Beruflich Dokumente
Kultur Dokumente
LA CUESTA PROJECT
SCOOPING STUDY
REV
BY
DATE
CHECKED
J Berrocal
H Parra
02/11/2016
F Matos
H Parra
15/11/2016
F Matos
H Parra
22/11/2016
Internal review
1.0.0 OBJECTIVE
Calculate areas, flows of multimedia filtration equipment and ultra-filtration.
Calculate the dosages of the reagents used in the pretreatment.
: 2308.026 m3/d
: 34582.203 ppm
Input Caudal
SDT
DESIGN DATA
5 17 gpm/ft2
15 -20 gpm/ft2
Data
Data
A=
Ft
Qt
; Ft =
V
N
Qt=Total flow
N= # multimedia filters
A= Filtering Area
Ft= Flow passing through the tank (gpm).
m3/d
1010
Ft=
A=
185.3 gpm
=61.76 gpm
3
133.883 gpm
=8.925 ft 2
15 gpm/ft 2
m3/h
42.08
gpm
185.3
V=
ULTRAFILTRATION
Calculation of filtrate area for ultrafiltration:
Flow rate
m3
)
h
N Modules=
N frames=
2
Filtering area 252(m )
=
=18 modules
module area
14 (m2)
N de modules
18
= =1 frame
N modules for frame 20
Dosing load:
Caudal (96.17 m3/h) * Dose (2 g/m3) = 0.192 Kg/h
Commercial dosing:
Dosinf load 0.192 (Kg pure/h) * 1/2,8 (l pure/Kg pure) * (100/40)(l disol./l pure) = 0.172 l/h
Kg of commecial product:
Commercial Dosing (l/h)* Density of solution (Kg/l) = 0.256 Kg/h
10 Day deposit:
Comercial dose (0.172 l/h) * shock (24h/day) * Das (10)= 41.215 lt
With this data, as with ferric chloride and other reagents, the dosing load and the necessary
commercial dosage are calculated, and then the requirements of the 10-day deposit and the
annual reagent requirements are calculated
Dosing load:
Caudal(96.17 m3/h) * Dose (5 g/m3) = 0.480 Kg/h
Comercial dosing:
Dosing load 0.477 (Kg /h) / Wealth 120 (g/l)= 4.01 l/h
Kg of commercial product:
Commercial dosing (l/h)* density (Kg/l) = 4.968 Kg/h
10 Day deposit:
Commercial dosing (3.98 l/h) * crash (6h/day) * Days(10)= 240.42 lt
Annual need for reagent:
Commercial Dosing (4.968 Kg/h)*crash (6h/d)*365 days = 10881.4246 Kg
Dosing load:
Caudal (95.44 m3/h) * Dose (20 g/m3) = 1.9088 Kg/h
commercial dosing:
3.718 (Kg puro/h) * 1/1,84 (l puro/Kg pure) * (100/98)(l disol./l pure) = 1.0585 l/h
Carga dosificadora0.84
3 days deposit:
Commercial dose (3.36 l/h) * crash (6h/day) * Days(3)= 60.51 lt
Dosing load:
Flow (84.04 m3/h) * Dose (0.001 g/m3) = 0.8404 Kg/h
5.0.0 CONCLUSION
The respective calculations were made to determine the amount of equipment and what type of
equipment would be used in the plant as well as the amount of reagents to be used.