Sie sind auf Seite 1von 10

KWALE GAS PLANT FLARE DOWN PROJECT

TECHNICAL REPORT DOCUMENT FOR ELECTRICAL


RESISTANCE TEST ON EXISTING ELECTRICAL EARTHING
SYSTEMS
Job # IPG-AMZ 14-01

Initd

Apprd

22-11-2016

Issued for Client Information

I. Ali

S. Daley

20-11-2016

Issued for Internal Review

i. Ali

S. Daley

REV

DATE

Document Number

DESCRIPTION
Project No.
AMZ-IPG 14-01

ORIG
Deliv. Code
1000

Doc. Type
5040

APPROVALS
Seq. Num.
004

Rev.
B

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

Table of Contents
1.0

PROJECT BACKGROUND .............................................................................................................. 5

2.0

IPGRUPP ENGINEERING PROPOSED SCOPE............................................................................. 5

3.0

WORK METHOD PLAN ................................................................................................................... 6

4.0

FIELD MEASUREMENT RESULTS ................................................................................................. 8

Earthing Field Test Report doc rev 1

Page 2 of 10

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

...... 8
5.0

APPENDIX 1 PICTURES.................................................................................................................. 9

Earthing Field Test Report doc rev 1

Page 3 of 10

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

PIX
.................................................................................................................................................................... 10

Earthing Field Test Report doc rev 1

Page 4 of 10

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

1.0

PROJECT BACKGROUND

The Kwale Gas Plant Flaredown Project which was awarded to Amazon Energy
Limited involves the upgrading of the existing Kwale Gas Plant in order to recover
the associated gas currently flared!. The scope includes the procurement and
installation of atmospheric compression units and electric motor driven compressor
packages
IPgrupp Engineering is being invited to tender for field based electrical
survey/testing services on the existing electrical facilities.
The document provides a summary of our technical & commercial proposal to
execute identified works

2.0

IPGRUPP ENGINEERING PROPOSED SCOPE

IPgrupp Engineering shall provide all requisite Personnel and Equipment to


adequately perform the following field services:

Electrical resistance test on specified existing electrical systems namely


1. Electrical Switchgear or Panel Electrical Earth Bar
2. Telecommunications Tower Electrical Earth Bar
3. Equipment Skid Electrical Earth Bar
4. Instrument Panel Electrical Earth Bar

Earthing Field Test Report doc rev 1

Page 5 of 10

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

3.0

WORK METHOD PLAN

The resistance of an earth electrode is heavily influenced by the resistivity of the


soil in which it is driven and as such, soil resistivity measurements are an important
parameter when designing earthing installation. Resistivity testing for this site
aims to obtain a set of measurement which may be interpreted to yield an
equivalent model for the electrical performance of the earth seen by the existing
electrical systems
The test method proposed for these field measurement was the fall of potential 3
point Method engaging three electrodes at required spacing thru the use of field
calibrated Earth resistance measurement meter.
Care was taken to avoid misleading inaccurate reading due to interference from
power lines, mutual coupling of electrode cable reels or incorrect electrode spacing.
Several measurements at identified points were performed for each electrical
system to obtain statistical screening of incorrect data and provide a weighted
average earthing resistivity for each electrical system under test.
OBSERVATIONS
It was well observed that each equipment skid has their various and respective
Earthing system.
The earth resistance value for each skid were carefully taken and recorded as
tabulated in the attached document and their respective photographs numbered pix
1-16.
The equipment skid with high resistance values at the new plant area are:

LV/HV switch gear room

Knock out drum

Instrument panel area

Telecommunication / Radio mast

Earthing Field Test Report doc rev 1

Page 6 of 10

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

While those of the old plant area are:

Turbine fan cooler

Glycol vessel

Separator

Instrument panel

Earthing Field Test Report doc rev 1

Page 7 of 10

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

4.0

FIELD MEASUREMENT RESULTS

Earthing Field Test Report doc rev 1

Page 8 of 10

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

5.0

APPENDIX 1 Pictures

Pix 1

Pix 2

Pix 3

Pix 4

Pix 5

Pix 6

Pix 7

Pix 8

Pix 9

Pix 10

Pix 11

Earthing Field Test Report doc rev 1

Page 9 of 10

Pix 12

Print Date: 11/22/16

KWALE Gas Plant Flare Down Project

ELECTRICAL SYSTEMS EARTHING MEASURING


PROPOSAL

Pix 13

Pix 16

Pix 14

Pix 17 Taking Readings

Pix 15

Pix 18

Pix
Pix 19 Discussing Results

Earthing Field Test Report doc rev 1

Pix 20 Taking Readings

Page 10 of 10

Pix 21 Taking Readings

Print Date: 11/22/16