Sie sind auf Seite 1von 3

SAUDI ARAMCO ID/PID FORM REV 1 - 310811

Rev 4

31-Mar-11
SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


PRESSURE VESSEL INSTALLATION

SATIP-D-001-01

PROJECT TITLE:

ITEM
NO.
1.0

PROJECT PHASE &


Activity Code

APPROVED DATE

WBS/BI/JO/NO.

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

DISCIPLINE:

MECHANICAL

31-Aug-11
CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

SAUDI
ARAMCO

REMARKS

DOCUMENT REVIEW

1.1

Review Safety Instruction Sheet (SIS)

SAIC-D-2001

SAIC-D-2001

RH

RH

Supplemented by Procedure for Vessel & Internal


Component Installation

1.2

Review Procedure - Vessel Internal


Component Installation

SAIC-D-2001

SAIC-D-2001

RH

RH

Special Process Per Schedule Q

2.1

Verification of NMRs -Vessels & Trays

SAIC-D-2022

SAIC-D-2022

2.2

Visual Inspection
a) External Inspection
b) Internal Inspection

SAIC-D-2002
SAIC-D-2003

SAIC-D-2002
SAIC-D-2003

2.3

Ladders, platforms, and other structural


steel attachments

SAIC-D-2004

SAIC-D-2004

2.4

Storage, Handling and Preservation

SAIC-D-2005

SAIC-D-2005

2.5

Verification and visual inspection of


Vendor Supplied electrical and
instrumentation materials

See Remarks

See Remarks

Refer to respective SATIPs for Electrical & Instrum:


( SATIP-P-113-01, P-121-01 or P-104-02, P-515-01,
J-100-01, J-200-01, J-300-01, J-400-01, J-902-03)

3.1

Concrete placement

See Remarks

See Remarks

Refer to SATIP-Q-001-02

3.2

Pre-Installation inspection

SAIC-D-2006

SAIC-D-2006

3.3

Equipment Installation - Alignment &


Elevation Survey (Vertical Vessel &
Horizontal Vessel)

SAIC-D-2007

SAIC-D-2007

3.4

Grouting Inspection

See Remarks

See Remarks

Refer to SATIP-Q-010-01

3.5

Insp of Ladder, platform and other


structural attachment installations.

See Remarks

See Remarks

Refer to SATIP-M-001-01

3.6

Inspection of Vessel Trim Installation

SAIC-D-2008

SAIC-D-2008

3.7

Tray & Internal Component Installation

SAIC-D-2009

SAIC-D-2009

3.8

Tray Testing

SATR-D-2004

SATR-D-2004

2.0

3.0

MATERIAL RECEIVING

Use SAIC-M-2012 for Structural Welding

INSTALLATION

Page 1 of 3

Use SATR-D-2001 & SATR-D-2002

Special Process Per Schedule Q

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


PRESSURE VESSEL INSTALLATION

SATIP-D-001-01

PROJECT TITLE:

ITEM
NO.

APPROVED DATE

WBS/BI/JO/NO.

MECHANICAL

31-Aug-11
CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS

QUALITY
PROCEDURE

QUALITY
RECORD

Flange Joint- Gasket Verification & Bolt


tightening

SAIC-L-2014

SAIC-L-2014

3.10

Piping inspection

See Remarks

See Remarks

Refer to SATIP-L-350-01

3.11

Steam Tracing

See Remarks

See Remarks

Refer to SATIP-L-350-06

3.12

Internal CP (galvanic) for internally


coated vessels

See Remarks

See Remarks

Refer to SATIP-X series

3.13

Lighting Installation

See Remarks

See Remarks

Refer to SATIP-P-123-02

3.14

Relief Valve Installation

See Remarks

See Remarks

Refer to SATIP-J-600-01

3.15

Grounding Installation

See Remarks

See Remarks

Refer to SATIP-P-111-01

3.16

Electrical & Instrumentation installation

See Remarks

See Remarks

Refer to respective SATIPs for Electrical & Instrum:


( SATIP-P-113-01, P-121-01 or P-104-02, P-515-01,
J-100-01, J-200-01, J-300-01, J-400-01, J-902-03)

3.17

Painting, Vessel ID & color Coding

See Remarks

See Remarks

Refer to SATIP-H-100-01

3.18

Insulation

See Remarks

See Remarks

Refer to SATIP-N-001-01 or SATIP-N-001-02

3.19

Fireproofing

See Remarks

See Remarks

Refer to SATIP-B-006-01 or SATIP-B-006-02

4.1

Vessel Closure Inspection Certificate

SATR-D-2003

SATR-D-2003

4.2

Instrumentation and Electrical precommissioning

See Remarks

See Remarks

Refer to the respective SATIPs for Electrical &


Instrumentation

4.3

Tightness Test

See Remarks

See Remarks

Refer to SATIP-A-004-05

4.4

Final Inspection/Punch listing for ReInstatement (by Contractor)

SAIC-D-2012

SAIC-D-2012

4.5

Mechanical Completion Punch listing


(Final MCC or Partial MCC)

FEIL SA-6133

FEIL SA-6133

1.0
3.9

4.0

PROJECT PHASE &


Activity Code

DISCIPLINE:

DOCUMENT REVIEW

TASK / ACTIVITY

CNTRCTR

SAUDI
ARAMCO

REMARKS

Use SATR-L-2001 - See Note 1 of the General Notes , at


least 10% minimum thereafter.

PRE-COMMISSIONING

GENERAL NOTES

Page 2 of 3

S
H

Use SATR-A-2011

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


PRESSURE VESSEL INSTALLATION

SATIP-D-001-01

PROJECT TITLE:

ITEM
NO.
1.0
1

APPROVED DATE

WBS/BI/JO/NO.

PROJECT PHASE &


Activity Code

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

DISCIPLINE:

31-Aug-11

MECHANICAL

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

REMARKS

SAUDI
ARAMCO

The
first threeREVIEW
incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
DOCUMENT
levels of Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.

Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
representative is not present.

Hold:

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

100% Hold Point for QC Inspection or Test.

Witness Inspection/Test

organization

QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

LEGEND
R
RH

Review of Documents
Review and Approval of Documents

Page 3 of 3