CLIENT

CONTRACT NO.: 4600002029

CONTRACTOR.

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)
JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-013

Rev no:01

Date:17/08/2016
Location: Inside Port of
Salalah, Crown Wall Area.

Job description: JHA to carryout activities during unloading of product from ship.
Member present: HSE Department, Project department, Operation Department.

S.
No.
1.

2.

Activity job
stages
Concrete
Cutting using
Wire Saw
machine

Concrete
Drilling using

Hazards
(What can go wrong)
Working without valid
permit.
Hazardous fumes / vapours.
Defective power tools.
Spark from machine.
Fire / Explosion.
Physical and Mental Stress.

Working without valid

Controls
(How to prevent it)

Action
party

Contingency
(If control fails & result in
accident)

Valid permit to be obtained from POS


/ ORPIC before starting any job.
A Tool Box Talk to be conducted
before starting any job on daily basis.
Throughout work continues gas
monitoring has to be carried out and
to be recorded.
Gas test to be carried out by
Competent Gas Tester.
The area has to be covered from all
side using fire blanket.
Multi Gas monitor to be provided with
workforce.
Fire Watcher to be appointed.
Fire Extinguisher to be provided.
All power tools to be inspected for
any defects before starting the job.
Periodic rest breaks / stretch-outs /
crew rotation to be implemented.
After completion of the work
housekeeping to be carried out.
Valid permit to be obtained from POS

AWS

If in case of any incident


initiate Emergency Response
Plan.

Page 1 of 4

Seek Medical assistance


POS Emergency contact:
23220000 (Ext.666),
99247666.
AWS Emergency Contact
No.: 91409583, 91395892,
91395890.

AWS

If in case of any incident


initiate Emergency Response

Remarks

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-013

Rev no:01

Date:17/6/2016
Location: Inside Port of
Salalah, Crown Wall Area.

Job description: JHA to carryout activities during unloading of product from ship.
Member present: HSE Department, Project department, Operation Department.

Hilti Drilling
Machine.

permit.
Hazardous fumes / vapours.
Defective power tools.
Spark from machine.
Fire / Explosion.
Physical and Mental Stress.

/ ORPIC before starting any job.


A Tool Box Talk to be conducted
before starting any job on daily basis.
Throughout work continues gas
monitoring has to be carried out and
to be recorded.
Gas test to be carried out by
Competent Gas Tester.
The area has to be covered from all
side using fire blanket.
Multi Gas monitor to be provided with
workforce.
Fire Watcher to be appointed.
Fire Extinguisher to be provided.
All power tools to be inspected for
any defects before starting the job.
Periodic rest breaks / stretch-outs /
crew rotation to be implemented.
After completion of the work
housekeeping to be carried out.

Page 2 of 4

Plan.
Seek Medical assistance
POS Emergency contact:
23220000 (Ext.666),
99247666.
AWS Emergency Contact
No.: 91409583, 91395892,
91395890.

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-013

Rev no:01

Date:17/6/2016
Location: Inside Port of
Salalah, Crown Wall Area.

Job description: JHA to carryout activities during unloading of product from ship.
Member present: HSE Department, Project department, Operation Department.

3.

Concrete
Cutting using
machine

Working without valid


permit.
Hazardous fumes / vapours.
Defective power tools.
Spark from machine.
Fire / Explosion.
Physical and Mental Stress.

Valid permit to be obtained from POS


/ ORPIC before starting any job.
A Tool Box Talk to be conducted
before starting any job on daily basis.
Throughout work continues gas
monitoring has to be carried out and
to be recorded.
Gas test to be carried out by
Competent Gas Tester.
The area has to be covered from all
side using fire blanket.
Multi Gas monitor to be provided with
operators / labours.
Fire Watcher to be appointed.
Fire Extinguisher to be provided.
All power tools to be inspected for
any defects before starting the job.
Periodic rest breaks / stretch-outs /
crew rotation to be implemented.
After completion of the work
housekeeping to be carried out.

Page 3 of 4

AWS

If in case of any incident


initiate Emergency Response
Plan.
Seek Medical assistance
POS Emergency contact:
23220000 (Ext.666),
99247666.
AWS Emergency Contact
No.: 91409583, 91395892,
91395890.

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-013

Rev no:01

Job description: JHA to carryout activities during unloading of product from ship.

Date:17/6/2016
Location: Inside Port of
Salalah, Crown Wall Area.

Member present: HSE Department, Project department, Operation Department.

Note: During execution if any disturbance or emergency occurs to the process the job will be suspended immediately and shall be resumed after
the issue has been resolved.

PPE to be used during execution of the Job:


Hard hat, Safety Googles, Protective Clothing, Hand Gloves, Ear Plug / Muff, Nose mask, Safety Boots, Safety Harness, Fire Retardant Tarpaulin, Fire Blanket.
Other Misc. Equipments to be used during execution of the Job:
Wire Saw Concrete Cutting Machine, Hilti, Power Hammer, Jack Hammer, Drilling Machine, Hand Tools, Diesel Generator, Grinding Machine.

Page 4 of 4