METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
Date of validity:
1; ...-...-2009
--2009
Validity apply:
PVP-SERVICE
Page No:
1/ 13
PV-Power Service
DISTRIBUTION:
1.
General Director
01
2.
01
3.
Engineering Department
01
4.
01
5.
Electrical Department
01
METHOD STATEMENT
And Risk Analysis
Subject:
Feed water pump & Condensate extraction pump in the PM 3 Power Plant
PREPARED BY
CHECKED BY
APPROVED BY
Signature:
Signature:
Signature:
Title:
Title:Vice Manager
Mechanical Department
CONTENTS
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
--2009
DOCURMENT CODE:
QT-SCL
PAGE No:
2/ 13
I.
SCOPE OF WORK..............................................................................................03
II.
PROCEDURE.......................................................................................................03
1. Safety / Health..............................................................................................................03
2. Preparation...................................................................................................................04
3. Sequence of works........................................................................................................04
3.1
3.2
3.3
3.4
3.6
3.7
3.8
4. Personnel.......................................................................................................................10
5. Risk assessment............................................................................................................10
I.
SCOPE OF WORK
PVP-Service
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
3/ 13
This method statement discribles the work to be performed for Overhaul of the MV Feed
Water Pumps & Condensate Extraction Pumps in the ULA & UMA buildings
1. Familiarization with Equipment data, Latest drawings;
2. Record data from name plate;
3. Disconnecting the power cable and uncoupling;
4. Remove the motor from the foundation;
5. Pick up the motor and transport to workshop or GT building;
6. Motor disassembly must be mark carefully motors parts;
7. Inspection (Static test) and Milliohm check (Winding resistance) insulation
check;
8. Motor dismantling and separate rotor form stator;
9. Replacing and fixing any damage motors parts: Bearings, nuts, screws,....,
10. Cleaning the stator winding and rotor cleaning liquid
11. Cleaning and painting for all mechanical part & motor patrs
12. Varnish clears on stator core & ouside frame
13. Anti corrosion treatment the motor frame Red varnish spray
14. Reassemble the motor completely
15. Re-greasing the bearings / replace lubrication oil
16. Perform static check after reassembling Winding inductance Winding insulation
resistance
17. Reinstall the motor at foundation
18. Connect power cable and tighten terminal connector with torque screw driver or
torque wrench
19. Thermal stickers at HV terminals
20. Rotation test
PVP-Service
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
4/ 13
PROCEDURE
1.
Safety / Health
-
All personnel have fully the personnel safety devices and follow safety rules;
Carry out tool box meeting with personnel involved before doing any job;
To ensure all hand tools and lifting epuipment are in good condition and certified;
To ensure the load to be lifted does not exceed the lifting capacities of the lifting
device;
To ensure ony authorized personnel involved in this job can access to the working
area;
2.
1)
2)
Manpower:
PVP-Service
08 persons
4
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
3)
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
5/ 13
Sequence of works
3.1.
3.2.
3.3.
3.4.
A.
1)
-
Motor disassemly
Switch off the circuit breaker & Disconnect the motor from the mains supply,
auxiliary equipments and grounding connections
Remove mounting bolts & dowel pins between motor frame and mounting base or
from coupled machine.
Remove the half - coupling in order to release the motor & Drive
Lifting the motor by suitble slings and bring it to the large space to allow to
operation the machine
Remove the half coupling following instructions given in paragraph and remove
the key
Unscrew external fan securing screw and draw out external fan
Disconnect fan casing support brackets, unscrew securing screws and remove fan
casing complete
Unscrew safety screws of labyrith seals and remove the labyrth seals & V-ring seals
PVP-Service
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
-
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
6/ 13
Remove the bolts securing shields to frame and the passing through screws
securing inner caps
Remove out end shields from the frame by facing them with levers agains the
raised lugs
Insert a strip of metal sheet in the air gap between the stator and the rotor to protect
surfaces against rubbings during removal
Carefully make the rotor resting on the stator and remove the lifting slings and two
shields
Disassembly two air baffles from the stator, unscrewing their fixing screws and
draw out two interminal fans & their safety screws
Fit an extension steel pipe over the drive end of the rotor shaft after protecting it
properly by means of cloth or paper.
Sling the rotor respectively at the steel pipe end, in the proper seat and opposite
side. Chek that the angle of spread of the slings be not greater then 600
Rise slightly the rotorand slowly slide it out of the stator until the internal fan on
the extension side has completely gone outside the frame
Lay down the rotor core, along its entire lenght on a wooden saddle, suitable avoid
the rotor movements
Remove slings from the steel pipe and locate it close to the drive end internal fan,
avoiding that the sling rests against it.
Lay down again the rotor on the saddle and remove the extension pipe from the
shaft end
PVP-Service
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
-
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
7/ 13
If the stator core pack or windings need major repairs, the stator should be removed
from the frame. This should be made by drilling out pins and heating frame in order
2)
-
Motor reassembly
Reassemble the motor we carry out the previously detailed operations in the
reverse sequence
3)
Bearing s are vitally importance to the proper operation of any electrical machine
Care must be taken to avoid damaging the ball races and journal and bearing
surfaces must be protected while bearings are being moved. After removing the end
sheilds, slide of the bearing with an extractor to motor disassembly
After disassembly , both the bearings are surfaces of the shaft should be protected
against shocks and oxidation
4)
-
If grinding is necessary, ensure that not metal dust or particales reach the bearings
or left on the adjacent parts
Apply a thin film of grease to the surface of journals and adjacent parts to protect
them from corrosion. Heat the bearing in an oil bath at 700 - 800 slide it on the
journal and ensure that it is pressed firmly against the shoulders of the shaft until it
cools down to ambient temperature
B.
1)
-
Motor disassembly
Switch off the circuit breaker & Disconnect the motor from the mains supply,
auxiliary equipments and grounding connections
Shut the forced oil lubrication circuit & drain oil from bearing housings by
unscrewing drain plugs
PVP-Service
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
8/ 13
Remove the thermal couples from the bearing housing , remove the oil level
Remove mounting bolts and dowel pins between motor frame and the mounting
base
Remove the haft couplings in order to release the motor from driven machine
Lifting the motor by suitble slings and bring it to the large space to allow operation
the machine
Remove the half coupling following instructions given in paragraph and remove
the key
Remove the Grille from the casing and this operation includes the air baffle
Remove the fan casing by removing the connecting screw from the heat exchanger
and lower the bracket
Remove the clamping plate, external fan from the hub and extract the fan hub
Unscrew the securing screw of DE & NDE external protections from the rotor
shaft
Support properly the rotor by mean of crane and two slings placed araund the shaft
on both sides
Slightly under tension the slings without forcing, rotate gently up and remove the
two bottom half bearings . Remove oil ring on the shaft
Remove end sheilds and having first removed their screw and using two opposite
threaded holes suitable level against the frame
PVP-Service
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
-
--2009
DOCURMENT CODE:
QT-SCL
PAGE No:
9/ 13
Insert an extension steel pipe onto the main shaft end, after protecting it properly by
mean of cloth or paper
Sling the rotor respectively at the steel pipe end, in the properseat and at the
opposite side. Check that the angle of spread of the slings be not greater than 600
Rise slightly the rotorand slowly slide it out of the stator until the internal fan on
the extension side has completely gone outside the frame
Lay down the rotor core, along its entire lenght on a wooden saddle, suitable avoid
the rotor movements
Remove slings from the steel pipe and locate it close to the drive end internal fan,
avoiding that the sling rests against it.
Lay down again the rotor on the saddle and remove the extension pipe from the
shaft end
If the stator core pack or windings need major repairs, the stator should be removed
from the frame. This should be made by drilling out pins and heating frame in order
2)
-
Motor reassembly
Reassemble the motor we carry out the previously detailed operations in the
reverse sequence
3)
-
Care must however be taken to avoid damaging the bearings: all the exposed
journal and bearing surfaces must be protected against shocks and oxidation wkile
bearings are being removal
4)
-
PVP-Service
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
-
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
10/ 13
If grinding is necessary, ensure that not metal dust or particales reach the bearings
or left on the adjacent parts
Apply an oil film to the surface of journals and adjacent parts to protect them from
the corrosion before assembling
3.5.
3.6.
Check alignment
3.7.
Final inspection
After finish the work, to carry out final inspection for all the parts of equipments
are right position and according maintain procedure
Inspect all the areas & equipments are clean and make sure that all the hand tools,
equipments,.....are removed
3.8.
3.9.
4.
Personnel
PV Power Service Company have to carry out this job under supervised by
PM 3 Power Plant supervision
5.
Risk assessment
ACTIVITY DESCRIPTION
ASSESSMENT TEAM
Date: 01/04/2009
No
STEP DESCRIPTION
PVP-Service
EQUIPMENT
REFERENCE No
PROCEDURE
10
PEOPLE
DOCUMENTS
SUPERVISOR
DOCURMENT CODE:
METHOD STATEMENT
PVP-SERVICE
ISO ITEM:
ISSUE TIME:
QT-SCL
DATE OF VALIDITY:
1;...-...-2009
PAGE No:
--2009
11/ 13
/TOOLS
01
Disconnect/Connect the
Handtools
power cables
M/Statement
02
M/Statement
05
M/Statement
05
M/Statement
04
M/Statement
02
M/Statement
02
M/Statement
02
M/Statement
04
Handtools,
02
lifting
equipment,
crane
Handtools,
03
Disassembly/Assembly
the Motor
lifting
equipment,
crane
04
Replacing/Fixing any
Handtools
Handtools,
05
lifting
rotor
equipment,
crane
Handtools,
lifting
equipment,
Motor parts
crane
Handtools
08
Handtools
Perform static
& other
check/Rotation test
equipments
Handtools
09
Coupling alignment
& other
03
equipments
No
ACTION TAKEN
PVP-Service
HAZARD
RF
ADDITIONAL CONTROLS TO
11
RF
APPROVED
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
01
Connect the
Slip, fall,
drop,
shock
Remove/Install
Slip, fall,
the Motor
drop
Disassembly/As
03
sembly the
Motor
12/ 13
BE USED
power cables
02
QT-SCL
PAGE No:
--2009
IN STEP
Disconnect/
DOCURMENT CODE:
Slip, fall,
drop
Replacing/
04
Fixing any
Slip, fall,
damaged
drop
motors parts
05
Cleaning the
Stator & rotor
Slip, fall
Cleaning &
06
Slip, fall,
mechanical parts
paited
Varnish clear on
Slip, fall,
drop
outside, anti
corrosion
treatment the
motor frame
PVP-Service
12
PVP-SERVICE
METHOD STATEMENT
ISO ITEM:
ISSUE TIME:
DATE OF VALIDITY:
1;...-...-2009
DOCURMENT CODE:
QT-SCL
PAGE No:
--2009
13/ 13
red varnish
spray, Regreasing the
bearings /
replace
lubrication oil
Perform static
08
check/Rotation
test
09
Slip, fall,
drop
Coupling
Slip, fall,
alignment
drop
PVP-Service
G
- To ensure be used proper
tools
- To ensure to be used
safety harness, gloves
- To ensure electrical
equipment in condition and
secured
- Lifting equipments with
certified safe
13