Beruflich Dokumente
Kultur Dokumente
H92/112
L30/551
F30/781
COPING SYSTEM
F30/781
COPING SYSTEM
H11/111
H92/111
H11/111
H11/136
L1 Cill +56445
PPC INSULATED INFILL PANEL - GLAZED IN
TO CURTAIN WALLING
L1 First Floor Level +55215 FFL
US of L1 Slab +54780
US of L1 Slab +54780
H11/140
L0 Ceiling +54150
H11/136
175
5375
1500
1001
1250
8999
L20/283
L20/283
175
East Elevation
1 : 50
File Ref:
PLEASE NOTE
FOR CONSTRUCTION PURPOSES USE ONLY FIGURED
DIMENSIONS. THIS DRAWING MUST ALWAYS BE READ IN
CONJUNCTION WITH ALL RELEVANT PROJECT DETAILS.
ALL DIMENSIONS MUST BE CHECKED ON SITE PRIOR TO
COMMENCEMENT. PLEASE REPORT ANY DISCREPANCY
TO THE ARCHITECT OR CONTRACT ADMINISTRATOR
COPYRIGHT HMY 2014
Revisions
T 1 03-10-16
DRH
TENDER ISSUE
1702_ 036_ T1
Drawing
Date
East GA Elevation
05/05/16
Project/ Client
Scale @ A1
Drawing Number
1702_ 036
1 : 50
Revision
Purpose of Issue
T1
Tender