SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)

CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.
Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

Sl.No

: GTC/488G/2012

: ALSTOM

Description

Page No

Relay Details .

Local Relay Power system data......

Remote Relay Power system data.......

Relay Address

Visual Check..

Watch dog Contact Checks.

Measured Value Test

7.1. CT Measurement.

7.2. VT Measurement.

Differential Protection
8.1. Setting verification...

8.2. Differential & Bias value measurement...

8.2.1. Differential & Bias value measurement (local end)..


8.3. 87-1 Pickup & timing Test

Tested by

8.3.1. Calculation..

8.3.2. Setting verification..

8.3.3. Test result..

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 1 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

8.4. Bias Characterstic check

9
10

8.4.1. Calculation....

8.4.2. Setting verification

8.4.3. Lower slope test result...

8.4.4. Upper slope test result .

Stability check...
Distance Protection
10.1. Distance general settings..

10-11

10.2. Distance Zone reach & operating time.

11

Sl.No

Tested by

9-10

Description

Page No

11

SOTF Function..

11

12

VT Supervision.

11

13

Fault Locator..

12

14

Thermal overload protection.

12

15

Power Swing Detection.

13

16

Backup over current and Earth fault protection .

13-14

17

Binary input.

14-15

18

Binary output.

15-16

19

LED Indications...

16

20

Fault recorder signals.

17

21

Functional checks..

18

22

Instruments used.

18

23

Remarks.

18

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 2 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

1. RELAY DETAILS:
Make

ALSTOM

Relay Designation

F872

Model No.

P54581KC6M0710M

Nominal Current

1/5 Amp

Serial Number

33405206/08/15

Auxiliary Volt.

48-125V DC

Rated Frequency

50/60 Hz

IP Address

Software version

P545____6A_710_D

2. LOCAL RELAY POWER SYSTEM DATA:


CT star point

Towards line

Line VT Ratio

66kV/110V

Display Voltage (Pri/Sec)

Primary

Phase CT Ratio

1200A/1A

EF CT Ratio

1200A/1A

Correction factor

Display Current (Pri /Sec)

Primary

3. REMOTE RELAY POWER SYSTEM DATA:


CT star point

Towards line

Line VT Ratio

66kV/110V

Display Voltage (Pri/Sec)

Primary

Phase CT Ratio

1200A/1A

EF CT Ratio

1200/1A

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 3 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

Correction factor
Display Current (Pri /Sec)

1.00

Primary

: GTC/488G/2012

Contract No.

: ALSTOM

4. RELAY ADDRESS:
For testing purpose_ B10_ _ _feeder kept as local end relay and_ B30_ _ _as remote end relay.
Local End Relay (Relay 1)

1A

Remote End Relay (Relay 2)

1B

5. VISUAL CHECK:

Tested (

Inspect for no physical damage.

Verify the wiring connection as per approved drawing.

Confirm that only ring type Lugs are used for all CT.

Relay case connected to a local earth bar.

Confirm the LED & Function Key Labels are provided.

Check that Serial no. of relay matching with serial no. of case

6. WATCHDOG CONTACT CHECKS:

Tested (

Supply Off - Terminals M11 & M12 (Closed)

Supply Off - Terminals M13 & M14 (Open)

Supply On - Terminals M11 & M12 (Open)

Supply On - Terminals M13 & M14 (Closed)

7. MEASURED VALUE TEST:


7.1.

CT Measurement: Inject current in the relay as per the table below and observe the reading on
the relay display, in secondary values and in primary values.
Tolerance:
Current: 0.05 to 3 In +/- 1.0% of reading, Voltage: 0.05 to 2 Vn +/- 1.0% of reading
Phase
injected

Tested by

Current
injected
(Amps)

Primary current read on relay


display in kA

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

Secondary current read on relay


display in Amp

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 4 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

IA

IB

IC

ISEF

IA

IB

IC

ISEF

R-E

1.0

1.202

0.00

0.00

1.205

1.002

0.00

0.00

1.004

Y-E

1.0

0.00

1.202

0.00

1.205

0.00

1.002

0.00

1.004

B-E

1.0

0.00

0.00

1.202

1.205

0.00

0.00

1.002

1.004

R-Y

1.0

1.203

1.202

0.00

0.00

1.002

1.002

0.00

0.00

Y-B

1.0

0.00

1.202

1.203

0.00

0.00

1.003

1.002

0.00

B-R

1.0

1.204

0.00

1.203

0.00

1.002

0.00

1.002

0.00

R-Y-B

1.0

1.203

1.202

1.203

0.00

1.002

1.002

1.002

0.00

7.2.

VT Measurement: Inject Voltage in the relay as per the table below. Observe the reading on the
relay display, in primary values.

Phase applied

Tested by

: GTC/488G/2012

Contract No.

Voltage
applied
(Volts)

Primary Voltage read on relay display in kV


VAN

VBN

VCN

VAB

VBC

VCA

V0

R-E

63.50

38.11

0.00

0.00

38.11

0.00

38.12

12.71

Y-E

63.50

0.00

38.12

0.00

38.12

38.12

0.00

12.71

B-E

63.50

0.00

0.00

38.13

0.00

38.13

38.13

12.71

R-Y

110.0

38.11

38.12

0.00

66.02

38.12

38.13

12.71

Y-B

110.0

0.00

38.12

38.13

38.12

66.02

38.13

12.71

B-R

110.0

38.10

0.00

38.13

38.11

38.13

66.05

12.70

R-Y-B

110.0

38.10

38.12

38.13

66.02

66.03

66.05

0.00

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 5 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

: GTC/488G/2012

Contract No.
Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

8. DIFFERENTIAL PROTECTION:
8.1.

Setting Verification:
Description

Verified

Application specific function setting applied?

YES

Application specific PSL applied?

YES

8.2.
Differential and Bias Value Measurement:
8.2.1 Current of 1.0Amp injected in LOCAL end relay. The differential and Bias currents observed in
both the relays.
(Injected Current * Local factor/remote factor)* Remote CT ratio = 1200A

Fault Type

No Current

R-E

Y-E

B-E
R-Y

Tested by

Local End Relay (A)

I Diff / *I
bias.

Remote End Relay (A)

IA

IB

IC

IA

IB

IC

I diff.

0.00

0.00

0.00

0.00

0.00

0.00

I bias.

0.00

0.00

0.00

0.00

0.00

0.00

I diff.

1203

0.00

0.00

1196

0.00

0.00

I bias.

601.5

0.00

0.00

599.8

0.00

0.00

I diff.

0.00

1199

0.00

0.00

1198

0.00

I bias.

0.00

599.9

0.00

0.00

599.6

0.00

I diff.

0.00

0.00

1203

0.00

0.00

1198

I bias.

0.00

0.00

600.9

0.00

0.00

599.2

I diff.

1200

1201

0.00

1202

1201

0.00

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 6 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

Y-B

B-R

R-Y-B

8.3.

: GTC/488G/2012

Contract No.

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

: ALSTOM

I bias.

600.2

600.2

0.00

599.7

599.6

0.00

I diff.

0.00

1202

1200

0.00

1202

1202

I bias.

0.00

600.9

600.9

0.00

601.7

601.4

I diff.

1201

0.00

1201

1198

0.00

1201

I bias.

600.5

0.00

600.8

600.8

0.00

600.8

I diff.

1200

1199

1201

1200

1199

1201

I bias.

600.4

600.4

600.6

601.4

599.9

599.6

87 Pickup and Timing Test:

8.3.1. Calculation:
I I Diff I >

( k1 * I I Bias I + Is1 ) / Corr. Factor Loc. = 0 .352

8.3.2. Setting Verification:


S.No

Description

Setting

Range

1
2

Is1
Is2

300.0 mA
2.000 A

0.200<= <=2.000
1.000<=<=30.00

3
4
5

K1
K2
T

30.00 %
150.0 %
0

30.0<=<=150.0
30.0<=<=150.0

8.3.3. Test result:

Idiff=IS1/ (1-0.5*K1)/Corr. Factor


Actual Trip Time
Expected Trip Time
in m-sec at
in m-sec
5 x I Pickup
<35mSec
27.40

Fault Type

Expected Pickup
In Amp

Actual Pickup
In Amp

R-E

0.352

0.354

Y-E

0.352

0.355

28.10

B-E

0.352

0.355

26.80

R-Y

0.352

0.355

25.90

Y-B

0.352

0.355

24.90

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 7 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

B-R

0.352

0.354

26.40

R-Y-B

0.352

0.355

25.50

Tolerance (pickup) = Formula +/-10%


8.4.

Bias characteristic check

8.4.1. Calculation:
Slope

= (I difl2 I difl1) / (I Rest2 I Rest1)

Lower Slope: Idiff

=K1*Ibias+Is1

Upper Slope: Idiff

=K2* Ibias (K2-K1)Is2+Is1

8.4.2. Setting Verification:


S.No

Description

Setting

1
2
3

Is1
Is2
K1

300.0 mA
2.000 A
30.00 %

4
5
6

K2
Corr. FL
Corr. FR

150.0 %
1.0
1.0

Tolerance (pickup) = Formula +/-10%


8.4.3. Lower slope test result:
Fault Type
R-E
Y-E
B-E
R-Y
Y-B
B-R

Tested by

Current
I1(Relay1)

Current
I2(Relay2)

I Diff.
R

I Diff.
Y

I Diff.
B

I Bias
R

I Bias
Y

I Bias
B

0.695
1.122
0.697
1.123
0.697
1.122
0.696
1.122
0.697
1.123
0.698

1.305
1.878
1.303
1.877
1.303
1.878
1.304
1.878
1.303
1.877
1.302

735.6
913.0
0
0
0
0
729.3
905.1
0
0
726.0

0
0
726.8
906.4
0
0
728.6
909.5
727.6
907.0
0

0
0
0
0
729.8
912.5
0
0
732.1
906.7
727.5

1198
1803
0
0
0
0
1200
1802
0
0
1199

0
0
1201
1803
0
0
1200
1804
1201
1803
0

0
0
0
0
1200
1806
0
0
1201
1803
1201

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

Measured slope
in %
29.32
29.83
30.15
29.58
29.40
31.05

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 8 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.
Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

R-Y-B

Tested by

1.120
0.696
1.122

1.880
1.304
1.878

913.6
730.2
906.2

ALSTOM GRID / SIEMENS / NCC

Signature

0
730.3
910.7

Verified by

913.8
731.0
909.9

1802
1200
1803

: GTC/488G/2012

: ALSTOM

0
1199
1804

1802
1199
1805

29.51

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 9 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

Contract No.

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

8.4.4. Upper slope test result


Current
I1(Relay1)

Fault Type

Current
I2(Relay2)

I Diff.
R

I Diff.
Y

I Diff.
B

I Bias
R

I Bias
Y

I Bias
B

4.225
5.095
4.220
5.095
4.220
5.095
4.225
5.095
4.220
5.095
4.220
5.100
4.220
5.100

2951
3836
0
0
0
0
2948
3837
0
0
2942
3850
2945
3854

0
0
2946
3852
0
0
2956
3851
2941
3849
0
0
2951
3864

0
0
0
0
2946
3846
0
0
2941
3845
2944
3862
2949
3860

3610
4211
0
0
0
0
3610
4215
0
0
3616
4216
3613
4214

0
0
3614
4220
0
0
3614
4219
3613
4216
0
0
3616
4221

0
0
0
0
3619
4225
0
0
3616
4218
3620
4224
3617
4222

1.775
1.905
1.780
Y-E
1.905
1.780
B-E
1.905
1.775
R-Y
1.905
1.780
Y-B
1.905
1.780
B-R
1.900
1.780
R-Y-B
1.900
Acceptance Norm
R-E

Measured slope
in %
147.25
149.50
148.51
147.44
150.37
151.66
150.91

87 Function will operate if harmonic content more than setting and it will block if harmonic content less
than setting.
9. STABILITY CHECK:
Current is injected in both Relay 1 and Relay 2 simultaneously.
External Through Fault: The Differential and bias currents are observed in both the Relay 1 & Relay 2 with
180 deg phase shift between the two currents being injected in both the relays.
Current Injected in Relay 1
Fault Type

Relay1

Relay 2
Relay
Action

Relay 2

Phase
angle

Differential
Current in
Amps

Bias
Current
in Amps

Differential
Current in
Amps

Bias
Current in
Amps

180

1200

1200

NO TRIP

-120

60

1201

1200

NO TRIP

B-E

120

300

1201

1202

NO TRIP

R-Y-B

R=0
Y=-120
B=120

R=180
Y=60
B=300

R=1201
Y=1202
B=1199

NO TRIP

Relay 1

Phase
angle

R-E

Y-E

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

R=0
Y=0
B=0

Verified by

R=1202
Y=1201
B=1202

R=0
Y=0
B=0

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 10 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

Contract No.

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

In Zone Fault: The Differential and Restraining currents are observed in both the Relay 1 & Relay 2 with 0
deg phase shift between the two currents being injected in both the relays.

Current Injected in Relay 1

Relay1

Relay 2
Relay
Action

Relay 1

Phase
angle

Relay
2

Phase
angle

Differenti
al
Current
in Amps

Restrain
Current in
Amps

Differential
Current in
Amps

Restrain
Current in
Amps

R-E

2399

1199

2400

1201

TRIP

Y-E

-120

-120

2400

1200

2403

1201

TRIP

B-E

120

120

2399

1200

2404

1202

TRIP

R-Y-B

R=1201
Y=1202
B=1200

R=2402
Y=2400
B=2400

R=1201
Y=1201
B=1201

TRIP

Fault Type

R=0
Y=-120
B=120

R=0
Y=-120
B=120

R=2401
Y=2401
B=2404

10. DISTANCE PROTECTION:


10.1.

Distance General Settings:

Line Length
Line Impedance

: 7660m
: 2.720 Ohm

Line Angle
Setting mode

: 85.00 deg
: Advance

Phase/Ground Chars.

: Quad

Zones

Ph/Gnd Status

Ph/Gnd Reach

Ph/Gnd Phase Angle

Ph-Ph
Resistance

Ph-Gnd Resistance

Z1

Enabled

1.910

85.00

4.740

5.690

Z2

Enabled

4.080

85.00

10.16

12.20

Z3

Enabled

5.440

85.00

13.55

16.26

Zones

Sensit. Iph>1

Sensit. Ignd>1

kZN Res. Comp

kZN Res. Angle

t ph/Gnd Delay

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 11 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

Z1

100.0 mA

100.0 mA

0.290

-141.0

0s

Z2

100.0 mA

100.0 mA

0.290

-141.0

400.0 ms

Z3

85.00 mA

50.0 mA

0.290

-141.0

5.000 s

10.2.

Distance Zone Reach and Operating time:

Note: For Distance reach and operating time results please refer Annexure -3 (Omicron tests result)
11. SOTF FUNCTION:
Settings:
Opto Input (CB manual Close command) energised:
Fault Type
Z2

Without CB manual close (Z2 trip time


mSec)

With CB manual close - Actual Trip Time


in msec.

L1-E

422.9

25.90

L2-E

420.8

24.90

L3-E

420.3

24.50

L1-L2-L3

438.0

24.30

12. VT SUPERVISION:

Va pickup
33.55

Va
drop off

Vb pickup

Vb
drop off

Vc Pickup

Vc
Drop off

Vabc pickup

Vabc
Drop off

35.05

33.50

35.05

33.50

35.05

10.00

30.50

Applied 3 phase voltage 63.5 V with 1A 3ph current.

Function

Checked

Blocking of distance protection by VT Fail(1ph fail,2ph fail and 3ph fail)

TESTED:OK

Blocking of distance protection by VT MCB Trip

TESTED:OK

VT Inhibit

Settings (A)

Measured (A)

VTS I>

5.00 A

4.960

VTS I2>

50.00 mA

49.00 mA

13. FAULT LOCATOR:

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 12 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

: GTC/488G/2012

Contract No.

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

Inject faults at different percentages of the line impedance and check the reading of the fault locator on
the relay display.

Fault Location

Fault Location

Fault Type

Percentage of
the line

Impedance
()

Dist(km)

Percentage of
the line

Impedance
()

Dist(km)

Ph-E

100

2.720

7.621

50

1.36

3.819

2 Ph

100

2.720

7.621

50

1.36

3.820

3 Ph

100

2.720

7.581

50

1.36

3.777

Tolerance: +/-2% of line length


14. THERMAL OVER LOAD PROTECTION:
Time constant ()

: 10min

Steady state pre-load current Ip

: 0.00

Current overload

Full load current rating Thermal Trip IFLC : 1.00 A


Constant (K)

: 1.05

Thermal Overload Alarm

: 80.00 %

Injected Current in Amp


2.00
5.00
Tolerance:

Calculated Operating time


(in Sec)

Measured operating time


( in Sec)

Alarm

Trip

Alarm

Trip

154.7

193.4

147.5

190.8

21.64

27.06

21.19

26.60

Thermal alarm and overload pick-up: calculated trip time +/-10%

15. POWER SWING DETECTION:


Simulated Power Swing, Blocking checks,

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 13 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

: GTC/488G/2012

Contract No.
Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

Zone

Block

Trip

Zone-1

Blocked

No Trip

Zone-2

Blocked

No Trip

Zone-3

Blocked

No Trip

16. BACKUP OVERCURRENT PROTECTION:


16.1
Definite Time 50(N):
50-B1
Pickup Setting (A): 1.50

Delay Setting (s): 1.00

50N-B1

Pickup Setting (A): 0.20

Delay Setting (s): 1.00

50-B2

Pickup Setting (A): 4.00

Delay Setting (s): 0.50

50N-B2

Pickup Setting (A): 0.60

Delay Setting (s): 0.50

Phase

50-B1/
50N-B1
Actual Pickup
current
(A)

50-B1/
50N-B1 Actual
Drop Out
current
(A)

50-B1/
50N-B1 Actual
Trip Time @
2 x setting
(sec)

50-B2/
50N-B2
Actual Pickup
current
(A)

50-B2/
50N-B2 Actual
Drop out
current
(A)

50-B2/50N-B2
Actual Trip
Time @2 x
setting (sec)

1.495

1.420

1.026

3.980

3.780

0.535

1.495

1.420

1.021

3.980

3.775

0.530

1.493

1.419

1.034

3.970

3.770

0.530

0.200

0.180

1.034

0.599

0.540

0.528

16.2 Inverse Time: 51(N)


51-B

Pickup Setting (A): 1.00

Time Dial Setting: 0.60

51N-B

Pickup Setting (A): 0.20

Time Dial Setting: 0.60

IEC Curve : Normal Inverse

Operating Time (s)


@ 2 x Setting

Phase

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

Operating Time (s)


@ 5 x Setting

Operating Time(s)
@ 10 x Setting

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 14 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.
Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

Actual
Pickup
current
0.998

Actual Drop
out current
(A)
0.947

0.997

0.948

0.998

0.948

0.198

0.179

Calculated

Measured

Calculated

6.009
6.003

6.017

5.994

: GTC/488G/2012

: ALSTOM

Measured

Calculated

2.576
2.568

6.013

Measured
1.799

2.576

1.782

2.575
2.583

1.802
1.798
1.795

Tolerance:
Pickup: +/- 5%, Drop off: 0.95xsetting +/- 5%, Inverse time: +/-40ms or 5%, whichever is greater
17. BINARY INPUT:
Binary Input check:
BI No.

BI Assigned to as per approved Schematic drawings

BI01

I/T Send (BF Satge-2/BB Trip/End Fault Protn)

BI02

CB Close Status

BI03

CB Close Order

BI04

VT MCB Trip

BI05

CB Open Status

BI06

ES Open Status

BI07

ES Close Status

BI08

Line Isol. Open Status

BI09

Line Isol. Close Status

BI10

Diff Protn Main-2 Test block in test mode

BI11

BCU Unhealthy

BI12

BCU-1 & 2 DC Fail

BI13

IED FO CH-1 Fail

BI14

IED FO CH-2 Fail

BI15

Spare wired

BI16

Spare wired

BI17

Spare

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

Tested(

Remarks

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 15 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.
Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

Spare

BI19

Spare

BI20

Spare

BI21

Spare

BI22

Spare

BI23

Spare

BI24

Binary Input DC Fail

: ALSTOM

Tested(

Binary Input check:


BI18

: GTC/488G/2012

Remarks

18. BINARY OUTPUT:


Binary Output check:
Resistance
(max. 0.2 )

BO No.

BO Assigned to as per approved Schematic drawings

BO1

Spare wired

0.2

BO2

Spare wired

0.2

BO3

Spare wired

0.2

BO4

Diff /BU Dist./OC/SOTF Trip & Inter Trip Received to 86-2

0.1

BO5

Diff /BU Dist./OC/SOTF Trip to TC-2

0.2

BO6

Spare

0.2

BO7

Spare

0.1

BO8

Spare

0.2

BO9

Spare

0.2

BO10

Spare

0.2

BO11

Spare

0.2

BO12

Spare

0.1

BO13

Spare

0.2

BO14

Spare

0.2

BO15

Spare

0.2

BO16

Spare

0.2

BO17

Spare

0.2

BO18

Spare

0.1

BO19

Spare

0.2

BO20

Spare

0.2

BO21

Spare

0.2

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

Tested(

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 16 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

Binary Output check:


BO22

Spare

0.2

BO23

Spare

0.2

BO24

Spare

0.1

BO25

Spare

0.2

BO26

Spare

0.2

BO27

Spare

0.2

BO28

Spare

0.2

BO29

Spare

0.2

BO30

Spare

0.1

BO31

Spare

0.2

BO32

Spare

0.2

19. LED INDICATION:


LED Indication check:
LED No.

LED Assigned to as per approved Schematic drawings

LED 1

Differential Trip

LED 2

Dist Z1 Trip

LED 3

Dist Z2/Z3 Trip

LED 4

Remarks

R / Y / B PH Start

LED 5

Back Up OC / EF Trip

LED 6

InterTrip Rec

LED 7

InterTrip Send

LED 8

Diff. Comm 1 . Fail

FKey-1

Diff.Comm 2 Fail

FKey-2

Diff . Blocked

FKey-3

VT MCB fail/ VT Fuse Fail / Dist Blocked

FKey-4

Remote CB Open / Close

FKey-5

Remote Earth Switch Open / Close

FKey-6

Remote Line Isolator Open / Close

FKey-7

Power Swing Detected

FKey-8

Any Trip L1

FKey-9

Any Trip L2

Tested by

Tested(

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 17 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

LED Indication check:


FKey-10

Any Trip L3
20. FAULT RECORDER SIGNALS:

Test Fault Record -> Open Last recorded file and check the following signals are configured.
Fault Recorder Signal check: (Minimum Requirement As Per KM Standard)
1

Relay Pickup Phase A

Relay Pickup Phase B

Relay Pickup Phase C

Relay Pickup Ground

87 General Trip

Protection Interface 1 Failure (Diff. Comm. CH-1 Fail)

Protection Interface 2 Failure (Diff. Comm. CH-2 Fail)

87 is Blocked

Inter Trip Received CH 1

10

Inter Trip Received CH 2

11

Inter Trip Send CH 1

12

Inter Trip Send CH 2

13

21 Z1 Pickup

14

21 Z2 Pickup

15

21 Z3 Pickup

16

21 Z1 Trip with single Phase Fault

17

21 Z1 Trip with multi Phase Fault

18

21 Z2 Trip

19

21 Z3 Trip

20

21 is Blocked

21

SOTF Trip

22

VT MCB Trip

23

68 Power swing detected (PSB)

24

VT Fuse Failure

25

49 Overload

26

Backup Over Current Pickup

27

Backup Over Current Trip

28

E/F Pickup

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 18 of 19

SITE ACCEPTANCE TEST PROCEDURE FOR CABLE DIFFERENTIAL RELAY P545 (87C+ BU 21)
CLIENT:

CONSULTANT:

CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE 11 SUBSTATIONS ADDENDUM PACKAGES S17 & S18

Contract No.

: GTC/488G/2012

Date

06.11.2016

B10.RP

Name of Substation

66/11kV PSS-4 Substation

Bay

Name of Equipment

CABLE DIFFERENTIAL B/U DIST. MAIN-1 PROTECTION

Manufacturer

: ALSTOM

Fault Recorder Signal check: (Minimum Requirement As Per KM Standard)


29

E/F Trip

21. FUNCTIONAL CHECK:


Functional Check:
SL. No.

Function Description

Tested(

Test Block Operation checked for CT&VT Isolation

Test Block Operation checked for CT Shorting

Differential function blocked when local end test switch in test position

Differential function blocked when Remote end test switch in test position

Diff. Prot. is blocked when both Communication Channels (FO Link) Fails

Inter trip send on activation of binary input

Distance protection Z1 Inactive when differential protection is Active

Distance protection Z1 active when differential protection is Blocked/Inactive

Test Switch Operation checked for tripping isolation

10

Final Settings downloaded to Relay after Test

11

Relay found healthy

Remark
s

N/A

22. INSTRUMENTS USED:

Sl. No

Description

Make / Model

Equipment
Sl No.

Calibration date

Calibration due
date

Secondary
Injection Kit

Omicron /
CMC356

GK747N

03 DEC 2015

02 DEC 2016

Multimeter

Fluke / 87 V

17010311

03 JAN 2016

02 JAN 2017

23. REMARKS:

Tested by

ALSTOM GRID / SIEMENS / NCC

Signature

Verified by

ENERGOPROJEKT-ENTEL / KAHRAMAA

Signature

Name

Senthilkumar Paramasivam

Name

Date

06.11.2016

Date

Doc.No.

PH11-8G-301-36-P007

Rev.

Annexure

Page 19 of 19