Project: J

FIRE ALARAM ACTIVITIES


Sl No
A
1
2
B
1
2
C
1
2
3
4
D
1
2
3
4
5
6
7
8

Project: JUAYMAH380

RE ALARAM ACTIVITIES
Description
380KV GIS BUILDING
Installation of fire alarm conduit at basement
Installation of fire alarm conduit at ground floor
230 KV GIS BUILDING
Installation of fire alaram conduit at basement
Installation of fire alarm conduit at ground floor
CONTROL BUILDING
Installation of fire alaram conduit at basement
Installation of fire alarm conduit at ground floor
Installation of fire alarm conduit at Auxilliary Room, Switch gear room and Corridor
Installation of fire alarm conduit at Communication and fire alarm room
CABLE TUNNEL
Tunnel - A ( 230 KV Power Cable Tunnel )
Tunnel - B( 230 KV Control Cable Tunnel )
Tunnel - C ( 230 KV Power Cable Tunnel )
Tunnel - D ( 380 KV Control Cable Tunnel )
Tunnel - E ( 380 KV to Control Room )
Tunnel - F ( Transformer to 230 KV GIS Building )
Tunnel - G ( 230 KV to Control Room )
Tunnel - H ( 230 KV to Gantry )

YMAH380/230KV BSP
Date : 19.09.2015
Progress
Total Qty
till date in
in %
%

Present
day
progress

Balance

100
100

90
90

0
10

10
10

100
100

90
0

0
0

10
100

100
100
100
100

90
100
60
60

0
10
40
60

10
0
40
40

100
100
100
100
100
100
100
100

0
90
0
90
0
0
0
0

0
0
0
10
0
0
0
0

100
10
100
10
100
100
100
100

ate : 19.09.2015
Remark

Roof side completed , Laying on the walls in progress

Civil dept clearance required / Tunnel completed


Civil dept clearance required / Tunnel completed
Tunnel not yet constucted
Civil dept clearance required
Civil works not yet finished
Tunnel civil work in progress