Beruflich Dokumente
Kultur Dokumente
Page No: 1 of 1
Date: 26 th Apr 2014
KULESHWOR
Particular
Foundation
Pedestal
F1
F2
F3
Foundation Beam
Grid 1-1
Stirrups
Grid 2-2
Stirrups
Grid 3-3
Stirrups
Grid 4-4
Stirrups
3
Strap Beam
Grid A & B
Stirrups
Grid C
Stirrups
Grid D
Stirrups
Grid E
Stirrups
FOUNDATION REBAR
B
1
Column
Col A
upto Plinth Lvl
Stirrups
Prepared By:
Dia
mm
No of No. bar
Total No
unit
/unit
Length
ft.
8 mm
12
12
12
5
5
3
12
14
16
60
70
48
12
8
12
8
12
8
12
8
1
1
3
1
3
1
3
1
4
52
4
45
4
26
4
95
4
52
12
45
12
26
12
95
30.32
5.09
26.66
5.09
17.49
5.09
51.66
5.09
16
8
16
8
16
8
16
2
1
1
1
1
1
1
12
50
6
44
6
40
6
36
18.32
5.09
27.66
5.09
25.82
5.09
23.91
5.09
24
50
6
44
6
40
6
36
16
12
8
13
13
1
4
4
10
52
52
10
31.86
27.57
15.93
58.20
10 mm
Weight in kg.
16 mm
12 mm
4.52 -
0.00
211.55
79.83
74.54
69.01
578.56
434.93
285.42
138.06 -
Approved By:
Page No: 2 of 2
Date: 26 th Apr 2014
KULESHWOR
Particular
Ground/ first floor/second floor
8
16
12
No of No. bar
Total No
unit
/unit
10
1
10
144
36
4
144
36
4
Length
ft.
8 mm
10 mm
3.75
4.52 9.33 9.33 -
Weight in kg.
16 mm
12 mm
-
646.60
363.86 -
Stirrups
8
36
19
36
19
684
684
3.75
3.75
Dia
mm
StairCase
Flight 1
main bar
distribution bar
nosing bar
12
12
12
12
8
8
2
2
2
2
2
2
6
6
6
6
53
15
step bars
15
17.20
4.50
6.39
6.70
3.50
3.00
2.92
Floor BEAM
1 Grid A & B
Bottom bars Through
Bottom Extra bars
Top Bars Through
extra top bars at 1
Stirrups
16
12
16
12
8
3
3
3
3
3
16
12
8
8
Prepared By:
12
12
12
12
106
30
30
2
1
2
1
29
2
1
6
3
6
3
87
17.04
8.40
17.04
8.40
3.59
16
8
24.54 12.65 -
0.00
501.92
55.88
14.62
20.77
21.77
0.00
932.02
113.04
37.58 -
0.00
49.18
6.82 -
49.18
6.82 -
188.87
27.40 -
Approved By:
Page No: 3 of 3
Date: 26 th Apr 2014
KULESHWOR
Particular
Top Bars Through
extra top bars at 1
Stirrups
Dia
No of No. bar
Total No
mm
unit
/unit
16
8
2
16
12
8
1
8
8
8
352
44
3 Grid 1
Bottom bars Through
Bottom Extra bars
Top Bars Through
extra top bars at 1
Stirrups
16
12
16
12
8
3
3
3
3
3
3 Grid 2
Bottom bars Through
Bottom Extra bars
Top Bars Through
extra top bars at 1
Stirrups
16
12
16
12
8
3
3
3
3
3
3 Grid 3
Bottom bars Through
Bottom Extra bars
Top Bars Through
extra top bars at 1
Stirrups
16
12
16
12
8
3
3
3
3
3
3 Grid 4
Bottom bars Through
Bottom Extra bars
Top Bars Through
16
12
16
3
3
3
Prepared By:
2
1
2
1
55
2
1
2
1
48
2
1
2
1
28
2
1
2
Length
ft.
8 mm
10 mm
24.54 12.65 3.59
152.05 -
6
3
6
3
165
30.45
15.61
30.45
15.61
3.59
6
3
6
3
144
26.79
13.77
26.79
13.77
3.59
6
3
6
3
84
16.70
8.73
16.70
8.73
3.59
6
3
6
12 mm
-
71.27 -
62.20 -
36.28 -
Weight in kg.
16 mm
188.87
27.40 -
87.91
12.68 -
87.91
12.68 -
77.32
11.19 -
77.32
11.19 -
48.22
7.09 -
48.22
7.09 -
146.60
20.93 -
146.60
Approved By:
Page No: 4 of 4
Date: 26 th Apr 2014
KULESHWOR
Particular
TOTAL REBAR
Dia
No of No. bar
Total No
mm
unit
/unit
12
3
1
3
8
3
288
96
10
8
8
13
13
13
23
23
11
Weight in kg.
Length
ft.
8 mm
10 mm
12 mm
16 mm
25.77 20.93 3.59
124.41 483.80
0.00
172.21 1196.20
299
299
143
(A+B+C+D+E)
11.83 11.50
6.00
665.56 665.56
0.67
0.00
1.37
0.00
2.56
Prepared By:
Approved By:
ht in kg.
20 mm
25 mm
0.00
0.00
Page No: 5 of 5
Date: 26 th Apr 2014
Remarks
1251.18
Prepared By:
Approved By:
ht in kg.
20 mm
-
25 mm
0.00
0.00
KULESHWOR
Page No: 6 of 6
Date: 26 th Apr 2014
Remarks
0.00
2061.36
M1
E1
E2
E3
0.00
716.38
Through Bars
Through Bars
Prepared By:
Approved By:
ht in kg.
20 mm
-
25 mm
KULESHWOR
Page No: 7 of 7
Date: 26 th Apr 2014
Remarks
Through Bars
Through Bars
Through Bars
Through Bars
Through Bars
Prepared By:
Approved By:
ht in kg.
20 mm
25 mm
0.00
0.00
0.00
0.00
Page No: 8 of 8
Date: 26 th Apr 2014
Remarks
Extra Top Bars
1852.21
S1
S2
S3
0.00
0.00
Prepared By:
1182.98
6.53
Approved By:
S.No
Description
Units
Quantity
Upto
Plinth
GF
SF
External
Earth
Cement
cu.m
kg
Upto Plinth
1 Building Layout
GF
FF/SF
806.00
2 Earthwork-Excavation
cu.m
58.77
58.77
3 Earthwork-Filling
cu.m
62.83
62.83
sq.m
106.61
106.61
5 Brickwork
cu.m
6 PCC
cu.m
7 RCC
cu.m
8 Screeding/Punning
sq.m
252.30
9 Skirting
sq.m
200.66
10 Plastering
sq.m
888.07
62.83
70.34
1,713.91
3.49
1,117.01
61.38
62.83
3,356.15
1,964.12
9,666.25
8,794.32
12,224.89
12,497.17
12,150.47
14,189.02
244.00
284.00
250.00
bags
Local Units:
Rates of Materials(NRs):
Cost of Materials :
900.00
500.00
31,413.00
225,000.00
219,600.00
255,600.00
Up to Plinth:
732,795.63
282,100.00
1,014,895.63
GF:
831,024.69
342,550.00
1,173,574.69
FF/SF:
858,932.69
438,600.00
1,297,532.69
Cost of Construction:
3,486,003.00
174,300.15
Total Cost:
3,660,303.15
1991.459820457
Notes: the above cost includes earthworks, brickworks, PCC, RCC, Plastering and 38 mm screeding/punning over three floors (GF=806 sq.ft, FF=806 sq.ft and SF=226 sq.ft)
Estimates
Materials
Aggregates
20mm Down
Sand
cu.m
Upto Plinth
GF
FF
Upto Plinth
GF
Aggregates
10mm down
Bricks
cu.m
Nos
FF
Upto Plinth
GF
4,477.75
4.63
9.06
5.30
7.48
10.39
1.55
9,083.72
17,787.58
11.61
13,561.47
17,787.58
5.00
13,562.00
17,788.00
2.97
8.22
16.63
15.13
21.03
5.80
11.61
12.97
14.40
16.54
34.46
19.59
7.00
15.00
9.00
6.00
trips
15.13
21.03
7.00
9.00
trips
9,500.00
57,000.00
66,500.00
142,500.00
trips
9,600.00
86,400.00
67,200.00
86,400.00
trips
###
48,000.00
14
189,868.00
249,032.00
86.25
2.442374129
250
250
#VALUE!
#VALUE!
Labour
Bricks
Reinforcement
Nos
Kg
FF/SF
Upto Plinth
Units
1,683.70
806.00
2.0
1,612.00
cu.ft
2,075.50
15.0
31,132.44
cu.ft
2,218.64
5.0
11,093.19
sq.ft
1,147.16
5.0
5,735.78
cu.ft
2,484.05
65.0
161,463.25
4,816.30 cu.ft
369.81
20.0
7,396.15
sq.ft
5,926.35
100.0
592,634.89
sq.ft
2,714.78
29.0
78,728.75
630.08
15.0
9,451.27
9,555.66
21.0
200,668.81
1,099,916.54
Total Floor :
2,241.00
sq.ft
1,683.70
4,816.30
10,410.00
Kg
14.00
145,740.00
Amount
sq.ft
r.ft
trips
Rates
GF/FF/SF
10,409.85
10,409.85
Quantity
85
143,114.63
409,385.37
416.00