Introduction to Artificial Ground Freezing
Application of AGF in Tunneling Works
Risk and Control Measures
Case Study
Horizontal freezing
According to freezing pipe arrangement, there
are vertical freezing and horizontal freezing.
vertical freezing
Brine freezing
-Indirect freezing
Brine Freezing
Electrical Power No
Large cost
Min. Temp.
-196C
-30C
Frozen soil
Freezing rate
Environmental
impact
Cost-effective
Slow
Controlability
Rapid
No pollution, no noise, no
vibration
Not good
Economic for small volumes or
time critical operations
Not easy
Risk
Applicability
u In 1883, freezing method was initially used to sink a shaft for a coalmine in
Kaebari, German, with success.
u In 1955, freezing method was initially used to excavate shaft for coal mine
in China.
u By the end of 1960s, freezing method was initially used in Beijing
metropolitan.
u Currently, freezing method is widely used in cross passage and shield
break-in and break-out reinforcement construction for metro tunnel in
most of the metro cities, such as Shanghai, Beijing, Tianjin, Guangzhou,
Shenzhen
Shaft sinking
Tunneling
Foundation
Recovery
Environmental
Mining
Others
Save
salvage
Cross-passage construction
Ground reinforcement for shield
launching or arriving
Tunnel restoration
11000
1100
1100
R2800
0 00
R240 R18
R2
20
0
700
1400
Cross-Passages in Metro
(with drainage sump)
R300
10
R3
75
R2
600
3500
4400
4800
600
2000
2900
3300
5640
300
1000
2000
643.3
Cross-passage construction
,93
,149
95.97
,0
,-26
,-59
,-1110
,-1752
,-2752
7727,-375'
5953,-5131
1034.05
1859.4
2256.31
2523.5
2689.96
804.02
1675.72
2253.27
,424
0
15
R3
50
R28
Tunnel restoration
Segment deformation
Ice-wall failure
Using stuffing-box
- As Blow-Out Preventer (BOP)
Ground Segment
Flaned casing-stub
Gate valve (spherical)
Freeze-tube
Bleed valve
segment
Flood-prevention facility
steel segment
Safety door
Experience of STEC
Experience of STEC
No.
Project name
Overburden
Project type/parts/location
15
33~39
8 cross passages
circular section with
diameter around 5m
12
21.6
cross passage
25
35
road/cross passage
Tianjin metro
13
17
cross passage
Hangzhou metro
12
23.5
cross passage
25
reinforcement
15
shield break-in
16
shield break-out
shield break-in
7
8
9
10
11
12
Nanjing metro
Length
Hangzhou metro
23
23
shield break-out
18
shield break-in
23
shield break-out
Remarks
cases tunnel
excavation
by NATM
cases
shield
break-in
and breakout soil
improvement
Case Study
Cross Passage Construction of
East Fuxing Rd. Double-Deck
Cross-River Tunnel (Shanghai)
Cross Passage Construction
in the Shanghai Yangtze River
Tunnel (Shanghai)
Stonecutters Island Sewage
Treatment Works (Hong Kong)
Special Cases
Shantou Undersea Tunnel Repair
Replacement of the wire brush tail
seal during the long-distance
shield driving in Shanghai Yangtze
River Tunnel
Restoration of the tunnel collapse
of Line 4, Shanghai Metro