Sie sind auf Seite 1von 54

DETAILED CUM ABSTRACT ESTIMATE

Name of the work:- Construction of PHC Building at Anatharam of Mahabubabad (M)


Grant : BRGF 50% G P Share
Sl
Description of item
NO
2
1
1

Measurements
B
D
5
6

Qty
7

1
1

x9
x1

1.30
22.98

1.30
0.45

1.50
0.10

22.82
1.03

1
1
1

x1
x1
x9

4.78
1.65
1.30

0.45
1.00
0.45

0.10
0.15
0.10

0.22
0.25
-0.53
23.79
Cum

Plain Cement Concrete (1:5:10) prop using 40mm size HBG (SS5) metal
including Cost and Conveyance of all materials and curing charges but
excluding unskilled wages etc., complete for finished item of work for
Foundations and Flooring Bed (APSS No. 402) (CSSR)
Column footings
Inbetween columns alround the
building
For Cross wall
For steps
Duduct column footing portion
For Flooring
Clinic
Delivery Room
Toilet

L
4

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a
lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305 MORD / 304
MORTH
Column footings
Inbetween columns alround the
building
For Cross wall
For steps
Duduct column footing portion

Nos

1
1

x9
x1

1.30
22.98

1.30
0.45

0.30
0.10

4.56
1.03

1
1
1

x1
x1
x9

4.78
1.65
0.23

0.45
1.00
0.23

0.10
0.15
0.10

0.22
0.25
-0.05

1
1
1

x1
x1
x1

5.00
3.70
3.05

2.75
3.05
1.20

0.10
0.10
0.10

1.38
1.13
0.37
8.89
Cum

0.20

3.04

RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size
graded machine crushed hard Granite metal incl. C/c of all M/L charges but
excluding cost of steel and its fabrication charges, centering and Shittering etc.,
comp for finished item of work
a) Column footing flat portion

x9

1.30

Trapezoidal portion

x9

0.10 0.232+1.302 +
3

1.30
0.23 x 1.30
2

0.61

b) For Columns below G.L


Columns above G.L
Deductions :Plinth beam portion alround

1
1

x9
x9

0.23
0.23

0.23
0.23

0.90
3.90

x9

0.23

0.23

0.30

c) For Plinth beam alround


For Plinth beam Cross wall

1
1

x1
x1

22.98
5.00

0.23
0.23

0.30
0.30

Page 1

3.65
Cum
0.43
1.86
-0.14
2.15
Cum
1.59
0.35
1.94

Cum
d) For Lintels over Doors and Window
Over Door
Over Window

1
1

x1
x4

1.65
1.95

e) For Sunshade over windows


Over Door

1
1

x4
x1

1.95
1.50

Page 2

0.23
0.23

0.60
0.60

0.15
0.15

0.06
0.27
0.33
Cum

4.68
0.90
5.58
Sqm

f) Roof level beams L/W


.do . S/W
Deduct column portion

1
1
1

x2
x3
x5

6.03
5.00
0.23

0.23
0.23
0.23

0.23
0.23
0.23

0.64
0.79
0.06
1.49

g) Roof slab 110mm thick

x1

7.09

6.06

42.97
Sqm

0.40
0.40

6.10
5.50
11.60
Cum

Filling with gravel in trenches, sides of foundations and basement complete for
finished item of work. (APSS NO. 309 & 310)(CSSR)
inside Delevery room and Toilet
inside Clinic

1
1

x1
x1

5.00
5.00

3.05
2.75

Masonry in superstructure with CM (1:8) prop: using 2nd class traditional Bricks
of size 23x11x7 cms having minimum crushing strength of 50 kg/cm2 including
Cost and Conveyance of all materials, scaffolding charges, etc complete for
finished item of work. (APSS No. 501 & 504).
For Basement Brick on edge
For Cross wall

1
1

x2
x2

22.98
5.00

0.075
0.075

0.30
0.30

1.03
0.23

For Basement alround

x1

22.98

0.35

0.30

2.41

For Cross wall

x1

5.00

0.35

0.30

0.53

For Building alround


For Cross wall
Toilet Partion wall
For steps Ist step
2nd step
2rd step

1
1
1
1
1
1

x1
x1
x1
x1
x1
x1

22.98
5.00
3.05
1.50
1.50
1.50

0.23
0.23
0.10
0.90
0.60
0.30

3.07
3.07
3.07
0.30
0.30
0.30

16.23
3.53
0.94
0.41
0.27
0.14
25.72

Deductions :Column portions


Doors
Toilet Door
windows
Ventilators
Lintel over door
Lintel over Window

1
1
1
1
1
1
1

x9
x2
x1
x4
x6
x1
x4

0.23
1.20
0.75
1.50
0.90
1.65
1.95

0.23
0.23
0.10
0.23
0.23
0.23
0.23

3.37
2.10
2.10
1.35
0.30
0.15
0.15

-1.60
-1.16
-0.16
-1.86
-0.37
-0.06
-0.27
20.24
Cum

Providing impervious coat over RCC roof slab to required slopes with CM (1:3)
prop. 20mm thick (average) mixed with water proofing compound at 1Kg/bag of
cement, laid over roof slab when it is green, finished smooth with a floating coat
of neat cement and thread lining at regular intervals of 45cmx45cm including
Cost and Conveyance of all materials complete for finished item of work (APSS
No. 901 & 903).(CSSR)

Over roof slab

x1

Page 3

7.09

6.06

42.97
Sqm

Supply and Fixing of 15-18mm thick Polished Shahabad stone slab (Tandur
Blue Variety 1st quality) in Single piece with the edges flat nosed and set over
already laid CC Bed/RCC roof slab and fixing in position with neat cement paste
including c/c of all materials,taxes on all materials,dressing of stones to the
required sizes, mixing of cement mortar, fixing in position, curing, lift charges
etc., complete for finished item of work (APSS No.701 & 707) (CSSR)

Delivery room
Clinic room

1x
1x

1
1

3.70
5.00

3.05
2.75

11.29
13.75
25.04
Sqm

1.50
2.00
-

12.75
-1.50
3.66
-0.14
14.77
Sqm

Flooring with ceramic non skid tiles of first quality of make as approved by
ingineer in charge 7.30 mmthick of size 300 x 300 mm set over a base coat of
CM (1:8)prop , 12 mm thick over CC bed already laid including neat cement
slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
white cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and tiles etc.,
complete(excluding cost of cc bed), including seigniorage charges on all
materials cost of base coat and all labour charges for mixing ao cement mortor
laying tiles to required slope as directed by the Engineer in charge curing etc.,
complete for finished item of workAPSS No.701 & 707

etc, complete.
For Toilets alround
Deduct Door portion
For Toilet flooring
Deduct water closet portion

1x
1x
1x
1x

1
1
1
1

8.50
0.75
3.05
0.45

1.20
0.30

11 Supply and fixing of M.S grill of any design including C/C of all
materials etc complete
For ventilators
1x 6
each 15Kg

90.00
kg

12 Painting to new wood work with two coats of ready mixed synthetic enamel paint
first quality all shades over a base coat of wood primer making three coats in all
to give an even shade after thoroughly brushing the surface to remove all
remains of loose powdered materials, including c/c of all materials, site and
other taxes, all operationa, incidental and labour charges etc., complete for
finished item of work in all flooring for external walls. (APSS No.1201,1207
&1212). (CSSR)

complete.
For Doors
For Windows
For Ventilators

2x
4x
6x

2.25
2.75
2.00

1.20
1.50
0.90

13 Supply and fixing of Sal wood Door Double shutter fully pannlled door of size
1.20 x 2.10mt with frame made of well seasoned sal wood scantlings of size 100
x 75mm mm and shutter made of side rails 125mm X38, top rail 125mmX38mm,
bottom rail 125mmX38mm and intermediate rails of 125 x 38 mm and panels 8 nos 25mm thick with all fixtures complete as per specifications (APSS
NO.1001 & 1002)(CSSR)

Page 4

2.10
1.35
0.30

11.34
7.43
1.08
19.85
Sqm

for frames and shutters

1x

2.00
No

1.00
No

4.00
Nos

14 Supply and fixing of salwood Door single shutter fully pannlled door of size .75
x 2.0mt with frame of sal Wood scantlings of size 100 x 75mm and bottom
reeper of size 75x38mm and shutter of side rails 125mm X38, top rail
125mmX38mm, bottom rail 175mmX38mm and intermediate rails of 125 x 38
mm and panels - 4 nos 25mm thick with all fixtures complete including cost and
conveyance of all materials and labour charges etc. complete as per
specifications (APSS NO.1001 & 1002) (CSSR)

x 2.00 M with double leaf inclu ding cost and conveyance of all labour
charges fixtures for wrought and putup and fixing in position of frames
and shutters for Doors
1x
1
-

15 Supply and fixing of Window size 1.25 x 1.25 mt with sal wood frame of size
75x100mm along with II class teak wood three shutters made with styles& rails
of 100mmx30mm thick with 12mm prelaminated particle board both side
laminated interior grade and S/F of 4Nos. MS Hold fasts, 6Nos. MS tower bolts
100mm long. 6 Nos. MS Hinges 75mm long,2Nos MS Handles 3 Nos window
stays. incl. all labour charges and fiXing 11 Nos. 16mm plain safety bars in to
frame etc,(CSSR)

for frames and shutters

1x

Page 5

16 Ornamental plastering to ceiling 12mm thick in CM (1:3) with dubara sponge


finish including Cost and Conveyance of all materials like cement, sand, water
etc., to site, including taxes on all materials, all operational, incidental charges
etc complete for finished item of work.(APSS 901& 903 ) (CSSR)
Delivery room Ceiling
Toilet room ceiling
Clinic room ceiling
Sunshade ceilings
Slab Projection ceiling alround

1x 1
1x 1
1x 1
1 x4
1 x1

3.05
3.05
2.75
1.95
25.10

3.70
1.20
5.00
0.60
0.30

11.29
3.66
13.75
4.68
7.53
40.91
Sqm

17 Plastering 12mm thick double coat in CM (1:6) 8mm thick base coat and top
coat CM(1:4) of 4mm thick with dubara sponge finish including c/c of all
materials like cement, sand,water etc., to site, other taxes on all materials, all
operational, incidental charges etc etc., complete for finished item of work.
(APSS 901,903 & 904) - Internal Walls
Inside
Delivery room alround
Toilet room alround
Clinic inside
Out side
Building alround
Sunshade edges
Roof slab edge alround
Deductions
Doors
Toilet Door
Windows

1x
1x
1x

1
1
1

13.50
8.50
15.50

3.30
1.80
3.30

44.55
15.30
51.15

1x 1
1x 4
1 x1

23.90
3.15
26.30

3.90
0.05
0.10

93.21
0.63
2.63

1.20
0.75
1.50

2.10
2.00
1.35

-5.04
-1.50
-8.10
192.83
Sqm

1x
1x
1x

2
1
4

18 Whiting to new walls and ceiling in two coats with Surya cem or equavalent
quality to give an even shade after throughly brushing the surface to remove all
loose powdered materials including c/c of all materials and water to site, &
other taxes, all operational, incidental and labour charges such as cleaning the
surface, painting, curing etc., complete for finished item of work. (APSS No.901
& 908) (CSSR)
As per Qty item No 16 + Inside quantity of item No.17
Deductions
Door
1x 1
Toilet Door
1x 1
As per out side qty item No 17
Deductions
Doors
1x 1
Windows
1x 4

151.91
1.20
0.75

2.10
2.00

-2.52
-1.50
96.47

1.20
1.50

2.10
1.35

-2.52
-8.10
233.74

1150.00
Kg

Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending and binding
wire of 20SWG, forming grills for reinforcement work as per approved designs
and drawings including Cost and Conveyance of bars from approved sources to
site of work with all taxes complete for finished item of work (APSS No.126) in
all floors
23 Provision for VAT 5%
24 0.50% QC Charges

Page 6

Add L S for U/F Items

Assistant Engineer
PR Mahabubabad

Page 7

ED CUM ABSTRACT ESTIMATE

on of PHC Building at Anatharam of Mahabubabad (M)


Est Rs

1.42 Lakhs

Rate

per

Amount

10

91.00 Cum

2165.00

2924.04 Cum

25995.00

5657.12 Cum

20648.00

6684.33 Cum

14371.00

7169.12 Cum

13908.00

Page 8

6695.33 Cum

2209.00

556.52 sqm

3105.00

Page 9

6862.93 Cum

10226.00

702.99 sqm

3021.00

292.44 Cum

3392.00

3146.18 Cum

63679.00

249.87 Sqm

10737.00

Page 10

364.23 Sqm

9120.00

571.50 sqm

8441.00

65.00 Kg

5850.00

92.16 10Sqm

Page 11

183.00

8843.89 each

17688.00

6065.41 each

6065.00

2435.71 No.

9743.00

Page 12

100.82 Sqm

4125.00

198.95 Sqm

38364.00

203.88 10sqm

50890.00 MT

4765.00

58524.00
14000.00
1634.00

Page 13

Total Rs:

351958.00

Page 14

SPECIFICATION REPORT

Name of the work:- Construction of Addl Room to PHC Building at Jangiligonda of Maha
Grant : BRGF 50% M P Share

ESTIMATE COST:-

The above said work is administratively sanctioned Vide Proc Rc No D/148/2011 Dt 2


Mahabubabad under BRGF 30% MP Share for Rs 0.70 Lakhs
Hence the Estimate is prepared with following specifications and provisions.
1

RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size graded machine crushed hard
M/L charges but excluding cost of steel and its fabrication charges, centering and Shittering etc., comp for finis
f) Roof level beams L/W
g) Roof slab 110mm thick

Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per IS 1786-1985) of 8mm
bending and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and d
Conveyance of bars from approved sources to site of work with all taxes complete for finished item of work (AP

Provision for VAT 5%

0.50% QC Charges

Add L S for U/F Items

With the above provision the estimate is worked out to Rs 0.70 Lakhs. This estimate is prepared
2011-12 and with AP revised standard datas.
An early technical sanction to this estimate is solicited

Assistant Engineer
PR Mahabubabad

SPECIFICATION REPORT

Addl Room to PHC Building at Jangiligonda of Mahabubabad (M)


0.70 Lakhs

ministratively sanctioned Vide Proc Rc No D/148/2011 Dt 28.10.2011 of the MPDO MP


s 0.70 Lakhs

9 of IS 456 using 20mm size graded machine crushed hard Granite metal incl. C/c of all
brication charges, centering and Shittering etc., comp for finished item of work

steel TMT bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting,
grills for reinforcement work as per approved designs and drawings including Cost and
te of work with all taxes complete for finished item of work (APSS No.126) in all floors

mate is worked out to Rs 0.70 Lakhs. This estimate is prepared based on current SOR of

estimate is solicited

DETAILED CUM ABSTRACT ESTIMATE

Name of the work:- Construction of Addl Room to PHC Building at Jangiligonda of Mahabubab
Grant : BRGF 50% M P Share
Nos
Measurements
Sl
Description of item
NO
L
B
D
2
3
4
5
6
1
1 RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size
graded machine crushed hard Granite metal incl. C/c of all M/L charges but
excluding cost of steel and its fabrication charges, centering and Shittering etc.,
comp for finished item of work

Qty
7

f) Roof level beams L/W


.do . S/W
Deduct column portion

1
1
1

x2
x3
x5

6.03
5.00
0.23

0.23
0.23
0.23

0.23
0.23
0.23

0.64
0.79
0.06
1.49

g) Roof slab 110mm thick

x1

7.09

6.06

42.97
Sqm

Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending and binding
wire of 20SWG, forming grills for reinforcement work as per approved designs
and drawings including Cost and Conveyance of bars from approved sources to
site of work with all taxes complete for finished item of work (APSS No.126) in
all floors
-

Provision for VAT 5%

0.50% QC Charges

Add L S for U/F Items

Assistant Engineer
PR Mahabubabad

430.00
Kg

ESTIMATE

lding at Jangiligonda of Mahabubabad (M)


Est Rs

0.70 Lakhs

Rate

per

Amount

10

6862.93 Cum

10226.00

702.99 sqm

30207.00

50890.00 MT

21883.00
62316.00
3116.00
312.00
29.00

Total Rs:

65773.00

DETAILED CUM ABSTRACT ESTIMATE


Name of the work:- Construction of PHC Building at Anatharam of Mahabubabad (M)
Est Rs

Grant : BRGF 50% G P Share


Nos
Measurements
Sl
Description of item
NO
L
B
D
2
3
4
5
6
1
1 Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a
lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305 MORD / 304
MORTH
Column footings
Inbetween columns alround the
building
For Cross wall
Duduct column footing portion

Qty

Rate

1
1

x9
x1

1.30
22.98

1.30
0.45

1.50
0.10

22.82
1.03

1
1

x1
x9

4.78
1.30

0.45
0.45

0.10
0.10

0.22
-0.53
23.54
Cum

Plain Cement Concrete (1:5:10) prop using 40mm size HBG (SS5) metal
including Cost and Conveyance of all materials and curing charges but
excluding unskilled wages etc., complete for finished item of work for
Foundations and Flooring Bed (APSS No. 402) (CSSR)
Column footings
Inbetween columns alround the
building
For Cross wall
Duduct column footing portion
For Flooring
Clinic
Delivery Room
Toilet

1
1

x9
x1

1.30
22.98

1.30
0.45

0.30
0.10

4.56
1.03

1
1

x1
x9

4.78
0.23

0.45
0.23

0.10
0.10

0.22
-0.05

1
1
1

x1
x1
x1

5.00
3.70
3.05

2.75
3.05
1.20

0.10
0.10
0.10
5.76
Cum

91.00

2924.04

RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size
graded machine crushed hard Granite metal incl. C/c of all M/L charges but
excluding cost of steel and its fabrication charges, centering and Shittering etc.,
comp for finished item of work
a) Column footing flat portion

x9

1.30

Trapezoidal portion

x9

0.10 0.232+1.302 +
3

b) For Columns below G.L


Columns above G.L
Deductions :Plinth beam portion alround

c) For Plinth beam alround


For Plinth beam Cross wall

f) Roof level beams L/W

1.30

0.20

0.61

0.232 x 1.302

1
1

x9
x9

0.23
0.23

0.23
0.23

0.90
3.90

x9

0.23

0.23

0.30

1
1

x1
x1

x2

Page 19

22.98
5.00

6.03

3.04

0.23
0.23

0.23

0.30
0.30

0.23

3.65
Cum
0.43
1.86
-0.14
2.15
Cum
1.59
0.35
1.94
Cum
0.64

5657.12

6684.33

7169.12

.do . S/W
Deduct column portion

g) Roof slab 110mm thick

x3
x5

5.00
0.23

x1

7.09

0.23
0.23

0.23
0.23

6.06

0.79
0.06
1.49

42.97
Sqm

0.40
0.40

6.10
5.50
11.60
Cum

6862.93
702.99

Filling with gravel in trenches, sides of foundations and basement complete for
finished item of work. (APSS NO. 309 & 310)(CSSR)
inside Delevery room and Toilet
inside Clinic

1
1

1
1

x1
x1

5.00
5.00

3.05
2.75

292.44

Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending and binding
wire of 20SWG, forming grills for reinforcement work as per approved designs
and drawings including Cost and Conveyance of bars from approved sources to
site of work with all taxes complete for finished item of work (APSS No.126) in
all floors
-

Provision for VAT 5%

0.50% QC Charges

Add L S for U/F Items

1000.00
Kg

50890.00

Total Rs:

Assistant Engineer
PR Mahabubabad

Page 20

ABSTRACT ESTIMATE
Building at Anatharam of Mahabubabad (M)
1.42 Lakhs
per

Amount

10

Cum

2142.00

Cum

16842.00

Cum

20648.00

Cum

14371.00

Cum

13908.00

Page 21

Cum

10226.00

sqm

3021.00

Cum

3392.00

MT

50890.00
135440.00
6772.00
677.00
160.00

143049.00

Page 22

Name of the work:- Construction of PHC Building at Anatharam of Mahabubabad (M)

RCC roof Slab 100MM th.


RCC columns
0.23x0.23M

3.30M
3.05M

2.75M
Flooring with Polished stone 25MM th.

0.60M

Sand

filling

0.90m
0.10
0.20
0.30
0

1.30M

0.10M

1.50M

0.30

1.30M

1.30M

SECTION A - A'

Column 0.23 x 0.23 M


M 6.49
M 3.28
C/C

M 2.98

TOILET
X 1.20 3.05

Column 0.23 x 0.23 M

C/C

M 2.615
C/C

D1
M 5.23
C/C

DELiVERY ROOM
X 3.70 3.05

M 5.46

CLINIC
X 5.00 2.75

A
W

D
W

M 2.615
C/C

M C/C 6.26

D : 1.20 x 2.10
W : 1.50 x 1.35

PLAN

Assistant Engineer
PR Mahabubabad

V : 0.90 x 0.30
T- Beam 0.23 x 0.45

0
0

f Mahabubabad (M)

g with Polished stone 25MM th.

'A

20 x 2.10
50 x 1.35

90 x 0.30
am 0.23 x 0.45

CALCULATION OF STEEL

Name of the Work : Construction of Anganwadi Building at Anantharam MP Julurupad

S.No
1
1

No
3

Name of the item


2

L
4

Column footings
10 mm dia bars

2x

Columns
12 mm dia main bars
8 mm dia stirrups
12 mm dia over laps

9x
9x
9x

4
38
4

6.30
0.82
0.48

3x
3x
3x

4
2
43

6.41
6.81
0.96

2x
2x
2x
5x

4
2
43
6

6.04
6.44
0.96
0.48

1x
1x
1x
1x

4
2
43
2

2.81
3.01
0.96
0.48

2x
2x
2x
2x

2
1
2
7

1.46
1.10
1.46
0.66

4x
4x
4x
4x

2
1
2
7

1.46
1.66
1.46
0.66

Plinth beam
Long walls
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
Short walls
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
12 mm dia over laps
Cross wall between varandah
and store room
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
12 mm dia over laps
Lintel over Door
10 mm dia main bars
10 mm dia main bars Crank
8 mm dia hanging bars
8mm dia stirrups
Lintel over Window
12 mm dia main bars
12 mm dia main bars Crank
10 mm dia hanging bars
8mm dia stirrups

9x

1.00

Varandah Beam
Long wall
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
Short walls
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
Sunshade
over windows
8mm dia main bars
6mm dia dist.
Over Varandah
Long wall
8mm dia main bars
6mm dia dist.
Short walls
8mm dia main bars
6mm dia dist.
Roof level Beam
Long walls
12mm main bars
12mm crank bars
8mm dia stirrups
Short walls
12mm main bars
12mm crank bars
8mm dia stirrups
Short walls
12mm main bars
12mm crank bars
8mm dia stirrups
Short walls
12mm main bars
12mm crank bars
8mm dia stirrups
Fornt Long walls
12mm main bars
12mm crank bars

1x
1x
1x

4
2
15

2.29
2.43
0.82

1x
1x
1x

4
2
18

2.81
2.95
0.82

4x
4x

12
5

0.83
1.45

1x
1x

31
5

0.83
3.89

1x
1x

27
5

0.83
3.41

2x
2x
2x

4
2
36

6.45
6.85
0.96

1x
1x
1x

4
2
19

3.50
3.70
0.96

1x
1x
1x

4
2
16

2.65
3.85
0.96

1x
1x
1x

4
3
19

3.35
3.55
0.96

1x
1x

4
2

6.10
6.50

8mm dia stirrups


T - Beam
12mm main bars
12mm crank bars
8mm dia stirrups

1x

36

0.96

1x
1x
1x

5
3
19

3.50
3.85
0.96

1x
1x
1x
1x
1x
1x

42
36
2x
2x
10
9

7.03
6.65
1.20
1.20
1.40
1.20

8 RCC Roof Slab

8mm dia Main bars


8mm dia dist. bars
8mm dia extra bars on L/W
8mm dia extra bars on L/W
8mm extra bars on T - beam
8mm extra bars on middle beam

10
10

ram MP Julurupad

Qty
7

6mm

8mm

162.00

226.80
280.44
17.28

76.92
40.86
123.84
48.32
25.76
82.56
14.40

11.24
6.02
41.28
0.96

5.84
2.20
5.84
9.24
11.68
6.64
11.68
18.48

10mm

12mm

162.00

226.80
280.44
17.28

76.92
40.86
123.84
48.32
25.76
82.56
14.40

11.24
6.02
41.28
0.96

5.84
2.20
5.84
9.24
11.68
6.64
11.68
18.48

16mm

9.16
4.86
12.30

9.16
4.86
12.30

11.24
5.90
14.76

11.24
5.90
14.76

39.84
29.00

29.00

25.73
19.45

19.45

22.41
17.05

51.60
27.40
69.12
14.00
7.40
18.24
10.60
7.70
15.36
13.40
10.65
18.24
24.40
13.00

39.84

25.73

22.41
17.05

51.60
27.40
69.12
14.00
7.40
18.24
10.60
7.70
15.36
13.40
10.65
18.24
24.40
13.00

34.56

34.56

17.50
11.55
18.24

17.50
11.55
18.24

295.26
239.40
24.00
24.00
14.00
10.80

295.26
239.40
24.00
24.00

14.00
10.80
65.5

Total qty =

1457.94
181.72
727.24
x0.22
x 0.39
x 0.62
x 0.89
14.41
568.6
112.67
647.24
1342.92 Kg

SVPCPL
A

PMGSY

C
LEAD CHARGES
Earth/Gravel/San
d

RCC NP3 P
Metal

Bricks

600

loading

34.30

68.30

134.10

unloading
stacking
0
0

10.90
0.00
0.00
0.00

10.90
0.00
0.00
0.00

134.10 Pipes cost


0.00 Collars cost
0.00
0.00

21.50

19.10

31.75

60.90

2
3
4
5
6

30.20
40.20
48.80
57.40
66.00

26.70
40.20
48.80
57.40
66.00

44.46
59.28
71.98
84.68
97.38

60.90
60.90
60.90
60.90
63.70

74.60

74.60

110.08

66.50

8
9

83.20
91.80

83.20
91.80

122.78
135.48

69.30
72.10

10

100.40

100.40

148.18

74.90

11

109.00

109.00

160.88

77.70

12

117.60

117.60

173.58

80.50

13

126.20

126.20

186.28

83.30

14

134.80

134.80

198.98

86.10

15

143.40

143.40

211.68

88.90

16

152.00

152.00

224.38

91.70

17

160.60

160.60

237.08

94.50

18

169.20

169.20

249.78

97.30

19

177.80

177.80

262.48

100.10

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

E. Loading and Unloadi


1915.00
349.00
0.00
0.00

Warangal Dist

SVPCPL

PMGSY

20

186.40

186.40

275.18

102.90

21

195.00

195.00

287.88

105.70

22

203.60

203.60

300.58

108.50

23

212.20

212.20

313.28

111.30

24
25
26
27

220.80
229.40
238.00
246.60

220.80
229.40
238.00
246.60

325.98
338.68
351.38
364.08

114.10
116.90
119.70
122.50

28

255.20

255.20

376.78

125.30

29
30
31
32

263.80
272.40
279.60
286.80

263.80
272.40
279.60
286.80

389.48
402.18
412.76
423.34

128.10
130.90
133.70
136.50

33

294.00

294.00

433.92

139.30

34

301.20

301.20

444.50

142.10

35

308.40

308.40

455.08

144.90

36

315.60

315.60

465.66

147.70

37

322.80

322.80

476.24

150.50

38

330.00

330.00

486.82

153.30

39

337.20

337.20

497.40

156.10

40

344.40

344.40

507.98

158.90

41

351.60

351.60

518.56

161.70

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL

PMGSY

42

358.80

358.80

529.14

164.50

43
44
45

366.00
373.20
380.40

366.00
373.20
380.40

539.72
550.30
560.88

167.30
170.10
172.90

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

387.60
394.80
402.00
409.20
416.40
423.60
430.80
438.00
445.20
452.40
459.60
466.80
474.00
481.20
488.40
495.60
502.80
510.00
517.20
524.40
531.60
538.80
546.00
553.20
560.40
567.60
574.80
582.00
589.20
596.40
603.60
610.80
618.00
625.20
632.40

387.60
394.80
402.00
409.20
416.40
423.60
430.80
438.00
445.20
452.40
459.60
466.80
474.00
481.20
488.40
495.60
502.80
510.00
517.20
524.40
531.60
538.80
546.00
553.20
560.40
567.60
574.80
582.00
589.20
596.40
603.60
610.80
618.00
625.20
632.40

571.46
582.04
592.62
603.20
613.78
624.36
634.94
645.52
656.10
666.68
677.26
687.84
698.42
709.00
719.58
730.16
740.74
751.32
761.90
772.48
783.06
793.64
804.22
814.80
825.38
835.96
846.54
857.12
867.70
878.28
888.86
899.44
910.02
920.60
931.18

175.70
178.50
181.30
184.10
186.90
189.70
192.50
195.30
198.10
200.90
203.70
206.50
209.30
212.10
214.90
217.70
220.50
223.30
226.10
228.90
231.70
234.50
237.30
240.10
242.90
245.70
248.50
251.30
254.10
256.90
259.70
262.50
265.30
268.10
270.90

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL
81
82
83
84
85
86
87
88
89

PMGSY

639.60
646.80
654.00
661.20
668.40
675.60
682.80
690.00
697.20

639.60
646.80
654.00
661.20
668.40
675.60
682.80
690.00
697.20

941.76
952.34
962.92
973.50
984.08
994.66
1005.24
1015.82
1026.40

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

273.70
276.50
279.30
282.10
284.90
287.70
290.50
293.30
296.10

Warangal Dist

SVPCPL
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138

PMGSY

704.40
711.60
718.80
726.00
733.20
740.40
747.60
754.80
762.00
769.20
776.40
783.60
790.80
798.00
805.20
812.40
819.60
826.80
834.00
841.20
848.40
855.60
862.80
870.00
877.20
884.40
891.60
898.80
906.00
913.20
920.40
927.60
934.80
942.00
949.20
956.40
963.60
970.80
978.00
985.20
992.40
999.60
1006.80
1014.00
1021.20
1028.40
1035.60
1042.80
1050.00

704.40
711.60
718.80
726.00
733.20
740.40
747.60
754.80
762.00
769.20
776.40
783.60
790.80
798.00
805.20
812.40
819.60
826.80
834.00
841.20
848.40
855.60
862.80
870.00
877.20
884.40
891.60
898.80
906.00
913.20
920.40
927.60
934.80
942.00
949.20
956.40
963.60
970.80
978.00
985.20
992.40
999.60
1006.80
1014.00
1021.20
1028.40
1035.60
1042.80
1050.00

1036.98
1047.56
1058.14
1068.72
1079.30
1089.88
1100.46
1111.04
1121.62
1132.20
1142.78
1153.36
1163.94
1174.52
1185.10
1195.68
1206.26
1216.84
1227.42
1238.00
1248.58
1259.16
1269.74
1280.32
1290.90
1301.48
1312.06
1322.64
1333.22
1343.80
1354.38
1364.96
1375.54
1386.12
1396.70
1407.28
1417.86
1428.44
1439.02
1449.60
1460.18
1470.76
1481.34
1491.92
1502.50
1513.08
1523.66
1534.24
1544.82

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

298.90
301.70
304.50
307.30
310.10
312.90
315.70
318.50
321.30
324.10
326.90
329.70
332.50
335.30
338.10
340.90
343.70
346.50
349.30
352.10
354.90
357.70
360.50
363.30
366.10
368.90
371.70
374.50
377.30
380.10
382.90
385.70
388.50
391.30
394.10
396.90
399.70
402.50
405.30
408.10
410.90
413.70
416.50
419.30
422.10
424.90
427.70
430.50
433.30

Warangal Dist

SVPCPL
139
140
141
142
143
144
145
146
147
148
149
150

PMGSY

1057.20
1064.40
1071.60
1078.80
1086.00
1093.20
1100.40
1107.60
1114.80
1122.00
1129.20
1136.40

1057.20
1064.40
1071.60
1078.80
1086.00
1093.20
1100.40
1107.60
1114.80
1122.00
1129.20
1136.40

1555.40
1565.98
1576.56
1587.14
1597.72
1608.30
1618.88
1629.46
1640.04
1650.62
1661.20
1671.78

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

436.10
438.90
441.70
444.50
447.30
450.10
452.90
455.70
458.50
461.30
464.10
466.90

Warangal Dist

SVPCPL

RCC NP3 PLAIN ENDED PIPES


700

800

900

1000

1200

E. Loading and Unloading charges by Mechanical Means

PMGSY

2370.00
466.00
0.00
0.00

3129.00
594.00
0.00
0.00

3920.00
693.00
0.00
0.00

4885.00
866.00
0.00
0.00

6762.00
1371.00
0.00
0.00

67.70

81.20

106.60

128.70

155.70

67.70
67.70
67.70
67.70
71.00

81.20
81.20
81.20
81.20
84.50

106.60
106.60
106.60
106.60
112.80

128.70
128.70
128.70
128.70
134.90

155.70
155.70
155.70
155.70
162.40

74.30

87.80

119.00

141.10

169.10

77.60
80.90

91.10
94.40

125.20
131.40

147.30
153.50

175.80
182.50

84.20

97.70

137.60

159.70

189.20

87.50

101.00

143.80

165.90

195.90

90.80

104.30

150.00

172.10

202.60

94.10

107.60

156.20

178.30

209.30

97.40

110.90

162.40

184.50

216.00

100.70

114.20

168.60

190.70

222.70

104.00

117.50

174.80

196.90

229.40

107.30

120.80

181.00

203.10

236.10

110.60

124.10

187.20

209.30

242.80

113.90

127.40

193.40

215.50

249.50

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL

PMGSY

117.20

130.70

199.60

221.70

256.20

120.50

134.00

205.80

227.90

262.90

123.80

137.30

212.00

234.10

269.60

127.10

140.60

218.20

240.30

276.30

130.40
133.70
137.00
140.30

143.90
147.20
150.50
153.80

224.40
230.60
236.80
243.00

246.50
252.70
258.90
265.10

283.00
289.70
296.40
303.10

143.60

157.10

249.20

271.30

309.80

146.90
150.20
153.50
156.80

160.40
163.70
167.00
170.30

255.40
261.60
267.80
274.00

277.50
283.70
289.90
296.10

316.50
323.20
329.90
336.60

160.10

173.60

280.20

302.30

343.30

163.40

176.90

286.40

308.50

350.00

166.70

180.20

292.60

314.70

356.70

170.00

183.50

298.80

320.90

363.40

173.30

186.80

305.00

327.10

370.10

176.60

190.10

311.20

333.30

376.80

179.90

193.40

317.40

339.50

383.50

183.20

196.70

323.60

345.70

390.20

186.50

200.00

329.80

351.90

396.90

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL

PMGSY

189.80

203.30

336.00

358.10

403.60

193.10
196.40
199.70

206.60
209.90
213.20

342.20
348.40
354.60

364.30
370.50
376.70

410.30
417.00
423.70

203.00
206.30
209.60
212.90
216.20
219.50
222.80
226.10
229.40
232.70
236.00
239.30
242.60
245.90
249.20
252.50
255.80
259.10
262.40
265.70
269.00
272.30
275.60
278.90
282.20
285.50
288.80
292.10
295.40
298.70
302.00
305.30
308.60
311.90
315.20

216.50
219.80
223.10
226.40
229.70
233.00
236.30
239.60
242.90
246.20
249.50
252.80
256.10
259.40
262.70
266.00
269.30
272.60
275.90
279.20
282.50
285.80
289.10
292.40
295.70
299.00
302.30
305.60
308.90
312.20
315.50
318.80
322.10
325.40
328.70

360.80
367.00
373.20
379.40
385.60
391.80
398.00
404.20
410.40
416.60
422.80
429.00
435.20
441.40
447.60
453.80
460.00
466.20
472.40
478.60
484.80
491.00
497.20
503.40
509.60
515.80
522.00
528.20
534.40
540.60
546.80
553.00
559.20
565.40
571.60

382.90
389.10
395.30
401.50
407.70
413.90
420.10
426.30
432.50
438.70
444.90
451.10
457.30
463.50
469.70
475.90
482.10
488.30
494.50
500.70
506.90
513.10
519.30
525.50
531.70
537.90
544.10
550.30
556.50
562.70
568.90
575.10
581.30
587.50
593.70

430.40
437.10
443.80
450.50
457.20
463.90
470.60
477.30
484.00
490.70
497.40
504.10
510.80
517.50
524.20
530.90
537.60
544.30
551.00
557.70
564.40
571.10
577.80
584.50
591.20
597.90
604.60
611.30
618.00
624.70
631.40
638.10
644.80
651.50
658.20

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL
318.50
321.80
325.10
328.40
331.70
335.00
338.30
341.60
344.90

PMGSY

332.00
335.30
338.60
341.90
345.20
348.50
351.80
355.10
358.40

577.80
584.00
590.20
596.40
602.60
608.80
615.00
621.20
627.40

599.90
606.10
612.30
618.50
624.70
630.90
637.10
643.30
649.50

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

664.90
671.60
678.30
685.00
691.70
698.40
705.10
711.80
718.50

Warangal Dist

SVPCPL
348.20
351.50
354.80
358.10
361.40
364.70
368.00
371.30
374.60
377.90
381.20
384.50
387.80
391.10
394.40
397.70
401.00
404.30
407.60
410.90
414.20
417.50
420.80
424.10
427.40
430.70
434.00
437.30
440.60
443.90
447.20
450.50
453.80
457.10
460.40
463.70
467.00
470.30
473.60
476.90
480.20
483.50
486.80
490.10
493.40
496.70
500.00
503.30
506.60

PMGSY

361.70
365.00
368.30
371.60
374.90
378.20
381.50
384.80
388.10
391.40
394.70
398.00
401.30
404.60
407.90
411.20
414.50
417.80
421.10
424.40
427.70
431.00
434.30
437.60
440.90
444.20
447.50
450.80
454.10
457.40
460.70
464.00
467.30
470.60
473.90
477.20
480.50
483.80
487.10
490.40
493.70
497.00
500.30
503.60
506.90
510.20
513.50
516.80
520.10

633.60
639.80
646.00
652.20
658.40
664.60
670.80
677.00
683.20
689.40
695.60
701.80
708.00
714.20
720.40
726.60
732.80
739.00
745.20
751.40
757.60
763.80
770.00
776.20
782.40
788.60
794.80
801.00
807.20
813.40
819.60
825.80
832.00
838.20
844.40
850.60
856.80
863.00
869.20
875.40
881.60
887.80
894.00
900.20
906.40
912.60
918.80
925.00
931.20

655.70
661.90
668.10
674.30
680.50
686.70
692.90
699.10
705.30
711.50
717.70
723.90
730.10
736.30
742.50
748.70
754.90
761.10
767.30
773.50
779.70
785.90
792.10
798.30
804.50
810.70
816.90
823.10
829.30
835.50
841.70
847.90
854.10
860.30
866.50
872.70
878.90
885.10
891.30
897.50
903.70
909.90
916.10
922.30
928.50
934.70
940.90
947.10
953.30

725.20
731.90
738.60
745.30
752.00
758.70
765.40
772.10
778.80
785.50
792.20
798.90
805.60
812.30
819.00
825.70
832.40
839.10
845.80
852.50
859.20
865.90
872.60
879.30
886.00
892.70
899.40
906.10
912.80
919.50
926.20
932.90
939.60
946.30
953.00
959.70
966.40
973.10
979.80
986.50
993.20
999.90
1006.60
1013.30
1020.00
1026.70
1033.40
1040.10
1046.80

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL
509.90
513.20
516.50
519.80
523.10
526.40
529.70
533.00
536.30
539.60
542.90
546.20

PMGSY

523.40
526.70
530.00
533.30
536.60
539.90
543.20
546.50
549.80
553.10
556.40
559.70

937.40
943.60
949.80
956.00
962.20
968.40
974.60
980.80
987.00
993.20
999.40
1005.60

959.50
965.70
971.90
978.10
984.30
990.50
996.70
1002.90
1009.10
1015.30
1021.50
1027.70

1053.50
1060.20
1066.90
1073.60
1080.30
1087.00
1093.70
1100.40
1107.10
1113.80
1120.50
1127.20

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL
E

F
Cost of Materials, Labour

Material Rates
1
2
3
14

60 to 63 mm IRC & MoRTH HBG metal


50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal

360.00
390.00
500.00

15

25 to 27 mm IRC & MoRTH HBG M/C metal

830.00

16
17
18
19

19 to 22 mm IRC & MoRTH HBG M/C metal


12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal

950.00
690.00
560.00
430.00
260.00

20

Aggregate below 5.60mm HB stone of Granite, Dolamite, Dolerite


and Trap.IRC and MoRTH HBG metal

505.00

HBG Stone chips 2.36mm and below

236.00

Stone crusher dust finer than 3mm with not more than 10% passing
through 75 micron

255.00

63mm to 45 mm HB stone of Granite, Dolamite, Dolerite and


Trap.IRC and MoRTH HBG metal (Grade II)

595.00

53mm to 22.4 mm HB stone of Granite, Dolamite, Dolerite and


Trap.IRC and MoRTH HBG metal (Grade III)

765.00

11.2mm to 0.09 mm HB stone of Granite, Dolamite, Dolerite and


Trap.IRC and MoRTH HBG metal

630.00

13.2mm to 5.60 mm HB stone of Granite, Dolamite, Dolerite and


Trap.IRC and MoRTH HBG metal

805.00

25mm to 10 mm HB stone of Granite, Dolamite, Dolerite and


Trap.IRC and MoRTH HBG metal

985.00

21

50.50
22

Gravel / quarry rubbish (spall) including stacking


72.50

29

PMGSY

Fine aggregate / sand (screened) including seigniorage

260.00

Sand for mortar

220.00

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL
29
Fine aggregate / sand (Un-screened) including seigniorage
Sand for Filling and blindage

70.00

Coarse sand for filling including seigniorage

110.00

Coarse sand for Mortar including seigniorage

130.00

Roughstone 300mm (HBG)for revetment


Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm

136.00
117.00
71.00
95.00

Boulders with minimum size of 300mm for pitching

145.00

SS Revetment work 450mm


Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal

114.00
98.00
114.00
156.00

150 mm -200 quarried stone for hand broken

130.00

23

Aggregates 40mm nominal size Granite, Dolamite, Dolerite and Trap


inclusive of Seigniorage, Blasting, Machine crushing

745.00

24

Aggregates 25mm nominal size Granite, Dolamite, Dolerite and Trap


inclusive of Seigniorage, Blasting, Machine crushing

1155.00

25

Aggregates 20mm nominal size Granite, Dolamite, Dolerite and Trap


inclusive of Seigniorage, Blasting, Machine crushing

1175.00

26

Aggregates 13.2/12.5mm nominal size Granite, Dolamite, Dolerite


and Trap inclusive of Seigniorage, Blasting, Machine crushing

980.00

27

Aggregates 10mm nominal size Granite, Dolamite, Dolerite and Trap


inclusive of Seigniorage, Blasting, Machine crushing

820.00

28

Aggregates 6mm nominal size Granite, Dolamite, Dolerite and Trap


inclusive of Seigniorage, Blasting, Machine crushing

655.00

30

4
5
6
7
8
9
10
11
12
13

PMGSY

130.00

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

41.25
82.00

Warangal Dist

SVPCPL

31

HYSD Steel / TMT Fe 415

43000.00

32
33
34

Mild Steel , Structral steel


Cement
Mild Steel 6mm

32500.00
5700.00
32000.00

BT-Rates
Bulk 80/100 Grade
Bulk 60/70 Grade
Emulsion (Bulk) RS
Emulsion (Bulk) MS
Emulsion (Bulk) SS
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69

PMGSY

Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges G.O Ms.No: 198 13/08/2009
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mason Ist class
Mazdoor unskilled
Machinery Rates
Dozer D80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

30,458.60
31,373.96
23,833.69
24,062.53
23,135.72
70.00
70.00
50.00
22.00
40.00
285.00
315.00
250.00
1729.90
2600.00
1808.50
1320.00
629.80
1704.60
746.50
345.00
345.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00
15525.00
1090.00
2070.00
1320.00
1035.00
920.00
1550.00

Warangal Dist

SVPCPL
70
71
72
73
74
75
76
77
78

PMGSY

Generator set 125 KVA


Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer
Crane with Grab bucket 0.75 CuM
Crane with 3.0T
Crane with 35T

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

1090.00
620.00
345.00
4.50
4.50
40.00
1725.00
280.00
630.00

Warangal Dist

SVPCPL

PMGSY

79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
64

Dozer 80 HP for spreading @ 200 cum per hour


MASON I CLASS
Vibrating charges needle vibarator petrol 40mm

99
100
101
102

Binding wire
100mm dia AC pipe CL 20
MS clamps
Filter media for drainage to mass walls
Concrete mixer 0.2/0.80 cum
Bricks
Polished shabad stone (0.457 x 0.304m)

Hume pipes 1200mm Dia., NP3


Hume pipes 1000mm Dia., NP3
Hume pipes 900mm Dia., NP3
Hume pipes 800mm Dia., NP3
Hume pipes 600mm Dia., NP3
Cost of 1kl water
Curing compound
Super Plasticizer (conplast RP 264 or equivalent
Tar felt joint filler board 20mm thick
Tipper 10Tonne capacity for carriage of stone
chips from stock pile on road side to chip
spreader
Paver finisher Hydrostatic with sensor control 100TPH
Needle vibrator 40mm (electrical)
Vibrating charges needle vibarator petrol 60mm

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

1729.90
285.00
108.60
7991.00
5756.00
5100.00
4064.00
2412.00
90.00
95.00
50.00
520.00

2530.00
102.50
114.10

52.00
224.00
30.00
305.00
345.00
3100.00
1291.00

Warangal Dist

SVPCPL

PMGSY

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL

S.S.R sl. No./page


No.

53 I / 16
52 h / 16
51g / 16
50 f / 16
49 e / 16
48 d / 16
47 c / 16
46 b / 16
45 33 a / 16
M 030 / 26

92 b / 17
M 021 / 26

M 038 / 27

M 036 / 27

M 041 / 27

M 043 / 27

M 046 / 27
90 34 & 91 35 a / 17
M-008/25

including seiginiorage 22/-

28 / 12

including seiginiorage 40/-

93 36.a / 17

PMGSY

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL

27 / 12

including seiginiorage 40/-

94 36.b / 17
M-004/25

including seiginiorage 40/-

M-005/25

including seiginiorage 40/-

9 d iv / 14
8 d iii / 14
2 b I / 14
3 b ii / 14
M-003 / 25

including seiginiorage 50/-

4 b iii / 14
6 d I / 14
7 d ii / 14
5 c / 14
83,84 / 17

Average of (47.5+35)/2

78 z 2 / 17

PMGSY

M-002 / 25

including seiginiorage 50/-

M-055 / 27

40mm HBG metal SS - 5

500.00

30 33.f / 15

M-054 / 27

25mm HBG metal SS - 5

828.00

29 33.e / 15

M-053 / 27

20mm HBG metal SS - 5

844.00

28 33.d / 15

M-052 / 27

12mm HBG metal SS - 5

688.00

27 33.c / 15

M-051 / 27

10mm HBG metal SS - 5

560.00

26 33.b / 15

M-050 / 27

6mm HBG metal SS - 5

428.00

25 33.a / 15

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL

Rates as per dated: 27/08/2010

For Bulk Bitumen 80/100, 60/70 & For


Emulsion (Bulk): HPCL Price List With
Effect From Dt.16-07-2010
36 / 15

134
135
135
71. 21 / 11
1a/9
78 6 b / 11
1 / 28
2 / 28
3 / 28
4 / 28
5 / 28
6 / 28
7 / 28
8 / 28
9 / 28
10 / 28
11 / 28
12 / 28
13 / 28
14 / 28
15 / 28
16 / 29
20 / 29
22 / 29
23 / 29
24 / 29
25 / 29
28 / 29
41 / 30

PMGSY

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL
41 / 30
41 / 30
36A / 30
43 / 30
43 / 30
46 / 31
33D / 29
33c / 29
33b / 29

PMGSY

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL
40206.00
1a/9
at 3700 cement rate
at 33000 6mm steel rate

M 189 / 34
15 / 12
70 / 13
74 / 14

21 / 29

3 / 11
/ 61
LQR
M 012 / 26
sl. No.18 / 130
BMTA-01/10
BMT-B05/11

PMGSY

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

SVPCPL

PMGSY

PWD Road Konaichalam to Thidugu,


Zaffergadh Mandal

Warangal Dist

Das könnte Ihnen auch gefallen