PowerTransformerTurnsRatioTest

Power Transformer Turns Ratio Test

Turnsratiobetweenthewindings
The turns ratio test is an AC low voltage test which determines the ratio of the high voltage winding to all other
windings at no-load. The turns ratio test is performed on all taps of every winding.
The Transformer Turns Ratio tester (TTR) is device used to measure the turns ratio between the windings (example
shown below).
Voltage is applied on the H marked leads and measured of the X marked lead by the test set.
http://electricalengineeringportal.com/powertransformerturnsratiotest

1/6

8/29/2016

PowerTransformerTurnsRatioTest|EEP

Ratio measurements are conducted on all tap positions and calculated by dividing the induced voltage reading into
the applied voltage value. When ratio tests are being made on three-phase transformers, the ratio is taken on one
phase at a time with a three-phase TTR until the ratio measurements of all three phases are completed.

Figure 1 Three-phase Transformer Turns Rati (TTR) Connection diagram.

Measured ratio variations should be within 0.5% of the nameplate markings.


Some TTR can perform transformer ratio measurement and also assess if on-load tap changer contacts are making
satisfactorily during its transition from one tap position to the next position.

Example of single phase, hand-cranked TTR


Transformer Turns Ratio Test Set
(Measures the turns ratio and exciting
current of windings in power, potential and
current transformers.)

TurnsRatioTestProcedure,StepbyStep
http://electricalengineeringportal.com/powertransformerturnsratiotest

2/6

8/29/2016

PowerTransformerTurnsRatioTest|EEP

Step1.
Isolate the equipment, apply working grounds to all incoming and outgoing cables and disconnect all incoming and
outgoing cables from the transformer bushing terminals connections.
Disconnected cables should have sufficient clearance from the switchgear terminals greater that the phase spacing
distance. Use nylon rope to hold cable away from incoming and outgoing terminals as required.

Step2.
Connect the H designated three-phase test lead with the military style connector at one end to the mating connection
on the test set marked with an H. Ensure that the connectors index notch lines up properly.

Step3.
Connect the X designated three-phase test of lead military style connector at one end to the mating connection on the
test set marked with an X. Ensure that the connectors index notch lines up properly.

Step4.
Connect the H1, H2, H3 designated test lead to the corresponding H1, H2, H3 transformer terminal / bushing.
Connect the H0 test lead if H0 terminal/bushing is present.
Refer to Figure 1.

Step5.
Connect the X1, X2, X3 designated test leads to the corresponding X1, X2,X3 transformer terminals / bushings.
Connect the X0 test lead if X0 terminal/bushing is present.

Step6.
Perform turns ratio measurements for all tap positions.

Step7.
http://electricalengineeringportal.com/powertransformerturnsratiotest

3/6

8/29/2016

PowerTransformerTurnsRatioTest|EEP

Confirm that the measured ratios is within 0.5% of the calculated ratios.

ImportantNote:
Transformers that have wye connections but do not have the neutral of the wye brought out shall be tested for
ratio with three-phase power supply.
Any inequality in the magnetizing characteristics of the three phases will then result in a shift of the neutral and
thereby cause unequal phase voltages. When such inequality is found, the connection should be changed, either to
a delta or to a wye connection, and the line voltages measured.
When these are found to be equal to each other and the proper values (1.732 times the phase voltages when connected in
wye), the ratio is correct.

PowerTransformerTesting
Automatically measuring ratio and winding resistance of all taps/phases.

Power Transformer Testing - Automatically measuring ratio and winding resis...

Reference: Substation Commissioning Course Raymond Lee, Technical Trainer

Relatedelectricalguides&articles//
Sharewithengineers//

http://electricalengineeringportal.com/powertransformerturnsratiotest

4/6

8/29/2016

PowerTransformerTurnsRatioTest|EEP

AboutAuthor//
Edvard Csanyi
Edvard - Electrical engineer, programmer and founder of EEP. Highly specialized for
design of LV high power busbar trunking (<6300A) in power substations, buildings and
industry fascilities. Designing of LV/MV switchgears.Professional in AutoCAD
programming and web-design.Present on Google+
2016 EEP - Electrical Engineering Portal. All Rights Reserved | Privacy Policy |
Terms of Service | 53 queries in 0.193 seconds.
Powered by CsanyiGroup
SHARE

TOP
Get PDF
Electrical Tools
Excel Spreadsheets
Windows Software
Android App
Electrical Guides
Electrical Engineering
Power Substations
Generation T&D
Data Center Guides
Control & Protection
Industry Automation
ABB Drives Guides
ABB Protection Books
Siemens EE Basics
Schneider Electric CTs
Alternative Energy
Electrical Design Docs
Video Trainings
Electrical Engineering
PLC Programming
Testing & Commiss.
Home
Technical Articles
http://electricalengineeringportal.com/powertransformerturnsratiotest

5/6

8/29/2016

PowerTransformerTurnsRatioTest|EEP

Article Categories (38)


EE Resources
Sitemap
Contact
Advertisement
Subscriptions
Complete Technical Articles
Articles Alert
Download Updates
Facebook Linkedin Google Plus Twitter

http://electricalengineeringportal.com/powertransformerturnsratiotest

6/6

Das könnte Ihnen auch gefallen