PEV-3C
Pressure Equalizing Valve
User Manual
Table of Contents
Nomenclature.................................................................................................................. 1
Description ...................................................................................................................... 1
Installation ....................................................................................................................... 1
Maintenance.................................................................................................................... 2
Service Tools............................................................................................................... 3
Disassembling the PEV ............................................................................................... 3
Piston Assembly Maintenance..................................................................................... 3
End Cap Maintenance ................................................................................................. 4
PEV Reassembly......................................................................................................... 5
Bill of Materials ................................................................................................................ 6
Nomenclature
Description
The PEV-3C Pressure Equalizer Valve is designed to reduce differential pressure across the
valve seats of True-Cut C Series Samplers. Differential pressure reductions will range from 5
psi at 50-psi line pressure to approximately 300 psi at 1500-psi line pressure.
Installation
Install the PEV-3C equalizer valve as follows:
1. Locate the PEV equalizer valve as close to the sampler as possible.
2. Connect the sampler discharge port to the PEV port marked SAMPLER with a
minimum length of tubing.
3. Connect the PEV port marked LINE to the shut-off valve on the pipeline.
4. Connect the 1/8-in. pipe outlet fitting at the end of the PEV to the sample receptacle.
5. Start the sampler and allow it to run 5 to 10 samples; then, open the equalizer line to the
pipeline.
May 2004
CAUTION: The PEV-3C pressure equalizer valve has full internal line pressure. Only qualified
personnel should service these units. A caution tag is provided to alert all personnel to this
potential hazard.
Maintenance
The piston assembly should be refurbished at regular intervals of approximately 6 months,
however the maintenance schedule may vary, depending on the location and the application
used.
Typical maintenance includes disassembling the PEV, disassembling the piston assembly,
replacing worn or broken parts with the PEV Repair Kit, replacing the seal head and seal
retainer in the end cap, and reassembling the PEV. Each of these steps is described, step by
step, in the following instructions.
May 2004
Service Tools
The following tools may be required to disassemble and reassemble the PEV-3C Pressure
Equalizer Valve for routine repairs:
1/16-in. punch
a 3/32-in. punch
cleaning fluid
May 2004
5. If the seal tip was removed, replace the spring (item 7) and seal tip (item 15) using the
new roll pin (item 9).
6. Slide the piston seal tool (Part No. 50142200499) onto the piston assembly with the skirt
of the piston closest to the O-ring groove.
7. Lubricate the O-ring (item 10) with light oil and slide it over the piston seal tool into the
O-ring groove.
8. Lubricate the slipper seal (item 11) in the same manner as the O-ring and slide the slipper
seal over the piston seal tool and O-ring.
CAUTION: Do not damage the slipper seal. Apply a few drops of light oil or lubricant onto the
slipper seal and O-ring to ease assembly.
9. Pull the piston assembly through the inside-tapered seating cylinder tool (Part No.
50142200498) several times, reversing the direction of the piston assembly each time.
10. Let the piston assembly stand in the seating tool for several minutes to allow the slipper
seal to return to its original shape.
5. Set the end adapter with the RECEPTACLE marking face-down on a flat surface.
6. With the tapered end of the seal head up, insert the seal head (item 13) and O-ring (item
14) into the end adapter.
7. Insert the seal retainer (item 8), and tap the seal head (item 13) into position with a punch
and a small hammer.
8. Insert the retainer ring (item 6).
May 2004
PEV Reassembly
Reassemble the equalizer valve as follows:
1. Insert the piston assembly into the LINE end of the PEV body with the seal tip end
entering first.
2. Reinstall the spring (item 16).
3. Reinstall the end cap (item 18) and the O-ring (item 17).
4. Reinstall the end adapter assembly (items 6, 8, 12, 13, and 14) and the O-ring (item 17).
Caution: Never allow the sampler nipple to penetrate into the PEV body far enough to interfere
with or contact the end adapter assembly.
May 2004
QTY.
PART NUMBER
DESCRIPTION
50142200477
PEV Body
50142200553
PEV Piston
50142200554
50142200560
Washer
50142200558
PEV Bearing
50142200556
Retaining Ring
1*
50142200557
PEV Spring
50142200552
1*
50142200559
10
1*
50142200368
11
1*
50142200464
12
50142200555
13
1*
50142200485
14
1*
50142200079
15
1*
50142200551
16
50142200497
PEV Spring
50142200462
50142200509
17
18
2*
1
* Parts included in a PEV Repair Kit; Repair Kit for PEV-3C is Part No. 50142151248