Beruflich Dokumente
Kultur Dokumente
N-2301
REV. D
ENGLISH
E
03 / 2014
CO
ONTEC
C
Comiss
o de Normalizzao
Tcnica
Prep
paration
n of the
Weldiing Technical Docume
D
entation
n
SC-26
Welding
1st Amendm
ment
CONTE
ENTS OF THE
T
1st AME
ENDMENT - 03/2014
- Section 2:
Include of FBTS N-0
007.
- Subse
ection 4.5:
Alteratio
on of the textt.
- Subse
ection B.2:
Alteratio
on the text off the enumerration j).
- Subse
ection C.2.1:
Alteratio
on the text off the enumerration h).
- Subse
ection D.2:
Alteratio
on the text off the enumerration l).
- Subse
ection E.2.3:
Alteratio
on the text off the enumerration q).
- Subse
ection F.2:
Alteratio
on the text off the enumerration g).
- Subse
ection G.2:
Alteratio
on the text off the enumerration h).
PROPE
ERTY OF PETROBRAS
2 pages
-PUBLIC-
N-2301
REV.. L
- Subse
ection H.2:
Alteratio
on the text off the enumerration l).
- Subse
ection I.2:
Alteratio
on the text off the enumerration q).
- Subse
ection J.2:
Alteratio
on the text off the enumerration k).
ENGLISH
03 / 2014
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
Preparation of the
Welding Technical Documentation
Procedure
This Standard replaces and cancels its previous revision.
The CONTEC - Authoring Subcommittee provides guidance on the
interpretation of this Standard when questions arise regarding its contents. The
Department of PETROBRAS that uses this Standard is responsible for adopting
and applying the sections, subsections and enumerates thereof.
CONTEC
Comisso de Normalizao
Tcnica
SC - 26
Welding
Introduction
PETROBRAS Technical Standards are prepared by Working Groups - WG
(consisting specialized of Technical Collaborators from Company and its Subsidiaries), are
commented by Company Units and its Subsidiaries, are approved by the Authoring Subcommittees SCs (consisting of technicians from the same specialty, representing the various Company Units and
its Subsidiaries), and ratified by the Executive Nucleus (consisting of representatives of the Company
Units and its Subsidiaries). A PETROBRAS Technical Standard is subject to revision at any time by its
Authoring Subcommittee and shall be reviewed every 5 years to be revalidated, revised or cancelled.
PETROBRAS Technical Standards are prepared in accordance with PETROBRAS Technical
Standard N-1. For complete information about PETROBRAS Technical Standards see PETROBRAS
Technical Standards Catalog.
.
PROPERTY OF PETROBRAS
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
Forewo
ord
This Sta
andard is the
e English verrsion (issued
d in 04/2012)) of PETROB
BRAS N-23001 REV. D 05
5/2011. In
case of doubt, the Portuguese
P
version,
v
whicch is the valid document for all intentts and purpo
oses, shall
d.
be used
1 Scop
pe
1.1 Thiss Standard sets forth
h the mand
datory requirements fo
or the prepparation of technical
docume
entation used for the planning, exe
ecution, con
ntrol, registra
ation and ceertification of
o welding
servicess.
o welding a
applied to manufacturin
ng, construcction, assem
mbly and
1.2 Thiss Standard applies to
mainten
nance of equipment, pipe
es, ducts and
d steel structu
ures.
a
to me
etallic materia
als weldable by fusion.
1.3 Thiss standard applies
a
to the preparatio
on of technica
al documentation for wellding operatiions, from
1.4 Thiss Standard applies
the date
e of its edition
n.
c
only
y Technical R
Requirements.
1.5 Thiss Standard contains
2 Norm
mative Refe
erences
owing refere
enced docum
ments are ind
dispensable for
f the applic
cation of thiss document. For dated
The follo
referencces, only the
e edition cited applies. Fo
or undated references,
r
the latest ediition of the re
eferenced
docume
ent applies.
RAS N-133 - Welding;
PETROBR
RAS N-381 - Execution o
of Drawing an
nd Other Gen
neral Techniccal Documen
nts;
PETROBR
RAS N-1438 - Terminolog
gia Soldagem
m;
PETROBR
RAS N-1738
8 - Desconttinuidades em
e Juntas Soldadas,
S
F
Fundidos, Fo
orjados e
PETROBR
Laminadoss;
RAS N-2163 - Soldagem e Trepana
o em Equipamentos, T
Tubulaes Industriais
PETROBR
e Dutos em
m Operao;;
BR 14842:20
003 - Critrio
os para a Qualificao
Q
e Certificao de Inspetores de
ABNT NB
Soldagem;
007 - Critrio
os para a Qu
ualificao e Certificao
o de Engenhheiro Especialista em
FBTS N-0
Soldagem e Tecnlogo
o de Soldage
em;
4:2007 - Stan
ndard Symbo
ols for Weldin
ng, Brazing and
a Nondesttructive Exam
mination;
AWS A2.4
0:2001 - Wellding Terms and Definitio
ons;
AWS A 3.0
E ISO/IEC 17024:2003
3 - Conform
mity Assessm
ment - Geneeral Requirements for
BSI BS EN
Bodies Op
perating Certification of P
Persons.
NOTE
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
3 Term
ms and Deffinitions
o this docum
ment, the terrms and definitions of PE
ETROBRAS N-1438, N--1738 and
For the purposes of
AWS 3.0:2001 shall apply.
4 Gene
eral conditiions
s
be use
ed with stand
dards regard
ding the design, manufaccturing, asse
embly and
4.1 Thiss Standard shall
mainten
nance of equ
uipment, pipe
es, ducts and
d metal struc
ctures, and this
t
Standardd shall preva
ail in case
of confliicts.
ery documen
nt mentioned
d in this Stan
ndard shall be prepared
d when requ ired by PET
TROBRAS
4.2 Eve
N-133 o
or by the standards
s
re
egarding the
e design, ma
anufacturing, assembly and mainte
enance of
equipme
ent, pipes, ducts and metal structuress or by otherr contract doc
cuments.
d drawings sh
hall be prepa
ared in accorrdance with P
PETROBRA
AS N-381.
4.3 All ttechnical doccuments and
es of welding
g performed overseas, th
he welding inspectors shhall be certiffied in the
4.6 Forr the service
applicab
ble main Sttandard, by internationa
al entities meeting the
e requireme nts specified in BSI
BS EN IISO/IEC 170
024:2003, and these profe
fessionals sh
hall be previo
ously approveed by PETRO
OBRAS.
ng in equipm
ment, pipes and
a
ducts in
n operation, besides the technical
4.7 Forr welding and hot tappin
docume
entation requ
uired by this Standard,
S
req
quirements set
s forth in PETROBRAS
S N-2163 must also be
met.
5 Spec
cific Condiitions
cumentation
n for Weldin
ng Planning
5.1 Doc
ents mentioned in Sec
ction 5 shalll be issued
d, approved and submiitted for approval by
Docume
PETRO
OBRAS inspe
ection, before
e the comme
encing of the welding serv
vices.
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
5.1.2 The Welding Procedures Qualification Plan, when requested by PETROBRAS, shall include, at
a minimum:
a) cover sheet, including:
document title;
identification of equipment, pipe or other metallic materials;
identification of the qualification Standard;
a Table of Contents for documents presented;
purchase order issued by PETROBRAS (if any);
b) list of test parts to be welded, including:
test part identification code;
welding procedure specification code;
welding process;
specification of base metal, diameter (if applicable) and thickness of each joint
element;
joint type;
type of bevel;
welding position;
c) non-destructive test plan in tabular form, listing the test pieces and the applicable nondestructive tests before and after welding and heat treatment (when required);
d) mechanical and macrographic tests plan, containing:
drawings of test pieces indicating rolling orientation, samples location and their
respective identifications;
table listing samples, mechanic tests to perform and Standards applicable to the test
performance, preparation of samples and acceptance criteria;
e) range of heat input (when required).
5.1.3 The Qualification Plan for Welders and Welding Operators shall be prepared in an analogous
way, with the same minimum content as the Welding Procedure Qualification plan mentioned in 5.12
of this Standard, besides the criteria for disqualification and training, and the number of WPS and
WPQC shall be mentioned.
5.1.4 The Implementation Plan for Production Testing must contain, at least:
a) cover sheet, including:
document title;
identification of the equipment, pipe or other metallic materials;
Identification of code, standard and design specification;
identification of the manufacturing or construction and assembly Standard;
a Table of Contents for documents presented;
purchase order issued by PETROBRAS (if any);
b) list of production tests to perform, in tabular form, including:
welding procedures;
expected length of weld for each welding procedure;
4
-PUBLIC-
N-2301
c)
d)
e)
f)
REV. D
ENGLISH
05 / 2011
5.2.1 The instruction for execution and inspection of welding must be prepared according to Annex E
of this Standard.
5.2.2 The list of qualified welders and welding operators must be prepared in accordance with Annex
F of this Standard.
5.2.3 The welders and welding operators performance control must be prepared according to
Annex G of this Standard.
5.2.4 The qualification registration of welders and welding operators must be prepared according to
Annex D of this Standard.
5.3.1 The welding registration report must be prepared according to Annex H of this Standard.
5.3.2 The heat treatment registration report must be prepared according to Annex I of this Standard.
5.3.3 The production test implementation report must be prepared according to Annex C of this
Standard.
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
A.1.2 When listing joints with same characteristics defined below in Section A.2. in the same drawing,
these joint may be listed only once.
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
Ann
nex B - Insttructions fo
or Preparattion of Wellding Proce
edure Speccification (W
WPS)
B.1 Ge
eneral Con
nditions
PS shall be prepared
p
bas
sed on the d
design, manu
ufacturing, assembly andd maintenance codes,
The WP
standard
ds and specification, in compliance
c
w
with PETROB
BRAS N-133. After the we
welding completion and
approva
al of JTBW, welding
w
para
ameters rang
ges shall be revised to match the valuues actually used with
the tolerances allow
wed in the relevant qualiffication stand
dards for the
e production welds implementation
WPS.
B.2 Sp
pecific Con
nditions
PS must con
ntain at leas
st all the info
ormation spe
ecified in the
e relevant quualification standards,
s
The WP
and:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
NOTE
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
C.2 Sp
pecific Con
nditions
ntain, at lea
The WPQR and the PT
TIR shall con
ast the follow
wing informaation, as we
ell as the
C.2.1 T
informattion foreseen
n in the respe
ective qualifiication stand
dards:
a) welding
g procedure identificatio
on (prelimina
ary WPS forr the WPQR
R or WPS issued for
producttion, in the case of in the
e case of PTIR);
b) welder or welding operation
o
ide ntification;
ntification, in the case of identification
n of the prod uction test in
n the case
c) producttion test iden
of PTIR
R;
d) list of documents
d
atttached and their respecttive identifica
ation;
e) identificcation of applicable qualification
n standards
s and staandards forr design,
manufa
acturing or as
ssembly of e
equipment, as well as the
e revision ideentification da
ata;
f) test tem
mperature;
g) date off issuance;
h) full nam
me, signature
e and registtration number of the Sis
stema Nacioonal de Qualificao e
Certificcao (SNQC
C) level 2 we
elding inspec
ctor or certified welding specialist en
ngineer or
certified
d welding tec
chnologist.
entity performing
p
th
he test;
identificcation of the test impleme
entation stan
ndard;
identificcation (seriall number) of the testing machine,
m
identificcation, date of
o issuance and name of the issuer of
o the calibraation certifica
ate for the
test ma
achine;
identificcation of the preparation standard forr test sample
es;
identificcation of the test part and
d of the test samples;
s
types and
a sizes of test
t
sampless;
identificcation of the results evalu
uation standa
ard and the acceptance
a
ccriterion;
nick-bre
eak point;
strength limits, spec
cified and acctual;
stretchiing, where applicable;
date off preparation and approva
al.
-PUBLIC-
N-2301
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
REV. D
ENGLISH
05 / 2011
C.2.4 The results registration report for the impact test shall include, at a minimum, the following
information:
a)
b)
c)
d)
e)
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
C.2.7 The results registration report for the nick-break test shall include, at a minimum, the following
information:
a) entity performing the test;
b) identification of the test implementation standard;
c) identification of the preparation standard for test samples;
d) identification of the test part of the test samples;
e) sizes of test samples;
f) identification of the results evaluation standard;
g) identification and dimensions of the discontinuities detected;
h) date of issuance.
10
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
Annex D - Instruc
ctions for Preparatio
on of the Qualificatio
on Registrration for Welders
QR)
and Welding
W
Ope
erators (WQ
D.1 Ge
eneral Con
nditions
QR shall be issued
i
for ea
ach successfful test by ea
ach welder orr welding opeerator.
One WQ
D.2 Sp
pecific Con
nditions
QR must con
ntain at leas
st all the info
ormation spe
ecified in the
e relevant quualification standards,
s
The WQ
and:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
name and
a social se
ecurity numbe
er of the welder or weldin
ng operator;
identificcation code (seal)
(
of the w
elding operattor;
welder or we
identificcation of the applicable q
qualification standard
s
and
d revision;
identificcation of welding procedu
ure used;
identificcation of the welding proccess(es);
all esse
ential variables with value
es actually used for qualification and qualified ran
nges;
type of tests, examinations and analyses pe
erformed;
ype of test sa
amples used;
identificcation and ty
results of tests, exa
aminations an
nd analyses performed fo
or each test ssample;
suer of testts, examinations and
identificcation, date of issuanc e and name of the iss
analyse
es registratio
on reports;
k) date off preparation and approva
al;
me, signature
e and registtration number of the Sis
stema Nacioonal de Qualificao e
l) full nam
Certificcao (SNQC
C) level 2 we
elding inspec
ctor or certified welding specialist en
ngineer or
certified
d welding tec
chnologist.
11
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
E.1.2 The WEII shall detail each joint to be welded during a particular service, and when the amount
of joints to be welded is high, upon previous approval by PETROBRAS, identical joints may be
grouped. In any case, the traceability of the individual and the welding procedure applicable shall be
ensured.
E.2.1 Drawing number and identification of equipment, pipes, ducts or metallic structures, with
location of joints to be welded.
E.2.2 ndividual joint identification or group identification for joint to be welded, according with E.1.2 of
this Annex.
E.2.3 Specific information for the execution and inspection of welds in joints or group of joints, such
as:
a)
b)
c)
d)
e)
12
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
13
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
Annex F - Instruc
ctions for Preparatio
on of the List
L
of Qua
alified Wellders and Welding
Opera
ators (LQW
W)
F.1 Ge
eneral Conditions
Shall be issue
ed one LQW for each rele
evant qualific
cation standa
ard.
F.1.1 S
Each qualifica
ation of a pa
articular weld
der or weldin
ng operator shall
s
be indivvidually transcribed in
F.1.2 E
the LQW
W.
F.2 Sp
pecific Con
nditions
W shall inclu
ude, at a minimum:
The LQW
a)
b)
c)
d)
e)
f)
g)
14
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
Annex G - Instruc
ctions for Preparing
P
the Welderrs and Welding Opera
rators Perfo
ormance
Contro
ol (WPC)
G.1 Ge
eneral Con
nditions
The WPC shall
s
be iss
sued at inte
ervals according to the
e standardss criteria fo
or design,
G.1.1 T
manufaccturing and assembly
a
of equipment o
or according to the contra
act documenttation.
G.2 Sp
pecific Con
nditions
PC shall inclu
ude, at a min
nimum:
The WP
a) identificcation code of
o the welderr or welding operator;
o
b) total nu
umber of rad
diographs ta
aken, or tota
al length inspected at thhe specified period of
time, whichever
w
is applicable;
a
c) total nu
umber of rejected radiogra
aphs or the sum
s
of faulty lengths duri ng a specific
c period of
time, whatever
w
is ap
pplicable;
d) percenttage of defec
cts calculate
ed by dividing
g the amount shown in c)) of this subs
section by
the amount shown in b) of this ssubsection, multiplied
m
by 100;
and d) of this
s subsection
n up to the daate of issuan
nce of the
e) aggregated values from b), c) a
WPCs;
gregated valu
ue of d) of th
his subsection of the prev
vious WPC;
f) the agg
g) date off issuance;
me, signature
e and registtration number of the Sis
stema Nacioonal de Qualificao e
h) full nam
Certificcao (SNQC
C) level 1 or 2 welding ins
spector or ce
ertified weldi ng specialistt engineer
or certiffied welding technologistt.
15
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
A
Annex H - In
nstructions
s for Prepa
aring the Welding
W
Reg
gistration R
Report (WR
RS)
H.1 Ge
eneral Con
nditions
RS applies to
t the weldin
ng of test pa
arts for proc
cedures and welders quaalification an
nd for the
The WR
production test weld
ding, according to C.1 a
a) of Annex C of this Sta
andard and to the manu
ufacturing,
bly and maintenance of equipment,
e
p
pipes, ducts and metal structures,
s
ass required by
b 4.2 and
assemb
5.3 of th
his Standard.
H.2 Sp
pecific Con
nditions
RS shall conttain at least the
t following information::
The WR
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
16
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
Anne
ex I - Instru
uctions for Preparing the Heat Treatment
T
Registratio
R
on Report (HTRR)
I.1 Gen
neral Cond
ditions
t the heat treatment reg
gistration of test
t
parts, as
s required inn C.1 b) of Annex C of
The HTRR applies to
andard and to the manuffacturing, asssembly and maintenanc
ce of equipm
ment, pipes, ducts
d
and
this Sta
metal sttructures, as required by 4.2 and 5.3 of this Stand
dard.
I.2 Spe
ecific Cond
ditions
ntain at leastt the followin g information
n:
The HTRR must con
a)
b)
c)
d)
17
-PUBLIC-
N-2301
REV. D
ENGLISH
E
05 / 2011
Ann
nex J - Instrructions fo
or Preparin g the Conttrol of the Work
W
Repaair Index (C
CWRI);
J.1 Ge
eneral Cond
ditions
ble level of repairs shalll be agreed
d in advance
e between tthe manufac
cturer and
J.1.1 The acceptab
OBRAS, including how calculations wi ll be done.
PETRO
m
be iss
sued at inte
ervals according to the
e standardss criteria fo
or design,
J.1.2 The CWRI must
embly of equipment and ccontract documents.
manufaccturing, asse
d by the num
mber of rejec
cted films orr by the totall length of
J.1.3 The level of repairs shall be controlled
defects..
J.2 Sp
pecific Conditions
WRI must con
ntain, at a minimum:
The CW
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
identificcation code of
o the welderr or welding operator;
o
equipm
ment identifica
ation;
joint ide
entification;
total nu
umber of radiographs or ttotal length inspected with ultrasoundd, during the
e specified
period, whichever is
s applicable;
umber of radiographs reje
ected or the total length of
o defects deetected with the
t use of
total nu
ultrasou
und, during the
t specific p
period of time
e, whatever is applicablee;
percenttage of defec
cts calculate
ed by dividing
g the amountt shown in e)) of this subs
section by
the amount shown in d) of this ssubsection, multiplied
m
by 100;
and f) of this
s subsection up to the daate of issuan
nce of the
aggregated values from d), e) a
CWRI;
gregated valu
ue of f) of thi s subsection
n of the previous CWRI;
the agg
calculation interval expressed in
n days, statin
ng start and final
f
date;
date off issuance;
me, signature
e and registtration number of the Sis
stema Nacioonal de Qualificao e
full nam
Certificcao (SNQC
C) level 2 we
elding inspec
ctor or certified welding specialist en
ngineer or
certified
d welding tec
chnologist.
18
N-2301
REV. D
ENGLISH
NDICE DE REVISES
REV. A and B
There is no index of revisions.
REV. C
Affected Parts
Description of Alteration
1.2
Revised
4.1 a 4.3
Revised
4.5
Revised
5.1 a 5.3
Revised
B-2
Revised
C-1
Revised
C-2.1
Revised
C-2.4
Revised
C-2.6
Revised
D-2
Revised
E-1.1
Revised
E-2.1
Revised
E-2.3
Revised
F-2
Revised
H-1 e H-2
Revised
I-1 e I-2
Revised
REV. D
Affected Parts
All
Description of Alteration
Revised
IR 1/1
05 / 2011
N-2301
REV. D
ENGLISH
05 / 2011
Department
Telephone
Key
Andr Mariano
ENGENHARIA/SL/SEQUI/ATFCM
816-5370
CSM0
ENGENHARIA/IEABAST/IERF/PS
857-2821
CTM0
MATERIAIS/CCB/IF/IFEE
819-1961
EMR9
819-3088
EI5W
Technical Secretary
Svio Batalha Fiuza
ENGENHARIA/AG/NORTEC-GC
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
Foreword
This Standard is the English version (issued in 04/2012) of PETROBRAS N-2301 REV. D 05/2011. In
case of doubt, the Portuguese version, which is the valid document for all intents and purposes, shall
be used.
1 Scope
1.1 This Standard sets forth the mandatory requirements for the preparation of technical
documentation used for the planning, execution, control, registration and certification of welding
services.
1.2 This Standard applies to welding applied to manufacturing, construction, assembly and
maintenance of equipment, pipes, ducts and steel structures.
1.4 This Standard applies to the preparation of technical documentation for welding operations, from
the date of its edition.
2 Normative References
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document applies.
PETROBRAS N-133 - Welding;
PETROBRAS N-381 - Execution of Drawing and Other General Technical Documents;
PETROBRAS N-1438 - Terminologia Soldagem;
PETROBRAS N-1738 - Descontinuidades em Juntas Soldadas, Fundidos, Forjados e
Laminados;
PETROBRAS N-2163 - Soldagem e Trepanao em Equipamentos, Tubulaes Industriais
e Dutos em Operao;
ABNT NBR 14842:2003 - Critrios para a Qualificao e Certificao de Inspetores de
Soldagem;
AWS A2.4:2007 - Standard Symbols for Welding, Brazing and Nondestructive Examination;
AWS A 3.0:2001 - Welding Terms and Definitions;
BSI BS EN ISO/IEC 17024:2003 - Conformity Assessment - General Requirements for
Bodies Operating Certification of Persons.
NOTE
For documents referred in this Standard and for which only the Portuguese version is
available, the PETROBRAS department that uses this Standard should be consulted for any
information required for the specific application.
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
4 General conditions
4.1 This Standard shall be used with standards regarding the design, manufacturing, assembly and
maintenance of equipment, pipes, ducts and metal structures, and this Standard shall prevail in case
of conflicts.
4.2 Every document mentioned in this Standard shall be prepared when required by PETROBRAS
N-133 or by the standards regarding the design, manufacturing, assembly and maintenance of
equipment, pipes, ducts and metal structures or by other contract documents.
4.3 All technical documents and drawings shall be prepared in accordance with PETROBRAS N-381.
4.4 The metric units shall those in effect in Brazil according to Brazilian Metrology Law. When the
nature of the subject indicates the convenience of English units, these shall be written inside brackets
after the corresponding Brazilian legal measuring unit.
4.5 All documents shall be approved by the welding inspector certified in accordance with
ABNT NBR 14842:2003, with due respect to the responsibilities of each certification level.
NOTE 1 Alternatively, the Welding Execution and Inspection Instruction (WEII) may be approved by
the welding specialist of the operational unit for repairs and maintenance services, where
there is a need for expertise on the equipment deterioration mechanisms and the integrity
status
NOTE 2 All Level 2 welding inspectors working under contracts signed by Petrobras, shall have
minimal training as metal mechanic technicians in the metal mechanic field and be
registered with the Regional Council of Engineering, Architecture and Agronomy (CREA,
Brazil) to perform the duties of the position (starting from January 2016).
4.6 For the services of welding performed overseas, the welding inspectors shall be certified in the
applicable main Standard, by international entities meeting the requirements specified in BSI BS EN
ISO/IEC 17024:2003, and these professionals shall be previously approved by PETROBRAS.
4.7 For welding and hot tapping in equipment, pipes and ducts in operation, besides the technical
documentation required by this Standard, requirements set forth in PETROBRAS N-2163 must also be
met.
5 Specific Conditions
5.1 Documentation for Welding Planning
Documents mentioned in Section 5 shall be issued, approved and submitted for approval by
PETROBRAS inspection, before the commencing of the welding services.
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
NOTE
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
C.2.2 The results registration report for the tensile test shall include, at a minimum, the following
information:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
C.2.3 The results registration report for the bending test shall include, at a minimum, the following
information:
8
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
11
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
o) process data, such as: type of fluid, pressure and temperature class (if applicable);
p) date of preparation and approval;
q) full name, signature and SNQC registration of the Level 2 Welding Inspector.
13
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
Annex F - Instructions for Preparation of the List of Qualified Welders and Welding
Operators (LQW)
F.1 General Conditions
F.1.1 Shall be issued one LQW for each relevant qualification standard.
F.1.2 Each qualification of a particular welder or welding operator shall be individually transcribed in
the LQW.
14
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
Annex G - Instructions for Preparing the Welders and Welding Operators Performance
Control (WPC)
G.1 General Conditions
G.1.1 The WPC shall be issued at intervals according to the standards criteria for design,
manufacturing and assembly of equipment or according to the contract documentation.
G.1.2 The welder and welding operators performance control shall be performed according with the
number of rejected films or with the total length of defects.
15
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
16
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
Annex I - Instructions for Preparing the Heat Treatment Registration Report (HTRR)
I.1 General Conditions
The HTRR applies to the heat treatment registration of test parts, as required in C.1 b) of Annex C of
this Standard and to the manufacturing, assembly and maintenance of equipment, pipes, ducts and
metal structures, as required by 4.2 and 5.3 of this Standard.
17
-PUBLIC-
N-2301
REV. D
ENGLISH
05 / 2011
Annex J - Instructions for Preparing the Control of the Work Repair Index (CWRI);
J.1 General Conditions
J.1.1 The acceptable level of repairs shall be agreed in advance between the manufacturer and
PETROBRAS, including how calculations will be done.
J.1.2 The CWRI must be issued at intervals according to the standards criteria for design,
manufacturing, assembly of equipment and contract documents.
J.1.3 The level of repairs shall be controlled by the number of rejected films or by the total length of
defects.
18