2 OF D50=12" RIPRAP
US Army Corps
of Engineers
Jacksonville District
1-1"
Approved
B
S105
BRIDGE ABUTMENT
2-6"
SERRATED GALVANIZED
2-6"
GRATING: GW-125
OR EQUIVALENT
HANDRAIL
1-1"
3-6"
WP
HANDRAIL DETAIL
20-0"
10-6"
8-0"
6-3"
5-0"
A
Description
OR EQUIVALENT
S105
BRACKET
SPAN
1 1/2 "
1-0"
1-4"
4-0"
S105
GRATING: GW-125
8-6"
SERRATED GALVANIZED
SPAN
90
PLATFORM
REMOVABLE GRATING
GATE POSITION
3"
GRATING FASTENED TO
SENSOR HOUSING
STEEL CONNECTORS
C 10 X 20
STAFF
1 1/2 "
GALVANIZED
13-9"
7-6"
GAGE
STEEL
Zone
HERE
Symbol
4-0"
3
10 (X8 WIDE)
1
EL H
1
21-3"
4
EL I
NOTE:
SEE DETAIL A
AL PIPE
IS PERPENDICULAR
TO LEVEE ALIGNMENT
HANDRAIL (TYP)
FOR DETAILS
SCALE:
"C"
Inv. No.
NOVEMBER 2002
LEVEE, PLATFORM
SLIDE GATE
DOWNWARD OPERATING
ABUTMENT
1-6"
5-0"
EL E
1-3" TYPICAL
CJ EL G
CULVERT
2 OF D50=12" RIPRAP
(G2)
ELEVATION
WORKING POINT:
WORKING POINT:
X = 710476.722
X = 711786.049
Y = 1081342.548
Y = 1077652.381
27.88
26.88
24.60
24.50
24.10
23.50
1-3"
LOCATION
OUTFALL STRUCTURE
6"
GATE ELEVATION
5-0"
NOTES:
SECTION
SCALE: "A"
A-S105
S105
1. RAILING FRAME FOR SLIDE GATE IS MOUNTED ON ANCHOR BOLTS IN GATE WELL WALL.
D
22.60
22.00
21.00
18.50
18.50
17.50
17.50
16.50
23.50
N/A
18.50
13.50
24.00
22.00
TAYLOR
CREEK
BOLTS IN GATE WELL WALL. BRACKET IS AVAILABLE FROM SLIDE GATE MANUFACTURER.
GATE SIZE
SCALE:
EL F
LAKE OKEECHOBEE WATER RETENTION/
S 391
2-0"
S 392
File name:
12-3"
Dated:
RW
STRUCTURAL
(ALL AROUND)
BRIDGE
EL D
EH
EL C
CJ @ EL J
BRDR2D.DGN
BRIDGE ONLY
Reference files:
AT ACCESS
MFG.
Dwn by:
ON DWG S106
EL B
S105CNTLGT.DGN
BERM
RECOMMENDED BY MFG.
BY GATE
EH
SEE DETAIL B
Designed by:
ANCHOR BRACKET AS
BRACKET
3-4"
Ckd by:
"A"
DRAWING NO.
60X30
6. FOR OTHER EQUIPMENT LOCATED OFF OR NEAR CONTROL GATE SEE DWG E111.
SCALE:
"B"
S105
RECORD DRAWING
$$$$$$SYTIME$$$$$$
$$$$$$$DGNSPECIFICATION$$$$$$$
CONTROL GATE
TRANSITION LENGTH
GATE OPERATOR
SCHEDULE 80
BRIDGE
08/08/02
EDGE OF TOP OF
PEDESTAL MOUNTED
Plot date:
STRUCTURE OVER 25
ON DWG S106
AS SHOWN
ACCESS
XX/XX/02
WP LOCATED AT
Dated:
SLOPE AT CONTROL
DACWxx-02-x-xxxx
SEE DETAIL C
D.O.FILE NO.
402-38, 292
ON DWG S106
ORIGINAL GROUND
12-0"
C
L LEVEE
SCALE: "A"
PREPARED BY:
S105
JACKSONVILLE, FLORIDA
S105
Scale:
"B"
SCALE:
B-S105
SECTION
No.
12-0"
US Army Corps
of Engineers
Jacksonville District
SAFETY ON THIS JOB
DEPENDS ON YOU
STEEL
2-0"
(TYP)
1. STRUCTURAL STEEL IS DESIGNED IN ACCORDANCE WITH AND
2 ADDL. #5 BARS
EACH FACE
#5 @ 12"
Approved
#5 @ 12"
ADDL. #7 X 5-0"
EACH CORNER @
BLOCKOUT (TYP.)
A
S106
#5 @ 12"
(TYP)
2-0"
S106
3 ADDL. #7 BARS
Description
12-6"
EACH FACE
DETAIL
ADDITIONAL REINFORCING
N.T.S
Zone
Symbol
SCALE: "A"
SHRINK GROUT.
5. STEEL FRAMING SHALL BE TRUED AND PLUMB BEFORE
No.
4"
9"
5 #6
L 4 X 4 X 3/8 X 6 LONG
GALVANIZED
2"
#7 @ 12"
#5 @ 12"
(WALL W/GATE
2"
OPENING ONLY)
#5 @ 12"
#5 @ 12"
ANCHOR BOLT
PREPARED BY:
#5 @ 12"
JACKSONVILLE, FLORIDA
12-6"
C 10 X 20
3"
1 1/2 "
@ EACH POST
STRINGER (GALV)
1/2 " X 6" WELDED HEAD
1/4 "
5"
C 10 X 20 STRINGER (GALV)
L 4 X 4 X 1/4 X 6 LONG
GRATING BEARING BARS
GALVANIZED
DETAIL
SCALE:
"B"
B-S106
S105
DETAIL
SCALE:
C-S106
"B"
S105
1
2
DETAIL
ANGLE
N.T.S.
SCALE:
A-S106
S105
402-38, 292
NOVEMBER 2002
08/08/02
Plot date:
Scale:
RW
DRAWING NO.
"A"
SCALE:
S106
6IN
"B"
RECORD DRAWING
$$$$$$SYTIME$$$$$$
$$$$$$$DGNSPECIFICATION$$$$$$$
PL 1/4 X 5 X 6 1/2
1/2 "
1/4 "
C 10 X 20
1/4 "
S106
CONTROL GATE
3"
S106
1 1/2 "
STRUCTURAL
S106
1 1/2 "
1 1/2 "
A-S106
File name:
BAR (GALV)
SECTION
AS SHOWN
XX/XX/02
Dated:
1/2 "
#5 @ 12"
#5 @ 12"
D.O.FILE NO.
ACCESS BRIDGE
Dated:
BRDR2D.DGN
BAR (GALV)
Reference files:
EH
AL GUARDRAIL POST
#5 @ 12"
Ckd by:
ACCESS BRIDGE
#5 @ 12"
Designed by:
C
L POST
Dwn by:
S106
S106RNFC.DGN
"B"
SCALE:
B-S106
Inv. No.
SECTION
EH
DACWxx-02-x-xxxx
STRINGER (GALV)
US Army Corps
of Engineers
5-0" TYP
1-6"
Jacksonville District
SAFETY ON THIS JOB
DEPENDS ON YOU
1-1"
3-6"
Approved
AL PIPE (TYP)
1-4"
C
L POST
A
S107
NOTE:
C
L POST
80 AL PIPE POST
1 1/2 "
IN SLEEVE.
AL GUARDRAIL POST
(TYP)
TYP
Description
3/16
40 AL PIPE SLEEVE
2"
N.T.S.
2"
4" LEG
4"
2"
BEND 90^
IN ANGLE
SLOTTED TO
ANCHOR BOLTS
RAIL HEIGHTS.
Symbol
Zone
EACH END
SCALE: "A"
S105
S107
A-S107
CLR
1/2 "
6"
AL PIPE SLEEVE
SEE RAILING
PL 3" DIA X 1/8 "
PLANS
DETAIL
BASE SLAB
SCALE: "A"
B-S107
S108
SECTION
B-S107
SCALE: "A"
S107
LAP SPLICE
MAX. OF 2 ADDITIONAL BARS
OR 1/2 OF BARS INTERRUPTED
BY OPENING ON EACH SIDE OF
OPENING, EA. FACE, SAME SIZE
1 ADDITIONAL BAR
1/8
DRAWING NO.
SCALE: "A"
S107
6IN
RECORD DRAWING
$$$$$$SYTIME$$$$$$
$$$$$$$DGNSPECIFICATION$$$$$$$
D.O.FILE NO.
NOVEMBER 2002
Dated:
EH
STRUCTURES
GROUT
SCHEDULE 40
File name:
4" DIA
2" DIA
BRDR2D.DGN
3" CHAMFER
Reference files:
VARIES
1/2 "
3-0" TYP.
DIAMETER
2"
OPENING
1"
1/4 "
S107DETL.DGN
AL PIPE SLEEVE
3/16
EH
TYP
Designed by:
80 AL PIPE POST
RW
AL GUARDRAIL POST
3-0" TYP.
MISCELLANEOUS DETAILS
1/8
Dated:
IN SLEEVE
Plot scale:
2"
08/08/02
S107
Ckd by:
Dwn by:
WELDED TO PIPE.
C
L POST
Inv. No.
Plot date:
BETWEEN CENTERS,
Scale:
XX/XX/02
DACWxx-02-x-xxxx
AS SHOWN
2"
2 - 3/8 " DIA TYPE
402-38, 293
C
L POST
N.T.S.
SCALE: "A"
SECTION
A-S107
DETAIL
3-6" HIGH POST.
PREPARED BY:
(LLV)
JACKSONVILLE, FLORIDA
1 1/2 "
4"
8"
1 1/2 "
No.
2"
1/2 "
TRASH RACK
US Army Corps
of Engineers
T
T/3
Jacksonville District
T/3
T/3
1-1"
SAFETY ON THIS JOB
DEPENDS ON YOU
SEALANT
1"
SCHEDULE 80
AL PIPE (TYP)
1-4"
MATERIAL
1 1/2 "
Approved
CENTERED
1/2 "
#5 @ 14"
(MAX. SPACING)
OR FIBER CAP.
9"
EL 26.00
CONST. JOINT
W/KEYWAY
WATERSTOP
(AS NEEDED)
APPROVED METAL
S107
S110
Description
N.T.S.
N.T.S.
13-10"
CJ EL 19.0
Zone
EDGES
NOTE:
Symbol
MATERIAL
9-6"
EL 10.50
11-6"
2-4"
N.T.S.
STEP FOR SUPPORTING
N.T.S.
5-6"
5-6"
1-8"
19-2"
1-8"
TRASH RACK
SCHEDULE 80
5-0"
ELEVATION
AL PIPE (TYP)
(TYP)
SCALE: "A"
A-S109
S108
NOTE:
TRASH RACK CONNECTION
1"
ALTERNATE LEGS
1-8"
WHERE SHOWN.
AS SHOWN @ 1-0" OC,
"
EL 12.17
36
IE 13.00
PREPARED BY:
JACKSONVILLE, FLORIDA
1-0"
No.
REINFORCING @
SLOPING STEMWALL
(TYP)
Dated:
D.O.FILE NO.
Plot scale:
RW
EH
Ckd by:
# 5 EF
Dwn by:
AL PIPE (TYP)
2 ADDITIONAL
BRDR2D.DGN
SCHEDULE 80
Reference files:
13-10"
CJ EL 19.0
13-10"
#5 @ 12 (TYP)
1
Designed by:
#7 @ 6
1-6"
File name:
#5 @ 12 EF
10-0"
NOVEMBER 2002
2
LENGTH VARIES
#5 @ 1-0" MAX
Dated:
Inv. No.
0"
#7 @ 6" MAX
OF WINGWALL
S109RNFC.DGN
1-0"
20
ANGLED PORTION
08/08/02
EL 26.00
6"
EL 26.00
Plot date:
#4 @ 1-6" MAX
CONCRETE PAD
AS SHOWN
10 X 24
EH
Scale:
XX/XX/02
DACWxx-02-x-xxxx
TYP.
1-0"
#7 @ 6 EF
1-8"
EL 12.17
#7 @ 6
#7 @ 6" W/
#7 @ 6"
STANDARD HOOK
#5 @ 12" (TYP)
8-10"
5-6"
2-4"
EL 10.5
2-4"
4-0"
LENGTH VARIES
1-8"
7-0"
STRAIGHT PORTION
OF WINGWALL
EL 8.17
10-0"
1-8"
SECTION
16-0"
NOTE:
C-S109
ELEVATION
DRAWING NO.
B-S109
S109
SCALE: "A"
S108
SCALE: "A"
PENETRATION DETAIL.
S108
SCALE:
"A"
RECORD DRAWING
$$$$$$SYTIME$$$$$$
$$$$$$$DGNSPECIFICATION$$$$$$$
13.00
INTAKE STRUCTURE
OF SAND
SLOPED PIPE
#5 EACH FACE
STRUCTURAL
INV EL
FLOW
2 ADDITIONAL
60
#5 @ 12 EF
THIS SHEET
FLOW
5-10"
36"
GROUT BTWN
EL 18.00