I. INTRODUCTION
P
J1 =
J 3 =
J = Pbal
5
P
V
Q
J4 =
V
Pbal
J6 =
V
J2 =
PUPFC
E
UPFC
Q
J8 =
E
Pbal
J9 =
E
J7 =
( 2)
Pbal = PB + PE = 0
(3)
A. Sensitivity Analysis
1) Sensitivity analysis for Voltage stability
Impedance of branches in high voltage system is more
reactive. So, injected reactive power primarily depends on
voltage altitude of a bus. While injected active power mainly
depends on voltage angle [6], [7].
To determine voltage control capability of power system,
the voltage change (V ) should be analyzed with small
J P
J
Q
J Pv P
*
=
J QV V Q
(5)
P J1
Q = J
3
Pbal J 5
J2
J4
J6
J 7
J 8 * V
J 9 E
= J P1 J PV V
(1)
(6)
So,
( J Q J P1 J PV + J QV )V = Q
144424443
(7 )
J QV
V = J QV Q = SVQ Q
(8)
Vm
ref
m
(9)
(Qloss / Q )
JP =
i Pi
2n
Max
i 2n Pi
JV = bm (Vm Vmref ) 2
(10)
(11)
Where
i
m
n
ai , bm
Pi
Pi
max
4
West Azarbaijan Network
HS835
58. km
FH827
100. km
BF834
18. km
Urmieh C.C
Mahabad2
Tikmeh
BN835
85. km
MU801
121. km
N Sahand
AQ901
150. km
MN817
58. km
TM803
79. km
CH838
75. km
HM804
27. km
EN830
30. km
AE902
200. km
Miandoab2
ASTARA NET
ZN820
134. km
TAGIDIZAJ
VS816
34. km
DT825
81. km
Sardrood
AN810
72. km
AD829
14. km
GILAN NET
AD828
14. km
CU801
24. km
CU802
24. km
Vali
Tabriz
BZ831
43. km
AL809
118. km
AB810
43. km
Urmieh 2
MOGHAN
BZ815
43. km
AR813
21. km
IMISH2
Shafa
AF812
53. km
LU808
130. km
Khoy3
FR821
32. km
EXCH. Azerbaijan
ZH824
106. km
AZAR
LU807
130. km
AHAR
BH823
97. km
SUNGUN
FH822
100. km
GS831
87. km
AGARA2
TURKEY 154
TURKY1
Ardabil Network
GH832
98. km
EXCH. Armania
EXCH. TURKEY
ARDABIL
Mianeh
MN818
58. km
NSAHAN4
MIANE4
ZANJAN
GHARB
C.IMP. 5
C.IMP. 2
C.IMP. 15
C.IMP. 3
V
~
ZANJAN
C.IMP. 8
C.IMP. 12
V
~
SHAHIDGHAYATI2
C.IMP. 4
C.IMP. 10
C.IMP. 9
C.IMP. 11
NGS_GILAN
SAGHEZ2
C.IMP. 6
C.IMP. 1 ASTARA
C.IMP. 14
V
Punel (AC V.)
C.IMP. 7
B. Network Modeling
Sufficient information for network modeling of national
grid including current status, quantity of production in
generation units, size and location of new power plants and
new power lines, available compensation elements and
amount of loads was obtained from planning deputy of
TAVANIR (Irans national ISO) and added to model structure
to form proper Deck in DIgSILENT environment. In addition
to mentioned information, all data belongs to Azerbaijan
network state in 2016 and connection to neighboring countries
also was implemented in software environment.
C.IMP. 13
PUNEL2
5
TABLE II
PARAMETERS OF TRANSMISSION LINES OBTAINED FROM REDUCED MODEL OF
NATIONAL GRID
Line
IMP.1
IMP.2
IMP.3
IMP.4
IMP.5
IMP.6
IMP.7
IMP.8
Impedance (pu)
(+7.1-j15.1)E+12
(+2.9+j24.7)E-05
(-5.2+j32.8)E+10
(+8.2+j74.0)E+1
(+8.6+j15.1)E+1
(-7.5-j13.9)E+14
(+1.9+j8.1)E-04
(+1.0+j55.3)E-05
Line
IMP.9
IMP.10
IMP.11
IMP.12
IMP.13
IMP.14
IMP.15
Impedance
(1.6+j41)E-5
(-1.5+j31)E-3
(5.2-j3.3)E10
(-1.8+j5.8)E0
(-4.9+j1.6)E0
(1.2+j1.1)E-3
(-0.4+j1.3)E0
i = 1, n = 2
1 Pi
J P = Max
i 4 Pi
(12)
Jp (n=2,i=1)
Fig. 5. V / Q changes in Azerbaijan networks buses
No Area
1
U
2
U
3
U
4
U
5
U
6
U
7
U
8
U
9
T
10
T
11
T
12
T
13
T
14
T
15
T
16
T
17
T
18
T
19
T
20
T
21
T
22
T
23
A
24
A
25
A
26
A
27
A
28
A
Locatio
P2-C3
P4-C2
P4-C1
P1-C4
P8-C3
P7-C4
P2-C1
P2-C2
P14-C1
P7-C3
P10-C3
P10-C4
P18-C1
P23-C1
P18-C2
P7-C2
P13-C1
P16-C4
P11-C3
P18-C3
P18-C4
P17-C1
P19-C3
P19-C2
P19-C1
P24-C1
P21-C4
P21-C3
Steps
St.1 St.2 St.3 St.4 St.5 St.6
0.2 0.2 0.2 0.2 0.2 0.2
0.3 0.3 0.2 0.2 0.2 0.2
0.2 0.2
0.2 0.2 0.3
0.2 0.2 0.2 0.2 0.3 0.3
0.2
0.2 0.2 0.2 0.3
0.2 0.2 0.2 0.2 0.2 0.3
0.2 0.2 0.2 0.2 0.3 0.3
0.2 0.2 0.2 0.2 0.3 0.3
0.2 0.2 0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.2
0.2
0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.3
0.2 0.2 0.2 0.2 0.2 0.3
0.2 0.2 0.2 0.2 0.3 0.3
0.2 0.2 0.2 0.2 0.3 0.3
0.2 0.2 0.2 0.2 0.3 0.3
0.2 0.2 0.2 0.2 0.3
0.2 0.2 0.2 0.3 0.3 0.4
0.2 0.2 0.2 0.3 0.3 0.4
0.2 0.2 0.2 0.3 0.4 0.5
0.2 0.2 0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.2
0.2 0.2 0.2 0.2 0.2 0.3
0.2 0.2 0.2 0.2 0.2 0.3
JV = 0.2(Vm 230) 2
(13)
(14)
Where
lossm
loss ref
Cm
TABLE IV
RESULTS OF JV ASSESSMENT WITH UPFC IMPLEMENTATION
Jv
No Area
1
U
2
U
3
U
4
U
5
U
6
U
7
U
8
T
9
T
10
T
11
T
12
T
13
T
14
T
15
T
16
T
17
T
18
T
19
T
20
T
21
T
22
T
23
T
24
T
25
T
26
T
27
T
28
T
29
A
30
A
31
A
32
A
Steps
Locatio
P1-C1
P1-C2
P5-C1
P2-C1
P6-C2
P22-C1
P1-C3
P12-C1
P14-C1
P26-C2
P16-C1
P2-C2
P13-C4
P14-C3
P11-C4
P15-C1
P2-C3
P17-C1
P13-C1
P11-C2
P16-C3
P7-C2
P16-C4
P14-C2
P11-C1
P8-C1
P8-C2
P13-C2
P19-C1
P19-C2
P19-C5
P24-C2
St.1
0.1
0.1
0.07
0.08
0.08
0.07
0.08
0.09
0.08
0.08
0.08
0.07
0.08
0.08
0.08
0.07
0.08
0.07
0.08
0.08
0.08
0.09
0.08
0.09
0.08
0.08
0.08
0.08
0.08
0.08
0.1
0.08
St.2
0.08
0.08
0.07
0.07
0.07
0.06
0.07
0.08
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.08
0.08
0.08
0.08
0.09
0.08
0.08
0.08
0.08
0.07
0.07
0.09
0.08
St.3
0.06
0.06
0.06
0.07
0.07
0.06
0.07
0.07
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.07
0.07
0.07
0.07
0.07
0.09
0.07
0.08
0.08
0.08
0.06
0.07
0.08
0.07
St.4
0.06
0.06
0.06
0.06
0.06
0.06
0.07
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.07
0.07
0.07
0.07
0.08
0.07
0.07
0.07
0.07
0.06
0.07
0.08
0.07
St.5
0.05
0.05
0.05
0.06
0.06
0.06
0.06
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.06
0.06
0.06
0.06
0.06
0.06
0.07
0.07
0.07
0.07
0.07
0.05
0.06
0.07
0.07
TABLE V
CALCULATED RESULTS OF POWER LOSS INDEX
Losses
No Area Locatio St.
1
U
P 1-C1 94
2
U
P 1-C4 91
3
U
P 2-C1 93
4
U
P 2-C2 91
5
U
P 2-C3 91
6
U
P 4-C1 95
7
U
P 4-C2 100
8
U
P 5-C1 92
9
U
P 22-C1 90
10
T
P 7-C2 92
11
T
P 7-C3 96
12
T
P 7-C4 93
13
T
P 8-C1 92
14
T
P 10-C3 93
15
T
P 10-C4 102
16
T
P 11-C4 93
17
T
P 12-C1 96
18
T
P 13-C1 92
19
T
P 13-C3 92
20
T
P 14-C1 92
21
T
P 14-C3 92
22
T
P 15-C1 91
23
T
P 16-C1 92
24
T
P 16-C3 94
25
T
P 16-C4 92
26
T
P 18-C1 93
28
T
P 18-C2 92
29
T
P 18-C4 92
30
T
P 23-C1 92
31
T
P 26-C2 92
32
A
P 19-C1 93
33
A
P 19-C2 92
34
A
P 19-C3 92
35
A
P 19-C5 95
36
A
P 20-C1 92
37
A
P 21-C3 93
38
A
P 21-C4 92
St.
92
92
94
91
91
92
96
93
90
93
94
93
92
91
97
94
92
93
93
92
93
91
91
94
92
92
91
93
94
92
93
91
92
93
92
93
94
Steps
St. St.
91 93
94 96
95 98
92 94
91 92
91 90
92 90
94 96
91 93
93 94
93 94
94 95
93 94
91 91
94 92
96 98
90 90
94 95
93 94
92 94
94 96
92 94
91 91
94 95
93 95
94 96
92 93
95 97
96 98
92 93
95 98
91 91
92 92
92 93
93 95
95 97
96 99
St.
96
100
103
99
94
92
88
101
96
98
95
99
97
92
89
104
93
99
97
98
101
101
93
96
99
102
98
102
104
96
104
93
93
94
101
103
105
St.
96
100
103
99
94
92
88
101
96
98
95
99
97
92
89
104
93
99
97
98
101
101
93
96
99
102
98
102
104
96
104
93
93
94
101
103
105
St.6
0.05
0.05
0.05
0.05
0.05
0.05
0.06
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.05
0.06
0.06
0.07
(15)
mentioned
indexes
( J P , JV , J loss )
by
following
equation:
(16)
Steps
U
U
U
U
U
U
U
U
U
U
U
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
A
A
A
A
A
A
A
A
A
A
P1-C1
P1-C2
P1-C4
P2-C1
P2-C2
P2-C3
P4-C1
P4-C2
P4-C3
P5-C1
P22-C1
P7-C2
P7-C3
P7-C4
P8-C1
P8-C2
P8-C3
P8-C5
P10-C3
P10-C4
P11-C2
P11-C3
P11-C4
P13-C1
P13-C3
P13-C4
P14-C1
P14-C3
P15-C1
P16-C1
P16-C3
P16-C4
P18-C1
P18-C2
P18-C4
P23-C1
P26-C2
P19-C1
P19-C2
P19-C3
P19-C4
P19-C5
P20-C1
P21-C3
P21-C4
P24-C1
P24-C2
1.2
2.6
0.8
0.3
0.5
0.7
1.9
13.4
5.8
0.4
1.8
0.4
2.6
0.6
0.3
1.4
0.4
1.2
0.4
19.5
2.9
0.3
0.3
0.6
0.4
0.4
0.4
0.7
0.4
0.9
0.4
0.5
0.7
0.6
0.3
0.4
0.3
0.4
0.3
1.2
0.3
0.3
0.3
0.6
0.3
0.4
1.3
0.3
0.6
0.5
0.9
0.8
3.2
0.7
0.3
1.3
0.3
1.2
0.6
0.3
1.7
2.0
5.2
2.1
0.7
0.8
0.3
0.6
1.1
0.4
0.3
0.7
0.6
1.0
0.4
0.5
0.7
0.6
0.7
0.5
0.4
0.7
0.4
0.3
0.4
0.3
0.5
0.8
1.5
0.7
0.6
1.5
0.9
1.9
0.3
0.8
0.8
0.7
0.7
0.3
0.7
0.8
0.4
2.0
1.0
3.5
1.0
0.6
4.1
0.7
2.4
0.5
0.7
3.1
0.3
0.7
0.4
0.9
1.1
0.4
0.7
0.5
1.5
2.6
0.6
1.2
0.9
0.4
0.4
0.3
0.5
1.7
3.0
3.2
2.4
0.4
4.4
3.0
6.2
1.1
0.4
1.9
1.8
1.7
3.1
0.4
0.9
0.9
1.9
1.0
3.1
0.9
6.7
0.8
0.4
8.4
0.5
7.6
1.7
1.2
8.4
0.7
2.9
0.9
0.6
1.8
1.5
3.2
0.8
4.3
7.5
1.0
5.7
0.7
0.4
0.9
0.3
2.0
5.2
8.4
6.8
7.9
2.8
14.7
12.4
23.8
9.4
1.1
0.8
4.0
0.7
16.7
2.3
5.7
2.0
8.8
5.4
5.3
0.4
16.9
0.4
2.4
0.7
1.4
28.6
7.9
4.6
28.8
7.1
16.3
14.3
0.4
3.4
10.1
18.4
5.8
19.9
27.2
4.3
25.5
0.3
0.4
5.9
0.6
13.8
23.7
33.5
20.1
33.9
2.8
14.7
12.4
23.8
9.4
1.1
0.5
3.6
0.4
16.8
2.3
5.7
1.8
8.7
5.5
5.3
0.5
16.8
0.4
2.5
0.6
1.3
28.6
7.9
4.5
28.8
7.1
16.3
14.3
0.5
3.6
10.1
18.3
5.6
19.8
27.2
4.7
25.5
0.3
0.4
5.9
0.6
13.8
23.7
33.5
20.2
33.9
VI. REFERENCES
[1]
[2]
[3]
[4]
[5]
[6]
Edris,A. et al. "Controlling the Flow of Real and Reactive Power, IEEE
Computer Applications in power, Vol. 11, no. 1, January 1998
L. Gyugyi, C.D. Schauder, S.L. Williams, T.R.Reitman, D.R. Torgerson,
A. Edris, The Unified Power Flow Controller: A New Approach to
PowerTransmission Control, IEEE Trans. on Power Delivery, Vol. 10,
No. 2, pp. 1085-1097, April 95.
S.A. Nabavi-Niaki, M.R. Iravani, Steady State and Dynmaic Models of
UPFC for Power System Studies, IEEE trans. on power systems, Vol.
11, No.4, pp. 1937-19436, November 1999.
Xuan Wei, Joe H. Chow, Behruz Fardanesh, A Common Modeling
Framework of Voltage-Sourced Converters for Load Flow, Sensitivity,
and Dispatch Analysis IEEE Trans. on Power Systems, Vol. 19, No. 2,
May 2004
Seungwon An, John Condren, Thomas W. Gedra, An Ideal Transformer
UPFC Model, OPF First-Order Sensitivities, and Application to
Screening for Optimal UPFC Locations , IEEE Transactions On Power
Systems, Vol. 22, No. 1, February 2007
880. Available: http://www.halcyon.com/pub/journals/21ps03-vidmar
[7]
VII. BIOGRAPHIES
Babak Asadzadeh was born in Sardasht, Iran in
1975. He received the B.S. degree in electrical engineering in 1998 from the University of PWIT,
Tehran, Iran, the M.S. degree from University of
Tabriz, Tabriz, Iran, in 2008.
His current research interests include modeling
and application of power electronic devices in power
systems. He is employer in Azerbaijan Regional