Sie sind auf Seite 1von 10

MEP Outstanding Items

Level

Location
Near Riser 2

LR
Near Water
Tank
Near Riser 1

Near FS Room
ST-2
ST-1
Pantry
HCP
L23

Lobby
Male toilet
Female toilet
Corridor

L22

L21

Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office

Page 1 of 10

MEP Outstanding Items


Level

L20

Location
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor

L19

Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby

L18

Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby

L17

Male toilet
Female toilet
Corridor
Office

Page 2 of 10

MEP Outstanding Items


Level

L16

Location
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby

L15

Male toilet
Female toilet
Corridor
Office

L14

ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office

L13

ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office

Page 3 of 10

MEP Outstanding Items


Level

L12

L11

L10

L9

Location
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office

L8
L7b
L7a
L6b
L6a
L5b
L5a
L4b
L4a

Genset Room
Roof
Carpark
Carpark
Carpark
Carpark
Carpark
Carpark
Carpark
Carpark
Carpark
Page 4 of 10

MEP Outstanding Items


Level
L3b
L3a
L2
L1
Basement

Location
Carpark
Carpark

Page 5 of 10

MEP Outstanding Items


Level

LR

L23

L22

L21

Location

Description
CHW pipe riser incomplete
Lobby Pressurization fan & duct incomplete, opening o/s
Near Riser 2
1 FS tank water level 350mm height, another 0
AHU room light, cable, FS, CHWP pipe incomplete
High zone lift room finishing pending for lighting, FS pipe installation
Lots of openings no services and not seal up
Water Treatment plant installation O/S
FL01 lift installation on-going
Outdoor fans cable installation o/s
Near Water Outdoor PS pipe installation to tank incomplete, valve support plinth
Tank
provided, screw & flange rust, tank water connection by two different
AHU room light, cable, FS, CHWP pipe incomplete
Near Riser 1
PVC drinking water pipe for cable installation
Outdoor cable installation o/s
FS pump by-pass pipe incomplete
Near FS Room
Outdoor duct works incomplete
One opening at the very high level top of FL02
ST-2
CHW pipe riser incomplete, welding is on-going
under floor trunking o/s, pressurization louver o/s
ST-1
under floor trunking o/s, pressurization louver o/s
Pantry
MEP services above ceiling incomplete
HCP
MEP services above ceiling incomplete
MEP services above ceiling incomplete,
Lobby
PS pipe level to be checked any clashing with ceiling
Male toilet
MEP services above ceiling 80% completed
Female toilet MEP services above ceiling 70% completed
air duct riser to lower roof incomplete, PS pipe painting, Cu pipe, Fire
Corridor
point/break glass, FS pipe, cable pulling o/s
Office
sprinkler pipe lower layer incomplete, CDP o/s
ST-1
ELV rack is full of rubbish, under floor trunking o/s, pressurization louv
ST-2
under floor trunking o/s, pressurization louver o/s
Pantry
MEP services above ceiling incomplete, FCU installed, FS, CHW pipe o
HCP
MEP services above ceiling incomplete
Lobby
MEP services above ceiling incomplete, duct, FS pipe etc.
Male toilet
MEP services above ceiling 80% completed, wall tile 80% done
Female toilet MEP services above ceiling 70% completed, wall tile 80% done
PS pipe painting, Cu pipe, Fire alarm/call point/break glass, FS pipe, c
Corridor
pulling o/s
Office
sprinkler pipe lower layer incomplete, CDP o/s
ST-1
under floor trunking o/s, pressurization louver o/s
ST-2
under floor trunking o/s, pressurization louver o/s
Pantry
MEP services above ceiling incomplete, FCU installed, FS, CHW pipe o
HCP
MEP services above ceiling incomplete
Lobby
MEP services above ceiling incomplete, duct, FS pipe etc.
Male toilet
MEP services above ceiling 70% completed, wall tile 90% done
Female toilet MEP services above ceiling 60% completed, wall tile 90% done
PS pipe painting, Cu pipe, Fire alarm/call point/break glass, FS pipe, c
Corridor
pulling o/s
Office
sprinkler pipe upper & lower layer incomplete, CDP o/s

Page 6 of 10

MEP Outstanding Items


Level

L20

Location
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor

L19

Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby

L18

Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby

L17

Male toilet
Female toilet
Corridor
Office

Description
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU installed, FS, CHW pipe o
MEP services above ceiling incomplete, wall tile 90% done
MEP services above ceiling incomplete, duct, FS pipe etc.
MEP services above ceiling 70% completed, wall tile 90% done
MEP services above ceiling 60% completed, wall tile 90% done
PS pipe painting, Cu pipe, Fire alarm/call point/break glass on-going, F
cable pulling o/s
sprinkler pipe upper & lower layer incomplete, CDP o/s
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU installed, FS, CHW pipe o
MEP services above ceiling incomplete, wall tile 90% done
MEP services above ceiling incomplete, duct, FS pipe etc.
MEP services above ceiling 70% completed, wall tile 90% done
MEP services above ceiling 60% completed, wall tile 90% done
PS pipe painting, Cu pipe, Fire alarm/call point/break glass on-going, F
cable pulling o/s
sprinkler pipe upper & lower layer incomplete, CDP o/s, partition wall
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s, duct i
MEP services above ceiling incomplete, wall tile 90% done
MEP services above ceiling incomplete, duct, FS pipe etc.
Male/Female toilet layout different, MEP services above ceiling 60% c
wall tile 90% done
MEP services above ceiling 60% completed, wall tile 90% done
PS pipe painting, Cu pipe, Fire alarm/call point/break glass on-going, F
cable pulling o/s
sprinkler pipe upper & lower layer incomplete, CDP on-going, partitio
started
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s, duct i
MEP services above ceiling incomplete, wall tile 90% done
MEP services above ceiling incomplete, duct, FS pipe etc.
Male/Female toilet layout different, MEP services above ceiling 60% c
wall tile 90% done
MEP services above ceiling 60% completed, wall tile 90% done
PS pipe painting, Cu pipe, Fire alarm/call point/break glass on-going, F
cable pulling o/s
sprinkler pipe upper & lower layer incomplete, CDP no insulation, par
started

Page 7 of 10

MEP Outstanding Items


Level

L16

Location
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby

L15

Male toilet
Female toilet
Corridor
Office

L14

ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office

L13

ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office

Description
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s, duct n
installed
Flexible duct o/s, wall tile 100% done, ceiling grid installed
MEP services above ceiling incomplete, duct, FS pipe etc.
Male/Female toilet layout different, MEP services above ceiling 60% c
wall tile 100% done, part of ceiling grid installed but stopped
MEP services above ceiling 60% completed, duct modification on-goin
tile 100% done
PS pipe painting, Cu pipe, Fire alarm/call point/break glass on-going, F
cable pulling o/s
sprinkler pipe upper & lower layer incomplete, CDP no insulation, par
started
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s
ceiling grid installed
ceiling grid installed
MEP services above ceiling 95% completed, wall tile 100% done, ceili
installed but damaged
MEP services above ceiling 95% completed, duct modification on-goin
tile 100% done, ceiling grid installed but damaged
PS pipe painting, Cu pipe, FS pipe, cable pulling o/s, Fire alarm/call po
glass installed
sprinkler pipe upper & lower layer incomplete, CDP no insulation, par
started, lots of FS pipe material
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s
ceiling grid installed
ceiling grid installed
wall tile 100% done, ceiling panel started
wall tile 100% done, ceiling grid installed
PS pipe painting, Cu pipe, FS pipe, cable pulling o/s, duct near ST-2 in
Fire alarm/call point/break glass installed
sprinkler pipe upper & lower layer incomplete, CDP no insulation, par
started
under floor trunking done, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s
ceiling grid installed
ceiling panel completed, lighting, grille, detector, speaker o/s
wall tile done, ceiling panel completed, lighting, grille, detector, spea
wall tile done, ceiling panel completed, lighting, grille, detector, spea
PS pipe painting, PS pipe near ST-2 incomplete, FS pipe, cable pulling
alarm/call point/break glass installed
sprinkler pipe upper & lower layer incomplete, CDP no insulation, par
started
Page 8 of 10

MEP Outstanding Items


Level

L12

L11

L10

L9

L8
L7b
L7a
L6b
L6a
L5b
L5a
L4b
L4a

Location
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor
Office
ST-1
ST-2
Pantry
HCP
Lobby
Male toilet
Female toilet
Corridor

Description
under floor trunking done, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s
ceiling grid installed
ceiling panel completed, lighting, grille, detector, speaker o/s
wall tile 100% done, ceiling grid installed
wall tile 100% done, ceiling grid installed
PS pipe painting, FS pipe, cable pulling o/s, Fire alarm/call point/break
installed
CDP no insulation, partition wall started, ceiling hanger started
under floor trunking done, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s
ceiling grid installed
ceiling panel completed, lighting, grille, detector, speaker o/s
wall tile 100% done, part of ceiling grid installed but stopped due to d
wall tile 100% done, ceiling panel completed, lighting, grille, detector
o/s
PS pipe painting, FS pipe, cable pulling o/s, Fire alarm/call point/break
installed
CDP no insulation, partition wall started, ceiling grid started
under floor trunking done, pressurization louver o/s
under floor trunking on-going, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe o/s
ceiling panel completed, lighting, grille, detector, speaker o/s
ceiling panel completed, lighting, grille, detector, speaker o/s
wall tile 100% done, ceiling panel completed, lighting, grille, detector
o/s
wall tile 100% done, ceiling panel completed, lighting, grille, detector
o/s
Ceiling installation on-going
CDP insulation on-going, partition wall started
under floor trunking o/s, pressurization louver o/s
under floor trunking o/s, pressurization louver o/s
MEP services above ceiling incomplete, FCU, FS, CHW pipe, duct not i
MEP services above ceiling incomplete
Old mock up area
Old mock up area
Old mock up area
Old mock up area
sprinkler pipe upper & lower layer incomplete, CDP no insulation, par
Office
started
Genset Room FS pipe installation on-going
Roof
Duct work incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Carpark
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Page 9 of 10

MEP Outstanding Items


Level
L3b
L3a
L2
L1
Basement

Location
Carpark
Carpark

Description
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
Duct, FS pipe, FCU CHW & CDP pipe, cabling pulling incomplete
smoke curtain, duct, FS pipe, electrical conduit on-going
smoke curtain, duct, FS pipe, electrical conduit on-going
Ejector tank, pipe on-going

Page 10 of 10