Sl. No
Name of Act
Section/
Rule ref
Rule 66(6)
Rule 66(7)
Rule 66 - E
Rule 66-F
Rule 67-A
Rule 67 - F
Rule 111
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Section 28(1)(a)(ii)
44
Section 29(1)(a)(iii),
Rule 60A
45
Section 29 (1)(b)
46
47
Rule 61 (8)
48
49
50
51
Rule 6
52
Rule 8
53
Rule 9
54
Rule 9A
55
Rule 12
56
Rule 16
57
Rule 19
58
Rule 20
59
Rule 22
60
Rule 24
61
Rule 25
62
Rule 26
63
Rule 28
64
Rule 32
65
Rule 33
66
Rule 45
67
Rule 46 A
68
Rule 49
69
Rule 50
70
Rule 128(1)
71
Rule 128(3)
72
Rule 35
73
Rule 57(3)
74
Rule 39(a)(i)
75
Rule 39(a)(i)
76
Rule 44(1)
77
Rule 45
78
Rule 46(1)(a)
79
Rule 51(1)
80
Rule 63(2)
81
Rule 64A(1)
82
Rule 64A(2)
83
Rule 65(5)
84
Rule 65(6)
85
Rule 66(1)
86
Rule 68(1)
87
Rule 70
88
89
90
91
92
93
Schedule I, Serial
No. 96(11)
94
Schedule I, Serial
No. 96(10)
95
Schedule I, Serial
No. 94 Para 2.5(2)
96
97
Rule 66(9)
98
Rule 66(10)
99
Rule 61(10)(i)
100
Rule 61(11)
101
Rule 61(11)
102
Rule 61(15)(k)(l)
103
Rule 61(16)(b)
104
Rule 61(12)
105
Rule 61(12)
106
Rule 117
107
Rule 43(1)
108
Rule 43(1)
Compliance Requirement
Eye Protection
Provision
of suitabl equipment for eye
Protection
Qualification of Operator of
lifiting, winches and of
signaller, etc
Notification of intention to
carry out excavation and
tunnelling
Notification of intention to
carry out excavation and
tunnelling
Appointment of Project
Engineer
Appointment of Responsible
Person
Illumination
Inflmmable Oils
Safety Committee
Safety Officer
Pile Testing
within
Locations of Pressure
Vessels
No Objection Certificate
Period of License
Maintenance of apparatus
Where energy at high or extra-high voltage
is being supplied, converted, transferred or
used
Records of Test
Where energy at high or extra-high voltage
is being supplied, converted, transferred or
used
Ensure the sub-stations and switchstations are erected above ground, and
in case of underground constructions
due provisions for ventilation and
drainage are made and Outdoor substations are protected by fencing not
less than 1.8 meters in height
Provision of Condensers
Where condensers are being used
Engravement on Engines
Provision of fire-alarm
Total capacity of building is over 500
persons
Fire-fighting arrangements
Inflammable things is being used
Legal Impact
Imprisonment up to 2 years or
fine up to Rs. 1,00,000/- or both
and on continuing contravention
further fine up to Rs. 1000/- for
each day (Section 92)
Imprisonment up to 2 years or
fine up to Rs. 1,00,000/- or both
and on continuing contravention
further fine up to Rs. 1000/- for
each day (Section 92)
Fine which may extend to on
thousands rupees for every such
contraventio or failure as the case
may be
Nil