ASummarize
This equipments is changed the hot machine host, equilibrium bucket
by the tube type, leaves the heart pump, hot water to equip (include the
steam tube road, jet machine, the hot water bucket), the frame and gauge
box etc. constitute. Used for the juice, milk or other hot sensitivity
liquids, it disinfects the cooling. The processed material forerunner
goes into the equilibrium bucket, through leave the heart pump to send
into the tube type to change the hot machine and pass by to prepare the
heat disinfect heat preservation cool off four stages, complete to
disinfect the process to the material. The material disinfects the
temperature is controled the box by the gauge to carry on the automatic
control and continuously record, in order to carry on the surveillance
and check towards disinfecting the process.
This equipments has the following characteristics:
a) the not easy knot is burnt, longer production time;
b) material credibility, operation the pressure is high;
c) the product can take the grain, in keeping with medium, high glue
the processing of one degree material;
d) be easy to clean, support the expenses lower;
e) the PLC control, operate simple, circulate the credibility.
EPDM 150
manufacturability 6000L/H
Disinfect the machine typeUHT
Structure formThe row tube type
CEquipments structure
That equipments is mainly changed the hot machine by the tube type 2, leave
the heart pump 3, material of equilibrium bucket 4, the hot water pump 8, the hot
water bucket 7, the steam valve a control system 11, the steam jet machine 10, the
spirit moves the valve door and the tube road, CIP to clean the system 5 with 6,
the machine a 1 etc.s constitute. Concretely saw the figure a.
picture 1
1frame 2The pipe type changes the hot machine 3The
c. START
d. operate
a). Equipment must be set according to process requirements before the system
parameters and PID parameters.
(a). system parameters set-in the main menu according to system parameters set
button (figure 2), into the parameters set screen, according to need process requirement
set the disinfection temperature (120 ), preproduction temperature (137 ), alkaline
cleaning temperature (80 ), acid cleaning temperature (75 ), add alkali time (20 S),
add acid time (15 S), the disinfection time (1200 S), the production time (900 S), and the
material roof water time (50 S), low level delay (3 S), water top material time (45 S),
alkaline cleaning time (1200 S), water rushed alkali time (60 S), acid cleaning time (1200
S), water rushed acid time (1200 S). According to return to exit parameters set screen, go
back to the main menu (figure 4).
(b). PID parameters set-in the main menu according to the PID parameters set
6
Figure 2
The open water of materials top delay = 50S , V22 delay open set = 50S material of the
water top off delay = 45S .
Figure 3
c). Automatic controlFirst into the parameters set screen, before the start of the must first
set in good parameter (set parameters above), set parameters according to the requirement of
process in the picture gets set the sterilization temperature (according to sterilization
temperature setting), the disinfection time setting (the disinfection temperature to start time, if
the temperature 2 , beyond the disinfection start time). The production time setting, the
disinfection temperature sterilization temperature excessive to production, achieve sterilization
temperature timing starts to production ready time, material against water time setting said
material in the bucket to the low water level, into the material to material barrels, the water with
material ejector time, delay perfusion time setting, material against water over time timing starts
to perfusion valves open time, hot water temperature setting means to produce sterilization
temperature when hot water (according to the material sterilization temperature setting), the
material temperature setting, according to the requirement of process set, sterilization
temperature sterilization and the lower limit set, control of material is unqualified, beyond the
scope to be automatic backflow, water top material time setting said the pipeline shutdown
equipment in the remaining material out through the vent discharge, parameters set parameters
are set to retire from the picture, back to the main menu screen (figure 4).
Next check the water, electricity , compressed air ( 0.6Mpa ) , steam (which
requires 0.6MPa ), the material is in place .
9
10
Figure 4
Figure 5
d). CIP cleaningCIP cleaning temperature said in the hot water temperature CIP cleaning
phase, according to the CIP cleaning process for the temperature setting. Time setting to deal
with good, each corresponding relation between the parameters of, not the right set parameters
11
Each instrument , the valve should be specifically responsible for , and comply with
the instructions for operation and maintenance .
Regular weekly check the cleaning of heat exchanger components , etc. is perfect , is
there sediment, coke water rust layer adhesion , and promptly cleared . At the same
time check the installation of heat exchanger components rubber pad is intact, so as to
avoid the rubber pad damage caused by leaks .
Meter box to properly " grounded " , the check should be cut off the total power . The
meter box should be placed on a relatively dry location, appropriately placed in the
12
Causes
water
temperature
does
not rise
Removal Methods
stuck
Material
temperature
does
not rise
too small
of
scaling
heat
exchanger
components
Replacement
of
temperature
measurement devices
Not
operate
normally
Forward.
leakage
Pneumatic valve
movement
disorders
Leakage of heat
exchanger
components
6000L/h
40
137
4s
90
14
Product ID
NO.
1
NAME
Qu.
Random tool
UNIT
Remarks
set.
Food rubber
Sealing ring
40495
set.
Food rubber
20
set.
Food rubber
38
Product specifications
Packing member
20
set.
Packing date
15
Certificate of compliance
Product Type
TG-UHT-6T
Product Name
Product ID
Products factory technical inspection Examination Bureau in line with a tubular heat exchanger
standards , quasi- factory , special permits issued this .
Inspector
Inspection date
16