Page :
Project / No.
Report No.
Area / Unit
Date
Location
Sub. Cont
No.
1
Result
Check Item
Accept
Reject
of
Remarks
Notes :
Prepared By
Inspected By
SUBCONTRACTOR
ADHI-GS E&C
Witnessed By
PERTAMINA/PMC
Name :
Name :
Name :
Date :
Date :
Date :
Form No: BL-01
Page :
Project / No.
Report No.
Area / Unit
Date
Location
Sub. Cont
No.
1
Result
Check Item
Accept
Reject
of
Remarks
Water Proofing
1.1 Material
1.2 Dry Surface for Laying Proofing
1.3 Overlap for joint
1.4 Laying of Insulation Board
Notes :
Prepared By
Inspected By
SUBCONTRACTOR
ADHI-GS E&C
Witnessed By
PERTAMINA/PMC
Name :
Name :
Name :
Date :
Date :
Date :
Form No: BL-02
Report No.
Area / Unit
Date
Location
Sub. Cont
No.
Page :
Result
Check Item
Accept
Reject
of
Remarks
Notes :
Prepared By
Inspected By
SUBCONTRACTOR
ADHI-GS E&C
Witnessed By
PERTAMINA/PMC
Name :
Name :
Name :
Date :
Date :
Date :
Form No: BL-03
Report No.
Area / Unit
Date
Location
Sub. Cont
No.
1
Page :
Result
Check Item
Accept
Reject
of
Remarks
Water Proofing
1.1 Material
1.2 Dry Surface for Laying Proofing
1.3 Overlap for joint
1.4 Laying of Insulation Board
Notes :
Prepared By
Inspected By
SUBCONTRACTOR
ADHI-GS E&C
Witnessed By
PERTAMINA/PMC
Name :
Name :
Name :
Date :
Date :
Date :
Form No: BL-04
Page :
Project / No.
Report No.
Area / Unit
Date
Location
Sub. Cont
No.
1
Result
Check Item
Accept
Reject
of
Remarks
Notes :
Prepared By
Inspected By
SUBCONTRACTOR
ADHI-GS E&C
Witnessed By
PERTAMINA/PMC
Name :
Name :
Name :
Date :
Date :
Date :
Form No: BL-05
Page :
Project / No.
Report No.
Area / Unit
Date
Location
Sub. Cont
No.
1
Result
Check Item
Accept
Reject
of
Remarks
Notes :
Prepared By
Inspected By
SUBCONTRACTOR
ADHI-GS E&C
Witnessed By
PERTAMINA/PMC
Name :
Name :
Name :
Date :
Date :
Date :
Form No: BL-06