Building and
Planning
2012
Danish Association of
Consulting Engineers
The Danish Association of Consulting Engineers (FRI) and the Danish Association of Architectural
Firms (DANSKE ARK)
0
0.1
0.2
0.3
0.4
Role of consultant
Client consultancy
Full-service consultancy
Split consultancy
Sub-consultancy
1
1.1
1.2
Initial consultancy
Appraisal
Design specification
2
2.1
2.2
3
3.1
3.2
3.3
3.4
3.5
4
4.1
4.2
5
5.1
5.2
5.3
6
6.1
6.2
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
Planning consultancy
Planning tasks
Brief and work programme
Preparatory work
Problem description
Forecasts
Objectives
Alternative plans
Impact assessment
Public comment procedures
8
8.1
8.2
8.3
8.4
Other services
Classification
Digital communication
Establishment of communications platform
Digital design
8.5
8.6
8.7
8.8
8.9
8.10
8.11
8.12
8.13
8.14
8.15
8.16
8.17
8.18
8.19
8.20
8.21
8.22
8.23
8.24
8.25
8.26
8.27
8.28
8.29
8.30
8.31
8.32
8.33
8.34
8.35
8.36
8.37
8.38
8.39
8.40
8.41
8.42
8.43
8.44
8.45
8.46
8.47
8.48
8.49
8.50
8.51
8.52
8.53
Digital tendering
Bill of quantities
Digital delivery
Assessment of building sites
Registration of existing conditions
Digitalisation of existing conditions
Geotechnical investigations
Environmental investigations
Official duties
Risk analyses
Cost analyses
Insurance
Process management/consultancy
Special visualisation
Measurement of work performed
As built
Compliance with special regulatory
requirements
Fire
Energy requirements
Thermal indoor climate
Atmospheric indoor climate
Noise and acoustic indoor climate
Optical indoor climate
Special requirements for accessibility
Accessibility audit
Sustainability
Sustainability certification
Sustainability management
Occuppational health and safety
Special tests
Client deliverables
Working and assembly drawings
Signage
Sales material
Complementary/alternative projects and
project changes
Artistic decoration
Prequalification
Negotiations under the Danish Act on
Tendering Procedures for Work Contracts
EU procedures
Negotiations under EU public procurement
directives
Detailed works programmes
Increased quality assurance
Change of consultant
Special meeting activities during the design
phase
Special meeting activities during the
construction phase
Increased technical supervision
Key performance indicators
Disputes
5-year inspection
9 Glossary
0. Role of consultant
1. Initial consultancy
2.1.4 Authorities
10
11
12
3.1.3 Programming
3.1.7 Client
13
14
landscaping expenses
public utilities connection fees
building basis
primary building components
complementary components
surface finishes
plumbing,heating and ventilation systems
electrical installations
fittings, fixtures and equipment
artistic decoration
building site costs and measures taken in
respect of weather conditions
environmental charges and other public taxes
administration and costs, possibly broken
down into consultant fees, including
construction management and technical
supervision, reproduction, other costs and
client administration
contingencies
VAT.
This budget is an overall budget to be
maintained by the consultant and is the
economic basis on which the client makes its
decisions.
The budget must contain information on:
the price index used and agreements on any
price adjustments
the intended type of tendering procedure
other conditions and any reservations in
respect of the budget and its items, such as
employment and market conditions, as well as
other matters essential to the preparation of
the budget.
3.2.5 Authorities
15
16
17
3.4.5 Authorities
18
3.5.7 Client
19
20
21
4.2.3 Programming
22
23
24
25
6.2.6 Client
26
7. Planning consultancy
population trends
27
28
8. Other services
ICT in construction
8.1 CLASSIFICATION
Other services
29
30
31
Review of accessibility.
8.30 SUSTAINABILITY
32
33
34
9. Glossary
cuneco
DBK
CCS
Forvaltnings Klassifikation
buildingSMART
Classification
35
ICT specification
Requirements model
Integrated design
36
FRI
Danish Association of Consulting Engineers (FRI)
Sundkrogskaj 20
DK-2100 Copenhagen
Tel.: +45 3525 3737
Fax: +45 3525 3738
www.frinet.dk
37