Document No.
Doc Respons/Approved
Date:
No
NE
Checked
FE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
RTN CAPTURE
Attachment RTN Capture
Rev:
File:
Checklist Item
Slot layout
NE attribute
Communication Parameter Settings -> IP
Interference (Up, Center, Down)
Link Configuration (Main and Standby)
Board Information Report
IF 1+1 Protection
IFH2 -> Hybrid/AM Configuration (Main and Standby)
IFH2 -> Ethernet Interface (Main and Standby)
EMS6 -> Ethernet LAN Service
EMS6 -> Ethernet Link Aggregation
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Project
Rev:
2. NE attribute
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
4. Interference
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Upper
Lower
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
5. Link Configuration
ODU 1 MAIN
ODU 2 STANDBY
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
7. IF 1+1 Protection
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Standby
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
12. QoS
Checked
Rev:
File:
13. Clock
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
14. Alarms
15. NE
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
16. 24
17. 24
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
18. PING
19. BER
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Rev:
RTN CAPTURE
Project
:HCPT-HUAWEI 2G MW, NORTH SUMATERA, INDONESIA
PT. Huchison CP Telecom Indonesia
Site
: 017001 (BSC Peukan Bada) To 010075 (Lhoknga)
017001(BSC Peukan Bada) RTN
1. Slot layout
2. NE attribute
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
4. Interference
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Upper
Lower
5. Link Configuration
Attachment RTN Capture
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
ODU 1 MAIN
ODU 2 STANDBY
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
7. IF 1+1 Protection
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Stanby
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Main
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
12. QoS
Checked
Rev:
File:
13. Clock
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
14. Alarms
15. 24
Checked
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
16. 24
Checked
17. Temperature
Checking
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
18. PING
19. BER
Rev:
File:
RTN CAPTURE
Prepared (also ssubject responsible if other)
Document No.
Doc Respons/Approved
Date:
Checked
Rev:
File: