Sie sind auf Seite 1von 12

SR.

No.

Client

Contract Type

Project
Capacity

Renew Power

Consultancy

6 MW

RSSB Educational and Environmental


Society, Beas

Consultancy

7.52 MW

Avant Garde Power Solutions Pvt Ltd,


Gurgaon

Consultancy

120 kW

Confidential

Consultancy

2x25 MW

Ganges Internationale Pvt Ltd, Delhi

Consultancy

20 MW

Confidential

Consultancy

20 MW

Gamesa Renewable Pvt Ltd, Gurgaon

Consultancy

31 MW

Wave solar systems Pvt Ltd, New


Delhi

Consultancy

5 MW

Ultimate Sun Systems Pvt. Ltd.,


Gurgaon

Consultancy

1 MW

10

Confidential

Consultancy

5 MW

11

Wal-Mart India Private Limited

Consultancy

500 kW

12

Engineers Mech India Pvt Ltd,


Gurgaon

EPC

47 kW

13

ACME Cleantech Solutions Pvt Ltd,


Gurgaon

Consultancy

25 MW

14

CPEC Limited, Delhi

Consultancy

100 MW

15

ARC Renewables Pvt Ltd, Gurgaon

EPC

20 kW

16

Confidential
Addwatt Power Solutions Pvt Ltd,
Noida
R K High Tech Centre Pvt Ltd, Kolkata

Consultancy

15 MW

Consultancy

500 kW

Consultancy

2 MW

17
18

19

Confidential

Consultancy

30 MW

20

Subhash Infraengineers Pvt Ltd,


Gurgaon

EPC

1 MW

21

M/s Jayanita Exports Pvt. Ltd.


(Statcon Power Controls Pvt Ltd,
Noida)

EPC

100 kW

22

Confidential

Consultancy

33 MW

23

Silver Cord, Manesar

24

Confidential

Consultancy

10 MW

25

Archer Business Solutions Pvt Ltd,


Delhi

Consultancy

100 MW

26

Emergent Ventures India Pvt Ltd,


Gurgaon

Consultancy

4 MW

27

Military Engineering Services, Delhi


Cantt A/C : Durga Traders

EPC

25 kW

28

Elcomponics Technologies India Pvt


Ltd, G.Noida

Consultancy

1 MW

29

Sai Saburi Urja Pvt Ltd, Noida

Consultancy

1 MW

30

Granzor Engineerings Pvt Ltd, Delhi

Consultancy

5 MW

22.4 kW

31

ACME Cleantech Solutions Pvt Ltd,


Gurgaon

EPC

7.5 MW

32

Clarity Aqua Systems Pvt Ltd, Kerela

Consultancy

450 kW

33

Trishe Green Solutions Pvt Ltd,


Chennai

Consultancy

152 kW

34

Scottish High International School,


Gurgaon

EPC

45 kW

35

Ryan International, Gurgaon

EPC

10 kW

Scope of Work

Project Location

1) Detailed Site survey


2) Technology selection,
3) Basic and detailed design & engineering,
4) Prepartion of technical specifications
5) Vendor selection
6) Quality Validation

Metro stations in NCR region

1) Site assesment,
2) Selection of EPC vendor,
Review of design, quality standards, procedures
and manuals provided by EPC,
3) Project management

Beas, Punjab

1)Site survey and Project feasibility study,


2)Technology selection & Technical support in
vendor selection,
3)Detailed design & engineering,

Nagpur, Maharashtra

Plant audit as per IEC 62446


Validation of MMS and civil foundation design
report

Dhule, Maharasthra
Varoius locations in Punjab

1) Basic Design and Engineering


2) Finalization of Technical specifications of
system components
3) Preparation of tender docuement

Various locations

Detailed design and engineering

Various

Feasibility study for setting up solar PV system

Wave city, Ghaziabad

1) Detailed Site survey, topographical survey and


soil investigation
2) Technology selection,
3) Basic and detailed design & engineering,
4) Preparion of RFP & technical specifications,
5) Vendor selection
6) Project supervision,
7) Pre-commissioning tests,
8) Preparation of O & M manual

Narnaul, Haryana

Plant audit as per IEC 62446

New Delhi

Feasibility study for setting up solar PV system

Various

Design, Supply, Installation, Testing and


Commissioning

Gurgaon, Haryana

Design of MMS and civil foundation

Kauriwara, Punjab

1) Site Analysis,
2) Project Techno-economic feasibility analysis

Various locations

Design, Supply, Installation, Testing and


Commissioning

Moti Nagar, New Delhi

Plant audit as per IEC 62446

Charanka, Gujarat

Detailed design and engineering

Pune, Maharasthra

Detailed design and engineering

Malaysia

Plant audit as per IEC 62446

Rani, Rajasthan

Design, Supply, Installation, Testing and


Commissioning

Narnaul, Haryana

Design, Supply, Installation, Testing and


Commissioning

G.Noida, U.P.

Plant audit as per IEC 62446

Bapp, Rajasthan

Design, Supply, Installation, Testing and


Commissioning

Manesar, Haryana

Plant audit as per IEC 62446

Ballari, Karnataka

1) Site Analysis
2) Basic Design and Engineering
3) Finalization of Technical specifications of
system components
4) Project techno-economic feasibility analysis
5) Preparation of DPR

Nellore, A.P.

1) Basic Design and Engineering


2) Finalization of Technical specifications of
system components
3) Preparation of tender docuement
4) Invitaion and evaluaion of bids on technocommerial basis
5) Selection of EPC vendor

Narimanan, Tamilnadu

Design, Supply, Installation, Testing and


Commissioning

Airforce station, Gurgaon

1) Site Analysis,
2) Technology selection,
3) Basic and detailed design & engineering,
4) Preparion of RFP & technical specifications,
5) Project supervision,
6) Pre-commissioning tests,
7) Preparation of O & M manual

G.Noida, U.P.

1)Project feasibility study, 2)Preparation of DPR,


3)Technology selection & Technical support in
procurement,
4) Basic and detailed design & engineering,
5)Project supervision,

Ujjain, M.P.

1)Site Analysis,
2)Project Techno-economic feasibility analysis,
3) Preparation of DPR,

Phalodi, Rajasthan

Supply, Installation, Testing and Commissioning

Chittor, A.P.

1) Site Analysis
1) Basic Design and Engineering
2) Finalization of Technical specifications of
system components
3) Project techno-economic feasibility analysis
4) Preparation of DPR

Kerala

1) Site Analysis
1) Basic Design and Engineering
2) Finalization of Technical specifications of
system components
3) Project techno-economic feasibility analysis
4) Preparation of DPR

Various locations

Design, Supply, Installation, Testing and


Commissioning

Gurgaon, Haryana

Design, Supply, Installation, Testing and


Commissioning

Gurgaon, Haryana

Project Type

Status

Roof top

On-going

Roof top

Completed

Roof top

Completed

Ground Mounted

Completed

Ground Mounted

Completed

Ground Mounted

Completed

Ground Mounted

On-going

Roof top

On-going

Ground Mounted

On-goingn

Ground Mounted

On-going

Roof top

Completed

Roof top

Completed

Ground Mounted

Completed

Ground Mounted

Completed

Roof top

On-going

Ground Mounted

Completed

Roof top

Completed

Ground Mounted

Completed

Ground Mounted

Completed

Ground Mounted

On-going

Ground Mounted

Completed

Ground Mounted

Completed

Roof top

Completed

Ground Mounted

Completed

Ground Mounted

Completed

Ground Mounted

Completed

Roof top

On-going

Ground Mounted

Completed

Ground Mounted

Completed

Ground Mounted

Completed

Ground Mounted

On-going

Roof top

Completed

Roof top

Completed

Roof top

Completed

Roof top

Completed

Das könnte Ihnen auch gefallen