boom/Jib selection

Link part movement


A2

A2

A2

Load selection

Differential lock

High speed translation


A2

Klaxon

Black

Emergency pump
Black

stop)

Black

(Emergency

Start engine

Basket emergency stop

Dead man

B141

Vertical movement

102

SB6

SWB02

A2

+12V Electronic

SWB04

2
B141

A3

246

(02-1)

B113

+12V Permanent

A3

242

B116

(Power supply)

10

B114

F




Alim_+12V

E_TOR





E_TOR



E_TOR

E_TOR

E_TOR



E_TOR

E_TOR



E_TOR

E_TOR

E_TOR

E_TOR



E_TOR



E_TOR



E_TOR

E_TOR

G
To turret

HEAD - Node B - NBB01

part
page 1

ADR2



K_Line



GND



201

+12V Electrovalves

(Power supply)

11/12

905

7/8

00

3/4/5/6

(02-1)

Accessories ground

(02-1)

LTB03



LTB04

LTB05

LTB06

LTB07

S_TOR_(0-12V)



Alim_0V



LTB08

LTB09

BZB01
(02-1)

+12V Accessories

LTB02



Alarm

13

LTB01



Load selection

1000



Compensation defauft

14



Reach limitation

1002



Overlaod

16



Tilt

1001



Power on

(CAN Bus)

15



Dead man pedal

S_TOR_(0-12V) S_TOR_(0-12V) S_TOR_(0-12V) S_TOR_(0-12V) S_TOR_(0-12V) S_TOR_(0-12V) S_TOR_(0-12V) S_TOR_(0-12V) S_TOR_(0-12V)

B508

ADR1



B509

ADR0



B507

GND



B506

R120



B505



B504



B503

CAN_Low CAN_High

Warning

GND



B502

R120



1003



Fuel reserve



B501

CAN_Low CAN_High

B500

Ground

(02-1)

Turret
Basket

3,1*8(/<+$8/277(
La Pronnire

BP 9
42152 L'HORME

TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

DESSINE PAR

DATE DE CREATION

B.Pallot

04-10-2006

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

15-10-2006

H28TJ+

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA
BPT

NBRE TOTAL DE FOLIOS

184P277460a
%$6.(73$57

SCHEMAS

01
5

Wiring diagram - Contact status - Diagnosis


H28TJ+ ( HB86TJ+)

10

11

A
242

(01-21)
0

12

13

14

15

16

17

18

19

20

+12V Permanent

(03-1)

Ground

(03-1)

B (01-21)

+5V Regulated

B400

(03-1)

Rear

B101

11

Front
out of neutral

B100

13

Y signal

B300

B102

Out of neutral

13

Y signal

B301

B103

Y signal

B302

Fr. right direct.

JYB01
Translation Joystick

Red

JYB02
Telescoping Joystick

Black

4 10

White

B108

B109

4 10

Lift
Joystick
9

X signal

B303

JYB03

12

Out of neutral

4 10

Fr. left direct.

out of neutral

F


Alim_5V





E_ANA
(0.5-2.5-4.5V)



E_ANA
(0.5-2.5-4.5V)



E_TOR



E_ANA
(0.5-2.5-4.5V)



E_TOR

E_ANA
(0.5-2.5-4.5V)





E_TOR



E_TOR

E_TOR



E_TOR

HEAD - Node B - NBB01

YV15A

19

25

YV18A

YV15B

18

YV42





26

22

YV29

YV19A

S_PWM

S_PWM



28

21

YV19B

YV50A

S_TOR_(0-12V)




B607

S_TOR_(0-12V) S_TOR_(0-12V)



B611

S_PWM_(0-3,5A)

B605



17

YV41

YV38

S_TOR_(0-12V)

B606



16

24

YV18B

S_TOR_(0-12V)



B610

S_TOR_(0-12V)

B602



B601



B600

B603

20

S_PWM_(0-3.5A) S_PWM_(0-3.5A)

B608



B609


B604

S_TOR_(0-12V) S_TOR_(0-12V)

B612

27

CNB02 - Spider
23

bundle connector

YV51

YV50B

Option

+12V Accessories

(01-6)
37

Working light

security

Basket

compensation

up

Basket
compensation

down

Basket
compensation

to left

Basket rotation

+12V Electrovalves

to right

Basket rotation

telescope

proportionality

Jib

telescope
in

Jib

Jib

telescope out

security

Jib

Jib up

Jib down

Jib

down

15

compensation up

compensation

Jib

905

HL6

Accessories ground

M (01-6)
38

00

(01-6)

3,1*8(/<+$8/277(
La Pronnire

BP 9
42152 L'HORME

TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

DESSINE PAR

DATE DE CREATION

B.Pallot

04-10-2006

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

15-10-2006

H28TJ+
184P277460a
%$6.(73$57

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA
BPT

NBRE TOTAL DE FOLIOS

SCHEMAS

02

Wiring diagram - Contact status - Diagnosis


H28TJ+ (HB86TJ+)

10

11

12

13

14

15

16

17

18

19

20

CNB02 - Spider bundle connector

A
FU17

telescope in

N2

N1

Jib

relative angle

Link part/boom

Jib/Basket

(Tilt -10)

B400

angle

Basket
absolute

(Tilt +10)

angle

absolute

Basket

(Inclino)

relative angle

7
6

B400

242

angle

C (02-21)

1A

absolute

(02-21)

Basket

242

2420

Weighting

B (02-21)

Ground
+12V Permanent
+5V Regulated

D
1

SL70

E_ANA_(4-20mA)



E_ANA_(4-20mA)

SL71

30
B311

B310


SL72

10



E_ANA_(0,5-4,5V)

SL73



E_TOR_(0-12V)

SQ28

SL80

32

14



E_TOR_(0-12V)



E_ANA_(4-20mA)

31



E_ANA_(4-20mA)

B144

SL61

29

B312

SL60

B313

B146

B145

B306



E_TOR_(0-12V)

HEAD - Node B - NBB01

3,1*8(/<+$8/277(
La Pronnire

BP 9
42152 L'HORME

TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

DESSINE PAR

DATE DE CREATION

B.Pallot

04-10-2006

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

H28TJ+

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA
BPT

NBRE TOTAL DE FOLIOS

184P277460a
%$6.(73$57

SCHEMAS

03
7

Wiring diagram - Contact status - Diagnosis


H28TJ+ ( HB86TJ+)
4 - Wiring diagram - Engine Part
1

10

11

12

13

14

15

16

17

18

19

20

A
101

FU4
30A

FU1

FU14

10A

15A

101

152

Shunt

101

FU13

FU11

250A

25A

160

100

115

120

Battery

To the Turret

To the Turret Part

KA2

Part

KP1

KM6

KM4

folio 2

B+

K
G2

B-

Cooler

305

167

D+

B7
161

Part
folio 2

Emergency Pump

109

To the Turret

KM5

Preheating

Option
Accelerator

Alternator

80A

folio 1

Injection Pump

HL1

FU3
To the Turret Part

Surcaleur [CSA]

Starter

12V

Fuel Pump

103

GB1

116

Battery light

folio 1

142

folio 1

166

To the Turret Part

104

M3

YA3

YA1

YA4

M4

YA2

EV

D27

IG

HL11

R1

R2

R3 R4

To the
0

Turret
Part

3,1*8(/<+$8/277(
La Pronnire

BP 9
42152 L'HORME

TEL: +33 4 77 29 24 24
FAX: +33 4 77 29 43 95

DESSINE PAR

DATE DE CREATION

B.Pallot

17-07-2007

VERIFIE PAR

DATE DE VERIFICATION

C.Jey

17-07-2007

H28TJ+

IND
a

DATE
11-03-2008

MODIFICATION
Cration NEBEFLC08061

VISA
BPT

NBRE TOTAL DE FOLIOS

184P291990a
(1*,1(3$57

SCHEMAS

01

Das könnte Ihnen auch gefallen