G10
G20
G30
G40
G50
G60
G70
G80
D00
P20
U20
A10
A20
A30
K10
K20
K30
C10
C20
C30
C40
C50
C60
C70
S10
S20
S30
EA0
EB0
EC0
ED0
EE0
EF0
EG0
EH0
EJ0
EK0
EL0
EM0
EN0
EP0
EV1
EV2
EV3
IS1
IP2
ID1
ID2
ID3
ID4
6/2/2003

General and Administrative


Standards and Specifications
Estimating, Tracking and Trending
Work Group Specified Activity (Study, etc)
Support/Coordination with Others
Subcontracts and Bulk Material Purchase
Field Coordination/Interface
Project Planning, Setup, Close-out, Quality Audits
Demolition
Plant Layout Above Ground
Plant Layout Under Ground
Buildings - Conceptual
Buildings - Production
Elevators and Building Equipment
Site Preparation
Railroads
Finished Grading, Roads and Paving
Foundations and Piling Locations, Piling
Concrete Superstructures (Pipe Rack, Structure, Building, Cooling Tower Box etc)
Foundations for Equipment
Foundations for Steel Pipe Racks
Foundations for Steel Structure or Steel Buildings
Miscellaneous Foundations
Concrete Area Paving, Thickened Paving, Trenches
Steel Pipe Racks
Steel Structures and Steel Building
Miscellaneous Steel Supports and Platforms
One Line Diagrams
Electrical Load List
Power Systems Analysis
Substation Building Layouts
Electrical Tie-ins
Electrical Equipment
Electrical Specialty Systems
Grounding
Lighting
Aboveground Electrical Power and Control
Underground Electrical Routing
Cable and Raceway
Electrical Wiring
Electrical Equipment Purchased by Others
Waste Water and Solid Waste
Air Emissions
Noise and Vibration
Instrument Vessel Sketches
Instrument Index, Alarm Summary
Instrument Location
Instrument Installation Details
Instrument Wiring
Instrument Loop Diagrams

ENGINEERING WORK OPERATIONS CODES


Revised June 2, 2003
Work Op
Description
ID7
I13
I16
I21
I22
I35
I44
MB1
MB2
MB3
MB4
MB5
MB6
MB7
MB8
MB9
MC2
MC3
MC4
MC5
MC6
MD2
MD3
MD4
MD5
MD6
MF2
MF3
MF4
MF5
MJ2
MJ3
MJ4
MJ5
MJ6
MJ7
MJ8
MJ9
ML3
ML4
ML5
ML6
ML9
MU2
MU3
MU4
MU5
MU6
MU9
MV1
6/2/2003

Miscellaneous Devices
Transmitters, Switches, Recorders
Gauges, Temperature Elements, Accessories
Flow Measuring Elements
Engineered Valves
Electronic Controls Systems
Analyzers and Analyzer Buildings
Furnace General Arrangement
Furnace Steel and Pipe Supports
Furnace Pressure Parts
Furnace Castings
Furnace Refractory
Furnace Equipment
Flares
Third Party Furnaces
API Data Sheets
Standard Shell and Tube Exchangers
Special Tubular Exchangers
Packaged Supplier Designed Exchangers
Cryogenic Supplier Design Exchangers
Compact Heat Exchangers
Columns and Towers
Converts, Reactors, Regenerators
Drums
Special Vessels
Pressurized Bins
Shop Fabricated Tanks
Field Assembled Tanks
Special Tanks
API Code Atmospheric Bins and Hoppers
Compressors
Pumps
Electric Motors
Turbines
Fans and Blowers
Generators and Condensers
Spare Parts
Other Rotating Items
Packaged Process Units
Filtering/Mixing/Drying Equipment
Miscellaneous Special Equipment
Polymer Processing Equipment
Other Special Equipment
Waste Water Treating
Water Treating (Cooling Tower, Boiler Feed, Potable, Etc)
Boilers/Incinerators
Miscellaneous Utility Equipment
Cooling Towers
Other Utility Items
Solids Arrangement, Chutes, Flow Diagrams

ENGINEERING WORK OPERATIONS CODES


Revised June 2, 2003
Work Op
Description
MV2
MV3
MV4
MV5
MV6
MV7
MV8
P10
P30
P40
P50
P60
P70
P80
P90
V10
R10
R20
R30
ZP0
ZF1
ZF2
ZF3
ZF4
ZF5
ZF6
ZE0
ZD0
MZ2
MZ9
YP0
Y10
Y20
Y30
Y40
Y50
Y60
Y70
Y80

Materials Transporting System and Equipment


Materials Processing Systems and Equipment
Mobile Equipment
Auxiliary Process/Systems and Equipment
Vessels and Storage Equipment
Special Process/Product System Equipment and Instrument
Miscellaneous Solids Handling Equipment, Instrument, Duct, Tubing
Plot Plan
Piping Material Specifications
Piping Under Ground
Piping Above Ground
Pipe Supports
Steam Tracing
Piping Tie-ins
Special Piping Items
Insulation, Fireproofing and Coating
Process Deliverables, Process Flow Diagrams
Process Equipment Data (including Vessel Analytical)
Advanced Process Automation
Process Safety - Reviews & Hazard Modeling
Fire Protection Equipment Location Plans
Fire Hazardous Area Drawing
Water Spray Systems
Fire & Gas Detection System
Hydraulic Calculations
Extinguishing System
Electrical Area Classification Drawings
Deluge
Fire Protection Safety Equipment
Other Fire & Safety Items
Process & Instrument Diagrams - P&ID
System Design Philosophy (Tracing, Over Protection, Vent and Drain)
Line List
Piping Battery Limit Summary
System Equipment Data
System Instrument Data
Relief Systems
Utility Balances
Utility Flow Diagram

X10