MaintenanceofSubstationEquipment
Navigation
TableofContents
Articles
1.0Introduction
Links
2.0BreakdownMaintenanceVersusPreventiveMaintenance
Categories
3.0Inspection,Servicing,Overhaul
Tags
4.0GuidelinesforMaintenanceofSwitchgear
5.0MaintenanceScheduleCheckList
6.0MaintenanceofCircuitBreakers
7.0MaintenanceofAirBreakCircuitBreaker,FusegearforLowandMediumVoltages.
Whatisthis?
Thisisanarticlepostedon
March11,2012.
8.0MaintenanceofOilCircuitBreakers(BOCB,MOCB)
9.0MaintenanceofAirBlastCircuitBreakers
10.0MaintenanceofVacuumCircuitBreaker
Sofar,thisarticlehas0
comments.
11.0MaintenanceofSF6CircuitBreaker
Thisarticleisapartofthe
12.0Likelytroublesandessentialperiodiccheckstoavoidthem
categorySubstation
13.0MaintenanceofTransformers
14.0CareandMaintenanceofEarthing
Thisarticleistaggedwith
maintenance
15.0InsulationResistanceMeasurement
1.0Introduction
Latestarticles
Theswitchgearandprotectiverelayingsystemshouldbealwaysalerttooperateagainstan
Hydrogen
unexpectedlyfault.Switchgearwhichwasinquiescentstatehastooperateimmediately.Forsuchan
Energyand
operation,regularanddetailedmaintenanceisnecessary.Thelackofmaintenancemayresultin
FuelCells,
failureinoperation.
posted1year,
Themaintenancerequirementsofstaticequipmentsliketransformers,capacitorsetc.aremuchless
comparedtootherdynamicequipmentslikecircuitbreakers,motorsetc.
1monthago.
Energy
Conservation,
TheSwitchgearmanufacturesuppliesInstructionManualofInstallation,Operationand
posted2years,
Maintenance.Thesemanualsshouldbecarefullystudiedbytrainedmaintenancestaff.Thecodeof
7monthsago.
practicebookletspublishedbythestandardsinstitutionregulationsofelectricalinstallationsarealso
Energy
useful.Detailedprogrammeofmaintenanceofswitchgearshouldbepreparedwithpredetermined
Conservation
intervalsbetweeninspections.Theperiodmaybeonetothreemonthsifswitchgearisoperated
BuildingCode,
frequentlyandsixmonthstotwelvemonthsifswitchgearisoperatedrarely.Afteroperationofthe
posted2years,
circuitbreakeronabnormalcondition,inspectionshouldbecarriedoutasearlyaspossible.Further,
7monthsago.
itisunwisetoleavethecircuitbreakercloseforaperiodlongerthansixmonthswithoutopening,
Energy
becausethemechanismmaybecomesluggishandcontactsmayneedcleaning.Henceduringthe
Conservation
periodicmaintenance,thecircuitbreakerispurposelyopenedandclosedbymanualcommand.
Act,posted
Themaintenancescheduleisusuallyintheformoflogsheetsonwhichweeks,monthsoftheyear
2years,
aretabulated.Eachequipmentinthesubstationortheplantisprovidedwithacolumn.The
7monthsago.
maintenanceperiodisindicatedagainsteachequipment.Furthereachmajorequipmentisprovided
Utilization
withahistorycard.Thedetailsaboutinspection,operationandremarksarewritteninthesecards.
Factorof
Liminaires,
http://electricalinfo.in/tech/substationmaintenance/
3/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
Thesparesareimportantformaintenanceduty.Thesparesarekeptinstockwithproperinventory
control.
Liminaires,
posted2years,
7monthsago.
Themaintenanceworkisdoneaccordingtotheschedule.Incaseofdifficultjobsthemanufactureris
Latestlinks
consulted.Themanufacturerprovidestrainedpersonnelonrequestandnecessarypayment.
2.0BreakdownMaintenanceVersusPreventiveMaintenance
Maintenanceisclassifiedintwocategoriesasfollows:
1.ThebreakdownorCorrectiveMaintenanceactivitiesareundertakenafterfailureofan
equipment.Suchmaintenanceresultsinoutageofcircuitandsupply.Ingeneral,it
consistsoflocatingthetrouble,repairandrecommissioning.
2.ThePreventiveMaintenanceisundertakentoensuresmoothandefficientworkingofa
system,equipment.Preventivemaintenanceisundertakenasperschedulebefore
breakdownofasystemormachinetakesplace.
Aperformancerecordofeachcriticalcomponentismaintainedandbasicdecisionsontheservicelife
ofthecomponentandthetotalserviceithasputin.Repairsorreplacementsaremadetoensurethat
nobreakdownoccursatanytimeduringtheservice.
Preventivemaintenanceiscarriedoutinplannedmanner.Breakdownmaintenanceiscarriedoutas
andwhennecessary.ForSwitchgearandprotectiveequipment,preventivemaintenanceis
recommendedbecausefailureofaswitchgearcannotbepermitted.
3.0Inspection,Servicing,Overhaul
Maintenancecoversawiderangeofactivitiesaimedatkeepingtheequipmentinperfectworking
conditionforperformingitsfunctionasperassignedduties.Thechoiceofactivitiesandschedule
dependsuponlocalrequirements.
1.Inspection:Thisreferstothemaintenanceactivitywhichcomprisescareful
observation/scrutinyoftheequipmentwithoutdismantlingit.Itusuallyincludesvisualand
operationalchecks.
2.Servicing:Thisreferstocleaning,adjustment,lubricationandothermaintenance
functionswithoutdismantlingtheequipment.
3.Examination:Thisreferstoinspectionwithnecessarydismantling,measurementsand
nondestructiveteststoobtaindataregardingtheconditionofcomponents/sub
assemblies.
4.Overhaul:Thisreferstotheworkdonewiththeobjectiveofrepairing/replacingwornout
partsanddefectiveparts.Theequipment,subassembliesaredismantledpartlyor
completely.Theconditionofcomponentsisinspected.Dimensionsofwornout
componentsaremeasured.Thecomponentswornoutbeyondacceptablelimitare
replaced.Theassemblyisfollowedbyfunctionalchecksandmeasurementstoensure
satisfactoryoperation.
4.0GuidelinesforMaintenanceofSwitchgear
Therequirementofinspection,servicingexaminationandoverhaulvarywith:
Environmentalaspectssuchasdust,chemicalfumes,moisture/humidity,ambient
temperaturevariations,etc.
Operatingdutyfrequencyofoperation,ratedcurrent.
Switchingdutyseverity,e.g.repeatedoperations.
http://electricalinfo.in/tech/substationmaintenance/
4/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
Switchingdutyseverity,e.g.repeatedoperations.
Manufacturergivesgeneralguideline.Itisnotpossibletoobtainexactmaintenanceschedule
meetinglocalrequirementofeachsite.Hencemaintenancescheduleisdeterminedafterinitial
periodicinspectionateachsite.Incaseofswitchgearandcontrolandprotectionpanelsdistinction
shouldbemadebetweenthemaintenanceoffixeddeviceslikebusbars,insulatedenclosuresetc.
andmaintenanceofswitchingdeviceslikecircuitbreaker,isolator,earthingswitch,contractorsetc.
havingmovingparts.
Thefixedpartsneedregularinspectionandservicingforremovingdustdamp,corrosionetc.Moving
partsneedregularinspectionandperiodicreplacementofwornoutparts.Thefunctionalreadinessof
switchingdevicesshouldalsobeensured.
Themaintenanceofswitchingdevicesisrelatedmainlywiththewearingoutofcontacts,deterioration
ofquenchingmediumandmechanismcomponents.Themaintenancerequirementsofvacuumcircuit
breakersSF6circuitbreakersarequitemodestascomparedwiththoseofoilcircuitbreakers,
minimumoilcircuitbreakers.Invacuumcircuitbreakersinterrupterisapermanentlysealedunitand
thecontractshavelongswitchinglife.PuffertypeSF6circuitbreakershavelongswitchinglifeand
thegasesdonotneedreplacement.Hencethepresenttrendistousemaintenancefreevacuumand
SF6circuitbreakers.
Tablebelowgivesrecommendationregardingtheperiodofmaintenanceofcontactsandquenching
mediumintermsofnumberofloadoperationsandnumberofshortcircuitoperationsonratedshort
circuitbreakingcurrent.Thescheduleshouldbeestablishedforeachsitebycheckingthecontactsof
onepoleaftereverythreemonthsandobservingtherateoferosion.
MaintenanceofQuenchingMediumContacts
MaintenanceofQuenchingMedium
Replacementofcontacts
TypeofC.B.
K(In)
Load*Operation FaultOperation Load**Operation FaultOperation
AirC.B.
3000
10to15
BulkOilC.B. 2000
6
2000
6
2000
MOCB
1000
3
1000
6
1000
AirBlastC.B.
15000
25
15000
SF6C.B.
5000
25
15000
25
15000
V.C.B.*
20000
100
20000
*Shelflife20years.
**MechanicalEnduranceTestshouldbeperformedwithspecifiednumberofoperationsonnoloadto
confirmsuitabilityofmechanism.
Note
Duringeverybreakingoperation,contactloosessomematerialandthequenchingmediumgets
decomposed.Thedecomposedproductsgetsdepositedontheinternalinsulatingpartsofthecircuit
breakers.ThedeteriorationofcontactsandinternalinsulationisproportionaltoK,thecumulativesum
oftheproductofthenumberofbreakingoperationandsquareofthebreakingcurrentinKA(In)
andistakenasaguidetotheinspectionofcontacts,internalinsulationandthequenchingmedium.
ThevalueofKdependsuponthetypeofcircuitbreakers(ReferTableabove).
Lifeofcontactsbecomesupposedlybadaftercertainoperationsonloadandorafterclearingfaults
onratedshortcircuitcurrentanindicationofwhichisshowninTable2.
MaintenanceofContacts
LifeofContacts
Typeof
Numberofloadoperationsonrated
Numberoffaultoperationsonratedshort
C.B.
loadcurrent
circuitcurrent
VCB
10,000
50100
http://electricalinfo.in/tech/substationmaintenance/
5/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
VCB
10,000
SF6
4,000
MOCB
1,000
Airbreak
50100
1525
36
CB
1,000
16
AirBlast
CB
4,000
1525
5.0MaintenanceScheduleCheckList
Thechecklistofmaintenanceofswitchgeargivesthelistofactivitiesandthereperiodicity.The
periodicityofaboveactivitiesvarieswith:
Typeofswitchingdevices.
Frequencyofoperatingdutyandbreakingcurrent.
Environment.
ImportantChecksonCircuitBreakersduringRoutineMaintenance
Activity
1.Checkinsulationresistanceofeachpoleofphasetogroundacross
terminals.
2.Checkanddielectricalstrength.
3.CheckMechanicaloperations.
4.Checktightnessofbolts.
5.Checkoillevel.
6.Cleanprocelaininsulators.
7.Checkcontactlengthandsimultaneouscontacttouch.
8.Measurecontactresistance.
9.Cleancrossjetpots,reconditioncontactsfilloil(OCB).
10.Measurecontactspeed.
11.MeasureBreakTime,MakeTime.
12.Levelofoil/gaspressure.
Half
yearly
Quarterly
Annual
X
X
X
X
X
X
X
X
ThechecklistandmaintenancescheduleforvarioustypesofcircuitbreakersareindicatedinTable
below,andthefollowingabbreviationshasbeenused:
DI= DailyInspection.
WI= WeeklyInspection.
MI= MonthlyInspection.
QI= QuarterlyInspection.
HI= HalfyearlyInspection.
AI= AnnualInspectionMaintenance.
OH= Overhaul.
N= Normalduty
R= Repeatedoperationsonratedloadcurrent
CheckListandMaintenanceScheduleforCircuitbreakers
Air
Air
Indoor
Minimum Vacuum SF6
break
Blast Metalclad
OilC.B.
C.B.
C.B.
Maintenanceactivity
C.B.
C.B.
MV
N R N
R
N R N R N R Switchgear
1
2 3 4
5
6
7 8 9 10 11
12
GeneralInspection
QI MI QI MI AI QI AI QI HI QI HI
Cleaningofexternalinsulation.
QI QI QI
QI QI QI Qi QI HI
Contacts,contactsshrouds(ABCB),Nozzles
(SF6CB)ArcControlDevices(MOCB),Ext.
HI QI HI QI AI AI 5Y AI 5Y AI
Contactposition(VCB)Contactresistance(All)
Quenchingmechanismincircuitbreakerand
HI QI
AI AI QI
toppingup
CleaningofinternalinsulationofCB
AI HI AI HI
5Y AI 5Y AI
Terminalconnections,earthingconnections,
AI HI AI HI AI AI AI AI AI AI QI
structure,cabinetcableetc.
Sealingleakageofmedium,Pressureof
QI QI
QI QI QI QI
medium
Mainmechanismoperatingchecks,interpole
HI QI HI QI AI AI AI AI AI AI
linkages
http://electricalinfo.in/tech/substationmaintenance/
6/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
linkages
Servicing
Controlwiring
OperatingchecksandInsulationresistance
measurement,Contactresistancemeasurement
PostfaultmaintenanceafterNo.offault
operations
Overhaulafterno.ofyears
No.offaultopearations
No.ofloadoperations
5Y AI AI
AI AI AI
HI
AI
5Y AI
AI AI
5Y AI 5Y AI AI
AI AI AI AI AI
AI HI AI
HI
AI
AI AI AI AI
10
5
5
1
1
2000 1000
AI
50
25
25
25
50
10
10000
10
10
5
5
5000 5000
6.0MaintenanceofCircuitBreakers
ThefollowingstepsareinvolvedinMaintenanceofCircuitBreakers:
1.GeneralInspection:Observethecircuitbreakervisually.Notethecleanliness,terminals,
earthconnections,readingsofcounters,levelsofquenchingmedium(incaseofOil
Circuitbreaker),pressureofquenchingmediumincaseofSF6circuitbreakersetc.
2.CleaningandDrying:UseCTCLortrichloroethyleneorothercleaningagent
recommendedbymanufacturer.Thefluidshouldbecompatiblewiththesurfacetobe
cleaned.Useairpressurejet(3kg/cm2)forcleaning.Usecleanclothwhichdoesnot
leavefibresorparticlesonthesurface.
Careshouldbetakentoavoidfallingofdust,ironparticles,nutbolts,washersetc.inside
thebreaker.Avoidwater,moistureordampnessduringcleaning.Internaldustand
moisturecausesgradualdepositsoninternalsurfaceresultingingradualincreaseof
surfaceleakagecurrentsandinternalflashoverbytracking.Congealedlubricantsshould
beremovedbymeansofsolvents.Thecleaningandslidingsurfacesshouldbecleaned,
relubricated.Beforeassemblyofthecircuitbreaker,theinterruptersupportporcelain
componentsetc.shouldbecleanedindrycleanatmosphere.
Afterassembly,evacuatethebreakerpoletoremovemoisture,dustmoleculesetc.and
thenfilloilorSF6gas.GroovesforOringsonflangesshouldbecleanedwith
tricloroethylene,soastoremovehardenedgreaseanddust.Suchadustorgreasewill
givetheunevensittingofthenewOringandcausegradualleakageofSF6oil.Nodust,
chalkmarksfibres,hardgreaseetc.isallowedontheOringgrooves.
Terminalsshouldbecleanedofdust,oxidecoatingifanybyemerypaperwithoutiron
particles.
Circuitbreakerpolecanbeinternallydriedbycirculatingdryhotairorbyevacuatingto2
mmofmercury.IncaseofSF6circuitbreakerorporcelaincladvacuumcircuitbreaker,
thedryingofpoleunitsshouldbecarriedoutbeforefillingSF6gasordrynitrogen.SF6
gasordrynitrogendoesnotremovethewaterdropsanddustdepositedontheinternal
surface.Hencedryingandevacuatingisnecessary.
AsmallportablevacuumpumpwithTeflonhoseisconnectedtothevalve.Thebreakeris
keptundervacuumforafewhours.ThereaftertheSF6gas/drynitrogenisfilled.The
moistureiseliminatedduetoapplicationofvacuum.Dryingisrecommendedbeforefilling
offreshSF6gas/nitrogen/oilinthebreaker.
3.InsulationSurface:Inspectvisually,carefullyforsignsofcracks,trackingoranyother
defects.Cleantheinternalinsulatingsurfacesandexternalinsulatingsurfacesas
mentionedin2above.Insulationshouldbefreefromelectricalormechanicaldefects.
Performinsulationresistancemeasurementtestsaftercleaning.Insulationresistance
measurementgivesindicationaboutthehealthoftheinsulation.
http://electricalinfo.in/tech/substationmaintenance/
7/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
Incaseofoilcircuitbreakersandminimumoilcircuitbreakers,theinternalinsulation
shouldbecleanedthoroughlybymeansoftrichloroethylene,cleanclothandairjet.The
depositionofsludgeandcarbonparticles,conductingdustparticlesshallberemoved
beforereassembly.
IncaseofSF6circuitbreaker,thedecompositionproducts(graycolour)getdepositedon
internalsurfacesofinsulators.Thesearenonconductingwhendry.Ifthecircuitbreakeris
dismantledduringmoistatmosphere,thesesurfacesarenotcleanedbeforeassembly,the
internalflashoverislikelytooccurdespitethegoodpropertiesofSF6gas.Incaseof
vacuuminterruptersonlyexternalcleaningispossible.
Incaseofairblastcircuitbreakers,nointernalcleaningisgenerallynecessaryasfresh
mediumisusedforarcquenching.Incaseofporcelaincladoutdoorvacuumcircuit
breaker,thepoleunitsshouldbeinternallycleananddrytoavoidinternalflashoverby
tracking.Glassfibrepullrodsshouldbecleanedthoroughly.
Particularattentionshouldbepaidtothenozzles,arccontrolpots,arccontrolplates.They
shouldbecleaned.Ifburntordisfigured,replacethem.
AftercleaninganddryingmeasureinsulationresistancebyMegaohmmeter(Megger)
betweentwoterminalsofeachinterrupterandbetweentheterminalandearth.Insulators
ofcircuitbreakersinstalledinheavilypollutedareasandseashoresneedfrequent
externalcleaning.Themethodofmeasuringtheinsulationresistanceisshownintheend
ofthischapter.
4.Interrupter:Studytheoperationandmaintenancemanualofthecircuitbreaker.Notethe
importantsettingsandmeasurementsofmovingcontact,othermovablepartswith
referencetofixedflangesandtheallowedtoleranceinthesettings.Checksimultaneous
touchof3polesifslowclosingispossible.Mainactivitiesintheinterruptermaintenance
include:
Observation,cleaning,replacementofmain/arcingcontactsPTFEnozzles,
arccontrolpotplatesetc.
Cleaningtheotherpartsaswell.
ReplacinghardenedOrings,wornoutslidingparts.
Removalofcarbon/metallicdecomposedproducts.
Cleaningofventingsystemstoensurefreepassageofoil/gases.Thevents
shouldbemadefreebutnotenlarged.
Cleaningterminalsandslidingcontactsurfaces.
Assemblywithpropersettingsofcomponents.
5.Mechanism:Checkoperationopencloseclosingfollowedbyopeninglocally.If
operationO,C,COaresatisfactory,themechanismissatisfactoryanddoesnotneedany
majorrepair/maintenance.
Checkoperationcounter.Ifthemechanismhasoperatedmorethan1000times,itneeds
verycloseobservationandmayneedoverhaul.Checktheconditionofspringsand
dashpots.Twoimportantteststodeterminethehealthoftheoperatingmechanism,
linkagesandmovingcontactsettingsinclude:
Checkingsimultaneousopeningandclosingof3poles.
Checkingnoloadtimesvs.travelcharacteristicsofmovingcontactforO,CO,
http://electricalinfo.in/tech/substationmaintenance/
8/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
OCOoperations.
1.MethodofobtainingTimeTravelCharacteristiconnoload:Incaseof
MOCBorSF6CBpoles,thischaracteristicisextremelyimportantbecausethe
breakingcapacityisrelatedwiththetime/travelcharacteristicsofmoving
contact.Noloadcharacteristicgivessufficientindicationaboutthehealthof
mechanismlinkages.
Forsatisfactoryareinterruptionthemovingcontactshouldopenandtravelwith
optimumcharacteristic.Slowinitialmovementindicatesexcessivefriction
betweenslidingparts.Slowmovementduringmiddleofstrokeindicatesvery
highdynamicloadduringarcquenching.Slowmovementduringfinalpartof
thestrokeindicatesexcessivedampingorlowenergyofoperatingmechanism
duringopening.
Astraightrodisconnectedtothemovingcontactormovablepart(contactor
mechanism).Thisrodisinturnconnectedtothecurvorollerorrectilinear
transducer(TravelRecorded).Curvorollerisaspeciallydesignedmotordriven
drummountedonthetophoodoftheMOCB.Thepencilattachedtotherod
fixedonthemovingcontacttouchesthepaperonthedrum.Themotoris
drivenelectrically.Thedrumrotatesatknownspeed.Thegraphsheetfixedon
thedrumhasdefinitecircumferentialspeed.Duringtheopeningstrokeand
closingstrokes,thepencilgivesthetime/travelcharacteristicmarkingonthe
graphsheetonthecurvoroller.
ForhighspeedSF6circuitbreakerthecurvorollersarenotsuitable.
Rectilineartransducerisfittedsuitablyonthebreakerframe.Ithasacylindrical
resistancewithinternalmovingpiston.Thepistonisattachedtotherodwith
andswiveljointattheend.Theswiveljointandrodoftherectilineartransducer
areconnectedtothemovingrodattachedtothecontactmovementsystem.In
caseofSF6oroilCB,asuitablerectilinearsealshouldbedesignedtopermit
movementwithoutleakageofSF6/oil.Therectilineartransducerisconnected
likeapotentiometer.Thecentralterminalgivesvariationproportionaltothe
travelofthecontact.
TheoutputisgiventoUVrecorder.ThetraceofTime/Travelisobtainedon
U.V.Recorder.Thetripsignal/closingsignalisalsorecordedsimultaneously.
TheTime/Travelcharacteristicshouldmatchwiththatobtainedinthe
manufacturersworks.
2.MethodofcheckingtheContactSetting:Followmanufacturersinstruction
booklet.IncaseofMOCBandSF6,measurementofdistancefromthetop
flangesurfacetothetipofclosedcontactmaybepossible.Incaseofvacuum
interrupter,agaugewithpointermayhavebeenprovidedbythemanufacturer
toindicatecontacterosion.
MeasurementofContactResistance:Theresistancebetweenterminalsof
eachinterrupterandeachpoleismeasuredbymeansofmicroohmmeter.
Theresistanceshouldbewithinafewtensormicroohms.Apairofcontacts
hasaresistanceofabout15microohms.
http://electricalinfo.in/tech/substationmaintenance/
9/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
Contactresistanceisinverselyproportionaltothecontactpressure.Low
contactpressuremaybeduetoweekspringsorwornoutcontacts.High
contactresistancecauseexcessiveheatingofcontactswhilecarryingnormal
currentandpossibleweldingduringthroughshortcircuit.
3.MechanicalAssembly:Checkthatallthenutboltsareintheirpositionand
checktheirtightness.Checkcirclips,splitpins.Cleanandlubricatesparingly.
Oildashpotsshouldbecheckedforcurrentlevelandoperation.AirDashpots
shouldbecheckedforcurrentoperation.
Cleaninspectandreplacewornoutpartsduringoverhauls.Incaseofspring
operatedmechanismchecktheratchetwheelsandprawtsforbrokenor
chippedteeth.
Valvesofpneumaticmechanismorhydraulicmechanismshouldnotbe
disturbedunlessthediagnostictestsindicatetheneedfortheirreadjustment.
4.Interpolelinkages:Forensuringsimultaneousoperationof3poles(within
polediscrepancyof5milliseconds),theinterpolelinkagesshouldbechecked
fordeteriorationofsprings,othercomponents.Linkagepins,circlips,nutbolts,
etc.shouldbechecked.Verifythatfixingsaretightandpivotpinsaresecure.
Maloperationofmechanism,interpolelinkage,dashpotsetc.canberevealed
bythetime/travelrecordof3polesplottedonUVrecorderasdescribedearlier.
Congealedlubricantsshouldberemovedfromsliding,rollingsurfaces.The
partsshouldberelubricatedaspertheinstructionsofthemanufacturer.
Themovingcontactsofeachphaseshouldmeetthefixedcontactpractically
SpecialOffers.
AdspoweredbyWajam
simultaneously.Anelectricalmethodofcheckingthecontactsisillustratedin
Fig.1.Alowvoltagesupply,lampsareneeded.Simultaneousglowingoflamps
indicatessimultaneousmakingofcontacts.
6.CheckandMaintenanceofotherimportantaccessories:
MainConnections.Ensurethatgoodcontactismaintainedandconnectionsarerightand
secure.
SecondaryWiringandFuses.Ensuretightandsecureconnections,cleanlinessand
freedomfromdustandmoisture.Heaterinthecabinetshouldbecheckedandrepaired,if
AdspoweredbyWajam
necessary.
EarthConnection.Themainandsecondaryearthconnectionshouldbetightandfree
fromdustandrust.
Heater.Theheaterprovidedinthecontrolcabinetshouldbeinworkingcondition.
SafetyShutters.Theshuttersmechanisminmetalcladmediumvoltageswitchgear
shouldbeverifiedafterpullingoutofdrawoutunitanddeenergizingthebusbars.
BusbarsandBusbarChambers.Thebusbarsandthebusbarchambersshouldbe
checkedforcleanlinessofinsulators,tightnessofjointsandfreedomfromdust,dampand
foreignmaterials/insectsetc.Thereshallnotbeanyloosejointsorsignsofoverheating,
meltingsparking.
AuxiliarySwitches,IndicatingDevicesandInterlocks.Auxiliaryswitchesshallbekept
http://electricalinfo.in/tech/substationmaintenance/
10/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
AuxiliarySwitches,IndicatingDevicesandInterlocks.Auxiliaryswitchesshallbekept
incleanandsoundconditionbecausethecorrectfunctioningofotheritemsofequipment,
includingprotectivegeardependsonauxiliaryswitch.
Inspectthecontactsandcleanorrenewifnecessary,wherepossibleverifycorrect
contactforceandcorrecttimingofcontacts.IndicatingdevicessuchasmechanicalON
andOFFindicators,semaphoresetc.shallbeinspectedtoensurethattheyareingood
orderandoperatingcorrectly.
Interlocksandlockingdevicesshallreceiveparticularattentionespeciallythose
associatedwithearthingandtestingfacilities.Adefectiveorworndevicemayresultina
dangerouscondition.Itshallbeverifiedthatanyincorrectoperationissatisfactorily
inhibitedlubricateasnecessary.
Particularattentionshallbepaidtotherequiredtimingoftheauxiliarycontactscontrolling
thetripcircuit.
IsolatingContacts.Cleaninspectforsignsofoverheating,reneworreconditionif
necessary,lubricateasrequired.
OverloadDevicesandProtectiveRelays.Routinemaintenanceshouldbecarriedoutat
correctintervals.
InstrumentsandProtectiveTransformer.Routinemaintenanceshouldbecarriedout
accordingtoinstructions.
ControlRelaysorContractors.Inspectmechanicalpartsforfreemovementwithcontrol
andmainsolenoidormotorcircuitisolatedcleanarcchutes.Inspectcontactsandrenew,
ifnecessary.
Anyflexiblebraidsshallbeinspected,especiallyforfrayingattheterminations,and
renewedifnecessary.Whereexposedtoexternalatmosphere,thebraidsshallbetreated
withasuitableprotectivecompoundwhichwillnotimpairtheirflexibility.
PressureGaugesandPressureSwitches.Thereadingsofpressuregaugesare
checkedagainstastandardgauge.Theoperationofpressureswitchesshouldbe
checkedagainsttheirsetting.
7.FinalVerification:Beforereturningtoserviceaftertheoverhaul,thecircuitbreakeris
subjectedtooperationalchecksbyperformingC,O,COoperationsfromlocalcontrol
cabinetandfromthecontrolroom.Simultaneoustouchingofthecontactsofthreephases
isverified.Insulationresistanceismeasuredbetweentheterminalsofopeninterrupter
andbetweenthelowerterminalandearth.Insulationresistanceofauxiliarywiringisalso
measured.
8.TypicalMaintenanceRecordCard:Historycardiskeptforeachcircuitbreaker.
:CircuitbreakerS.N.:
:Make:
:YearofManufacture:
:Ratings:
:Making/BrakingCapacity:
:ShortTimeRating:
:Inspectiondate:
:Permittoworknumber:
http://electricalinfo.in/tech/substationmaintenance/
11/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
Component
Mechanism
Linkages
Quenchingmedium
Maincontacts
Arcingcontacts
Terminals
Finalverification
7.0MaintenanceofAirBreakCircuitBreaker,FusegearforLowandMediumVoltages.
Thescheduleofmaintenancedependsuponthefrequencyofloadoperationsandfaultoperations.
Forfrequentloadoperations/faultoperations,maintenancerequirementishigh.Forindoor,dustfree
installationwithinfrequentloadoperations,thefollowingscheduleisrecommended:
Inspectasoftenaspossiblewithmaximumintervalof12months.
Examineat5yearsinterval.
Overhaulwhenexaminationanddiagnostic,testsindicateneed.Maximumintervalof15
years.
Maintenanceforaircircuitbreakerandswitchgear
RoutineMintenance
Maintenanceoperation
Examinationand
Inspection
overhaul
Operationalchecks.
X
X
VisualInspection.
X
X
Cleaning.
X
Insulationresistance.
X
X
Circuitbreakerenclosure.
X
Main/archingcontacts.
X
ArccontroldevicesandInterphase
X
barriers.
Mechanisms.
Auxiliaryswitches,indicatingdevicesand
X
interlocks.
Isolatingcontacts.
X
Overloaddevicesandprotectiverelays.
X
X
Instrumentandprotectivetransformers.
X
Controlrelayorcontractor.
X
Mainconnection.
X
Secondarywiringandfuses.
X
Earthconnection.
X
Heaters.
X
Shutters.
X
X
Switchgearspouts.
X
Busbarsandbusbarschamber.
X
Weathershields.
X
Finalverification.
X
X
Maintenanceofauxiliaryequipment.
X
Diagnostictesting
Postfault
maintenance
X
X
X
X
8.0MaintenanceofOilCircuitBreakers(BOCB,MOCB)
Thescheduleforinspectionandmaintenancedependsuponthefrequencyofloadoperationsand
faultoperations.Oilcircuitbreakerinstalledoutdoorandindamp/rainyareasneedfrequent
inspection.Themainrequirementisinspectionofoil,contactsandinternalinsulation.
1.Undernormalconditionsforfrequentoperations:Oncein6monthswithmaximumperiod
http://electricalinfo.in/tech/substationmaintenance/
12/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
1.Undernormalconditionsforfrequentoperations:Oncein6monthswithmaximumperiod
of9months.
2.Forfrequentoperations:Onceinthreemonths.
3.Afterfaultclearance.Iffaultlevelishighinspectasearlyaspossible.Iffaultlevelislow,
inspectafterfaultopeningoperations.
4.Overhaul.Oncein5yearsfornormalandoncein3yearsforrepeated/frequentfaultduty.
5.Duringtheperiodiccheckupthefollowingchecksshouldbemade:
1.Checkthelevelandconditionofoil.
2.Cleantheinsulatorswithfinefabriccloththatwillnotleavefibres.Donotuse
cottonwasteinanycase.Forremovingoil,grease,carbondeposituse
trichloroethyleneorotherchemicalrecommendedbythemanufacturer.
3.Checkcontacts.
4.Checkoperatingmechanism.
5.Checkoil.
6.Checkauxiliaryswitches.
7.Tightennuts,boltsetc.
8.Testinsulationresistancebymeansofhighvoltage(1000V.D.C.)meggerin
caseofhighvoltagecircuitsandby500Vmeggerin220Vcontrolcircuits.
9.Carryouttestsaccordingtothespecifications.
10.Takethestepsasmentionedinthesubsequentparagraphs.
6.Whenthebreakeroperatesonfault,theinternalandexternalinspectionshouldbecarried
outassoonastheoperatingschedulepermits.
1.Examinetheoil.Ifbadlydeteriorated,changeit.
2.Checkarcingcontacts.Cleanwithsmoothfile.Ifbadlydamaged,replace
them.
3.Inspecttheinsulation,carefullycheckthesurface.
4.Checkthearccontroldevice.Ifdamaged,replacetheplates.
5.Checkthetrippingcircuitandoperatingmechanism.
6.Besurethatnotoolsareleftinthetank.Somefurtherdetailsaregivenbelow.
7.Checkthedielectricpropertiesofoil.Inoilcircuitbreakersandminimumoil
circuitbreakers,oilservesasinsulationandarcextinguishingmedium.
Insulatingoilfortransformersandswitchgear(IS3351963)(BS1481959)is
recommendedintheseapplications.Propertiesoftransformeroil(BS:148
1959)aregivenintheTable6.
PropertiesofDielectricOil
Characteristic
Limitingwave
Sludge(maximum)
1.200%
Flashpoint(closedminimum)
295(146C)
Viscosityat700F
37CS
Electricstrength,1minuteminimum 40kVr.m.s.
Saponificationvalue(maximum)
1.00mgKOH/gm
Copperdiscoloration
Negative
Crackle
Shallpasstest
Impuritieshaveabadeffectonthepropertiesofoil.Theoilsampleistakenin
astandardoiltestingcup(90mmx60mmx100mmhigh).Electrodeare
http://electricalinfo.in/tech/substationmaintenance/
13/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
astandardoiltestingcup(90mmx60mmx100mmhigh).Electrodeare
polishedbrasssphere12.7mmdiamountedhorizontally.Thegapspacingis
4mm+0.02mm.Dielectricstrengthofoilisveryimportant.
Asampleofinsulatingoilistakenfromthebottomofthecircuitbreakertank.
Darkandbrowncloudsindicatedeterioration.Oilingoodconditionhaspale
yellowishuniformcolour.Itistestedbymeansofportableoiltestingsetwhich
consistsofaautotransformer,voltmeter,trippingdeviceetc.Thevoltagecan
begraduallyincreased.Oilingoodconditionshouldwithstand40kVr.m.s.for
oneminuteinastandardoiltestingcupwith4mmgapbetweenelectrodes.A
gapof2.5mm,shouldhavebreakdownvalueabove40kV.Theoilshouldbe
testedduringtheperiodiccheckupandwheneverthecircuitbreakerclearsa
fault.
OilMaintenance:Oilmaintenanceiscarriedoutinaccordancewiththe
standardtitledCode,PracticesofMaintenanceofInsulatingOils.Thecode
referstothecontaminationofoilanddeterminationofwhethertheoilis
suitableforfurtherservice.Itgivestheprocedureoftreatmentofoilatsite.
Contaminationofoilduetomoistureorsolidscanbedealtwithsatisfactorilyat
site.Centrifugalseparatorsareeffectiveinremovingfreewaterandfinesolid
impurities.Filtersremovethesolidimpurities.Theoilisheatedtoabout700C
bymeansofelectricheater.Thepurificationsetconsistsofpurifier,heater,
deaerator,oilpumps,strainerandotheraccessories.Theoiliscirculated
throughthepurifiertillthedesireddielectricstrengthisobtained.
Thedielectricoilshouldnevercontainsuspendedparticles,watersolubleacids
andbases,activesulphurorcolloidalcarbon.Theseimpuritiesaccelerate
deteriorationoftheinsulatingpropertiesofthedielectricoilresultingininternal
flashovers.Thedustparticles,carbonparticlesandsludgeintheoilwhichisin
suspendedformintheoilgathersalongtheconductorandinsulatorsurfacesin
presenceofelectricfield.Therebyathinconductinglayerisformedgradually
alongthesurfaceofinternalinsulationduringservice.Theflashovercanoccur
alongthesurfaceoftheinsulationduetotracking.Dustandotherparticlesare
removedbymeansoffiltersintheoilfilteringunit.
Moistureinoillowersthedielectricstrength.Therebycausinginternal
flashover.Moistureisintroducedinthecircuitbreakerthroughdefectiveseals.
Sometimes,oilfilledinbreakermayitselfhavemoisturecontent.
Viscosityindicatesfluidity.Oilwithlowviscosityhavemorefluidityandgives
bettercoolingandshorteropeningtime.Atlowerambienttemperaturethe
viscositysharplyrisesandthespeedofcontacttravelreduces.Henceviscosity
shouldbemeasuredatvarioustemperaturesandthecharacteristicofcontact
travelshouldbeplottedatvarioustemperatures.
Higher,flashpoint(145C)ispreferred.Flashpointindicatestendencyto
evaporate.Forflashpointslowerthan135C,theoiltendstoevaporate
rapidly,therebytheviscosityrisesandvolumeofoilreduces.
Whenfillingswitchgeartankwithoilitisagoodpracticetofirstrinsethetank
andtheimmersedpartwithcleanoil.Itisessentialthatthetankandthe
http://electricalinfo.in/tech/substationmaintenance/
14/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
surfacesofconductorsandinsulatorbekeptfreefromfibresandmoistureas
contaminationwhichlowertheelectricstrengthoftheoil.
Thereshouldbeaslittleaerationofoilaspossibleduringthefillingofthetank.
Astandingtimeshouldbeallowedafterthetankisfilledbeforecommissioning
theequipment.Hotoilshouldnotbeusedtofillswitchgear.
Inadditiontotheabove,aregularinspectionshouldbemadeofoillevels.
8.SilicajelBreather:IncaseofMOCBsandOCBs,porcelaincladVCB,silica
jelbreathermaybeprovided.Itisinstalledataslightlyhigherlevelthantop
chamberofMOCB.Duringhigherloadstheoilinthetankexpandsandthe
levelofoilinthetopchamberraises.Theaircushioninthetopchamber
permitsexpansionandcontractionoftheoilinthepolewithoutcontactwith
moistexternalair.Theaircushioninthetopchamberisconnectedtothe
externalatmosphereviaasilicajelbreatherensuringdrynessofincomingair
duringthebreathing.IncaseofporcelaincladVCB,thebreathermaybefitted
atthebottomofpole.Silicajelbreathersarefittedwithasightglassthrough
whichthecolourofthecrystalscanbeseen.Thecolourchangesfromtheblue
topinkasthecrystalsabsorbmoisture.Whenthecrystalsgetsaturatedwith
moisturetheybecomepinkandshould,therefore,bereactivated.
Thecrystalsshouldbebakedatatemperatureofabout2000Cuntilthewhole
massisatthistemperatureandthebluecolourhasbeenrestored.Cleanthe
breatherandreplacethedrycrystalsandrenewtheoilinthesealingcupatthe
bottom.
Silicajelbreathermaynotbeprovidedwithsomeoilcircuitbreakersinwhich
theupperchamberisfilledwithdrynitrogenpermanently.
MaintenancerecommendedforOCB,MOCBaresummarizedinTablebelow.
MaintenanceforOilCircuitBreakersinMetalenclosedSwitchgear
RoutineMaintenance
Maintenanceoperation
Examination
Postfault
and
maintenance
Inspection
overhaul
1.OperationalcheckC,O,CO
2.Generalinspection
3.Cleaning
4.Insulation,Insulatingoil
5.Circuitbreakerenclosure
6.Mainarcingcontacts
7.Arccontroldevices
8.Isolatingcontacts
9.Ventingandgasseals
10.Mechanism
11.Auxiliaryswitches,indicating
devicesandinterlocks
http://electricalinfo.in/tech/substationmaintenance/
15/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
12.Overloaddevicesandprotective
13.InstrumentandCTs,VTs
14.Controlrelayorcontactor
15.Insulatingoil
16.Tankandtanklining
17.Tankliftingmechanism
18.Mainconnections
19.Secondarywiringandfuses
20.Earthconnections
21.Heaters
22.Shutters
23.Switchgearspouts
24.Busbarsandbusbarchambers
25.Weathershields
26.Finalverification
27.Jointsandseals
28.Generalmechanicalinspection
29.Maintenanceofoilswitchesetc
relays
30.Highvoltagefuseconnectionand
associatedlinkage
31.Maintenanceofairbreakisolating
devicesassociatedwithoil
switchgear
32.Maintenanceofauxiliary
equipment
Postfaultmaintenanceofoilcircuitbreakersinmetalenclosedswitchgear:Dependingonthe
designanddutyoftheOCB,MOCB,inspectionmaybenecessaryafteraboutsixfaultoperationsor
thenumberspecifiedbythemanufacturersandbasedonlocalfaultlevel.Whensuchaninspectionis
necessaryspecialattentionshallbegiventothepointslistedbelow.Isolationofwithdrawablemetal
cladcircuitbreakersshallbedelayedforatleast10minutesafteroperationonfaulttoallowforthe
disposalofanyexplosivegases.
1.Cleaning.Insulationtankliningandotherpartsliabletodispositionfrommetalvapour
shallbecleanedandinspectedforsignsofcracking,burningorotherdamage.An
inspectionforsignsoftrackingshouldalsobemade.
2.ContactsandArccontrolDevices.Contactsshouldbeinspectedforburningorother
damageandreconditionedorrenewedifnecessaryverifycontactforalignmentandwipe.
Toremovetracesofmetaldepositsitwillgenerallybefoundnecessarytoremovethearc
controldevicesorreconditionorrenewthem.
3.Mechanism.Itshallbeverifiedthatthemechanismoperatescorrectly.Attentionshallbe
paidtosettingandclearancesaftercontactsorarccontroldevicesarereplaced.
http://electricalinfo.in/tech/substationmaintenance/
16/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
paidtosettingandclearancesaftercontactsorarccontroldevicesarereplaced.
4.InsulationResistance.Atestshouldbemadeoftheinsulationresistancebeforeputting
theswitchgearbackintoservice.
5.InsulatingOil.Iftheoilisbadlydiscolouredorshowevidenceofcarbonparticlesin
suspension,itmayrequirechanging.
6.JointsandSeals.Alljointsandsealsshouldbeinspectedfortightnessandparticular
attentionshouldbepaidtotankgasketswherethesearefitted.
GeneralMechanicalInspection.Thisshouldbemadeformechanismstructure,internalorexternal
tothetank.Theswitchgearshouldbetrippedandclosed.
9.0MaintenanceofAirBlastCircuitBreakers
Thecircuitbreakerusesfreshcompressedairforarcquenchinganddoesnotrequiremaintenanceof
quenchingmedium.Onlythedrynessofairshouldbeensured.Thecompressedairsystemneeds
routineinspection.
Afterspecifiednumberofoperationscontactsandnozzlesininterruptersneedcheck.Thediameter
ofnozzleabove5%callsforreplacement.Themaintenancerecommendedforairblastcircuit
breakersissummarizedintablebelow:
MaintenanceforAirBlastCircuitBreakers
RoutineMaintenance
Maintenanceoperation
Examinationand
Inspection
overhaul
1.Operationalcheck
X
X
2.GeneralInspection
X
X
3.Cleaning
X
4.Airconditioning
X
X
5.Insulation
X
6.Loadcontrolkiosk
X
7.Pressuregauge
X
8.Pressureswitches
X
9.Mainconnection
X
10.Secondarywiringandfuses
X
11.Interpolelinkages
X
12.Mainmechanism
X
13.Auxiliaryswitches,indicatingdevicesand
X
interlocks
14.Sequenceisolator
X
15.Localairreceiversandpressurevessels
X
16.Interrupters
X
17.Isolatingandarcingswitches
X
18.Earthconnection
X
19.Enclosures
X
X
20.Overloaddevicesandprotective
X
X
transformers
21.Instrumentsandprotectivetransformers X
X
22.Controlrelaysorcontractors
X
23.Finalverification
X
X
Postfault
maintenance
X
X
X
X
X
X
Thefollowinglistgivesoperationswhichmayberequiredtobecarriedoutduringmaintenance:
1.Cleaning.Allthedirtsshouldbebrushedoffandanyjointorgasketshallbecleanedprior
tocommencing,anydismantling,toavoidingressofdirtintoanyinternalportionofthe
breaker.Thisisparticularlyimportantinthecaseofpneumaticvalvegearsincerelatively
smallparticlesofdirtcancauseadisproportionalamountofdamageleakageor
malfunction.
2.MaintenanceofCompressedAirPlant.Compressedairplantsshouldbeinspectedas
http://electricalinfo.in/tech/substationmaintenance/
17/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
MaintenanceofCompressedAirPlant.Compressedairplantsshouldbeinspectedas
partoftheregularsubstationinspection.Itisgoodpracticetocarryoutperiodicstart/stop
testsontheplant.
Therearestatutoryobligations,toinspect,testandcertifyairreceivers(pressurevessels)
periodically.Safetyandreducingvalues,shouldalsobeinspectedduringthesametime.Guidance
onthemaintenanceofthisequipmentgivenbythemanufacturershouldbefollowed.Thedriers
shouldbeinspected.Ifnecessary,thedryingagentshouldbechanged.
10.0MaintenanceofVacuumCircuitBreaker
Vacuuminterrupterissealedforlifeanddoesnotrequireanyreplacementofcontactsforseveral
thousandsloadoperationsandabout50operationsonratedshortcircuit.Mechanismneedsperiodic
lubricationasrecommendedbythemanufacturer.Theotherpartsneedcleaningandgeneral
inspection.ThedetailsaregiveninTablebelow:
MaintenanceforVacuumCircuitBreaker
RoutineMaintenance
Maintenanceoperation
Examinationand
Inspection
overhaul
1.Operationalcheck
X
2.GeneralInspection
X
3.Cleaning
X
4.Openingdevice(trip)
X
5.Insulation
X
X
6.Circuitbreakerenclosure(Interrupter)
X
7.Mainconnections
X
8.Secondarywiringandfuses
X
9.Mechanism
X
10.Auxiliaryswitches,indicatingdevicesand
X
interlocks
11.Shutters
X
X
12.Switchgearspouts
X
X
13.Isolatingcontacts
X
X
14.Vacuuminterrupter
X
15.Isolatingandearthingswitchgear
X
16.Earthconnection
X
X
17.Overloaddevicesandprotectiverelays
x
X
18.Instrumentprotectivetransformers
X
19.Controlrelaysorcontracts
X
20.Busbarsandbusbarchambers
X
21.Finalverification
X
X
Postfault
maintenance
11.0MaintenanceofSF6CircuitBreaker
Duringperiodicmaintenance,thegassamplefromSF6circuitbreakeriscollectedandtestedfor
moistureandotherimpurities(IEC376).Thegasiscirculatedthroughfilterscontainingactivated
alumina.TheactivatedaluminaabsorbstheimpuritieslikeS2F2,SF4moistureetc.Thegascanbe
usedagainafterregeneration.
ForinstallationandmaintenanceofSF6circuitbreakeragashandlingunitisnecessary.This
consistsofavacuumpump,valves,pipings,acompressorandaservicetank.
TheSF6gasinthebreakergetsdecomposedduringquenchingprocess.Mostofthelowerfluorides
recombine,butsomeremain(S2F2,SF4etc.)inthedecomposedform.Theyarepartlyabsorbedby
activatedaluminafiltersanddissicants.SF6gassubjectedtoarcingbecomescorrosive,irritantand
hasbadodour.Itshouldnotbeinhaledorleftinatmosphere.Itiscollectedintoservicetankofgas
handlingunitbymeansofthecompressor.
ThebreakerpolesarenotdismantledbeforereclaimingtheSF6gasintheservicetankofthegas
handlingunit.SparecylindersofSF6gasinsufficientquantityshouldbearrangedinadvancebefore
http://electricalinfo.in/tech/substationmaintenance/
18/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
startingthemaintenanceworkofSF6circuitbreakers.IfthesubstationhasonlyafewSF6circuit
breakers,thesimplesmallergashandlingunitisadequate.ForlargesubstationshavingseveralSF6
filledequipment,alargergashandlingunitisnecessary.AchemicallaboratoryfortestingSF6gasis
alsorecommended.
PoleUnitandInterrupter:Atasuitableintervaloneinterrupterperpoletobeexaminedtoestablish
therateofburninganderosionofthecontactsandthegeneralconditioninordertoassessthe
necessityforfurthermaintenanceetc.Thisworkmustbecarriedoutunderdryweatherconditions
andprecautionstakentoavoidtheingressofanymoisturedirtintothepoleunits.
Slightburningofcopperorcopperalloycontactsshouldnotcauseanytroublebutheavierburning
shouldberemovedwithafinefile(emeryorcarborundumpapershouldnotbeused).Copperalloy
andotherarcresistingmetalcontactsshouldbeinspectedforanysignsofexcessiveburning.In
general,considerableburningofcontactscanbetoleratedbeforereplacementbecomesnecessary
butitisrecommendedthatwherecontactsrequiredressing,theminimumamountofmaterialshallbe
removedandthemanufacturersrecommendedprofilemaintained.
Itisimperativethattheforcebetweencontactshallnotbemateriallyreduced.Anyburningawayfrom
thearcingareashouldbenotedandinvestigated.Transfercontactsshallbeinspectedforanysigns
ofburningandcleanedasnecessary.
ThenozzleoftheinterrupterisusuallymadefromPTFE.Itshallbeexaminedforexcessiveburning
orerosionandthiscanbedonebycomparisonwithanewnozzle.Ingeneralthedimensionsand
profileofthenozzlearenotascriticalinSF6circuitbreakerand,therefore,agreateramounterosion
canbetoleratedbeforereplacementbecomesnecessary(5%).However,themanufacturers
recommendationsinthisrespectshouldbecarefullyfollowed.
Theinsulationadjacenttothearcingareashouldbecleanedasnecessary.Burningofthisinsulation
willindicateamisplacedarcandiffoundthismustbeinvestigated.
TheentireinterrupterisgenerallyfilledwiththindustoferosionofTeflonnozzlecombinewith
fluoridesofcontactmaterial.ThisdustisinsulatingwhennotexposedtoSF6gas.Immediatelyafter
dismantlingofthebreaker,thisdustabsorbsmoistureandbecomesconducting.Henceitshouldbe
wipedoutcompletelybymeansofairjet,cloth,trychloroethelene.Thiscleaningisessentialincase
ofcircuitbreakers.Ifassembledwithoutcleaning,theinsulationresistancegoesdownandinternal
flashoveroccursduringthenormalclosedpositionbetweenthelivepartandearthduetosurface
trackingalonginternalinsulation.
TheimportantstepsinthemaintenanceofSF6circuitbreakerincludeinternalcleaningand
replacementofSF6gas.Theoperatinglinkagesshouldnotbedisturbedunlessdiagnostictestsora
visualexaminationindicatethatthisisnecessary.Thesettingdimensionsshouldbeverified.
FiltersandDessicants:Filtersand/ordissicantsareinstalledinSF6circuitbreakertofilteroutor
absorbsomeofthebreakdownproducts.Asalastoperationpriortoclosingupthechambersofthe
circuitbreakerthefiltersanddessicantsshouldbereplaced.Undernocircumstancesshould
untreatedfilterordessicantmaterialremovedfromthecircuitbreakerafterservicebeheated.
MaintenanceforSF6CircuitBreakers
RoutineMaintenance
Maintenanceoperation
Examinationand
Inspection
overhaul
1.Operationalchecks
X
X
2.GeneralInspection
X
X
3.Cleaning
X
4.Openingdevice(Trip)
X
X
http://electricalinfo.in/tech/substationmaintenance/
Postfault
maintenance
19/27
3/7/2016
4.Openingdevice(Trip)
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
5.Circuitbreakerenclosure
6.Gassystem
7.Sulphurhexafluoridegas
8.Insulation
9.Localcontrolkiosk
10.Pressuregauges
11.Pressureswitches
12.Mainconnection
13.Secondarywiringandfuses
14.Earthconnection
15.SF6gasheaters
16.Interpolelinkages
17.Mainmechanism
18.Auxiliaryswitches,indicatingdevicesand
interlocks
19.Interrupters
20.Localairreceivesandpressurevessels
21.Filtersanddesiccants
22.Overloaddevicesandprotectiverelays
23.Instrumentandprotectivetransformers
24.Controlrelayorcontractor
25.BusbarsandBusbarchambers
26.Finalverification
X
X
X
X
x
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MaintenanceofSF6CBinG.I.S.:Afterinterrupting25shortcircuitsatratedbreakingcapacityor
after5000interruptionsofratedcurrentorpartload,thecircuitbreakershouldbeoverhauled.Forthis
reasonthebreakersissodesignedthatitcanbeeasilyremovedfromtheinstallation.
Havingswitchedoffandearthedthebreaker,thegasisfirstpumpedusingtheservicetruck.Thenthe
casingcontainingtheoperatingmechanism,situatedoneend,canbeopened.Alloperating
elements,trippingdevices,auxiliarycontactsandsoonarenowaccessible.Theextinctionchambers
canberemovedfromthetankwithaspecialdevice,havingfirstwithdrawntheisolatingchamber
attachedtothecasingcontainingtheoperatingmechanism.
Thepartsofthebreakerandisolatorsmustbecleanedverycarefully,throughthistaskiseasily
performed.Havingreassembledthebreaker,itmustfirstbeevacuatedbeforeitisrefilledwithSF6
gas.Assoonasthebreakerhaspasseditsfunctionaltest,itcanbeputbackinservice.
12.0Likelytroublesandessentialperiodiccheckstoavoidthem
Thepointtobecheckedduringtheperiodicmaintenanceincludethefollowing:
1.Theoperatingmechanismofthecircuitbreakershouldbeingoodworkingconditionboth
mechanicallyandelectrically.
2.Insulationresistancephasetogroundofeachpoleshouldbeabove2000megaohms,
(upto1.1kV)10,000megaohmsforabove36kV.
3.Contactpressureisimportant.Whenthecontactpressureisenoughevenalinecontact
canpassnormalcurrentwithoutoverheating.Theresistanceofpoleunitshouldbeless
than50microohms.
Tripcircuitandbatterysupply.Maintenanceofthetripcircuitandbatterysupplyis
essentialforthesatisfactoryoperationofallprotectiverelays(shunttriptype).Thebattery
shouldbeinspecteddailyforcorrectvoltage,specificgravityetc.anditshouldbekepton
tricklecharge.Theintercellconnectorsshouldbeingoodcondition.Thereshouldbea
pilotlamporalarmindicationtodrawtheattentionoftheoperator,ifthetripcoilbattery
voltagefallsbelowcertainlimits.
1.Electrolytelevelmustbemaintained10to15mmabovetheplatesforthe
properreactionoftheconstituents.
http://electricalinfo.in/tech/substationmaintenance/
20/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
properreactionoftheconstituents.
2.Terminalvoltageofthecellmustnotbeallowedtofallbelow1.8V.
3.Batteryshouldbechargedtoitsratedcapacitytoincreaseitsefficiency.
4.Donotallowbatterytoremaininsemidischargedconditionforlong,
otherwisethelifeofbatterywillbereduced.
5.Commercialsulphuricacidshouldnotbeusedotherwisetheactive
componentswillbedamagedverysoon.
6.Usedistilledwaterfortoppingupthelevelofelectrolyte.
7.Avoidexcessivecharging,asitreducesthelifeofthebattery.
8.Bareandinsulatedleadshouldbepaintedwithrecommendedpainttoavoid
accidentalshortcircuit.
9.Batteryshouldbekeptcleananddryandbatteryroomshouldbewell
ventilatedtoavoidsuffocation.
10.Ifacidfallsoutofthebattery,wipeoverwithwetraganddrythoroughlyto
savethecomponentsfrombeingdamaged.
11.Terminalpostsandconnectorsshouldbecleanandfreefromcorrosionto
increasethelifeofthebattery.
12.Nutsandboltsofcellconnectorsshouldbekepttightenedandsmearedwith
Vaselinetoavoidrusting.
13.Itshouldnotbeleftindischargedconditionforlong,otherwisethedefectsof
sulphasionwilloccur.
4.Everyrelayshouldbetestedonceinsixmonths,withsuitabletestingsetandtherecords
ofsuchtestsshouldbeloggedinamaintenanceresistor.Duringtestsacheckshouldbe
madeifanyoftheoverloadortimesettingontherelayrequirechangeduetotheincrease
ordecreaseintheloadconditionssincethedateoflasttest.
Followingdefectsarepossible:
1.Impropercontactormisalignmentofthecontactprongsofthetripbattery
circuits,betweenthecubicleandthedrawouttruck.
2.Pointinanauxiliarywiringofsupplyfrombattery,ordischargedbattery.
3.Circuitbreakeroperatingmechanismnotbeingsluggishduetomechanical
defects,orstiffnessduetodustorrust,lackoflubrication,etc.
4.Wrongcurrenttransformerconnections.
5.Wrongrelaysettingsfortheloadconditions.
PreliminaryPreparation:Thepreliminarypreparationsincludestudyofdrawings,acceptance,report
checkingcertificatesandtestreportsoftheequipment,completionofcivilengineeringworkarranging
thetools,liftinggearsetc.organizingthelabour,preparethescheduleofinstallation,preparing
sequencecardsforerectionofmajoritemsetc.Suchcardsindicatethesequenceofoperationitems
involved,procedureinbriefetc.
Trouble
CommonTroublesandRemedialActions
Possiblecauses
PossibleRemedialActions
Circulatedryhotairor
1.LowinsulationResistance(below
2000Megaohms)between
Moisture
Dirtyinsulation
surfaceinternal
Phaseterminaland
http://electricalinfo.in/tech/substationmaintenance/
and/orexternal
oilthroughthebreaker
polefor4t06hours.
Dismantle,clean,
reassembleInsulation
21/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
earthedframe,with
Pooroil
breakerclosed
Carbon/copper
Phaseterminalsofa
particlessticking
pole.
tointernal
for1.1kVandabove
surface
10,000megaohms
resistanceshouldbe
above2000Megaohm,
above36kV
Reduced
contact
pressure
Loose
2.ResistancebetweenTerminalsof
Poletoohigh(above100
microhms)(15microohmperjoint)
connections
Contactsurface
damageddue
torepeated
contact
operations
Dismantle,repairand
assembleagain.If
necessary,replacethe
contacts
Insufficient
contactwipe
Oxidefilmon
contactsurface
Contacterosion
3.UnequalcontactWipeandTravel
duetorepeated
in3poleMeasuredfromtopsurface
loadoperations
Inspectcontacttips
ofinterrupterflangeandthecontact
orshortcircuit
Replaceifbadlyeroded
tipbyasimplerodwith
operations
Adjustcontactiflengths
Unequallength
areunequalinthree
duetowrong
pole.
breakeropen
breakerclosed
adjustmentsof
linkages
Pullrodfor
contact
damaged
Onethelinksof
4.Oneofthepoledoesnotclose.
thatpole
broken
Dismantlethepoleand
repairthedefect.
Contactofthat
poleseverely
damaged.
Excessive
frictioninthe
poleunit.
Contactgripto
5.BreakeroperationtooSlowDuring
http://electricalinfo.in/tech/substationmaintenance/
high
22/27
3/7/2016
5.BreakeroperationtooSlowDuring
opening(Timingfromtripcommand
tocontactseparationinstanttoo
large(60msinsteadofsay40ms)
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
high
Tripcoil
Identifythecause
operation
sluggish.
TakeRemedialaction.
Lowbattery
voltage,hence
highertripcoil
pickuptime.
Opencontrol
circuit
Spring
defective
Tripcircuit
open
Triplatch/coil
6.Breakerdoesnotoperateon
Electricalcommand.
defective
Springnot
changed
Checkcontrolcircuit
Checkclosingspring
visually
Identifythecauseand
takeremedialaction
Checksupplytospring
changingmotor.
Ifbreaker
operateswith
manual
Checkpressure
switches,relays,control
wiring.
operationoftrip
release,the
mechanismis
O.K.
13.0MaintenanceofTransformers
Transformerswillgivetroublefreeserviceforlongperiods,ifattentionispaidtothepointslistedin
Table13and14.Properrecordofalltheobservationsandrepairandmaintenanceoperationswill
forewarnofanyimpendingtroubles.
Acidity.Acidsareformedintransformeroilduringoperation.Theirformationisparticularlyrapidat
operatingtemperaturesabove75oC.Acidsarecorrosiveinnatureanddamagethewindings,core,
tanketc.Theyarealsoresponsibleforsludgeformation.Acidityisexpressedintermsofthenumber
ofmilligramsofpotassiumhydroxiderequiredtoneutralizethetotalfreeacidsinonegramofthe
material.
Therecommendedlimitsforacidityareasfollows:
Aciditybelow0.5mg.KOH/g.
Permissible,ifoilissatisfactoryotherwise.
Aciditybetween0.5and1.0mg.KOH/g. Keepoilunderobservation.
Acidityabove1.0mg.KOH/g.
Discardoil.
Theacidityofoilshouldbecheckedeverytwoyearsfortransformersupto1000KVAcapacity,and
annuallyfortransformersabovethissize.Theactualperiodmaybevarieddependinguponthe
severityoftheserviceandobservationofresults.Thistestmaynotbeperformedonpolemounted
transformersbecauseofthecostinvolved.Detailedprocedurefordeterminingacidityislaidin
I.S:18661960.
http://electricalinfo.in/tech/substationmaintenance/
23/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
I.S:18661960.
RecommendedMaintenanceScheduleofTransformers(AttendedSubstationsIndoororOutdoors)
Inspection
ItemstobeInspected
Remarks
Frequency
1.Ambienttemperature,Windingtemp,Oil
(1)Daily
temp,Load,Voltage.
1.Oillevel
2.Reliefdiaphragm.
(2)Monthly
3.Dehydratingbreather.Checkthatair
passagesarefree.Checkcolourofsilica
gel,whichshouldbeblue.
(3)
Quarterly
1.Lubricatebearingsetc.ofcoolerfans,
circulatingpumpsetc.ifany
Adjustloadif
temperatureishigh.
Iflow,topupwithdry
oil.Lookforany
signsofleakage.
Replaceifbroken.
Changeifcolouris
pink.
Replaceifnecessary
1.Checkoilfordielectricstrengthand
(4)Half
yearly
presenceofmoisture.
2.Checkbushes,insulatorsetc.
Filterorchangeoil
asnecessary.
3.Checkcableboxes.
Filterorreplace,if
1.Checkoilforacidity,sludge,andflushpoint,
ifpossible.
(5)Yearly
necessary.
Formethodsof
2.Checkrelays,alarms,contactsetc.
loweringearth
3.Checkearthresistance.
resistance,see
4.Checklightningarrestors.
Chapter3.
Lightning
(6)Five
yearly
1.Overallinspectionincludingliftingofcore
andcoils.
Washbyhosing
downwithcleandry
oil.
Notes:
Theabovescheduleisonlyindicativeandtestsmaybeperformedatmorefrequentintervals
dependingupontheseverityofservice.Theopeningtemperatureandthequalityofoilarethemost
importantfactorsindeterminingthelifeandperformanceofatransformer.Earthresistanceshouldbe
checkedtwiceayear,onceindryandhotseasonandonceatanyothertimeduringtheyear.
Period
MaintenanceScheduleofOutdoorUnattendedSubstation
Itemstobechecked
Action
1.Cleanbushesofalldirtandoil.
2.Examineconditionofswitchesandtightenconnections.
3.Lookforanyleaks.
Quarterly
4.CheckconditionofSilicagel.(Seethattheairpassages
http://electricalinfo.in/tech/substationmaintenance/
24/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
inthedehydratorarefree.)
5.Checkoillevelandtopup,ifnecessary
6.Lookforbrokenbushes.
1.Checkdielectricstrengthofoil.Testoilformoisture.
Yearly
2.Checkearthresistance.
Filterorreplace,as
Convenient.
3.Checklightningarrestors.
Five
yearly
1.Opentankforcleaningandreassembly.
Washdownwithclean
oil.
14.0CareandMaintenanceofEarthing
1.Checktheearthresistivityduringdryseasonhalfyearlyandmaintainandcomparethe
recordswithpreviousreadings.
2.Watershouldbepouredatregularintervalsduringdryseasonatthesmallsubstations.
3.Whenthesystemisexpanded,theearthingsystemshouldalsobeexpandedbyusing
additionalearthelectrodeandearthwireseparately.
4.Electrodeshouldbeplacesintheearthintheuprightverticalposition.
5.Theelectrodesandtheearthcontinuityconductorusedinthecircuitshouldbeofthe
samemateriali.e.copperorGI.
6.Checktheearthconnectionandtightenthemproperly.
7.Passtheearthcontinuityconductorthroughthegalvanizedpipefrombeingdamaged.
8.Inspectthebrokenorrustedearthcontinuityconductorsandreplacethemwithproper
size.
9.Theearthresistanceofthefollowingequipmentmustbemeasuredduringthedriestpart
oftheyear:
Transformerbodyandothermetalparts.
Lightningarrestor
Neutralofthetransformer.
10.Mixtureofsaltandwatermaybeaddedtoimprovetheearthresistance.
11.Inthecorrosiveearth,thesteelelectrodeshouldbereplacedbycoppercoatedsteel
electrode.
12.Theearthcontinuityconductorshouldbeproperlyweldedwiththeearthelectrode.
13.Avoidanyjointingsfromearthingconductor.
15.0InsulationResistanceMeasurement
Itistheresponsibilityoftheusertoensurethattheinsulationofelectricalswitchgearhasbeentested
andtheresultrecordedbeforecommissioningtheequipment.Duringthelifeofelectricalequipment
insulationresistancetestingwillgiveagoodindicationoftheconditionoftheequipmentandifthese
testsarerecordedcanhelpindecidingmaintenancerequirementforthewholeequipment.
Insulationresistancemeasurementsbetweenpolesandeartharecomparativelyeasilymadeandare
themostsuitableforroutinetests,buttofacilitatetheirproperinterpretationsystematictestingand
recordingmethodsareessential.Insulationresistancetestsarestrictlycomparative,inthatforeach
itemtestedarejectionvaluecanonlybefixedonthebasisofexperiencebycomparisonwithearlier
results.Forthisreasonthetestequipmentandmethodsusedshouldbethesameoneachoccasion.
Testvaluesobtainedshouldbeloggedonastandardformdesignedforthepurpose,togetherwith
http://electricalinfo.in/tech/substationmaintenance/
25/27
3/7/2016
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
thehumidityandtemperatureatthetimeofthetest,andingeneralasteadyfallofinsulation
resistanceoveraperiodoftimeisamorereliableindicationofdeteriorationthanisarelativelylow
valuewhichremainsreasonablyconstant.
Onlongpiecesofinsulation,suchaspullrodsonsomecircuitbreakerdeteriorationmaynotoccur
uniformlyandresistancemeasurementstakenovertheentirelengthmaynotreveallocalized
deterioration.Particularattentionshouldbepaidtothepullrodsofcircuitbreakers.Wherepracticable
theinsulationtobetestedshouldbeallowedtoreachambienttemperaturebeforeresistancetests
aremade.
Duringoverhauloftheelectricalequipment,theinsulationsurfaceshouldbecleanedwith
trichloroethlene,cleanclothcompressedair.
InsulationresistanceismeasuredbymeansofMegohmmeter(Megger).Themeggercomprisea
megohmmeterwithbuiltind.c.generator.Theminimumreadingiszeroandmaximumisinfinity.The
scaleisinmegohms.Thetwoterminalsofmeggerareconnectedacrosstheinsulation,i.e.onetothe
conductorandothertoearthbody.Thehandleisrotatedbyhandormotor.Theinsulationresistance
indicatedbythepointerinmegohms.
Forh.v.switchgear1000Vor5000V(d.c.)meggerispreferred.Theinsulationresistanceofh.v.
circuitbreakerisveryhigh(above10000megohmsofinfinity).Insulationresistanceofcontrolcircuit,
tripcircuit,relaycircuit,secondarycircuit,etc.ismeasuredbymeansof500Vmegger.Value
obtainedshouldnotbelessthan1megohm.
Forprimarycircuit,theinsulationresistanceistestedwiththebreakerclosedbetweenlowerterminal
andearthedframeforeachinterrupter.Withbreakeropen,insulationresistanceismeasured
betweenterminalsofeachinterrupter.
Testvoltagewhichcouldbeappliedtoprimaryinsulationwhenmakingresistancetestvaries
accordingtothevoltageratingoftheswitchgearandisshownintablebelow:
3phasesystemratingofprimary
insulatingofswitchgear
Upto1kV
Above1kV3.6kV
Above3.6kVto12kV
Above12kV
TestVoltages
Testvoltagerecommendedforinsulationresistancetest
(toearthandbetweenphases)kV(d.c.)
1
2
5
5
Comments
Postacomment
Name:
Emailaddress:
URL:
Comment:
Post
Preview
http://electricalinfo.in/tech/substationmaintenance/
26/27
3/7/2016
Post Preview
ElectricalInfo:Article|Articles|MaintenanceofSubstationEquipment
contentanddesign20122014electricalinfo.in
home
http://electricalinfo.in/tech/substationmaintenance/
glossary
contact
27/27