Volume 4
Malaysian Sewerage
Industry Guidelines
1.1
The owner must comply with the requirements set out in this volume
when submitting an application for approval to the Commissioner.
This volume does not cover any aspect other than Sewage Treatment
Plant requirements. All internal plumbing approvals need to be approved
by Local Authorities.
1.2
1.3
Volume 4
1.4
d)
e)
f)
g)
h)
i)
j)
k)
l)
Sufficient land area for the sewage treatment plants plus additional
area to allow for extensions to the plant, where necessary.
Land of suitable configuration shall be provided.
Sufficient buffer zones.
Volume 4
Malaysian Sewerage
Industry Guidelines
m)
n)
o)
p)
q)
r)
s)
t)
u)
v)
w)
x)
z)
y)
aa)
1.5
Volume 4
d)
e)
f)
g)
h)
Population Equivalent
(Recommended))
Residential
5 per house
Commercial:
- Partial residential
- Fully residential
1 per student
Hospitals
4 per bed
4 per room
3 per stall
1 per stall
15 per toilet
Bus terminal
Taxi terminal
Volume 4
Malaysian Sewerage
Industry Guidelines
Population Equivalent
(Recommended)
Stadium
Public toilet
15 per toilet
Airport
Laundry
10 per machine
Prison
Golf course
(Ref: Malaysian Standard 1228)
1.6
1 per person
20 per hole
d)
e)
Site layout plans showing all the process units, main pipe runs,
electrical conduit corridors, site services (water, drains, lighting,
other services), roads and paving, landscaping, buildings, fencing
and finished level contours (or spot levels). The set out and
overall dimensions of the plant shall also be shown.
Volume 4
f)
g)
h)
i)
j)
Volume 4
Malaysian Sewerage
Industry Guidelines
Volume 4
Volume 4
0.2m
0.4m
0.6m
0.8m
1.0m
1.2m
1.4m
1.6m
1.8m
2.0m
F.G.L.
-0.6M
PRIMARY PUMPING VALVE
SCREEN STATION CHAMBER
-0.4m
-0.2m
FGL
F.F.L.
I.L.
F.G.L.
SECONDARY SCREEN
SECONDARY SCREEN
F.G.L.
CL
I.L.
AERATION TANK
AERATION TANK
TWL
CL
I.L.
TWL
TWL
F.G.L.
CLARIFIER DISTRIBUTION
CHAMBER
CLARIFIER DISTRIBUTION
CHAMBER
F.G.L.
HYDRAULIC PROFILE
I.L.
CLARIFIERS
CLARIFIERS
TWL
TWL
TWL
TWL
F.G.L.
NOTES :
OUTFALL MEASUREMENT
FLUME
CHLORINE CONTACT
TANK
OUTFALL MEASUREMENT
FLUME
CHLORINE CONTACT
TANK
F.G.L.
Page 7
10
Volume 4
Malaysian Sewerage
Industry Guidelines
Volume 4
Volume 4
Pump
Pump
Raw Sewage
Raw Sewage
Screen
RAW SEWAGE
SS =
BOD =
Q=
RAW SEWAGE M
SS =
BOD =
Q=
RAW SEWAGE
SS =
BOD =
Q=
Screen
Filtrate =
SCREEN CHAMBER
Filtrate =
=
=
Q
BOD
Skimmer
Water =
=
=
=
Q
BOD
SS
Transfer Pump
GREASE CHAMBER
Grit Pump
Grit Classifier
Vortex
SS
BOD =
GRIT CHAMBER
Mixer
Pump
Balancing
BALANCING TANK
=
=
=
Q
BOD
SS
=
=
Q
BOD
SS
MLSS =
Aerator
Supernatant Decanter
REACTOR
SEQUENCING BATCH
=
=
=
Q
BOD
SS
HOLDING TANK
SLUDGE
Pump
Waste Sludge
TANK
MEASURING
SS
BOD
BLOWER
11
QiQi= =
BOD= =
BOD
SS= =
SS
Qi ++ Qr
Qr ++ Qw
Qw
QQ == Qi
BOD ==
BOD
SS ==
SS
Qe
Qe ==
BOD
BOD ==
SS
SS ==
SECONDARY
SECONDARY CLARIFIER
CLARIFIER
AERATIONTANK
TANK
AERATION
MLSS= =
MLSS
OUTLET
OUTLET
OVERFLOW
OVERFLOW SS
SS CONC
CONC==
BOD
BOD ==
Qr
Qr++Qw
Qw==
BOD =
BOD =
SS =
SS =
Qr, Xr
Qr,
Xr
Qr = X Qi =
Qr = X
BOD
= Qi =
BOD
=
SS =
SS =
AEROBIC DIGESTED
AEROBIC DIGESTED
SLUDGE HOLDING TANK
SLUDGE HOLDING TANK
Qw =
Qw ==
BOD
BOD
SS ==
SS ==
1%DS
1%DS =
SLUDGE THICKENER
SLUDGE THICKENER
Qw =
BOD
Qw ==
SS ==
BOD
4%DS
SS =
4%DS =
Qw OVERFLOW =
Qw OVERFLOW =
SPARE
SPARE
24T
24T
20A
20A
0 -3 0 A
0 -5 0 0 V
0 -3 0 A
3 0 A T P + N 1 0SK/s
AwM C C B
4 0 /0 .3 A 4 p R C C B
10A
0 -5 0 0 V
10A
S /s w
S /s w
4 0 /0 .3 A 4 p R C C B
20A
3x5A
B
6A
R SY/s wB
20A
RAW SEWAGE
SUBMERSIBLE
RAW SEWAGE
SUBMERSIBLE
PUMP PUMP
NO.2 (2.4kW)
Using
4c x 2.5mm
ARM Cable
NO.2 (2.4kW)
Using 4c
x 2.5mm
ARM Cable
TO CONTROL
CIRCUIT
TO CONTROL
CIRCUIT
2 x sq.
1.5mm
Using 2 Using
x 1.5mm
PVCsq. PVC
R
3x5A
0 -4 0 A
S /s w 0 -5 0 0 V
S /s w
PSR P HA SE S EQ UENC E
R E L A Y0 -4 0 A
S /s w
4 0 /0 .3 A 4 p R C C B
PSR P HA SE S EQ UENC E
R E LA Y
40A TP N 10KA M C C B
4 0 /0 .3 A 4 p R C C B
3x5A
D IS T R IB U T IO N B O X F O R
L IG H T IN G A N D P O W E R
D IS T R IB U T IO N B O X F O R
L IG H T IN G A N D P O W E R
6A
0 -5 0 0 V
TOR
TOR
w
YS /sB
TPN20A TPN20A
TOR
MCB
MCB
DOL
DOL
A
A
TPN20A TPN20A
TOR
MCB
MCB
DOL
DOL
A
A
SPN6A SPN6A
MCB
MCB
13A Socket
Outlet Outlet
13A Socket
Using 2Using
x 2.5mm
sq. PVCsq. PVC
2 x 2.5mm
To Control Circuit
To Control Circuit
E. STOP
x 1.5mm sq. PVC
E. STOP Using 2Using
2 x 1.5mm sq. PVC
3x5A
PSR
6A SPN
SPN
MCB 6APSR
MCB
TOR
16A TPN
TOR
TPN
MCB 16A
DOL
MCB
DOL
TOR
TOR
20A TPN
TOR
MCB 20A
TPN
DOL
MCB
DOL
20A TPN
TOR
MCB 20A
DOL
TPN
MCB
DOL
TOR
16A TPN
TOR
TPN
MCB 16A
DOL
MCB
DOL
M O T O R S E .Q P U M P S A N D S S T P U M P
RAW SEWAGE
SUBMERSIBRE
PUMP PUMP
RAW SEWAGE
SUBMERSIBRE
NO.1 (2.4kW)
Using
4c x 2.5mm
ARM Cable
NO.1 (2.4kW)
Using 4c
x 2.5mm
ARM Cable
S IN G L E L IN E L A Y O U T D IA G R A M F O R
R A W S E W A G E S U B M E R S IB L E P U M P
S IN G L E L IN E L A Y O U T D IA G R A M F O R
R A W S E W A G E S U B M E R S IB L E P U M P
S IN G L E L IN E L A Y O U T D IA G R A M F O R A IR B L O W E R
M O T O R S E .Q P U M P S A N D S S T P U M P
S IN G L E L IN E L A Y O U T D IA G R A M F O R A IR B L O W E R
4 0 /0 .1 A
2P R CCB
S P +N 30K A
1 04 0K/0
A .1
MAC C B
2P R CCB
U S IN G 4 C x 1 6 m m P V C /S W A P V C A R M . C A B L E
U S IN G 4 C x 1 0 m m P V C /S W A /P V C A R M . C A B L E
U S IN G 2 C x 6 m
E m P V C /S W A /P V C A R M . C A B L E
S P +N 30K A
40A TP N 10KA M C C B
30A TP +N 10KA M C C B
10 KA M CCB
40A TP+N
30A TP +N
30A SP+N
U S IN G 4 C x 1 6 m m P V C /S W A P V C A R M . C AMBCL C
EB
U S IN G 4 C x 1 0 m m P V C /S W A /P V C A R M . CMACBCLB
E
U S IN G 2 C x 6 m m P V C /S W A /P V C A R M .MCCAC
BB
LE
R
40A TP+N
MCCB
6A
3 x 6 0 /5 A
3 x 6 0 /5 A
0 -50 0V
R
6A
PSR
V .s .s w
Y B
30A TP +N
MCCB
30A SP+N
MCCB
0 -6 0 A
V .s .s w
0 -50 0V
V .s
wS E S E Q U E N C E
P .s
HA
R E L A Y 0 -6 0 A
.sC
wB
6 3 /0 .3 A 4 pV .s
RC
PSR PHASE SEQUENCE
6 0 A T P + N 2R5EKLAA Y
(4 P O L E ) M C C B
6 3 /0 .3 A 4 p R C C B
6 0 A T P + N 2 5 K A (4 P O L E ) M C C B
415 V S U P P LY
3 PHASE
T N B M E T E R IN G
PANEL
M U L T IC O R E A R M O U R E D
C ABLE TO
T N B R E Q U IM E N T
415 V S U P P LY
3 PHASE
S IN G L E L IN E L A Y O U T D IA G R A M F O R
M A IN S W IT C H B O A R D
S IN G L E L IN E L A Y O U T D IA G R A M F O R
M A IN S W IT C H B O A R D
T N B M E T E R IN G
PANEL
M U L T IC O R E A R M O U R E D
OR O M
IN C O M IN G S C
U APBPLLEYT F
T N B R E Q U IM E N T
M A IN D B 4 1 5 V
IN C O M IN G S U P P L Y F R O M
M A IN D B 4 1 5 V
12
10
10
Volume 4
Volume 4
Volume 4
Malaysian Sewerage
Malaysian
Sewerage
Industry Guidelines
Industry Guidelines
Malaysian Sewerage
Industry Guidelines