Data Sheet Exercise 2:

Construction of Raw Gas Supply


facility project

PS: PROJECT SCHEDULING & REPORTING

1. Create Network
Situation
The project definition for OML 3XXX and WBS for the project Construction of Raw Gas Supply
Facility, P.03XXX.1.D.CT2.00030305 has been created. The WBS maintenance has been
completed. Now you want to commence planning of the activities for the WBS element you are
responsible for.
Instructions
Use WBS element P.03XXX.1.D.CT2.00030305 in your project definition P.03XXX.1, where XXX is
your student number. Follow the procedure described in the work instruction to create the network.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
WBS Element
Network Description / 1
Plant/ 1
Network Description / 2
Plant/ 1

Value
CJ20N
P.03XXX.1.D.CT2.00030305
PLANNING AND MOBILISATION
2600
ENGINEERING
2600

User-Specific Data
This section provides the user-specific data required to complete this exercise.
User

Project Definition

WBS Element

Instructor

P.03000.1

P.03000.1.D.CT2.00030305

P.03001.1

P.03001.1.D.CT2.00030305

P.03002.1

P.03002.1.D.CT2.00030305

P.03003.1

P.03003.1.D.CT2.00030305

P.03004.1

P.03004.1.D.CT2.00030305

P.03005.1

P.03005.1.D.CT2.00030305

P.03006.1

P.03006.1.D.CT2.00030305

P.03007.1

P.03007.1.D.CT2.00030305

P.03008.1

P.03008.1.D.CT2.00030305

P.03009.1

P.03009.1.D.CT2.00030305

10

P.03010.1

P.03010.1.D.CT2.00030305

11

P.03011.1

P.03011.1.D.CT2.00030305

12

P.03012.1

P.03012.1.D.CT2.00030305

13

P.03013.1

P.03013.1.D.CT2.00030305

14

P.03014.1

P.03014.1.D.CT2.00030305

15

P.03015.1

P.03015.1.D.CT2.00030305

16

P.03016.1

P.03016.1.D.CT2.00030305

17

P.03017.1

P.03017.1.D.CT2.00030305

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

1/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

18

P.03018.1

P.03018.1.D.CT2.00030305

19

P.03019.1

P.03019.1.D.CT2.00030305

20

P.03050.1

P.03050.1.D.CT2.00030305

21

P.03051.1

P.03051.1.D.CT2.00030305

22

P.03052.1

P.03052.1.D.CT2.00030305

2. Create Activities
Situation
The project definition for OML 3XXX and WBS for the project Construction of Raw Gas Supply
Facility, P.03XXX.1.D.CT2.00030305 has been created. The WBS maintenance has been
completed, and the networks have been created. Now you want to commence planning the
schedule of the activities.
Instructions
Use WBS element P.03XXX.1.D.CT2.00030305 in your project definition P.03XXX.1, where XXX is
your student number. Follow the procedure described in the work instruction to create the activities
manually in the activity overview screen.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
Network / 1
Activity Description / 1
Normal Duration
Normal Duration Unit
Work
Unit for Work
Work Center
Activity Description / 2
Normal Duration
Normal Duration Unit
Work
Unit for Work
Work Center
Activity Description / 3
Normal Duration
Normal Duration Unit
Work
Unit for Work
Work Center

SEPTEMBER 2016

Value
CJ20N
PLANNING AND MOBILISATION
Contract Signing
1
DAY
4
AU
26OPGSDV
Project Kickoff Meeting
1
DAY
3
AU
26OPGSDV
Develop detailed Project Execution Plan
5
DAY
3
AU
26OPGSDV

PS: PROJECT SCHEDULING & REPORTING

2/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

Network / 2
Activity Description / 1
Normal Duration
Normal Duration Unit
Work
Unit for Work
Work Center
Activity Description / 2
Normal Duration
Normal Duration Unit
Work
Unit for Work
Work Center
Activity Description / 3
Normal Duration
Normal Duration Unit
Work
Unit for Work
Work Center

ENGINEERING
Mechanical
30
DAY
10
AU
26OPGSDV
Equipment Design
18
DAY
10
AU
26OPGSDV
Electrical
15
DAY
10
AU
26OPGSDV

User-Specific Data
This section provides the user-specific data required to complete this exercise.
User

Project Definition

WBS Element

Instructor

P.03000.1

P.03000.1.D.CT2.00030305

P.03001.1

P.03001.1.D.CT2.00030305

P.03002.1

P.03002.1.D.CT2.00030305

P.03003.1

P.03003.1.D.CT2.00030305

P.03004.1

P.03004.1.D.CT2.00030305

P.03005.1

P.03005.1.D.CT2.00030305

P.03006.1

P.03006.1.D.CT2.00030305

P.03007.1

P.03007.1.D.CT2.00030305

P.03008.1

P.03008.1.D.CT2.00030305

P.03009.1

P.03009.1.D.CT2.00030305

10

P.03010.1

P.03010.1.D.CT2.00030305

11

P.03011.1

P.03011.1.D.CT2.00030305

12

P.03012.1

P.03012.1.D.CT2.00030305

13

P.03013.1

P.03013.1.D.CT2.00030305

14

P.03014.1

P.03014.1.D.CT2.00030305

15

P.03015.1

P.03015.1.D.CT2.00030305

16

P.03016.1

P.03016.1.D.CT2.00030305

17

P.03017.1

P.03017.1.D.CT2.00030305

18

P.03018.1

P.03018.1.D.CT2.00030305

19

P.03019.1

P.03019.1.D.CT2.00030305

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

3/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

20

P.03050.1

P.03050.1.D.CT2.00030305

21

P.03051.1

P.03051.1.D.CT2.00030305

22

P.03052.1

P.03052.1.D.CT2.00030305

3. Perform Scheduling
Situation
You have created network header and activities for your project. You have also maintained duration
and dates for the activities. Now you want to schedule the activities by maintaining their
relationships.
Instructions
Use WBS element P.03XXX.1.D.CT2.00030305 in your project definition P.03XXX.1, where XXX is
your student number. Follow the procedure described in the work instruction to maintain the
relationships for the activities in the network overview screen.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
WBS Element
Basic Start Date

Value
CJ20N
P.03XXX.1.D.CT2.00030305

15.08.2016

User-Specific Data
This section provides the user-specific data required to complete this exercise.
User

Project Definition

WBS Element

Instructor

P.03000.1

P.03000.1.D.CT2.00030305

P.03001.1

P.03001.1.D.CT2.00030305

P.03002.1

P.03002.1.D.CT2.00030305

P.03003.1

P.03003.1.D.CT2.00030305

P.03004.1

P.03004.1.D.CT2.00030305

P.03005.1

P.03005.1.D.CT2.00030305

P.03006.1

P.03006.1.D.CT2.00030305

P.03007.1

P.03007.1.D.CT2.00030305

P.03008.1

P.03008.1.D.CT2.00030305

P.03009.1

P.03009.1.D.CT2.00030305

10

P.03010.1

P.03010.1.D.CT2.00030305

11

P.03011.1

P.03011.1.D.CT2.00030305

12

P.03012.1

P.03012.1.D.CT2.00030305

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

4/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

13

P.03013.1

P.03013.1.D.CT2.00030305

14

P.03014.1

P.03014.1.D.CT2.00030305

15

P.03015.1

P.03015.1.D.CT2.00030305

16

P.03016.1

P.03016.1.D.CT2.00030305

17

P.03017.1

P.03017.1.D.CT2.00030305

18

P.03018.1

P.03018.1.D.CT2.00030305

19

P.03019.1

P.03019.1.D.CT2.00030305

20

P.03050.1

P.03050.1.D.CT2.00030305

21

P.03051.1

P.03051.1.D.CT2.00030305

22

P.03052.1

P.03052.1.D.CT2.00030305

4. Review Project Schedule


Situation
As the project manager, you want to use the Project Structure overview report to review dates,
duration, work, work center and plant of all objects in your project structure in one report.
Instructions
Use the WBS element P.03XXX.1.D.CT2.00030305 of your project definition P.03XXX.1, where
XXX is your student number. Follow the procedure described in the work instruction to generate the
project structure overview.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE

Value
CN41N
ZNNPC_EV0001 -NNPC Std profile: earned value
analysis
P.03XXX.1.D.CT2.00030305

PS Info Profile
WBS Element

User-Specific Data
This section provides the user-specific data required to complete this exercise.
User

Project Definition

WBS Element

Instructor

P.03000.1

P.03000.1.D.CT2.00030305

P.03001.1

P.03001.1.D.CT2.00030305

P.03002.1

P.03002.1.D.CT2.00030305

P.03003.1

P.03003.1.D.CT2.00030305

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

5/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

P.03004.1

P.03004.1.D.CT2.00030305

P.03005.1

P.03005.1.D.CT2.00030305

P.03006.1

P.03006.1.D.CT2.00030305

P.03007.1

P.03007.1.D.CT2.00030305

P.03008.1

P.03008.1.D.CT2.00030305

P.03009.1

P.03009.1.D.CT2.00030305

10

P.03010.1

P.03010.1.D.CT2.00030305

11

P.03011.1

P.03011.1.D.CT2.00030305

12

P.03012.1

P.03012.1.D.CT2.00030305

13

P.03013.1

P.03013.1.D.CT2.00030305

14

P.03014.1

P.03014.1.D.CT2.00030305

15

P.03015.1

P.03015.1.D.CT2.00030305

16

P.03016.1

P.03016.1.D.CT2.00030305

17

P.03017.1

P.03017.1.D.CT2.00030305

18

P.03018.1

P.03018.1.D.CT2.00030305

19

P.03019.1

P.03019.1.D.CT2.00030305

20

P.03050.1

P.03050.1.D.CT2.00030305

21

P.03051.1

P.03051.1.D.CT2.00030305

22

P.03052.1

P.03052.1.D.CT2.00030305

5. Release Network
Situation
The networks for the project Construction of Raw Gas Supply Facility,
P.03XXX.1.D.CT2.00030305 have been created. You notice that the system status of the network is
"CRTD - Created". You have to release the network before you can commence execution of the
network activities.
Instructions
Use the WBS element P.03XXX.1.D.CT2.00030305 of your project definition P.03XXX.1, where
XXX is your student number. Follow the procedure described in the simulation or work instruction to
release the network.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
WBS Element
Network Description / 1
Network Description / 2

Value
CJ20N
P.03XXX.1.D.CT2.00030305
PLANNING AND MOBILISATION
ENGINEERING

User-Specific Data

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

6/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

This section provides the user-specific data required to complete this exercise.
User

Project Definition

WBS Element

Instructor

P.03000.1

P.03000.1.D.CT2.00030305

P.03001.1

P.03001.1.D.CT2.00030305

P.03002.1

P.03002.1.D.CT2.00030305

P.03003.1

P.03003.1.D.CT2.00030305

P.03004.1

P.03004.1.D.CT2.00030305

P.03005.1

P.03005.1.D.CT2.00030305

P.03006.1

P.03006.1.D.CT2.00030305

P.03007.1

P.03007.1.D.CT2.00030305

P.03008.1

P.03008.1.D.CT2.00030305

P.03009.1

P.03009.1.D.CT2.00030305

10

P.03010.1

P.03010.1.D.CT2.00030305

11

P.03011.1

P.03011.1.D.CT2.00030305

12

P.03012.1

P.03012.1.D.CT2.00030305

13

P.03013.1

P.03013.1.D.CT2.00030305

14

P.03014.1

P.03014.1.D.CT2.00030305

15

P.03015.1

P.03015.1.D.CT2.00030305

16

P.03016.1

P.03016.1.D.CT2.00030305

17

P.03017.1

P.03017.1.D.CT2.00030305

18

P.03018.1

P.03018.1.D.CT2.00030305

19

P.03019.1

P.03019.1.D.CT2.00030305

20

P.03050.1

P.03050.1.D.CT2.00030305

21

P.03051.1

P.03051.1.D.CT2.00030305

22

P.03052.1

P.03052.1.D.CT2.00030305

6. Save Baseline Version


Situation
You have completed planning and budgeting for your project. You want to save a baseline version of your
project.
Instructions
Use your project definition P.03XXX.1, where XXX is your student number. Follow the procedure
described in the simulation or work instruction to create a project version in the Project Builder.

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

7/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
Database prof.
WBS Element
Version key
Description
Version group

Value
CN72
000000000001 - Standard selection (structure)
P.03XXX.1.D.CT2.00030305
NPDC/0002
Construction of Raw Gas Supply Facility _v1
NPDC_PROJ_VERSIONS

User-Specific Data
This section provides the user-specific data required to complete this exercise.

User
Instructor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

SEPTEMBER 2016

Project Definition
P.03000.1
P.03001.1
P.03002.1
P.03003.1
P.03004.1
P.03005.1
P.03006.1
P.03007.1
P.03008.1
P.03009.1
P.03010.1
P.03011.1
P.03012.1
P.03013.1
P.03014.1
P.03015.1
P.03016.1
P.03017.1
P.03018.1
P.03019.1
P.03050.1
P.03051.1
P.03052.1

PS: PROJECT SCHEDULING & REPORTING

WBS Element
P.03000.1.D.CT2.00030305
P.03001.1.D.CT2.00030305
P.03002.1.D.CT2.00030305
P.03003.1.D.CT2.00030305
P.03004.1.D.CT2.00030305
P.03005.1.D.CT2.00030305
P.03006.1.D.CT2.00030305
P.03007.1.D.CT2.00030305
P.03008.1.D.CT2.00030305
P.03009.1.D.CT2.00030305
P.03010.1.D.CT2.00030305
P.03011.1.D.CT2.00030305
P.03012.1.D.CT2.00030305
P.03013.1.D.CT2.00030305
P.03014.1.D.CT2.00030305
P.03015.1.D.CT2.00030305
P.03016.1.D.CT2.00030305
P.03017.1.D.CT2.00030305
P.03018.1.D.CT2.00030305
P.03019.1.D.CT2.00030305
P.03050.1.D.CT2.00030305
P.03051.1.D.CT2.00030305
P.03052.1.D.CT2.00030305

8/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

7. Update Project Status


Situation
You have commenced execution of your project. Now you want to record the actual progress data for
activities in your project, using the Project Builder
Instructions
Use the WBS element P.03XXX.1.D.CT2.00030305 of your project definition P.03XXX.1, where XXX is
your student number. Follow the procedure described in the work instruction to record confirmation.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
Activity/ 1
Short Descript.
Actual Start
Actual Finish
Activity/ 2
Short Descript.
Actual Start
Actual Finish
Activity/ 3
Short Descript.
Actual Start
Actual Finish
Activity/ 1
Short Descript.
Actual Start
Actual Finish
Activity/ 2
Short Descript.
Actual Start
Actual Finish
Activity/ 3
Short Descript.
Actual Start
Actual Finish

Value
CJ20N
Contract Signing
Completed

15.08.2016
15.08.2016
Project Kickoff Meeting
Completed

16.08.2016
16.08.2016
Develop detailed Project Execution Plan
Completed

17.08.2016
21.08.2016
Mechanical
Completed

22.08.2016
19.09.2016
Equipment Design
Completed

20.09.2016
06.10.2016
Electrical
Completed

07.10.2016
20.10.2016

User-Specific Data
This section provides the user-specific data required to complete this exercise.

User
Instructor
1

SEPTEMBER 2016

Project Definition
P.03000.1
P.03001.1

PS: PROJECT SCHEDULING & REPORTING

WBS Element
P.03000.1.D.CT2.00030305
P.03001.1.D.CT2.00030305

9/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

P.03002.1
P.03003.1
P.03004.1
P.03005.1
P.03006.1
P.03007.1
P.03008.1
P.03009.1
P.03010.1
P.03011.1
P.03012.1
P.03013.1
P.03014.1
P.03015.1
P.03016.1
P.03017.1
P.03018.1
P.03019.1
P.03050.1
P.03051.1
P.03052.1

P.03002.1.D.CT2.00030305
P.03003.1.D.CT2.00030305
P.03004.1.D.CT2.00030305
P.03005.1.D.CT2.00030305
P.03006.1.D.CT2.00030305
P.03007.1.D.CT2.00030305
P.03008.1.D.CT2.00030305
P.03009.1.D.CT2.00030305
P.03010.1.D.CT2.00030305
P.03011.1.D.CT2.00030305
P.03012.1.D.CT2.00030305
P.03013.1.D.CT2.00030305
P.03014.1.D.CT2.00030305
P.03015.1.D.CT2.00030305
P.03016.1.D.CT2.00030305
P.03017.1.D.CT2.00030305
P.03018.1.D.CT2.00030305
P.03019.1.D.CT2.00030305
P.03050.1.D.CT2.00030305
P.03051.1.D.CT2.00030305
P.03052.1.D.CT2.00030305

8. Generate Status Report


Situation
As the project manager, you want to use the Project Structure overview report to review dates,
duration, work, work center and costs of all objects in your project structure in one report.
Instructions
Use the WBS element P.03XXX.1.D.CT2.00030305 of your project definition P.03XXX.1, where
XXX is your student number. Follow the procedure described in the work instruction to generate the
project structure overview.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

10/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

Field
KEYCODE

Value
CN41N
ZNNPC_EV0001 -NNPC Std profile: earned value
analysis
P.03XXX.1.D.CT2.00030305

PS Info Profile
WBS Element

User-Specific Data
This section provides the user-specific data required to complete this exercise.
User

Project Definition

WBS Element

Instructor

P.03000.1

P.03000.1.D.CT2.00030305

P.03001.1

P.03001.1.D.CT2.00030305

P.03002.1

P.03002.1.D.CT2.00030305

P.03003.1

P.03003.1.D.CT2.00030305

P.03004.1

P.03004.1.D.CT2.00030305

P.03005.1

P.03005.1.D.CT2.00030305

P.03006.1

P.03006.1.D.CT2.00030305

P.03007.1

P.03007.1.D.CT2.00030305

P.03008.1

P.03008.1.D.CT2.00030305

P.03009.1

P.03009.1.D.CT2.00030305

10

P.03010.1

P.03010.1.D.CT2.00030305

11

P.03011.1

P.03011.1.D.CT2.00030305

12

P.03012.1

P.03012.1.D.CT2.00030305

13

P.03013.1

P.03013.1.D.CT2.00030305

14

P.03014.1

P.03014.1.D.CT2.00030305

15

P.03015.1

P.03015.1.D.CT2.00030305

16

P.03016.1

P.03016.1.D.CT2.00030305

17

P.03017.1

P.03017.1.D.CT2.00030305

18

P.03018.1

P.03018.1.D.CT2.00030305

19

P.03019.1

P.03019.1.D.CT2.00030305

20

P.03050.1

P.03050.1.D.CT2.00030305

21

P.03051.1

P.03051.1.D.CT2.00030305

22

P.03052.1

P.03052.1.D.CT2.00030305

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

11/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

9. Generate S-Curve
Situation
As the project manager, you want to use the Project Structure overview report to view S-Curve of
plan work against actual work of all objects in your project structure in one report.
Instructions
Use the WBS element P.03XXX.1.D.CT2.00030305 of your project definition P.03XXX.1, where
XXX is your student number. Follow the procedure described in the work instruction to generate the
project structure overview.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE

Value
CN41
ZNNPC_EV0001 -NNPC Std profile: earned value
analysis
P.03XXX.1.D.CT2.00030305

PS Info Profile
WBS Element

User-Specific Data
This section provides the user-specific data required to complete this exercise.
User

Project Definition

WBS Element

Instructor

P.03000.1

P.03000.1.D.CT2.00030305

P.03001.1

P.03001.1.D.CT2.00030305

P.03002.1

P.03002.1.D.CT2.00030305

P.03003.1

P.03003.1.D.CT2.00030305

P.03004.1

P.03004.1.D.CT2.00030305

P.03005.1

P.03005.1.D.CT2.00030305

P.03006.1

P.03006.1.D.CT2.00030305

P.03007.1

P.03007.1.D.CT2.00030305

P.03008.1

P.03008.1.D.CT2.00030305

P.03009.1

P.03009.1.D.CT2.00030305

10

P.03010.1

P.03010.1.D.CT2.00030305

11

P.03011.1

P.03011.1.D.CT2.00030305

12

P.03012.1

P.03012.1.D.CT2.00030305

13

P.03013.1

P.03013.1.D.CT2.00030305

14

P.03014.1

P.03014.1.D.CT2.00030305

15

P.03015.1

P.03015.1.D.CT2.00030305

16

P.03016.1

P.03016.1.D.CT2.00030305

17

P.03017.1

P.03017.1.D.CT2.00030305

18

P.03018.1

P.03018.1.D.CT2.00030305

19

P.03019.1

P.03019.1.D.CT2.00030305

20

P.03050.1

P.03050.1.D.CT2.00030305

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

12/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

21

P.03051.1

P.03051.1.D.CT2.00030305

22

P.03052.1

P.03052.1.D.CT2.00030305

10. Enter Final Confirmation


Situation
You have commenced execution of your project. Now you want to record final confirmation of the actual
progress data for activities in your project, using the Project Builder.
Instructions
Use the WBS element P.03XXX.1.D.CT2.00030305 of your project definition P.03XXX.1, where XXX is
your student number. Follow the procedure described in the work instruction to record confirmation.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
WBS Element
Activity

Value
CJ20N
P.03XXX.1.D.CT2.00030305
The activity you confirmed earlier

User-Specific Data
This section provides the user-specific data required to complete this exercise.

User
Instructor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

SEPTEMBER 2016

Project Definition
P.03000.1
P.03001.1
P.03002.1
P.03003.1
P.03004.1
P.03005.1
P.03006.1
P.03007.1
P.03008.1
P.03009.1
P.03010.1
P.03011.1
P.03012.1
P.03013.1
P.03014.1
P.03015.1
P.03016.1

PS: PROJECT SCHEDULING & REPORTING

WBS Element
P.03000.1.D.CT2.00030305
P.03001.1.D.CT2.00030305
P.03002.1.D.CT2.00030305
P.03003.1.D.CT2.00030305
P.03004.1.D.CT2.00030305
P.03005.1.D.CT2.00030305
P.03006.1.D.CT2.00030305
P.03007.1.D.CT2.00030305
P.03008.1.D.CT2.00030305
P.03009.1.D.CT2.00030305
P.03010.1.D.CT2.00030305
P.03011.1.D.CT2.00030305
P.03012.1.D.CT2.00030305
P.03013.1.D.CT2.00030305
P.03014.1.D.CT2.00030305
P.03015.1.D.CT2.00030305
P.03016.1.D.CT2.00030305

13/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

PS: PROJECT SCHEDULING & REPORTING

17
18
19
20
21
22

P.03017.1
P.03018.1
P.03019.1
P.03050.1
P.03051.1
P.03052.1

P.03017.1.D.CT2.00030305
P.03018.1.D.CT2.00030305
P.03019.1.D.CT2.00030305
P.03050.1.D.CT2.00030305
P.03051.1.D.CT2.00030305
P.03052.1.D.CT2.00030305

11. Close Project Technically


Situation
All activities on your project have been completed. As the project manager, you want to indicate that your
project has been completed technically.
Instructions
Use the WBS element P.03XXX.1.D.CT2.00030305 of your project definition P.03XXX.1, where XXX is
your student number. Follow the procedure described in the simulation or work instruction to indicate
technical completion of the project.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as
necessary while performing the exercise.
Field
KEYCODE
WBS Element

Value
CJ20N
P.03XXX.1.D.CT2.00030305

User-Specific Data
This section provides the user-specific data required to complete this exercise.
User
Instructor
1
2
3
4
5
6
7
8
9
10
11
12
13

SEPTEMBER 2016

Project Definition
P.03000.1
P.03001.1
P.03002.1
P.03003.1
P.03004.1
P.03005.1
P.03006.1
P.03007.1
P.03008.1
P.03009.1
P.03010.1
P.03011.1
P.03012.1
P.03013.1

PS: PROJECT SCHEDULING & REPORTING

WBS Element
P.03000.1.D.CT2.00030305
P.03001.1.D.CT2.00030305
P.03002.1.D.CT2.00030305
P.03003.1.D.CT2.00030305
P.03004.1.D.CT2.00030305
P.03005.1.D.CT2.00030305
P.03006.1.D.CT2.00030305
P.03007.1.D.CT2.00030305
P.03008.1.D.CT2.00030305
P.03009.1.D.CT2.00030305
P.03010.1.D.CT2.00030305
P.03011.1.D.CT2.00030305
P.03012.1.D.CT2.00030305
P.03013.1.D.CT2.00030305

14/15

Data Sheet Exercise 2:


Construction of Raw Gas Supply
facility project

14
15
16
17
18
19
20
21
22

SEPTEMBER 2016

PS: PROJECT SCHEDULING & REPORTING

P.03014.1
P.03015.1
P.03016.1
P.03017.1
P.03018.1
P.03019.1
P.03050.1
P.03051.1
P.03052.1

PS: PROJECT SCHEDULING & REPORTING

P.03014.1.D.CT2.00030305
P.03015.1.D.CT2.00030305
P.03016.1.D.CT2.00030305
P.03017.1.D.CT2.00030305
P.03018.1.D.CT2.00030305
P.03019.1.D.CT2.00030305
P.03050.1.D.CT2.00030305
P.03051.1.D.CT2.00030305
P.03052.1.D.CT2.00030305

15/15

Das könnte Ihnen auch gefallen