132/11kV Dihan Main (Dimn) Substation

Design Calculations of 132/11kV Building


Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
1.0

DESIGN CRITERIA ............................................................................................................................ 3

1.1

GENERAL ......................................................................................................................................... 3

1.2

SCOPE............................................................................................................................................... 3

1.3

UNIT OF MEASUREMENT .............................................................................................................. 3

1.4

DESIGN CODE & REGULATIONS .................................................................................................. 3

1.5

MATERIAL STRENGTH .................................................................................................................. 3

1.6

GEOTECHNICAL PROPERTIES ...................................................................................................... 3

1.7

FRICTION FACTOR ......................................................................................................................... 4

1.8

SAFETY FACTOR FOR STABILITY CHECK .................................................................................. 4

1.9

REFERNCE DRAWINGS & DOCUMENTS ..................................................................................... 4

1.10

SOFT WARE REFERENCE............................................................................................................... 4

2.0

DISCREPTION & MODELING OF STRUCTURE ........................................................................... 4

3.0

STRUCTURAL FRAMING SKETCH ................................................................................................ 5

4.0

LOADING CALCULATION ............................................................................................................... 8

4.1

LOADS ABBREVIATIONS .............................................................................................................. 8

4.2

DEAD LOAD .................................................................................................................................... 8

..................................................................................................................................................................... 13
4.3

LIVE LOAD .................................................................................................................................... 14

4.4

WIND LOAD ................................................................................................................................... 16

4.5

WIND LOAD ON PARAPET WALLS ............................................................................................ 21

4.6

WIND LOAD ON ALUMINUM CLAUSTRA ................................................................................. 22

4.7

SEISMIC LOADS ............................................................................................................................ 23

4.8

EARTH PRESURE LOAD DUE TO BACKFILL ............................................................................ 24

4.9

EARTH PRESURE LOAD DUE TO SURCHARGE ........................................................................ 24

4.10

CRANE LOAD ................................................................................................................................ 25

4.11

OIL WATER LOAD IN TRANSFORMER COMPOUND ............................................................... 26

4.12

BLAST LOAD ................................................................................................................................. 26

4.13

UPLIFT LOAD ............................................................................................................................... 26

4.14

TEMPERATURE LOAD ................................................................................................................ 26

5.0

STAAD MODEL ................................................................................................................................ 27

6.0

BASIC LOAD CASE .......................................................................................................................... 28

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
7.0

SERVICE LOAD COMBINATION .................................................................................................. 28

8.0

DEFLECTION CHECK..................................................................................................................... 33

9.0

LATERAL CAPACITY CHECK FOR PILES ................................................................................. 38

10.0

SUPPORT NODE NUMBERS ........................................................................................................... 39

11.0

TYPICAL PILE LOAD CALCULATION ....................................................................................... 40

12.0

SUPPORT REACTION & PILE LOAD CALCULATION ............................................................ 41

13.0

ATTACHEMENT .............................................................................................................................. 42

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
1.0
1.1

DESIGN CRITERIA
GENERAL
1)
2)
3)
4)

1.2

Project
Client
Consultant
Contractor

: 132/11kV Dihan Main ( DIMN) substation


: Federal Electricity & Water Authority
: Energoprojekt Entel co.Ltd.
: Larsen & Toubro Limited

SCOPE
The scope of this document is to analyse and design the 132/11kV GIS building at Dihan. This document
contains the complete Load calculations, STAAD PRO Output files, Support Reactions & Pile load
Calculations

1.3

UNIT OF MEASUREMENT
The unit of measurement used in the analysis shall be SI units.

1.4

DESIGN CODE & REGULATIONS


1)
2)
3)
4)
5)

1.5

: Uniform Building Code


: Code of practice for Design and construction
: Code of Practice for Dead and Imposed loads
: Code of Practice for Wind loads
: Code of practice for design of concrete structures for retaining aqueous liquids

MATERIAL STRENGTH
1)
2)
3)
4)

1.6

UBC 1997
BS 8110 Part 1
BS 6399 Part 1
BS 6399 Part 2
BS 8007

Charact. Compressive strength of Concrete


Design Compressive strength of Concrete
Yield stress of reinforcement steel
Design yield stress of reinforcement steel

fc = 40 N/mm2
fc = 35 N/mm2
fy = 500 N/mm2
fy = 460 N/mm2

GEOTECHNICAL PROPERTIES
1)
2)

Highest Ground water table level


Type of foundation

: 2.35m BGL
: Pile Foundation

Pile Capacity as per soil Investigation Report


Pile Length
(m )
750
15
Dia

Compression
( kN)
1802

Horizontal
( kN)
90.10

Uplift
( kN)
650

Spring Constant
Vertical
Horizontal
(kN/m)
375000
18750

* Horizontal capacity and spring constants are assumed 5% of vertical values.

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
1.7

FRICTION FACTOR
1)
2)
3)

1.8

: 0.50
: 0.45
: 0.40

SAFETY FACTOR FOR STABILITY CHECK


1)
2)
3)

1.9

Concrete to soil
Steel to concrete
Steel to Steel

Overturning
Sliding
Uplift

: Safety Factor
: Safety Factor
: Safety Factor

> 2.00
> 2.00
> 1.50

REFERNCE DRAWINGS & DOCUMENTS


1)
2)
3)

E11-2011(1)/LNT/DIMN/CO3/30200
E11-2011(1)/LNT/DIMN/CO1/30005
E11-2011(1)/LNT/DIMN/GO1/50007

: Civil Design Criteria


: Soil Investigation Report
: Overall Equipment Layout

1.10 SOFT WARE REFERENCE


STAAD Pro V8i & Prokon

The above software packages are used in the analysis & design of the building. Input and output
is attached along with this document.
2.0

DISCREPTION & MODELING OF STRUCTURE

The building is modelled in STAAD pro as a 3D frame . The structural model includes all the
main frame members like columns and beams of the frames, basement wall & raft of the
building is modelled as 4 nodded finite element. Supports are modelled below column location
as per pile group. Transformer bays will be modelled using 4 nodded rectangular plate element
separated by expansion joint above foundation.

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
3.0

STRUCTURAL FRAMING SKETCH

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.0 LOADING CALCULATION
4.1

LOADS ABBREVIATIONS
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)

4.2

DL
LL
WL
EQ
EPB
EPS
CL
OW
BL
TL

:
:
:
:
:
:
:
:
:
:

Dead Load
Live Load
Wind Load
Seismic load
Earth Pressure due to back fill
Earth Pressure due to surcharge
Crane Load
Oil water load
Blast load
Temperature Load

DEAD LOAD

Self weight of members (in model ) are taken by STAAD based on member size and unit weight
A

Basement Floor

1.0

Cable Basement Floor /


Self-Weight of Slab
Self Weight of Screed ( Avg)

400mm thk.
150mm thk.

=
=

Total
2.0

13.60 kN/m2

Self-Weight of Slab

400mm thk.

0.4x 25

10.00kN/m2

Self Weight of Screed ( Avg)

180mm thk.

0.18x 24

4.32 kN/m2

14.32 kN/m2

Auxiliary Transformer Area


Self-Weight of Slab

400mm thk.

0.4x 25

10.00kN/m2

Self Weight of Screed ( Avg)

125mm thk.

0.125x 24

3.00 kN/m2

Total
4.0

10.00kN/m2
3.6 kN/m2

Transformer Area

Total
3.0

0.4x 25
0.15x 24

13.00 kN/m2

Transformer Plinth
Self-Weight of Plinth

3330mm thk.

3.33x 25

83.25kN/m2

( 2.480 +0.4 +0.45 ) = 3.33


Total

83.25 kN/m2

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
B

Ground Floor

1.0

Capacitor Room ( CAP1-CAP6 ) & CA room


Self-Weight of Slab
Self Weight of Screed

200mm thk.
80mm thk.

=
=

Total
2.0

Switch Gear Room( 132 & 11kV )


Self-Weight of Slab

200mm thk.

0.20x 25

5.00kN/m2

Self Weight of Screed

80mm thk.

0.080x 24

1.92 kN/m2

NER,SCADA,LVAC, Control , Battery , Store, Record room


Self-Weight of Slab
200mm thk.
= 0.20x 25

5.00kN/m2

Self Weight of Screed

1.92 kN/m2

80mm thk.

0.080x 24

7.00 kN/m2

Lobby , Air lock room & Corridors , Offloading platform


Self-Weight of Slab
200mm thk
= 0.20x 25

5.00kN/m2

Self Weight of Screed

1.92 kN/m2

80mm thk.

Total
5.0

7.00 kN/m2

Total
4.0

7.00 kN/m2

Total
3.0

5.00kN/m2
1.92 kN/m2

0.20x 25
0.080x 24

Toilet & wash


Self-Weight of Slab
Self Weight of foam concrete
Self Weight of Screed

0.080x 24

7.00 kN/m2

200mm thk

0.20x 25

5.00kN/m2

450mm thk.
80mm thk.
Total

=
=

0.45x 10
0.080x 24
=

4.50 kN/m2
1.92 kN/m2
11.50 kN/m2

Roof Slab

1.0

Lower Roof between Grid L & X - 4 & 2 10 ( Roof above capacitor room )
Self-Weight of Slab
Water Proofing Load
Self Weight of Screed ( Avg)

2.0

200mm thk.

135mm thk.
Total

=
=
=

0.20x 25

5.00kN/m2

0.135x 24
=

0.50 kN/m2
3.24 kN/m2
8.75 kN/m2

Lower Roof between Grid L & X - 13-4 - ( Roof above 11kV GIS Battery , store & corridor )
Self-Weight of Slab
Water Proofing Load
Self Weight of Screed ( Avg)
False Ceiling

200mm thk.

135mm thk.

=
=

0.20x 25

5.00kN/m2

0.135x 24

0.50 kN/m2
3.24 kN/m2
1.00 kN/m2

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
Total

3.0

9.75 kN/m2

Lower Roof between Grid A & k - 10-13 ( Roof above LVAC )


Self-Weight of Slab
Water Proofing Load
Self Weight of Screed ( Avg)
False Ceiling

200mm thk.

100mm thk.
Total

=
=
=
=

0.20x 25

5.00kN/m2

0.100x 24
=

0.50 kN/m2
2.40 kN/m2
1.00 kN/m2
9.00 kN/m2

0.20x 25

5.00kN/m2

4.0 Upper Roof between Grid C & J


Self-Weight of Slab
Water Proofing Load
Self Weight of Screed ( Avg)

200mm thk.

=
120mm thk.
Total

0.120x 24
=

0.50 kN/m2
2.88 kN/m2
8.40 kN/m2

150mm thk.

0.150x 25

3.75kN/m2

0.09x 24
=

0.50 kN/m2
2.16 kN/m2
6.41 kN/m2

5.0 Staircase Roof , Air lock roof


Self-Weight of Slab
Water Proofing Load
Self Weight of Screed ( Avg)

90mm thk.
Total

10

=
=

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
D

Other load

1.0

Main Staircase -1 & 2


Self-Weight of Slab
Avg thk for steps + finishes

300mm thk.
100mm thk.

=
=

7.50kN/m2
2.50 kN/m2

0.3x 25
0.1x 25

Total

10.00 kN/m2

UDL on Midlanding beam ( 0.45m , 3.0m & 5.5m) of Span 1.37m = ( 1.37 x 10/ 2 = 6.85 kN/m )
2.0

Offloading Staircase
Self-Weight of Slab
Avg thk for steps + finishes

200mm thk.
100mm thk.

=
=

5.00kN/m2
2.50 kN/m2

0.2x 25
0.1x 25

Total

7.50 kN/m2

UDL on supporting beam of Span 3.5m = ( 3.5 x 7.5/ 2 = 13.13 kN/m )

Masonry Weights
External 250mm thick thermo block with 50mm thk
thermal insulation including 20mm plaster ( 290mm thk )
Internal 200mm solid block work with 20mm plaster on
both sides. ( 240mm thk )
Internal 200mm hollow block work with 20mm plaster on
both sides.
Internal 150mm hollow block work with 20mm plaster on
both sides.
E

Masonry Loading on

1.0

Basement floor
240mm thk solid block wall (
5.28 kN/m2)

2.0

=
0.290 x 20

5.8 kN/m2

0.24 x22

= 5.28 kN/m2

0.2x16 + 0.04 x 20

= 4.00 kN/m2

0.15x16 + 0.04 x 20

= 3.2 kN/m2

3.28m high
(2.480+1.5-0.7)

5.28 x 3.28

17.32 kN/m

5.80 x 5.25

30.45 kN/m

5.80 x 5.25

30.45 kN/m

5.80 x 5.25

30.45 kN/m

5.80 x 5.45

31.61 kN/m

4.00 x 5.25

21.00 kN/m

Ground floor

290mm thk thermo block wall ( 5.8 kN/m2)


Wall on Grid 2, 4

5.25m high

( Capacitor,11kV,NER,SCADA)

( 7.65-1.5-0.9)

Wall on grid 13

5.25m high

( LVAC,Control,Battery,Record,Store )

( 7.65-1.5-0.9)

Wall on Grid C,X

5.25m high

( 132kV ,11kV )

( 7.65-1.5-0.9)

Wall on Grid L,M,O,P,Q,S,V

5.45m high

( Capacitor)

( 7.65-1.5-0.7)

200mm thk Hollow block wall ( 4.0 kN/m2)


Wall on Grid 4,7,10,11

5.25m high

11

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
( 132kV GIS ,11kV,corridor)

( 7.65-1.5-0.9)

Wall on Grid D,H,J,L,N,Q,R

5.45m high

( LVAC,NER, SCADA,Battery )

( 7.65-1.5-0.7)

4.00 x 5.45

21.80 kN/m

5.28 x 5.45

28.77 kN/m

5.8 x 3.0

17.40 kN/m

5.8 x 3.0

17.40 kN/m

3.2 x 3.70

11.84 kN/m

5 x1. 5

7.50 kN/m

20 x 2.73

54.60 kN/m

200mm thk Solid block wall ( 5.28 kN/m2)

3.0

Wall on Grid T,U,

5.45m high

( Toilet, Staircase-1 & 2 )

( 7.65-1.5-0.7)

Lower Roof floor

290mm thk thermo block wall ( 5.8 kN/m2 )


Wall on Grid 10,C,J
( 132kV GIS )

4.0

3.00m high
( 7.65-11.5-0.9)

Stair case room

290mm thk thermo block wall ( 5.8 kN/m2 )


Wall on Grid C,D,U,W
( 132kV GIS )

5.0

3.00m high
( 7.65-11.55-0.9)

132kV GIS room

150mm thk hollow block wall (3.20 kN/m2)


Wall on Grid 4

3.7m high
( 7.65-11.55-0.2)

Parapet wall

1.0

Self Weight parapet wall ( 0.2 x 25 = 5kN/m2 )


200mm thk Wall

1.50m high

Cobble Stone in Transformer compound

1.0

Self Weight of cobble stone =20kN/m3 )


Thickness of corbel stone

1.50m high
( 2.480 + 0.4-0.15 )

Considering 30% voids the dead weight can be reduced ( = 38.22 kN/m)

Self-Weight of Precast slab in Transformer compound


Self-weight of 200mm thk precast slab = 0.2 x 25 = 5kN/m2

12

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
I

Self-Weight of IDT Truss

1
7

Horizontal
Fx( kN )
8.086
-8.105

Vertical
Fy( kN )
3.401
3.4

Horizontal
Fz( kN )
2.356
2.363

0.038

2.623

-2.358

14

-0.019

2.624

-2.361

Node Number

14
7

1
8
J

Self-Weight of Aluminium Claustra on Roof

Independent staad model of claustra created with dead load & the support reaction from that
model are transferred to the supporting beam in the Main model.

13

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.3

LIVE LOAD

Basement Floor

1.0

Cable Basement Floor /


=

5.00 kN/m2

Live Load due to equipment

15.00 kN/m2

Live load due to services

1.0 kN/m2

Total

16.00 kN/m2

Cable basement
B

Ground Floor

1.0

Capacitor Room / CA room

2.0

132kV/11kV Switch gear room


Live Load due to equipment
Live load due to services

3.0

4.0

5.0

1.0 kN/m2

Total

16.00 kN/m2

Battery room,NER room, Store, CA room


Live Load due to equipment
Live load due to services

15.00 kN/m2
1.0 kN/m2

Total

16.00 kN/m2

Live Load

5.00 kN/m2

Total

5.00 kN/m2

15.00 kN/m2

Toilet & wash / Corridor/Air lock

Offloading Platform
Live Load
Live load due to services

1.0 kN/m2

16.00 kN/m2

Live Load considered

1.50 kN/m2

Live load due to services

1.00 kN/m2

Total

2.50 kN/m2

Total
C

Roof

1.0

Roof Normal Area

2.0

15.00 kN/m2

Roof ( A/C Condensing unit area )

14

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
Live Load considered
Live load due to services

=
=

5.0 kN/m2
1.0 kN/m2

Total

6.0 kN/m2

5.00 kN/m2

Other Load

1.0

Staircase Live Load


Live Load considered

Total
=
5.00 kN/m2
UDL on Midlanding beam ( 0.45m , 3.0m & 5.5m) of Span 1.37m = ( 1.37 x 5/ 2 = 3.50 kN/m )
2.0

Offloading Staircase
Live Load considered

5.00 kN/m2

Total
=
5.00 kN/m2
UDL on supporting beam of Span 3.5m = ( 3.5 x 5.0/ 2 = 8.75 kN/m )

Equipment Load

1.0

Weight of IDT-1,2& 3 Transformer

2.0

Load of Transformer including Oil

1020kN

Pedestal Area ( 2.6 x 8.350 )


Load on Transformer Plinth ( 1020/21.71 )

=
=

21.71m2
47 kN/m2

Load of Transformer including Oil

31.75kN

Pedestal Area ( 2.6 x 8.350 )


Load on Transformer Plinth ( 31.75/1.85 )

=
=

1.85m2
17.20 kN/m2

Weight of Auxiliary Transformer

15

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.4

WIND LOAD
Wind load calculation is done using the standard method as per BS-6399 part-2.

1)

Site wind speed

Vs

Vb . Sa . Sd . Ss . Sp

2)

Effective Wind Speed

Ve

Vs . Sb

3)

Dynamic pressure

qs

0.613 . ( Ve )2

Pressure acting on external surface

pe

qs . Cpe . Ca

Dynamic Augmentation factor ( Cr)


Kb

H(m)

Cr

11.5

0.021

Vb

Basic Wind Speed

27.0 m/s

Sa

1.001

Sd

Altitude factor ( 1+0.001S )


Directional factor

Ss

Seasonal factor

Sp

Probability factor

Vs

27.0 x 1.001 x 1 x1 x 1

Site wind speed

27.03 m/s

Building Height

11.50 m

He

Effective Height

11.50 m

Sb

Terrain & building factor

1.85

Ve

Effective Wind Speed

27.03 x 1.85
50.00 m/s

Dynamic pressure

qs

{0.613 . ( 50.00 )2}/ 1000


1.532 kN/m2

16

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
Building Dimensions
Length
L (m)
83

Width
W (m)
36

Height
H (m)
11.50

Standard Pressure Coefficients


Wind Normal To

Long Face

Short Face

Breadth B (m)

83

36

Inwind depth D (m)

36

83

D/H

3.13

7.22

Scaling length,b

23

23

External Pressure Coefficients Cpe for Vertical wall


Windward ( front) face

0.658

0.6

Leeward (rear) face

-0.158

-0.100

Net Pressure coefficient

0.7

0.816
Standard Wind loads
Size effect factor for external pressure , Ca
Site exposure type
Diagonal dimension ( m )
Ca

Pe

83.793
0.824

37.792
0,874

Net pressure acting on external

1.532 x 0.816 x 0.824

surface

1.03kN/m2

17

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

Wind Load on Grid -C ( +ve X Direction )


UDL ON Column

Area

Column on Grid-5

( 3.270/2+3.27/2 x 3.51)

Column on Grid-7

(3.27/2 + 6.33/2 x 10 )

16.67

16.67 x 1.03

17.17 kN

4.90kN/m

48 x 1.03

49.50 kN

4.95kN/m

44.65 x 1.03

46.00 kN

4.60kN/m

45.13 x 1.03

46.50 kN

5.25kN/m

33.63 x 1.03

34.63 kN

4.00kN/m

13.71 x 1.03

14.12 kN

2.30kN/m

13.68 x 1.03

14.09 kN

4.00kN/m

13.68 x 1.03

14.09 kN

4.00kN/m

27.46 x 1.03

28.28 kN

4.60kN/m

8.0 x 1.03

8.25 kN

1.35kN/m

39.57 x 1.03

40.76 kN

6.62kN/m

14.34 x 1.03

14.77 kN

5.80kN/m

11.79 x 1.03

12.71 kN

4.76kN/m

48
44.65
Column on Grid-10

( 6.33/2 + 2.6/2 x 10 )

Column on Grid-11

( 2.6/2 +7.6/2 x 8.85)

Column on Grid-13

(7.6/2 x 8.85 )

45.13
33.63

Wind load on Wall on Grid C 1.03 kN/m2

Wind Load on Grid -C ( -ve X Direction )


UDL ON Column
Column on Grid-2

Area
13.71
( 2.61/2 + 1.85/2 x6.15)

13.68
Column on Grid-2a

( 7.6/2 x 3.6)

Column on Grid-4

( 7.6/2 x 3.6)

13.68
27.46
Column on Grid-10

( 6.33/2 + 2.6/2 x 6.15 )

Column on Grid-11

( 2.6/2 x 6.15)

8.0
39.57
Column on Grid-7

( 6.54/2 + 6.33/2 x 6.15)

14.34
Column on Grid-4

( 6.54/ 2 +4.71/2 x2.55)


11.79

Column on Grid-3

( 4.54/2 +4.71/2 x 2.55 )

18

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

Wind Load on Grid -2 ( +ve Z Direction )


UDL ON Column

Area
4.08

Column on Grid-J

( 1.6/2 x 5.1)

Column on Grid-K

(1.60/2 x 51.0 )

4.08
18.00
Column on Grid-L

( 5.830/2 x 6.15 )

Column on Grid-M

( 5.83/2 +5.93/2 x6.15)

Column on Grid-O

(5.93/2 + 5.93/2 x 6.15 )

Column on Grid-P

( 5.93/2 + 2.72/2 x 6.15 )

Column on Grid-Q

(2.72/2 +5.93/2 x 6.15 )

Column on Grid-S

(5.93/2 +5.93/2 x 6.15 )

Column on Grid-V

(5.93/2 + 5.82/2 x 6.15 )

Column on Grid-X

( 5.82/2 x 6.15)

36.16
36.46
26.60
26.60
36.47
36.13
18.00
4.85
Column on Grid-Y

( 1.9/2 x 5.1

4.08 x 1.03

4.20 kN

0.82kN/m

4.08 x 1.03

4.20 kN

0.82kN/m

18.00 x 1.03

18.54 kN

3.01kN/m

36.16 x 1.03

37.55 kN

6.05kN/m

36.46 x 1.03

37.55kN

6.10kN/m

26.60 x 1.03

27.40 kN

4.45kN/m

26.60 x 1.03

27.40 kN

4.45kN/m

36.47 x 1.03

37.56 kN

6.10kN/m

36.13 x 1.03

37.21 kN

6.05kN/m

18.00 x 1.03

18.54 kN

3.01kN/m

4.85 x 1.03

5.00 kN

0.98kN/m

19

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

Wind Load on Grid -13 ( -ve Z Direction )


UDL ON Column

Area
10.480

Column on Grid-C

( 2.74/2 x 7.65)

18.80
Column on Grid-D

( 2.74/2 + 2.175/2 * 7.65 )

25.34
Column on Grid-E

( 2.175/2 + 4.450/2 x 7.65 )

35.80
Column on Grid-F

( 4.45/2 + 4.91/2 x 7.65 )

38.32
Column on Grid-G

( 4.91/2 + 5.115/2 x 7.65 )

38.00
Column on Grid-H

( 5.115/2 + 4.8/2 x 7.65 )

Column on Grid-I

( 4.8/2 + 5.085/2 x 7.65 )

Column on Grid-J

( 5.085/2 + 5.430/2 x 7.65 )

Column on Grid-K

( 5.430/2 x 7.65 )

Column on Grid-L

( 7.60/2 x 7.65 )

Column on Grid-N

( 7.6/2 + 4.16/2 x 7.65 )

37.81
40.20
20.77
29.07
45.00
38.60
Column on Grid-O

( 4.16/2 + 5.93/2 * 7.65

Column on Grid-P

( 5.93/2 + 5.74/2 ) x 7.65

Column on Grid-R

( 5.74/2 +4.895/2 x 7.65 )

Column on Grid-T

( 4.895/2 + 2.585/2 x 7.65 )

Column on Grid-U

( 2,585/2 + 2.74/2 x 7.65 )

44.63
40.67
28.61
20.36

Column on Grid-W
Column on Grid-X

27.46
( 2.74/2 + 4.44/2 x 7.65
29.20
)
( 4.44/2 + 3.185/2 x 7.65 )

10.480 x 1.03

10.80 kN

1.42kN/m

18.80 x 1.03

19.36 kN

2.53kN/m

25.34 x 1.03

26.10 kN

3.41kN/m

35.80 x 1.03

36.87 kN

4.82kN/m

38.32 x 1.03

39.46 kN

5.16kN/m

38.00 x 1.03

39.14 kN

5.10kN/m

37.81 x 1.03

38.94 kN

5.09kN/m

40.20 x 1.03

41.40 kN

5.41kN/m

20.77 x 1.03

21.40 kN

2.80kN/m

29.07 x 1.03

30.00 kN

4.00kN/m

45.00 x 1.03

46.35 kN

6.05kN/m

38.60 x 1.03

40.00 kN

5.20kN/m

44.63 x 1.03

45.96kN

6.00kN/m

40.67 x 1.03

42.00 kN

5.74kN/m

28.62 x 1.03

29.50 kN

3.85kN/m

20.36 x 1.03

21.00 kN

2.74kN/m

27.46 x 1.03

28.28 kN

3.70kN/m

29.20 x 1.03

30.07 kN

4.00kN/m

20

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.5

WIND LOAD ON PARAPET WALLS


Wall Dimensions
Height
H (m)
1.5

Length
L (m)
63.40

Size effect factor for external pressure , Ca


Site exposure type
Diagonal dimension ( m )
Ca

A
63.481

Net Pressure on Parapet wall


Zone

0.842

Zone A

Zone B

Zone C

Zone D

Solidity
Cp

1
2.1

1
1.8

1
1.4

1.2

Pe ( kN/m2 )

1.64

1.406

1.094

0.937

Pressure on the Wall for 1.5 m

2.46

2.10

1.64

1.405

(1.64 x 1.5 )

( 1.406 x 1.5 )

( 1.094 x 1.5 )

( 0.937 x1. 5 )

1.85

1.57

1.23

1.05

(1.64 x1.5/2 )

(1.405 x1.5/2 )

height ( Kn/m)
Moment on the Beam supporting
Parapet wall ( kNm/m )

( 2.46 x1.5/2 )

( 2.10 x1.5/2 )

However moment of 1.85 kNm/m Applied at all locations

21

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.6

WIND LOAD ON ALUMINUM CLAUSTRA

Wind loads are applied to a independent staad model of claustra & the support reaction are
transferred to the supporting beam in the Main model.

22

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.7

SEISMIC LOADS

Seismic Parameters as per UBC1997 are as given below


Seismic Zone Coefficient

0.15

Importance Factor

1.0

SC

Cv

0.25

Ca

0.18

Ct

0.073

Structural System

5.50

Fundamental Period of the

Ct ( h )3/4

0.073 ( 10.325)

0.42 Seconds

Soil Profile Type

Seismic Design Coefficient

Structure in Seconds

The Seismic loads are calculated according to the seismic coefficient method using Staad Pro.
the loads including dead loads & live loads are applied as joint/member/floor weights on the structure.
For Seismic case actual equipment load (100%) will be considered for lump mass calculation. And
Under Seismic lump mass calculation roof live load to be considered as 25% as per UBC 1997.
The total design base shear shall be determined from the following
VBASE
= Cv x I x W/ ( R xT )
=
=

0.25 x 1.0 x W / 5.5 x 0.42


0.10W ( kN )

The total design base shear need not exceed the following
VBASE
= 2.5 x Ca x I x W/ R
=
=

2.5 x 0.25 x 1.0 x W / 5.5


0.113W ( kN )

The total design base shear shall not be less than the following
VBASE
= 0.11 x Ca x I x W
=
=

0.11 x 0.25 x 1.0 x W


0.0275W ( kN )

23

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.8

EARTH PRESURE LOAD DUE TO BACKFILL

Soil Coefficient
Unit weight of soil ( )

16 kN/m3

Earth pressure at rest ( Ko )

0.5

Height of soil ( h )

3.0 m ( 2.480 +0.5 )

Pressure acting on the wall

Ko . . h

0.5 x 16 x 3.0

4.9

24.00 kN/m2

EARTH PRESURE LOAD DUE TO SURCHARGE

Surcharge Load ( SLW60)

= 33.33 kN/m2
= 41.66 kN/m2

Earth pressure at rest ( Ko )

= 0.5

Pressure acting on the wall

= 41.66 x 0.5

(Considering 25% impact)

= 20.83 kN/m2

Surcharge Load in other area

10.00 kN/m2

Earth pressure at rest ( Ko )

0.5

Pressure acting on the wall

10.00 x 0.5

5.00 kN/m2

24

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
4.10 CRANE LOAD
Crane Data:Crane capacity
Crane Data:Crane capacity
Weight of Crane bridge (without hoists)
Weight of Crane service platform
Weight of Crane bridge (including platform)
Weight of hoist and trolley
Maximum wheel load from manufacturer
Minimum wheel load from manufacturer
Total number of wheels
Span of Gantry girder beam (Max)
Wheel base

50.00 kN

=
=
=
=
=
=
=
=
=
=

50.00
42.07
10.00
52.07
4.50
37.46
12.85
4
5.115
2.50

kN
kN
kN
kN
kN
kN
kN
nos
m
m

Calculation of support reactions on the Corbel.


Maximum support reaction on the corbel occurs when one wheel is directly resting
over a support
a

L
Vmax

Max vertical wheel load considering impact, P


25% increase for impact
Max support reaction due to wheel load,

46.83

Weight of gantry beam per meter run


Selfweight of the gantry girder beam
Total vertical load acting on the corbel
Similarly the minimum vertical load is

=
=
=
=
=
=

(P*(L-a)+P*L)/L
70.76 kN
1.87
kN/m
9.57
kN
80.33 kN
33.84 kN

Max transverse surge = {10% of (lifted load + trolley


weight) }/ total no. of wheels
Max support reaction due to transverse surge

=
=

1.36
2.06

kN
kN

=
=

1.87
3.75

kN
kN

Vmax

Longitudinal surge force per wheel = {5% of (max wheel


load)}
Total longitudinal surge conisdering two wheels
The crane loads as applied on the Staad model are tabulated below
Fx (kN)
(longitudinal
)

4.0

Fy (kN)

Fy (kN)

Fz (kN)

(Vertical
max)

(Vertical
min)

(transverse)

82.0

34.0

3.0

25

kN

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

The Section Size for the Runway beam as per design is UB457X191X98kg/m
Area = 12530 mm2
Width of the section = 192.80 mm
Thickness of Flange = 19.60 mm
Thickness of Web = 11.40 mm
4.11 OIL WATER LOAD IN TRANSFORMER COMPOUND
2.88m high

Height of Oil water

( 2.480 + 0.4 )

2.88 x 10

28.80 kN/m

Since the Transformer compound is filled with corbel stones only the 30% void space will be
filled with oil ( 28.80 x 0.3 = 8.64 kN/m )
4.12 BLAST LOAD

Blast Load of 5kN/m2 applied to inner side of transformer walls


4.13 UPLIFT LOAD

Water table is at the bottom of raft , for uplift calculation seasonal variation of 1.0m
considering
Uplift Load

10.00 kN/m2

( 1.0 ) x10

4.14 TEMPERATURE LOAD

Considering outside atmospheric temperature of 55 & minimim temperature of 15dec


inside the building . The difference in temperature of 40 dec ( 55-15 ) is applied to all the
external members above ground.

26

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
5.0

STAAD MODEL

27

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
6.0

BASIC LOAD CASE

7.0

SERVICE LOAD COMBINATION

28

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

29

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

30

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

31

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

32

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
8.0

DEFLECTION CHECK
Storey drift is check by taking results of storey drift staad output
Maximum deflection
M = 0.7 R S
S = Storey Drift as per STAAD
R = Response reduction factor = 5.5

.. for seismic as per UBC 1997

Calculated storey drift using M shall not exceed 0.020 times the storey height(h ) as structures having a
fundamental period of less than 0.574 seconds i.e. Less than 0.7sec.
From below table maximum deflection is in Z-Direction for node no.9 which is 16.076 mm and for same
load combination deflection at bottom node no.19 in Z-Direction is 2.07 mm.
Therefore Storey drift, S

= 16.07-2.07 =13.97 mm

Allowable deflection 0.02 h

= 0.02 (6000) =120 mm

Actual deflection from Staad, M

= 0.7 x 5.5 x 13.97 = 53.78 mm < 120 mm

HENCE Deflection is under the Limiting value

33

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

Deflection on grid-C

34

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

Deflection on Grid-F

Deflection on Grid-H

35

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

Deflection on Grid-J

Deflection on Grid-K

36

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013

Deflection on Grid-O

37

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
9.0

LATERAL CAPACITY CHECK FOR PILES

The Total Base shear = 14726.48


Total Number of Piles = 184
Shear Per Pile = 14726.48/ 184 = 80.03 < 90.10 Hence safe

38

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
10.0 SUPPORT NODE NUMBERS

39

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
11.0 TYPICAL PILE LOAD CALCULATION

Support Node Number 7


Pile Group 2PB

Load Case Number = 100 ( 1DL+1LL+1EPB+1EPS+1OW )


P
Fx
Fz
Mx

=
=
=
=

2346 kN
32.04 kN
12.07 kN
-57.67 kNm

Load of Pile P1 = P + Mx
2
1.875
2346 + 57.67 = 1204 kN
2
1.875
Load of Pile P2 = P
2

- Mx
1.875

2346 - 56.67 = 1142 kN


2
1.875

40

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
12.0 SUPPORT REACTION & PILE LOAD CALCULATION

41

132/11kV Dihan Main (Dimn) Substation


Design Calculations of 132/11kV Building
Doc. No- E11-2011(1)/LNT/DIMN/C03/30241
Date- 04-06-2013
13.0 ATTACHEMENT