M&E RFI register list to Alpha


Plumbing & Sanitary System
S/N

RFI Ref No.

Description

Submitted
by

Submitted on

Target Date
on

Replied on

Status

QJI-TS-RFI-ME-001

RFI for deep well installation works

CNQC

5-Mar-14

7-Mar-14

10-Mar-14

Closed

QJI-TS-RFI-ME-002

RFI for test deep well installation works

CNQC

5-Mar-14

7-Mar-14

10-Mar-14

Closed

QJI-TS-RFI-ME-003

RFI for Permanent deep well installation works

CNQC

31-Mar-14

4-Apr-14

8-Apr-14

Closed

QJI-TS-RFI-ME-PS-004

RFI for Pipe sleeve penetration @ Grid


Y1/XA-XD & XD/Y2-Y3

CNQC

5-Apr-14

9-Apr-14

15-Apr-14

Closed

QJI-TS-RFI-ME-PS-005

RFI for Domestic Water Tank's Effective Capacity @ Basement


1& Gas Cylinder Room Layout @ Level1

CNQC

30-Jun-14

11-Jul-14

14-Jul-14

Closed

QJI-TS-RFI-ME-PS-006

CNQC

4-Jul-14

11-Jul-14

14-Jul-14

Closed

QJI-SS-RFI-ME-PS-007 R1
(QJI-SS-RFI-ME-PS-007)

CNQC

29-Jul-14

14-Aug-14

4-Aug-14

Closed

QJI-SS-RFI-ME-PS-008

DI & WC which is joined to WC bowl at Male & Female Toilet

CNQC

2-Jan-15

19-Jan-15

9-Jan-15

Closed

QJI-SS-RFI-ME-PS-009(Rev-1)

Information about the relocation of KWS & VP stack pipe and


additional floor trap FT

CNQC

26-Mar-15

9-Apr-15

30-Mar-15

Closed

10

QJI-SS-RFI-ME-PS-010

Information about the relocation at shop # 204 & # 205

CNQC

31-Mar-15

14-Apr-15

8-Apr-15

Closed

11

QJI-SS-RFI-ME-PS-011

Information avout the relocation of the floor trap crash with the post
tension beam @ Level 2

CNQC

4-Apr-15

18-Apr-15

6-Apr-15

Closed

12

QJI-SS-RFI-ME-PS-012

Information about the required make up water flow rate & water
quality

CNQC

9-Apr-15

23-Apr-15

4-May-15

Closed

13

QJI-SS-RFI-ME-PS-013 (R1)

Information about insufficient space at double slab area


@ Level 3

CNQC

19-May-15

29-May-15

25-May-15

Closed

14

QJI-SS-RFI-ME-PS-014

Request for the new setting of FT Location @ Level 3

CNQC

25-Apr-15

9-May-15

15-May-15

Closed

15

QJI-SS-RFI-ME-PS-015

Request advise for insufficient space of FT and for two numbers of


pipes vertically penetrated through the beam

CNQC

5-May-15

19-May-15

5-May-15

Closed

16

QJI-SS-RFI-ME-PS-016

Request the location of WC Pipe, FT and FW sitting on the beam


at male / female toilet @ (Level 9 -Level 16)

CNQC

14-May-15

29-May-15

17

QJI-SS-RFI-ME-PS-017

Request for advice about discrepancies of the quantity of bib tap in


DPA Drawings and ACE Drawings

CNQC

25-May-15

9-Jun-15

RFI for Sewage Treatment Room Setting Layout confirmation @


basement1 and 150DN ventilation Pipe to be naturally ventilated
without using exhaust fan
RFI for Deep Well Chamber Size to be reviewed
and request for approval drawing as proposed
deep well chamber drawing

1/5

Closed

26-May-15

Closed

25-Jul-15

Remarks

18

QJI-SS-RFI-ME-PS-018

Omission of Water Treatment System @ Level 11

CNQC

9-Jun-15

23-Jun-15

10-Jun-15

Closed

19

QJI-SS-RFI-ME-PS-019 (Rev-2)

Information about Details of Gully Trap and Request for the size of
Gully Trap

CNQC

3-Jul-15

17-Jul-15

6-Jul-15 /
15-Jul-15

Closed

20

QJI-SS-RFI-ME-PS-020

Information about Sanitary Shaft Opening @ Level 3 (Male


Changing Room)

CNQC

13-Jun-15

27-Jun-15

17-Jun-15

Closed

DPA Commented /

Updated date:

Date Over-due
25-Jul-15

M&E RFI register list to Alpha


Electrical System
S/N

RFI Ref No.

Description

Submitted
by

Submitted on

Target Date
on

Replied on

Status

QJI-SS-RFI-ME-EL-001

RFI for Telephone Distribution System

CNQC

24-Jun-14

8-Jun-14

4Jun14

Closed

QJI-SS-RFI-ME-EL-002

RFI for Fiber Optic Broadband


Distribution System

CNQC

26-May-14

8-Jun-14

4Jun14

Closed

QJI-SS-RFI-ME-EL-003

RFI for SMATV System, TV Outlet Missing

CNQC

26-May-14

8-Jun-14

4Jun14

Closed

QJI-SS-RFI-ME-EL-004

RFI for Fireman Intercom System

CNQC

29-May-14

12-Jun-14

4Jun14

Closed

QJISSRFIMEEL005

RFI for Trench Size

CNQC

11-Jun-14

25-Jun-14

14-Jul-14

Closed

QJISSRFIMEEL006

RFI for Lightning Protection System Test Link


Box Location and Installation

CNQC

11-Jul-14

14-Jul-14

Closed

QJISSRFIMEEL007

RFI for the Location of the Car Park Barriers


Central Controller System

CNQC

27-Jun-14

15-Jul-14

16Aug14

Closed

QJISSRFIMEEL008

RFI for busduct installation system(part 1)

CNQC

1-Jul-14

18-Jul-14

21-Aug-14

Closed

QJI-SS-RFI-ME-EL-009

RFI for busduct installation system(part 2)

CNQC

1-Jul-14

18-Jul-14

21-Aug-14

Closed

10

QJI-SS-RFI-ME-EL-010

RFI for Telephone direct lines requirements from MPT

CNQC

4-Jul-14

21-Jul-14

15-Jul-14

Closed

11

QJISSRFIMEEL011

RFI for Missing the circuits inside the SLD


for SCP and HCP panels

CNQC

17-Jul-14

4-Aug-14

21-Aug-14

Closed

12

QJISSRFIMEEL012

CNQC

25-Jul-14

14-Aug-14

3-Sep-15

Closed

13

QJISSRFIMEEL013

Information about MDF Room size as per


requested by MPT
Information about CO Lines and MPT( Myanmar Post &
Telecommunication) requirement items

CNQC

5-Aug-14

20-Aug-14

3-Sep-15

Closed

14

Information about BMS HL Requirements for Shop DB's Retail

CNQC

25-Aug-14

10-Sep-14

3-Sep-15

Closed

Information about Incoming Power Requirements From YESB

CNQC

29-Aug-14

12-Sep-14

18-Mar-15

Closed

16

QJISSRFIMEEL014
QJISSRFIMEEL015
QJISSRFIMEEL016

Relocation of Fuel Tank's Manhole & Changes of Diesel Pump Room

CNQC

4-Sep-14

19-Sep-14

11-Sep-14

17

QJISSRFIMEEL017

Electrical Equipment Installation @ Riser Rooms (part 1of5)

CNQC

8-Sep-14

22-Sep-14

Closed

18

QJI-SS-RFI-ME-EL-018

Electrical Equipment Installation @ Riser Rooms (part 2of5)

CNQC

8-Sep-14

22-Sep-14

Closed

19

QJI-SS-RFI-ME-EL-019

Electrical Equipment Installation @ Riser Rooms (part 3of5)

CNQC

8-Sep-14

22-Sep-14

Closed

15

2/5

Closed

Remarks

20

QJI-SS-RFI-ME-EL-020

Electrical Equipment Installation @ Riser Rooms (part 4of5)

CNQC

8-Sep-14

22-Sep-14

Closed

21

QJI-SS-RFI-ME-EL-021

Electrical Equipment Installation @ Riser Rooms (part 5of5)

CNQC

8-Sep-14

22-Sep-14

22

QJI-SS-RFI-ME-EL-022

RFI for Recessed Wall Lighting along Car Park Ramp

CNQC

12-Dec-14

26-Dec-14

3-Feb-15

Closed

23

QJI-SS-RFI-ME-EL-023 A

CNQC

6-Mar-15

27-Mar-15

27-Jun-15

Closed

24

QJI-SS-RFI-ME-EL-024

Request for issuing EI for Construction(Working) Drawing


RFI for the location of car park barrier at Anawrahtha Egress and
please find the attachment.

CNQC

5-Mar-15

19-Mar-15

11-Mar-15

Closed

25

QJI-SS-RFI-ME-EL-025

Discripencies for B1 Power Layout and Single Line 1

CNQC

11-Apr-15

24-Apr-15

23-Apr-15

Closed

26

QJI-SS-RFI-ME-EL-026

Provision Of GI Conduit, Junction Box and Power Point For


Security Door

CNQC

13-Apr-15

20-Apr-15

15-Apr-15

Closed

27

QJI-SS-RFI-ME-EL-027

RFI for Transformer Room Not big enough

CNQC

23-Apr-15

7-Apr-15

25-May-15

Closed

28

QJI-SS-RFI-ME-EL-028

RFI for Discrepancies on L3 & L9 Power Layouts and SLD 2, and


Updates for legend

CNQC

23-Apr-15

7-Apr-15

3-Jun-15

Closed

29

QJI-SS-RFI-ME-EL-029

RFI on L9 Power Layouts and SLD Descrepancies

CNQC

23-Apr-15

7-Apr-15

3-Jun-15

Closed

30

QJI-SS-RFI-ME-EL-030

RFI on L7 & L8 Power Layouts and SLD 2 Queries

CNQC

23-Apr-15

7-Apr-15

3-Jun-15

Closed

CNQC

27-Apr-15

11-May-15

28-May-15

Closed

CNQC

5-May-15

19-May-15

RFI on Electrical Power Provisions for Advertisement


Panels
RFI on Roller Shutters Locations & Power Requirement
Discrepancies

Closed

31

QJI-SS-RFI-ME-EL-031

32

QJI-SS-RFI-ME-EL-032

33

QJI-SS-RFI-ME-EL-033

RFI for Confirmation of Electrical Power Provisions on Level 1

CNQC

21-May-15

4-Jun-15

16-Jul-15

34

QJI-SS-RFI-ME-EL-034

RFI on Elect Risers' space too small(B1-L8)

CNQC

25-May-15

8-Jun-15

26-May-15

Closed

35

QJI-SS-RFI-ME-EL-035

RFI for Discrepancies on L1 & L2 Power Layout & Single Line


Diagram 1 & Query on B1 Power Layout & SLD 1

CNQC

8-Jun-15

22-Jun-15

22-Jun-15

Closed

36

QJI-SS-RFI-ME-EL-036

RFI for how to rectify the lightning tape (copper Tape) at Level 3
the existing Shangrila Hotel

CNQC

16-Jun-15

30-Jun-15

CNQC need to discuss with Archi.


Commented from ACE

Just for information


ACE Comments:
The information should be given
by YESB abd we can only give
you this information after we
receive it from YESB.

37

QJI-SS-RFI-ME-EL-037

RFI on YESB Cable Specs for HT Gear Termination Plug

CNQC

23-Jun-15

Urgent

26-Jun-15

38

QJI-SS-RFI-ME-EL-038

RFI on Lightning Strike Pads' Design & Quantities

CNQC

2-Jul-15

16-Jul-15

3-Jul-15

Closed

39

QJI-SS-RFI-ME-EL-039

RFI on Different Light Fitting Types at Carpark Levels

CNQC

2-Jul-15

16-Jul-15

3-Jul-15

Closed

40

QJI-SS-RFI-ME-EL-040

RFI on Proposed Fireman Intercom Box Location Standardization

CNQC

3-Jul-15

10-Jul-15

6-Jul-15

3/5

41

QJI-SS-RFI-ME-EL-041

RFI on Tel Incoming Cables' Technical Specification

CNQC

6-Jul-15

20-Jul-15

9-Jul-15

Commented from ACE

42

QJI-SS-RFI-ME-EL-042

RFI on Clarification of light Fitting type Changes Due to Ceiling


Omission At Service Lift Lobbies

CNQC

8-Jul-15

22-Jul-15

16-Jul-15

Commented from ACE

43

QJI-SS-RFI-ME-EL-043

RFI on EXIT Lighting Design & Discrepancies

CNQC

15-Jul-15

29-Jul-15

M&E RFI register list to Alpha


Project Light Design
S/N

RFI Ref No.

Updated date:
Description

Submitted
by

Submitted on

Target Date
on

Replied on

Status

QJI-SS-RFI-ME-PLD-001

RFI for Construction / Working Drawing of PLD in Hard Copy &


ACAD Softcopy

CNQC

11-Apr-15

27-Apr-15

27-May-15 Closed

QJI-SS-RFI-ME-PLD-002

RFI for Emergency Power Pack Lightings within PLD Area

CNQC

9-May-15

25-May-15

27-May-15 Closed

QJI-SS-RFI-ME-PLD-003

RFI on confirm for Lighting quantity and lighting type for UFO F07

CNQC

15-Jun-15

29-Jun-15

QJI-SS-RFI-ME-PLD-004

RFI on clarification of EI-M&E-037 on PLD Lighting

CNQC

8-Jul-15

22-Jul-15

Updated date:

Date Over-due
25-Jul-15
Remarks

Date Over-due
25-Jul-15

M&E RFI register list to Alpha


ACMV System
S/N

RFI Ref No.

Description

Submitted
by

Submitted on

Target Date
on

Replied on

Status

Remarks
To submit the bridge structure
drawing/ sketch details to
illustrate.

QJISSRFIMEACMV001

RFI for Installation problem of FCU Located GL


Y11/12 & XB/C at Level 1

CNQC

31-Jul-14

15-Aug-14

10Oct14

Resubmit

QJISSRFIMEACMV002

RFI for Cooling Tower Deck Louvers and Trellis

CNQC

27-Aug-14

15-Sep-14

10-Apr-15

Closed

QJI-SS-RFI-ME-ACMV-003

PAHU, CU, FCU & MV Fan Cooling Capcity

CNQC

7-Jan-14

22-Jan-14

8-Jan-14

Closed

ACE: Refer to attached sheets.

Closed

ACE:to relocate the main


CWS/CWR below the
towers.There will be safety issues
for preventing people from falling
out of the parapet wall.

Closed

1. No objection taken on proposed


the way to mount side throw
sprinkler.
2. To indicate section A-A and
direction on plan also;
3. To Show total points underneath
of bridge and its adjacent area, to
confirm compliance to fire code.

QJI-SS-RFI-ME-ACMV-004

QJI-SS-RFI-ME-ACMV-005 B

Trellis Pole crushed with CWS @ Cooling Tower

Request for the location of FCU at Pedestrian for glass bridge


(Request for the location of Sprinkler Pipe at Pedestrain for glass
bridge)

CNQC

CNQC

28-Jan-15

8-May-15

4/5

11-Feb-15

22-May-15

3-Feb-14

29-May-15

QJI-SS-RFI-ME-ACMV-006

Information about Insufficient for Level-1 Slab Opening

CNQC

24-Feb-15

10-Mar-15

10-Apr-15

Closed

ACE:
1.No Objection on the proposed
size of 1200x800;
2. The location can be shifted a bit
towards GL Y8.
3. To seek approval from architect
and structure Engineer.

QJI-SS-RFI-ME-ACMV-007 A

Information about 3600 x 6000 mm FAL

CNQC

12-Mar-15

26-Mar-15

1-Apr-15

Closed

By Mail: To proceed.

QJI-SS-RFI-ME-ACMV-008

Information about EAD Opening 925 x 850 mm @ 1st Storey Slab

CNQC

25-Mar-15

8-Apr-15

9-Apr-15

Closed

QJI-SS-RFI-ME-ACMV-009

Request for the ACMV openings @ Level 2, GL(Xc-Xd / Y14-Y15)

CNQC

4-May-15

18-May-15

10

QJI-SS-RFI-ME-ACMV-010

Request the confirmation of the location and setting out the


additional ACMV openings

CNQC

13-May-15

27-May-15

14-May-15

Closed

11

QJI-SS-RFI-ME-ACMV-011

RFI for the mounting height of CO Sensor

CNQC

14-May-15

21-May-15

15-May-15

Closed

12

QJI-SS-RFI-ME-ACMV-012

Information about three numbers of ACMV Opening Inside security


lockers

CNQC

22-May-15

5-Jun-15

13

QJI-SS-RFI-ME-ACMV-013

RFI for Descrepancies on schematic FAD drawing and Plan


Layout drawing

CNQC

24-Jun-15

8-Jul-15

26-Jun-15

Closed

14

QJI-SS-RFI-ME-ACMV-014

Request for Information about 150mm Condensate draing pipe


@ GL Y3, Y5, Y6, Y8 (Level 9 to Level 23)

CNQC

24-Jun-15

8-Jul-15

20-Jun-15

Closed

15

QJI-SS-RFI-ME-ACMV-015

Request for advice about the natural ventilation or mechanical


ventilation @ Lift motor room

CNQC

16-Jul-15

30-Jul-15

Closed

Updated date:

M&E RFI register list to Alpha


Lift & Escalator
S/N

RFI Ref No.

Description

Submitted
by

Submitted on

Target Date
on

Replied on
18-Aug-14

QJISSRFIMELES001

RFI For Cancellation of repeater panel(Lift) in FCC room @ Level 1

CNQC

12-Aug-14

1-Sep-14

QJISSRFIMELES002

RFI For Cancellation of Supervisory panel(Lift) in FCC room @


Level 1

CNQC

25-Aug-14

17-Sep-14

Status
Closed
Closed

QJI-SS-RFI-ME-LES-006A

Information about requirement of interior finished design @Lift's


car cage
To confirm about of Mock Up type for lift
Information about requirement of interior finished
design @Lift's car cage
Lift Car ID for FL01 & FL02

CNQC

11-Mar-15

25-Mar-15

11-Mar-15

QJI-SS-RFI-ME-LES-007

Lift Shaft Lighting and Machine Room Lighting

CNQC

26-Feb-15

12-Mar-15

3-Mar-15

Closed

QJI-SS-RFI-ME-LES-008

Request for voice guidance system

CNQC

10-Mar-15

24-Mar-15

10-Mar-15

Closed

QJI-SS-RFI-ME-LES-009

10mm protrusion for Lift Wall finishes for Lift No. PL01-PL08,
FL01-02 and PD01-04

CNQC

23-May-15

4-Jun-15

25-May-15

Closed

QJISSRFIMELES003

QJI-SS-RFI-ME-LES-004

QJI-SS-RFI-ME-LES-005

Location and sizes of openings to


follow structure engineer's
sketches as attached.

CNQC

24-Sep-14

10-Oct-14

CNQC

25-Sep-14

9-Oct-14

CNQC

23-Jan-15

5/5

16-Sep-14

Closed

6-Feb-15

26-Jan-15

Closed

Closed

Date Over-due
25-Jul-15

Remarks
Kindly take note the repeater
is not required.