CONTRATISTA
SUPERVISOR
TRAMO
MONTOS
Contractual
Adicional N 1
Adicional N 1
TOTAL
N de Valorizacin
ADEL DIREC
ADEL MAT
01
02
03
Parcial
ADICIONALES:
1
2
Parcial
Total Gral.
BRUTO
S/. 152,921.17
S/. 0.00
S/. 0.00
S/. 152,921.17
Valorizacin
Bruta
N de Contrato
Fecha de Inicio
Fecha de termino Contract.
Ampliacin de Plazo
Fecha de Termino de Amplia.
Reinicio de Obra
Termino de Obra Real
Ppto. Adicional N 01
Ppto. Adicional N 02
IGV
NETO
S/. 27,525.81 S/. 180,446.98
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 27,525.81 S/. 180,446.98
Adelanto en Efectivo
Adelanto
Amortizac.
S/. 0.00
Adelanto en Materiales
Adelanto
Amortizac.
S/. 0.00
S/. 152,921.17
S/. 0.00
S/. 152,921.17
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
014-2012-HMPP
8/14/2012
9/27/2012
No hubo
9/15/2012
No hubo
No hubo
IGV
Valorizacin Neta
S/. 0.00
S/. 0.00
S/. 0.00 S/. 27,525.81
S/. 0.00
S/. 0.00
###
S/. 0.00
S/. 0.00
S/. 180,446.98
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
###
S/. 180,446.98
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
100.00%
100.00%
0.00%
0.00%
S/. 180,446.98
S/. 0.00
S/. 152,921.17
Avance Fsico %
Actual
Acumulado
S/.
180,446.98
(DOSCIENTOS TREINTA Y CUATRO MIL DOSCIENTOS SETENTA Y CINCO CON 12/100 NUEVOS SOLES)
OBSERVACIONES:
Se tubo una sola Valorizacion de Obra N 01, correspondiente al mes de Setiembre 2012 (Periodo del 14.08.12 al 15.09.12). No se tiene Deductivo o Multa.
RESIDENTE
Constructora & Mineria Ureta S.A.C.
SUPERVISOR
INSTITUTO VIAL PROVINCIAL
014-2012-HMPP
Constructora & Mineria Ureta S.A.C.
Mantenimiento Periodico del Camino Vecinal Carhuac - Socorro
12.320 Km
Dpto.:
Pasco
Provincia:
Pasco
Distrito:
Ticlacayan
AUTORIZADO Y PAGADO
CON IGV
1.1.1 AUTORIZADO
Contrato Principal
SIN IGV
180,446.98
152,921.17
0.00
0.00
Adicional N
Deductivo N
Reajustes
MONTO PARCIAL
S/.
152,921.17
S/.
27,525.81
S/.
180,446.98
S/.
152,921.17
S/.
27,525.81
S/.
180,446.98
S/.
0.00
S/.
0.00
S/.
0.00
Contrato Principal
Adicional N
0.00
Deductivo N
Reajustes
MONTO PARCIAL
TOTAL AUTORIZADO
1.2.1 PAGADO
Contrato Principal
SIN IGV
152,921.17
Adicional N
Deductivo N
Reajustes
MONTO PARCIAL
1.2.2 IMPUESTO GENERAL A LAS VENTAS (IGV)
Contrato Principal
27,525.81
Adicional N
Deductivo N
Reajustes
MONTO PARCIAL
TOTAL PAGADO
SALDO
En Efectivo
En IGV
0.00
0.00
Monto Neto
0.00
0.00
OTROS - MULTA
3.1.1 Aplicados
3.1.2 Retenidos
Monto Neto
0.00
0.00
RESUMEN DE SALDOS
I.- AUTORIZADO Y PAGADO
Efectivo (Incluye IGV)
II.- ADELANTOS x AMORTIZAR
IV.- OTROS-MULTAS
A CARGO DEL
CONTRATISTA
0.00
0.00
0.00
TOTALES
A FAVOR DEL
CONTRATISTA
S/.
0.00
0.00
0.00
0.00
S/.
0.00
S/.
0.00
:
:
:
:
S/. 180,446.98
Mantenimiento Periodico del Camino Vecinal Carhuac - Socorro de 12.320 Km
:
:
12.320 Km
Dpto.: Pasco
Provincia: Pasco
Distrito: Ninacaca
Valorizacin
N
Valorizacion
Valorizacin
Bruta
Amortizacion
Valorizacin Neta
IGV
Monto Parcial
Impuesto
Detraccion
IGV
0.00
Adelanto
0.00
0.00
0.00
0.00
0.00
0.00
143,898.82
01
152,921.17
0.00
152,921.17
27,525.81
9,022.35
180,446.98
27,525.81
TOTAL ACUMULADO
152,921.17
0.00
152,921.17
27,525.81
180,446.98
143,898.82
9,022.35
27,525.81
0.00
180,446.98
180,446.98
C/P
Fecha
2012-05573
2012-05574
11/8/2012
11/21/2012
2012-05575
11/8/2012
CALCULO DE MULTA
OBRA
CONTRATO N
CONTRATISTA
SUPERVISOR
:
:
:
014-2021-HMPP
Constructora y Mineria Ureta S.A.C.
Ing. Ezequiel Efran LUCAS ESPINOZA
II
S/.
S/.
III
S/.
Atraso Total: C8 + D5
Comentario
S/.
S/.
S/.
No existe Multa Alguna, los plazos programados fueron cumplidos antes de la fecha prevista.
CALCULO DE MULTA
13/08/2012
14/08/2012
10 Das Calendarios
23/08/2012
14/08/2012
A 02 - F 03
0 Das Calendarios
14/08/2012
45
27/09/2012
0
45
27/09/2012
15/09/2012
A 47 - F 19
0
Das Calendarios
Das Calendarios
Das Calendarios
Das Calendarios
Das Calendarios
0 Das Calendarios
0 Das Calendarios
CONTRATISTA:
CONSTRUCTORA & MINERIA URETA SAC
SUPERVISOR:
ING. EFRAIN EZEQUIEL LUCAS ESPINOZA
RESIDENTE:
ING. MARCOS IGNACIO PARDAVE VERGARA
INICO:
8/14/2012
PLAZO:
45 DIAS CALENDARIOS
TERMINO VIGENTE PROGRAM.
9/27/2012
FECHA DE TERMINO REAL
9/15/2012
PERIODO
N
PARTIDAS
MES - AGOSTO
SUB-TOTAL
14
15
16
23
1.01
OBRAS PROVISIONALES
M0V. Y DESMOV. DE EQUIPO PESADO
4,580.00
2,290.00
1.02
2,751.43
1,650.86
2
2.01
PAVIMENTOS
REPOSICION DE AFIRMADO
3
3.01
TRANSPORTE
TRANSPORTE < 1.0 KM (AFIRMADO)
6,118.31
3.02
74,917.57
43,825.18
MES - SETIEMBRE
24
31
01
07
08
15
10,956.30
21,912.59
Err:502
44,950.54
29,967.03
162.50
04.01.02
120.00
120.00
04.02.01
REVEGETACION
81.76
UTI
S_T
IGV
T_P
EJECUTADO
S/.
AVANCE ACUMULADO
EJECUTADO
2.00%
6.36%
7.00%
18.00%
27
6,118.31
162.50
GG
22
1,100.57
IMPACTO AMBIENTAL
RESTAUR. AREA DE CAMPAMENTO Y PATIO MAQ.
132,556.75
21
2,290.00
4
04.01.01
COSTO DIRECTO
16
81.76
0.00
3,940.86
18,175.18
66,863.13
Err:502
0.00
0.00
2,651.14
8,434.31
9,278.97
152,921.17
27,525.81
180,446.98
0.00
0.00
0.00
0.00
0.00
0.00
78.82
250.75
275.86
4,546.29
818.33
5,364.62
363.50
1,156.45
1,272.26
20,967.39
3,774.13
24,741.52
1,337.26
4,254.36
4,680.42
77,135.17
13,884.33
91,019.50
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180,446.98
100.00
100.00
0.00
5,364.62
30,106.14
121,125.64
Err:502
0.00
0.00%
Err:502
0.00%
0.00%
Err:502
Err:502
Err:502
0.00
Err:502
SUPERVISOR
CONTRATISTA
TRAMOS SUPRVISADOS
MONTOS
Contractual
TOTAL
N de Valorizacin
ADEL DIREC
01
02
Parcial
NETO
S/. 12,669.49
IGV
S/. 2,280.51
BRUTO
S/. 14,950.00
S/. 12,669.49
S/. 2,280.51
S/. 14,950.00
Valorizacin
Bruta
S/. 11,402.54
S/. 0.00
S/. 11,402.54
AMPLIACIONES:
1
2
Parcial
N de Contrato
Fecha de Inicio
Fecha de Termino
Ampliacin de Servicios
Fecha de Termino de Amplia.
Reinicio de Servicios
Termino de Servicio Real
Adelanto en Efectivo
IGV
Adelanto
Amortizacion
S/. 0.00
S/. 0.00
S/. 0.00 S/. 2,052.46
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 13,455.00
S/.
13,455.00
OBSERVACIONES:
La presente Valorizacin de Supervisin N 01, corresponde a la aprobacin de la prestacin de servicios de supervisin de campo.
GERENTE GENERAL
INSTITUTO VIAL PROVINCIAL
9/15/2012
Avance Fsico %
Actual
Acumulado
90.00%
90.00%
0.00%
90.00%
S/. 13,455.00
S/. 0.00
S/. 0.00
S/. 11,402.54
S/. 0.00
S/. 13,455.00
S/. 0.00
S/. 0.00
Total Gral.
Valorizacin Neta
008-2012
8/14/2012
9/27/2012
No hubo
JEFE DE OPERACIONES
INSTITUTO VIAL PROVINCIAL
TABLA PARA DETERMINAR EL PORCENTAJE (%) DE AVANCE FISICO PARA LA VALORIZACION N 01 POR
LA PRESTACION DE LOS SERVICIOS DE SUPERVISION
SUPERVISION EXTERNO: Ing. Ezequiel Efran LUCAS ESPINOZA
N DE CONTRATO:
008-2012
PERIODO DEL:
8/14/2011
INICIO DE SUPERVISION:
8/14/2011
N CONTRATO
014-2012-HMPP
TRAMOS SUPERVISADOS
Carhuac - Socorro
AL:
9/15/2012
MONTO
CONTRATADO
S/.
A
Coeficiente de
Incidencia
S/. 180,446.98
B
AVANCE FISICO DE OBRA (%)
ANTERIOR
0.00%
AXB
AVANCE DEL SUPERVISOR EXTERNO (%)
ACTUAL
ACUMULADO
ANTERIOR
ACTUAL
100.00%
100.00%
0.00%
100.00%
0.00%
100.00%
ACUMULADO
100.00%
100.00%
S/. 11,402.54
100.00%
OBSERVACIONES:
La presente Valorizacin de Supervisin N 01, corresponde a la aprobacin de la
prestacin de servicios de supervisin de campo.
CONCEPTO
SUPERVICION DE CAMPO
LIQUIDACION DE OBRA
P. BASE
S/.
S/. 13,455.00
S/. 1,495.00
ANTERIOR
(%)
0.00
TOTAL
GERENTE GENERAL
INSTITUTO VIAL PROVINCIAL
JEFE DE OPERACIONES
INSTITUTO VIAL PROVINCIAL
ACTUAL
(%)
100.00%
S/. 14,950.00
ACUMULADO
(%)
100.00%
VALORIZACIN DE OBRA N 01
DEL 14/08/2012 AL 15/09/2012
DEPARTAMENTO DE PASCO
CONTRATISTA :
SUPERVISOR EXTERNO:
MONTO DEL CONTRATO :
S/. 0.00
Carhuac - Socorro
12.320 Km
ITEM
(CON IGV)
S/. 180,446.98
(SIN IGV)
S/. 152,921.17
(CON IGV)
S/. 0.00
(SIN IGV)
S/. 0.00
CANT.
P.U.
FECHA:
PROVINCIA :
DISTRITO:
VALORIZACIN DE OBRA
PRESUPUESTO CONTRACTUAL
DESCRIPCION
UND
01
N DE CONTRATO:
AVANCE ACTUAL
PARCIAL
METR.
VALORIZADO
METR.
VALORIZADO
VALORIZADO
OBRAS PRELIMINARES
01.01
glb
1.00
4,580.00
4,580.00
1.00
4,580.00
100.00
0.00
0.00
0.00
1.00
4,580.00
01.02
km
12.32
223.33
2,751.43
12.32
2,751.43
100.00
0.00
0.00
0.00
12.32
2,751.43
m3
2,847.64
15.39
43,825.18
2,847.64
43,825.18
100.00
0.00
0.00
0.00
2,847.64
43,825.18
02
02.01
03
PAVIMENTOS
Reposicin de Afirmado
TRANSPORTE
03.01
m3k
2,781.05
2.20
6,118.31
2,781.05
6,118.31
100.00
0.00
0.00
0.00
2,781.05
6,118.31
03.02
m3k
16,835.41
4.45
74,917.57
16,835.41
74,917.57
100.00
0.00
0.00
0.00
16,835.41
74,917.57
04
04.01
IMPACTO AMBIENTAL
PROGRAMA DE ABANDONO DE OBRA
04.01.01
ha
0.25
650.00
162.50
0.25
162.50
100.00
0.00
0.00
0.00
0.25
162.50
04.01.02
ha
0.30
400.00
120.00
0.30
120.00
100.00
0.00
0.00
0.00
0.30
120.00
ha
0.13
628.95
81.76
0.13
81.76
100.00
0.00
0.00
0.00
0.13
04.02
04.02.01
PROGRAMA DE REVEGETACION
Revegetacin
COSTO DIRECTO
GASTOS GENERALES FIJOS (2.00%)
GASTOS GENERALES VARIABLES (6.36279%)
UTILIDAD (7.0%)
SUB TOTAL
IGV (18%)
TOTAL
81.76
132,556.75
2,651.14
132,556.75
2,651.14
0.00
0.00
132,556.75
2,651.14
8,434.31
9,278.97
8,434.31
9,278.97
0.00
0.00
8,434.31
9,278.97
152,921.17
27,525.81
152,921.17
27,525.81
0.00
0.00
152,921.17
27,525.81
180,446.98
0.00
180,446.98
100.00%
0.00%
180,446.9
100.00%
100.00%
0.00%
100.00%
ACIN DE OBRA N 01
8/2012 AL 15/09/2012
TAMENTO DE PASCO
014-2012-HMPP
9/15/2012
Pasco
Ninacaca
VALORIZACIN DE OBRA
AVANCE ACUMUL. ACTUAL
METR.
VALORIZADO
100.00
0.00
0.00
0.00
100.00
0.00
0.00
0.00
100.00
0.00
0.00
###
0.00
100.00
0.00
0.00
100.00
0.00
0.00
###
0.00
###
0.00
100.00
0.00
0.00
###
###
0.00
100.00
0.00
0.00
0.00
100.00
0.00
0.00
###
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180,446.98
0.00
100.00%
0.00%
100.00%
0.00%