Sie sind auf Seite 1von 3

LAMPIRAN 1.

PERHITUNGAN MANUAL DESAIN ESP


1. Qrecommended

= 80 % x 717.4068
= 573.9254

2. Penentuan Pump Setting Depth


Pump Setting Depth

= WFL +100
= 4503.11257 + 100
= 4603.11257 ft

3. Penentuan Pump Intake Pressure (PIP)

Perbedaan Kedalaman = Mid Perforasi Pump Setting Depth (TVD)

Perbedaan Tekanan

6094.458 - 4603.11257

1491.134543

= Perbedaan Kedalaman x SGf


=

1491.134543 x 0.433732134

646.844 Psi

Pump Intake Pressure (PIP) = Pwf - PerbedaanTekanan


= 1483 639.6192
= 836.1552 Psi

4.Penentuan TDH (Total Dynamic Head)

PIP ( psi ) x 2.31 ft / psi


Sp. Gr. Campuran
Menentukan Fluid Over Pump (FOP).
Fluid Over Pump (FOP)=

=
=

836.1552 x 2.31
1.0098
1912.773 ft

Menentukan Vertical Lift (HD).


Vertical Lift (HD)

= Pump Setting Depth (TVD) - FOP


= 4603.11257 1912.773
= 2690.33957 ft

Menentukan Tubing Friction Loss (HF).


Friction Loss (F) dengan volume total fluida (Vt) dengan menggunakan persamaan :
1.85

100
Qt
2.083

C
34.3
Ft
ID 4.8655

1.85

100
120

200
Ft = 34,3

1,85
2.083

= 0.504783
Tubing Friction Loss (HF)

= Friction Loss (Ft) x PSD


= 0.504783 x 4603.11257
= 2323.573/1000 ft = 2.323573

Tubing Pr essure ( psi ) x 2.31 ft / psi


Sp. Gr. Campuran
Menentukan Tubing Head (HT).

Tubing Head (HT) =


=.

60 X 2.31
1.0098

= 137.254902 ft

Menentukan Total Dynamic Head (TDH).


Total Dynamic Head (TDH) = HD + HF + HT
(TDH) = HD + HF + HT
= 2690.33957 + 2.323573 + 137.254902
=

2829.918045

Head dilihat dari grafik saat Q = 573.9254 bpd diperoleh hasil 18 ft/stage

Stage =
=

TDH
Head
2829.918045
9

= 314 stages

Das könnte Ihnen auch gefallen