DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 23.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

14.5

0.0

10.50

16.5

Concrete Qty. for the Month - August 2016

99.5

56.0

464.0

294.0

297.5

Concrete Qty. for the Project Till Date

526.70

270.50

2580.50

834

693.25

23.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

361+100

RHS

Girder

IG2-5

361+100

RHS

Girder

IG2-5

361+100

RHS

RE PANEL

No.

361+100

RHS

Precast box culvert

BS1-04

361+100

RHS

PC Yard

Bed

380+043

RHS

Box Culvert

PCC

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

327.270

327.380

RHS

WMM TOP

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Opening Stock on
23.08.16

Bulk Material (MT)

Material Received on

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

95.416

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

53.865

River Sand (Screened )

2340

FOSROC CONPLAST KRM6

DON

33141

ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)

MANIKANDAN M

23.08.16

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Qty. (mt.) on the day


(23.08.16)

Executed
Base Course (DBM)

Wearing Course (BC)

WMM

458

2435

2435

53.00

1257.00

5049.95

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

11.5

0.0

34.5

Max. temp.

34.90

Min. temp.

22.0

Weather
Humidity (%)
(Recorded at
361+100 RHS
CAMP)

46.0

Rain fall(mm) for the day

104.50

87
37
3

Cum. Rainfall(mm) for


the month

30.1

Cum. Rainfall(mm) Till


Date

388.80

23.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

Quantity

Remarks

m3

m40

11.50

FROM BP2

m3

Slurry

0.50

FROM BP2

m3

M35

16.50

FROM BP2

m3

M30

10.50

FROM BP2

39.00
m3

M15

6.00

FROM BP1

m3

M15

8.00

FROM BP1

14.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

9.5

0.125

458.00

Remarks

458.00

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

ATUS as on 23.08.16 ;8:00am


Consumption on 23.08.16 Opening stock on 24.08.16

Storage Capacity

Remarks

3.460

91.956

140 mt.

14.535

39.330

200 mt.

17.411

2323

117.81

33023

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 24.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

3.0

0.0

42.00

16.5

Concrete Qty. for the Month - August 2016

102.5

56.0

506.0

294.0

314.0

Concrete Qty. for the Project Till Date

529.70

270.50

2622.50

834

709.75

24.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

361+100

RHS

Precast box culvert

BS2-55,BS2-56,BS1-5,AS3-7

361+100

RHS

PC yard

flooring

361+100

RHS

RE PANEL

F TYPE-26NOS., B TYPE-11NOS.

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

327.070

327.380

RHS

WMM TOP

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Opening Stock on
24.08.16

Bulk Material (MT)

Material Received on

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

91.956

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

39.330

River Sand (Screened )

2323

FOSROC CONPLAST KRM6

DON

33023

ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)

MANIKANDAN M

24.08.16

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(24.08.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

608

3043

3043

61.50

1318.50

5111.45

Quantity

Remarks

0.00

FROM BP2

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

0.0

46.00

34.5

104.50

24.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

0.00
m3

M30

42.00

m3

M15

3.00

m3

M35

16.50

61.50

FROM BP1

FROM BP1

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

9.5

0.125

608.00

MCW

608.00

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM ONWARDS

ATUS as on 25.08.16 ;8:00am


Consumption on 24.08.16 Opening stock on 25.08.16

Storage Capacity

Remarks

22.080

69.876

140 mt.

39.330

200 mt.

14.145

2309

138.92

32884

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 25.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

0.0

0.0

21.50

16.5

Concrete Qty. for the Month - August 2016

102.5

56.0

527.5

294.0

330.5

Concrete Qty. for the Project Till Date

529.70

270.50

2644.00

834

726.25

25.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

BATCHING PLANT
1

361+100

RHS

Precast box culvert

BS2-57,BS2-58

361+100

RHS

RE PANEL

F TYPE-26NOS., B TYPE-11NOS.

WET MIX MACADAM


S. No.
1
2

FROM

TO
361+100

325.840

326.040

SIDE

LAYER

RHS

TRIAL STRETCH FOR WMM

RHS

WMM 1ST

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Opening Stock on
25.08.16

Bulk Material (MT)

Material Received on

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

69.876

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

39.330

River Sand (Screened )

2295

FOSROC CONPLAST KRM6

DON

33023

ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)

MANIKANDAN M

25.08.16

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(25.08.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

694

3737

3737

38.00

1356.50

5149.45

Quantity

Remarks

0.00

FROM BP2

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

0.0

46.00

34.5

104.50

25.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

0.00

HING PLANT - 1
m3

M30

21.50

FROM BP1

m3

M35

16.50

FROM BP1

38.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

9.5

0.125

65.20

9.5

0.125

629.42

MCW

694.62

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM ONWARDS

ATUS as on 26.08.16 ;8:00am


Consumption on 25.08.16 Opening stock on 26.08.16

Storage Capacity

Remarks

14.010

55.866

140 mt.

39.330

200 mt.

8.740

2286

89.18

32934

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 26.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

9.0

0.0

32.00

16.5

Concrete Qty. for the Month - August 2016

111.5

56.0

559.5

294.0

347.0

Concrete Qty. for the Project Till Date

538.70

270.50

2676.00

834

742.75

26.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

BATCHING PLANT
1

361+100

RHS

Precast box culvert

Safety blocks

361+100

RHS

Precast box culvert

BS2-59,60,61

361+100

RHS

Girder

IG3-1

361+100

RHS

RE PANEL

F TYPE-26NOS., B TYPE-11NOS.

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

371.760

372.060

RHS

WMM 1ST

326.000

326.040

RHS

WMM 1ST

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Opening Stock on
26.08.16

Bulk Material (MT)

Material Received on

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

55.866

37.86

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

39.330

38.82

River Sand (Screened )

2286

FOSROC CONPLAST KRM6

DON

SHALIMAR KAVASHU PLAST (KG)

32934

FOSROC AURAMIX350 (KG)

4000

ADMIXTURE

MANIKANDAN M

26.08.16

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(26.08.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

741

4478

4478

69.00

1425.50

5218.45

Quantity

Remarks

0.00

FROM BP2

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

11.5

0.0

57.50

34.5

116.00

26.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

0.00

HING PLANT - 1
m3

M15

9.00

FROM BP1

m3

M30

32.00

FROM BP1

m3

M40

11.50

FROM BP1

m3

M35

16.50

FROM BP1

69.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

9.8

0.125

676.00

MCW

9.5

0.125

65.00

MCW

741.00

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM OF 24.08.16 ONWARDS

ATUS as on 27.08.16 ;8:00am


Consumption on 26.08.16 Opening stock on 27.08.16

Storage Capacity

Remarks

24.345

69.381

140 mt.

78.150

200 mt.

21.560

2264

32934

149.44

3851

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 27.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

0.0

17.0

52.50

17.0

Concrete Qty. for the Month - August 2016

111.5

73.0

612.0

294.0

364.0

Concrete Qty. for the Project Till Date

538.70

287.50

2728.50

834

759.75

27.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant Breakdown since 2


BATCHING PLANT
1

371+723

RHS

Pipe culvert

Encasing

378+401

RHS

Slab Culvert

Median wall

361+100

RHS

Precast box culvert

BS2-62,63,64 ; BS1-06

361+100

RHS

RE PANEL

F TYPE-26NOS., B TYPE-11NOS.

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

371.920

371.760

RHS

WMM TOP

325.840

326.040

RHS

WMM 1ST

373.980

374.220

RHS

WMM 1ST

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Opening Stock on
27.08.16

Bulk Material (MT)

Material Received on
27.08.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

69.381

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

78.150

2264

FOSROC CONPLAST KRM6

DON

32934

3851

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(27.08.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

1343

5821

5821

86.50

1512.00

5304.95

Quantity

Remarks

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

0.0

57.50

34.5

116.00

27.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

own since 24.08.16

FROM BP2

0.00

HING PLANT - 1
m3

M20

17.00

FROM BP1

m3

M30

10.50

FROM BP1

m3

M30

42.00

FROM BP1

m3

M35

17.00

FROM BP1

86.50

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

9.5

0.125

352.00

MCW

9.5

0.125

321.88

MCW

9.5

0.125

668.80

MCW

1342.68

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM OF 24.08.16 ONWARDS

ATUS as on 28.08.16 ;8:00am


Consumption on
27.08.16

Opening stock on
28.08.16

Storage Capacity

Remarks

30.460

38.921

140 mt.

78.150

200 mt.

19.895

2244

31

32903

98.21

3753

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 29.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

0.0

0.0

42.00

17.0

Concrete Qty. for the Month - August 2016

111.5

73.0

654.0

294.0

381.0

Concrete Qty. for the Project Till Date

538.70

287.50

2770.50

834

776.75

29.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant Breakdown since 2


BATCHING PLANT
1

361+100

RHS

Precast box culvert

BS2-65,66,67 ; BS3-03

361+100

RHS

RE PANEL

F TYPE-26NOS., B TYPE-11NOS.

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

325.270

325.550

RHS

WMM TOP

375.540

375.740

RHS

WMM 1ST

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
29.08.16

Material Received on
29.08.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

38.921

39.02

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

78.150

19.32

2264

FOSROC CONPLAST KRM6

DON

32903

3753

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(29.08.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

432

6253

6253

59.00

1571.00

5363.95

Quantity

Remarks

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

0.0

57.50

34.5

116.00

29.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

own since 24.08.16

FROM BP2

0.00

HING PLANT - 1
m3

M30

42.00

FROM BP1

m3

M35

17.00

FROM BP1

59.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

4.8

0.125

260.22

MCW

9.5

0.125

171.90

MCW

432.12

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM OF 24.08.16 ONWARDS

ATUS as on 30.08.16 ;8:00am


Consumption on
29.08.16

Opening stock on
30.08.16

Storage Capacity

Remarks

21.580

56.361

140 mt.

97.470

200 mt.

13.570

2250

32903

83.09

3669.91

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 30.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

2.5

0.0

42.00

18.0

Concrete Qty. for the Month - August 2016

114.0

73.0

696.0

294.0

399.0

Concrete Qty. for the Project Till Date

541.20

287.50

2812.50

834

794.75

30.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2 Breakdown since


BATCHING PLANT
1

361+100

RHS

Precast box culvert

BS2-68,69,70 ; BS3-04

361+100

RHS

Precast box culvert

Safety block

361+100

RHS

RE PANEL

F TYPE-26NOS., B TYPE-11NOS.

361+100

RHS

GIRDER

IG3-02

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

324.860

325.020

RHS

WMM 1

375.540

375.940

RHS

WMM 1

RHS

WMM 1ST

345.940

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Opening Stock on
30.08.16

Bulk Material (MT)

Material Received on
30.08.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

56.361

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

97.470

20.28

2250

FOSROC CONPLAST KRM6

DON

32903

3670

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(30.08.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

1247

7500

7500

74.00

1645.00

5437.95

Quantity

Remarks

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

11.5

0.0

69.00

34.5

127.50

30.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

own since 24.08.16

FROM BP2

0.00

HING PLANT - 1
m3

M30

42.00

FROM BP1

m3

M15

2.50

FROM BP1

m3

M35

18.00

FROM BP1

m3

M40

11.50

FROM BP1

74.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

4.8

0.125

215.00

MCW

4.8

0.125

966.82

MCW

0.125

65.60

Diversion

1247.42

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM OF 24.08.16 ONWARDS

ATUS as on 31.08.16 ;8:00am


Consumption on
30.08.16

Opening stock on
31.08.16

Storage Capacity

Remarks

26.980

29.381

140 mt.

117.750

200 mt.

22.655

2227

32898

102.36

3568

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)


Concrete Qty. for the day 31.08.16

M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

11.5

0.0

7.5

31.50

16.5

Concrete Qty. for the Month - August 2016

125.5

73.0

727.5

294.0

415.5

Concrete Qty. for the Project Till Date

552.70

287.50

14

2844.00

834

811.25

31.08.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2 Breakdown since


BATCHING PLANT
1

361+100

RHS

Precast box culvert

BS2-71,72,73

365+024&368+998&
370+058

LHS

Pipe Culvert

PCC for Head wall

376+530

RHS

MNB

Median wall PCC

371+723

RHS

Pipe Culvert

Slab Encasing

361+100

RHS

RE PANEL

F TYPE-26NOS., B TYPE-11NOS.

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

324.860

325.020

RHS

WMM TOP

LHS

DIVERSION

346.100

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
31.08.16

Material Received on
31.08.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

29.381

19.36

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

117.750

2227

FOSROC CONPLAST KRM6

DON

32898

3568

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(31.08.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
August 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

626

8126

8126

67.00

1712.00

5504.95

Quantity

Remarks

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

0.0

69.00

34.5

127.50

31.08.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

own since 24.08.16

FROM BP2

0.00

HING PLANT - 1
m3

M30

31.50

FROM BP1

m3

M15

6.50

FROM BP1

m3

M15

5.00

FROM BP1

m3

M25

7.50

FROM BP1

m3

M35

16.50

FROM BP1

67.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

4.8

0.125

490.00

MCW

4.8

0.125

136.00

MCW

626.00

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM OF 24.08.16 ONWARDS

ATUS as on 01.09.16 ;8:00am


Consumption on
31.08.16

Opening stock on
01.09.16

Storage Capacity

Remarks

23.150

25.591

140 mt.

117.750

200 mt.

15.410

2212

36.23

32862

67.31

3501

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)

Concrete Qty. for the day 01.09.16


M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

42

18.0

Concrete Qty. for the Month - September 2016


0.0

0.0

42

0.0

18.0

Concrete Qty. for the Project Till Date


552.70

287.50

14

2886.00

834

829.25

01.09.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2 Breakdown since


BATCHING PLANT
1

361+100

RHS

Precast box culvert

BS2-74,75,BS1-7,BS3-5

361+100

RHS

RE PANEL

F TYPE-27NOS., B TYPE-11NOS.

WET MIX MACADAM


S. No.

FROM

TO

SIDE

LAYER

324.840

324.880

RHS

WMM TOP

324.880

325.040

RHS

WMM TOP

LHS

DIVERSION

RHS

WM 1ST

3
4

369.720
375.940

376.160

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
01.09.16

Material Received on
01.09.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

25.591

19.92

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

117.750

2212

FOSROC CONPLAST KRM6

DON

32862

3501

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(01.09.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
Sep. 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

965

965

9091

60

60.00

5564.95

Quantity

Remarks

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

0.00

34.5

127.50

16

01.09.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

own since 24.08.16

FROM BP2

0.00

HING PLANT - 1
m3

M30

42.00

FROM BP1

m3

M35

18.00

FROM BP1

60.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

9.5

0.125

Quantity (mt.)

Remarks
MCW

372.24
4.8

0.125

MCW

4.8

0.125

97.98

MCW

9.5

0.125

494.36

MCW

965

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM OF 24.08.16 ONWARDS

ATUS as on 02.09.16 ;8:00am


Consumption on
01.09.16

Opening stock on
02.09.16

Storage Capacity

Remarks

21.960

23.551

140 mt.

117.750

200 mt.

13.800

2198

32862

84.42

3417

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)

Concrete Qty. for the day 02.09.16


M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

52

17.5

Concrete Qty. for the Month - September 2016


4.0

0.0

94

0.0

35.5

Concrete Qty. for the Project Till Date


556.70

287.50

14

2938.00

834

846.75

02.09.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2 started by 4pm of 2-9-16


1

361+100

RHS

Safety block

378+401

RHS

Slab Culvert

Median wall 1st lift - A1 side

361+100

RHS

Precast box culvert

BS2-76,77,78 ;BS1-08

361+100

RHS

RE PANEL

F TYPE-30NOS., B TYPE-15NOS.

BATCHING PLANT
1

361+100

RHS

Lab

Shed work

WET MIX MACADA


S. No.

FROM

TO

SIDE

LAYER

325.600

325.770

RHS

WMM TOP

GSB
1

344.020

344.180

LHS

GSB

343.520

343.720

LHS

GSB

379.700

RHS

GSB

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
02.09.16

Material Received on
02.09.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

23.551

0.00

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

117.750

2198

FOSROC CONPLAST KRM6

DON

32862

3417

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(02.09.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
Sep. 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

224

1189

9315

74

133.50

5638.45

Quantity

Remarks

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

0.0

0.00

34.5

127.50

16

02.09.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

HING PLANT - 2

( Breakdown From 24.08.16 to 3.9.16(4pm)


m3

M15

1.00

FROM BP2

m3

M30

10.00

FROM BP2

m3

M30

42.00

FROM BP1

m3

M35

17.50

FROM BP2

70.50

HING PLANT - 1
m3

M15

3.00

FROM BP1

3.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

4.8

0.125

224.76

MCW

14

0.2

338.00

MCW

14

0.2

334.00

MCW

14

0.2

112.00

MCW

GSB

784

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

6:40PM OF 24.08.16 TO 4PM OF


03.09.16

ATUS as on 02.09.16 ;8:00am


Consumption on
02.09.16

Opening stock on
03.09.16

Storage Capacity

Remarks

0.690

22.861

140 mt.

24.43

93.320

200 mt.

13.800

2184

23

32839

83.75

3333

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)

Concrete Qty. for the day 03.09.16


M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

0.5

6.5

42

18.0

Concrete Qty. for the Month - September 2016


4.5

136

53.5

Concrete Qty. for the Project Till Date


557.20

294.00

14

2980.00

834

864.75

03.09.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2
1

371+227

RHS

Box Culvert

Head wall - 2nd lift

361+100

RHS

Girder

Slurry

361+100

RHS

Girder

IG3-03

361+100

RHS

Precast box culvert

BS2-79,80,81 ;BS1-09

361+100

RHS

RE PANEL

F Type - 30nos., B Type-15nos.

BATCHING PLANT

WET MIX MACADA


S. No.

FROM

TO

SIDE

LAYER

378.060

378.120

RHS

WMM 1st

325.750

326.000

RHS

WMM TOP

GSB
1

343.520

343.700

RHS

GSB

379.500

379.700

RHS

GSB

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
03.09.16

Material Received on
03.09.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

22.861

0.00

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

93.320

2184

FOSROC CONPLAST KRM6

DON

32839

3333

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(03.09.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
Sep. 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

224

1189

9315

78.5

212.00

5716.95

e Qty (m3)

M35RCC PUMP

M40RCC

M40RCC
GIRDER

11.5

0.0

11.50

34.5

139.00

16

03.09.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

Quantity

Remarks

m3

M20

6.50

FROM BP2

m3

M40

0.50

FROM BP2

m3

M40

11.50

FROM BP2

m3

M30

42.00

FROM BP2

HING PLANT - 2

hing plant 2

m3

M35

18.00

FROM BP2

78.50

HING PLANT - 1
FROM BP1

0.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

4.5

0.125

184.00

MCW

9.5

0.125

740.52

MCW

924.52

GSB
14

0.2

607.00

MCW

14

0.2

302.56

MCW

910

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

Bucket failure

ATUS as on 04.09.16 ; 8:00am


Consumption on
03.09.16

Opening stock on
04.09.16

Storage Capacity

Remarks

0.000

22.861

140 mt.

28.89

64.435

200 mt.

23.276

2160.92

11.70

32827

114.06

3219

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)

Concrete Qty. for the day 06.09.16


M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

0.0

0.0

42

20.5

Concrete Qty. for the Month - September 2016


4.5

178

74.0

Concrete Qty. for the Project Till Date


557.20

294.00

14

3022.00

834

885.25

06.09.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2
4

361+100

RHS

Precast box culvert

BS2-82,83,84 ,85

361+100

RHS

RE PANEL

F Type -30nos., B Type-15nos.

BATCHING PLANT

WET MIX MACADA


S. No.

FROM

TO

SIDE

LAYER

378.170

378.310

RHS

WMM 1st

378.060

378.210

RHS

WMM 1st

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
06.09.16

Material Received on
06.09.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

22.861

19.90

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

64.435

59.92

2161

FOSROC CONPLAST KRM6

DON

32827

3219

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(06.09.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
Sep. 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

460

1649

9775

62.5

274.50

5779.45

e Qty (m3)

M35RCC
PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

11.50

34.5

139.00

16

06.09.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

Quantity

Remarks

m3

M30

42.00

FROM BP2

m3

M35

20.50

FROM BP2

HING PLANT - 2

hing plant 2

HING PLANT - 1

62.50

FROM BP1

0.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

4.5

0.125

Quantity (mt.)

Remarks
MCW

459.54
5.3

0.125

MCW

460

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

ATUS as on 04.09.16 ; 8:00am


Consumption on
06.09.16

Opening stock on
07.09.16

Storage Capacity

Remarks

42.761

140 mt.

22.91

101.445

200 mt.

15

2145.92

32827

87.75

3131.2

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION (

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)

Concrete Qty. for the day 07.09.16


M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

0.0

0.0

42

11.0

Concrete Qty. for the Month - September 2016


4.5

220

85.0

Concrete Qty. for the Project Till Date


557.20

294.00

14

3064.00

834

896.25

07.09.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2
1

361+100

RHS

Precast box culvert

BS2-86,87,88,89

361+100

RHS

RE PANEL

F Type -30nos., B Type-11nos.

BATCHING PLANT

WET MIX MACADA


S. No.

FROM

TO

SIDE

LAYER

378.210

378.310

RHS

WMM 1st

346.000

346.050

RHS

WMM 1st

378.400

378.900

RHS

WMM 1st

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
07.09.16

Material Received on
07.09.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

42.761

19.84

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

101.445

59.00

2146

FOSROC CONPLAST KRM6

DON

32827

3131

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(07.09.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
Sep. 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

947

2596

10722

53.0

327.50

5832.45

e Qty (m3)

M35RCC
PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

11.50

34.5

139.00

16

07.09.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

Quantity

Remarks

m3

M30

42.00

FROM BP2

m3

M35

11.00

FROM BP2

HING PLANT - 2

hing plant 2

HING PLANT - 1

53.00

FROM BP1

0.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

9.5

0.125

175.22

MCW

9.5

0.125

143.12

MCW

4.8

0.125

628.17

MCW

947

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

ATUS as on 08.09.16 ; 8:00am


Consumption on
07.09.16

Opening stock on
08.09.16

Storage Capacity

Remarks

62.601

140 mt.

19.30

141.145

200 mt.

12

2133.73

32827.3

75.11

3056.1

QA/QC - Section '2'

LARSEN & TOUBRO LIMI

HOSPET - CHITRADURGA ROAD P

DAILY PROGRESS REPORT - PLANT PRODUCTION

QUANTITY STATISTI
S. No.

Date of 1st Commencement of work

28.03.2016

Works Executed

Base Course (D
Bituminous
Wearing Course
Sub Base Course

WMM

Concrete Qty (m3)

Concrete Qty. for the day 08.09.16


M15pcc/
Slurry

M20pcc

M25RCC

M30RCC

M30RCC- PUMP

M35RCC

0.0

0.0

42

11.0

Concrete Qty. for the Month - September 2016


4.5

220

85.0

Concrete Qty. for the Project Till Date


557.20

294.00

14

3064.00

834

896.25

08.09.16

CONCRETE BATCHING PL
S. No.

Location

Side

Structure

Element

BATCHING PLANT

Batching plant 2
1

361+100

RHS

Precast box culvert

BS2-90,91,92 BS-06

370+058

LHS

Pipe culvert

Head wall 1st lift

361+100

RHS

RE PANEL

F Type -26nos., B Type-11nos.

361+100

RHS

Girder

IG-09

BATCHING PLANT
1

353+400

RHS

Temperory work

BS2-90,91,92 BS-06

353+400

LHS

Temperory work

Head wall 1st lift

WET MIX MACADA


S. No.

FROM

TO

SIDE

LAYER

378.400

378.900

RHS

WMM 1st

Breakdown details of Plant &


S.No

1
2

Description of Assets
Concrete Batching Plant
(make: Schwing
stetter)
Concrete Batching Plant
(make: Schwing
stetter)

Plant ID

Production capacity per hour

BP1

30m3

BP2

30m3

BULK MATERIAL STATUS as on


Bulk Material (MT)

Opening Stock on
08.09.16

Material Received on
08.09.16

CEMENT
(Ultratech OPC53 Grade)

PLANT 1

62.601

58.80

CEMENT
(Ultratech OPC53 Grade)

PLANT 2

141.145

19.74

2146

FOSROC CONPLAST KRM6

DON

32827

3131

River Sand (Screened )


ADMIXTURE

SHALIMAR KAVASHU PLAST (KG)


FOSROC AURAMIX350 (KG)

MANIKANDAN M

UBRO LIMITED TIIC

DURGA ROAD PROJET (NH7)

PRODUCTION (CH:361+100 RHS-1 Km, Inside )

TY STATISTICS- 2016*
Qty. (mt.) on the day
(08.09.16)

Executed

Cum. Qty.
Cum. Qty. achieved
achieved
in
Sep. 2016
Till Date

Base Course (DBM)

Wearing Course (BC)

WMM

947

2596

10722

53.0

327.50

5832.45

e Qty (m3)

M35RCC
PUMP

M40RCC

M40RCC
GIRDER

0.0

0.0

11.50

34.5

139.00

16

08.09.16
BATCHING PLANT PRODUCTION
Unit

Type of mix

Quantity

Remarks

m3

M30

42.00

FROM BP2

m3

M20

10.50

FROM BP2

m3

M35

14.00

FROM BP2

m3

M40

11.50

FROM BP2

HING PLANT - 2

hing plant 2

66.50

HING PLANT - 1
m3

M15

2.00

FROM BP2

m3

M20

2.00

FROM BP2

4.00

MIX MACADAM
WIDTH(m.)

THICKNESS(m)

Quantity (mt.)

Remarks

9.5

0.125

1184.71

MCW

1185

ils of Plant & Resource's


Reason for Breakdown

Period of Breakdown in Time

Remarks

ATUS as on 08.09.16 ; 8:00am


Consumption on
08.09.16

Opening stock on
09.09.16

Storage Capacity

Remarks

1.44

119.961

140 mt.

28.075

132.810

200 mt.

12.19

2133.73

26.14

32801.2

95.66

3035.5

QA/QC - Section '2'