Sie sind auf Seite 1von 2

Side Longitudinal

(Section 9.B.3.1)
2
W = 83.3/spr * m * a * l * p

m=
ma =
mk =
a=
l=
k=
PS =
spr =
sperm =
sL =
Wl =
Al =

0.93
0.26
1.00
0.61 m
1.83
1
2
34.02 kN/m
2
141.11 N/mm

em1 =
t=

>
<

0.50
1.00

spr

2
212.04 N/mm
2
70.93 N/mm

sperm max =

3
38.15 cm
2
1.49 cm

W Actual Side Long. ( L 125 x 75 x 7 )


l =
e=
l /e =
em1/e =

m
0.33

(Section 3.E.2.2 - Tabel 3.1)

1.83 m
0.61 m
3.00
0.820
0.500 m
50.020 cm
12 mm (side shell plate )

150 N/mm
2
230 N/mm

Lebar
x (cm)
50.020
0.7
7.5
S=

Tinggi
y (cm)
1.2
11.8
0.7
13.70

Luas
2

A (cm )
60.02
8.26
5.25
73.53

Lengan
z (cm)
0.60
7.10
13.35
21.05

Z1 = S Momen / S Luas

Momen

Inersia Individu

A.z (cm )
A.z (cm )
36.01
21.61
58.65
416.39
70.09
935.67
164.75
1373.66
Z2 =

7.20
95.84
0.21
103.26

11.46 cm

2.24 cm
4
Ixx =
1476.92 cm
INA = Ixx - ( z12 * A)
=
W1 =
=
Faktor ksp Profil L =

4
1107.82 cm

INA / Z1
494.47 cm

W2 =
3

1.15 ----->

=
W2 =

INA / Z2
96.67 cm

1/12 bh (cm )

84.06 (Memenuhi)

Das könnte Ihnen auch gefallen