QUANTUM MERUIT

CONSULTANTS
THE PROFESSIONAL CIVIL ENGINEERING
CONSULTING COMPANY
Provides Solutions for.
Contract/Sub-Contract Management
Contract/SubIdentification and Preparation of Contract Claims,
Presentation before DRB/Arbitration
Techno--legal view of Contract claims
Techno
Correspondences/Records
Drafting of Contract Documents
1

QMC EXPERTISE
Contract Management and Claims:
Claims:
Identification of new Claims based on the site conditions and contract
provisions, FIDIC etc
Conceptualization and preparation of Statement and evaluation of claims
Drafting of notices, important letters, contemporary records as claim backback-up
Well aware of law position in relations to Contract.
Contract.
Extension of Time and Prolongation costs claims:
claims:
Evaluating the delays and preparing the application of extension of time
Expertise in preparing prolongation costs with different formulae
Arbitration and Dispute Review Board:
Board:
Presentation or assistance to lawyer of claims to Arbitration Tribunal / DRB
Won many important award for the companies in last 15 years.
years.
2

QMC EXPERTISE.
Quantity Surveying and Final Bill:
Bill:
Techno--legal Expertise:
Techno
Expertise:

QMC is in touch with the various important awards of Arbitration and


judgments which have important applications on construction industry
works.. Well versed with Indian Contract Act and Arbitration Act.
works
Act.
QMC can engage services of the lawyer who are expert in contract
management, if required during the arbitration stage.
stage.
Sub-contract management:
Submanagement:
Drafting work order and rates of sub
sub--contracts in the best interest of the
works.. Defending the claims of subworks
sub-contractors.
contractors.
Training to Project Managers about Contract:
Contract:
QMC provide training to project managers/site managers about the Contract
Management and Claims to make them more efficient.
efficient.
Contractual Correspondence:
Correspondence:
Correspondence to Client and subsub-Contractor with respect to Contract
conditions in timely manner during the execution of Works.
Works.
3

QMC STRENGTH
QMCs team consist of knowledgeable Civil Engineering consultants
who have in depth onon-site experience in Hydro/highway/metro
sector and is well conversant of the current critical issues prevailing
in the construction industries in India.
QMC is well aware of the FIDIC contract conditions.
The group is lead by Mr
Mr.. Sanjay Kumar Goyal who is a Civil Engineering
graduate having 24 years of experience in this field with MNCs and has
won many prestigious claims in Arbitration and DRB proceedings.
proceedings.
He is a presently on the panel of Arbitrators of Construction Indian Council
of Arbitration (CIAC) and had participated in International Commercial
Arbitration in Paris
Paris..

What you get after assigning the works


Comprehensive Review and Piece of Mind:
Mind:
A comprehensive review of the project in terms of due payment, extra items and
claims that could be formulated or not after scrutiny of the Contract documents
and drawings in depth
depth..
Regular advice to site based on contract and also preparation of important
letters and contemporary records
The Claims:
Claims:
Claims shall be prepared and submitted in time along with records
records.. The
contemporary records will be kept in order to support the claims / extra items in
front of the Client.
Client.
QMC EXPERIENCE
EXPERIENCE::
Generally a Contractor losses 5 to 10 % or even more during the execution due
to non
non--identification and nonnon-preparation of claims/extra items and also due to
not preparing proper R.A. Bills.
Bills. Therefore expected profit is converted into
losses..
losses
QMCs experience suggest that if the contract management of a project is
professionally handled, then he could recover such sums which is negligible
against the professional fees.
fees.
5

Consultancy Works associated..


Linde Engineering India Limited, for Padur top side plant, Vadidara
SKE&C KCT JV (South Korean Indian JV), Mangalore Strategic
Crude Oil Project, Underground Caverns
Abir Infrastructure Private Limiited,
Limiited, for Claims of Geological surprises
and delay costs.
Associated Directly with Arbitration Tribunal for claim checking of
Lohirinag--Pala Project ((Uttrakhand
Lohirinag
Uttrakhand))
Sreeanant Construction Private Limited (A JV of SANCO and Patel
Engineering Limited) for Tapovan Vishnugarh H.E. Project.
Karam Chand Thapar (Tehri
(Tehri hydro electric project, Uttrakhand)
Uttrakhand)
Limbdi Branch Canal Project (Gujrat
(Gujrat)) with M/S KCT Limited

Consultancy Works associated..


China Coal Arbitration for Shikohabad Itawa section of NH # 1, 4 laning 57
Km (project costs Rs 150 Cr).
Om Metals for claims of Teesta Low Dam ProjctProjct-IV
Subhash Projects and Marketing Limited (Yamuna Vihar Pipe Line project,
Delhi)
Rithwik Swathi JV at Koteshwar Hydro project (project costs Rs 500 Cr) in
Uttrakhand..
Uttrakhand
Satav Infrastructure Limited for ADBs Chattishgarh Highway project
Package 11, 58.822 km (project costs Rs 45 Cr) in Gariyaband.
Gariyaband.
Longjiang Road and Bridge company (Pink City Expressway)
Associated with law firm Hemant Sahai and Company as Claim expert

Employement Details
Sanjay Kumar Goyal
Education B.E. CivilCivil- Engg.
Engg. Year 1989
Total Experience - 24 years
Area of Work - Hydro, Highways and Underground works
Specialization-- Contract Management, Claims, Project Management
Specialization
Year 2005 onwards - Started own company Quantum Meruit Consultants
Year 19941994- 2005 Continental
Continental--Foundation Joint Venture
(Indo-- Canadian JV), at Nathpa Jhakri Hydro project, Himachal Pradesh
(Indo
(1500 MW)
Last Designation held General Manager (C)
Year 19891989-1994 - Dumez Sogea Borie Sae (A French Consortium)
at DulDul-Hasti Hydro PROJECT, Jammu & Kashmir

Won many important award for the companies.


8

Employement Details
Mukesh Kumar Chaudhary
Education B.E. CivilCivil- Engg.
Engg. Year 2002
Total Experience - 11 years
Area of Work - Hydro, underground and Highways
Specialization-- Contract Management, Project Management and Quantity
Specialization
Suryeying
Year 2009
2009 Associated with Quantum Meruit Consultants
Year 20082008- L & T Limited
Year 2002 to 20072007- Progressive Construction Limited
Details of Other engineer and staff could be provided subsequently.

Contract info,

Web - www.quantummeruit.in
Email IDID- quantummeruitconsultants@yahoo.com
Phone # 098715098715-23451, 01200120-4207885
Address-- D-1503, Plumeria Garden, OmicronAddress
Omicron-III, Gr. Noida
Office 180, 2nd floor, Sukhdev Vihar,
Vihar, New Delhi -25