Beruflich Dokumente
Kultur Dokumente
MOVIMIENTO DE TIERRAS
ITEM
700
PARTIDAS
UND.
EXPLANACIONES
MEJORAMIENTOS
TRANSPORTES
700.A
m3k
108,048.73
40,279.67
700.B
m3k
6,830,387.80
2,593,047.10
700.C
m3k
700.D
mk
11.00
PUENTES PEATONALES
700.E
m3k
700.F
m3k
700
700.A
PARTIDAS
UND.
EXPLANACIONES
MEJORAMIENTOS
TRANSPORTES
TRANSPORTE DE MATERIAL GRANULAR D<= 1KM
m3k
108,048.73
40,279.67
700.B
m3k
700.C
m3k
700.D
mk
11.00
9,371,190.10
3,523,924.60
PUENTES PEATONALES
700.E
m3k
700.F
m3k
700
PARTIDAS
UND.
EXPLANACIONES
MEJORAMIENTOS
TRANSPORTES
700.A
m3k
108,048.73
40,279.67
9,371,190.10
3,523,924.60
700.B
mk
700.C
m3k
700.D
m3k
11.00
PUENTES PEATONALES
700.E
m3k
700.F
m3k
EL CALCULO DE LA PLANTA DE ASFALTO Y LA CHANCADORA SE HIZO CON UN ACCESO DE 13.5 KM (KM 28.5 DE LA CARRETERA FEDERI
CANTERA ISLA GUINEAL ACCESO 79.50 KM
CANTERA VACA ACCESO 71.41 KM
BASE GRANULAR
OBRAS DE ARTE
CARPETA
ASFALTICA
MUROS
ALCANTARILLAS
30,303.35
29,650.73
16,763.29
7,713.34
708.71
1,988,993.40
3,033,033.50
132,201.40
480,927.20
46,905.40
19,049.20
1,560,093.30
SUB DREN
PUENTES PEATONALES
836.04
52,510.90
ISLA GUINEAL.
PAVIMENTOS
SUB BASE
GRANULAR
30,303.35
BASE GRANULAR
59,301.47
OBRAS DE ARTE
CARPETA
ASFALTICA
16,763.29
5,117.93
MUROS EN RAMPA, DV E
INTERS
2,005.37
MUROS PARA
VEREDA
590.04
ALCANTARILLAS
708.71
2,906,826.10
2,816,044.00
28,573.80
19,049.20
1,560,093.30
455,137.50
177,767.40
52,057.30
60,932.80
ISLA GUINEAL.
PAVIMENTOS
SUB BASE
GRANULAR
BASE GRANULAR
OBRAS DE ARTE
CARPETA
ASFALTICA
MUROS EN RAMPA, DV E
INTERS
MUROS PARA
VEREDA
ALCANTARILLAS
30,303.35
59,301.47
16,763.29
5,117.93
2,005.37
590.04
708.71
2,906,826.10
2,816,044.00
1,238,197.90
455,137.50
177,767.40
52,057.30
60,932.80
19,049.20
350,469.50
METRADO
TOTAL
233,467.84
15,105,495.80
19,049.20
1,560,093.30
836.04
52,510.90
METRADOS NUEVOS
PUENTES PEATONALES
10,263.81
METRADO
TOTAL
NUEVAS CANTERAS
273,382.38
METRADO
TOTAL
CANTERAS NO UTILIZADA
233,467.84
999,505.90
20,391,959.50
15,105,495.80
19,049.20
19,049.20
1,560,093.30
1,560,093.30
-
836.04
2,022.16
2,858.21
836.04
74,627.90
198,751.80
273,379.70
52,510.90
METRADOS NUEVOS
PUENTES PEATONALES
METRADO
TOTAL
NUEVAS CANTERAS
METRADO
TOTAL
CANTERAS NO UTILIZADA
10,263.81
273,382.38
233,467.84
999,505.90
21,601,583.60
15,105,495.80
19,049.20
19,049.20
350,469.50
1,560,093.30
-
836.04
2,022.16
2,858.21
836.04
74,627.90
198,751.80
273,379.70
52,510.90
METRADO
TOTAL
ADICIONAL N01
39,914.54
P.U.
MONTO
7.25
289,380.44
5,286,463.70
1.45
7,665,372.37
7.95
1.45
2,022.17
7.25
14,660.71
220,868.80
1.45
320,259.76
TOTAL C.D.
8,289,673.28
METRADO
TOTAL
P.U.
MONTO
39,914.54
7.25
289,380.44
6,496,087.80
1.45
9,419,327.31
(1,209,623.80)
7.95
1.45
(1,753,954.51)
-
2,022.17
7.25
14,660.71
220,868.80
1.45
320,259.76
TOTAL C.D.
8,289,673.71