Sie sind auf Seite 1von 3

Municipal Corporation of Greater Mumbai

PARTICULAR CONDITIONS PART A CONTRACT DATA

2.1

Contract Data
FIDIC Gold
Book (General
Conditions)
Provision
1.1.24

1.1.26

1.1.32

Description of Item

Data

Where the Contract allows for Cost


Plus Profit, percentage profit to be
added to the Cost:
Cut-Off Date (number of days after
the Time for Completion of DesignBuild):
Employer's name and address:

1.1.35

Employer's Representative's name


and address:

1.1.70

Parts of the Works that shall be


designated a Section for the
purposes of the Contract:
Agreed methods of electronic
transmission:
Address
of
Employer
for
communications:

1.3 (c)
1.3 (d)

1.3 (d)

Address
of
Representative
communications:

1.3 (d)

Address
of
Contractor
communications1:

Bhandup Wastewater Treatment Facility

Employer's
for

5%

90 days

The
Deputy
Municipal
Commissioner (Engineering),
Municipal
Corporation
of
Greater Mumbai, 1st Floor,
Engineering Hub Building, Dr.
E. Moses Road, Near Worli
Naka, Worli, Mumbai 400 018
The
Chief
Engineer
(Mumbai Sewage Disposal
Project)
Municipal
Corporation
of
Greater Mumbai, 2nd Floor,
Engineering Hub Building Dr.
E. Moses Road, near Worli
Naka, Worli, Mumbai 400 018
Not Applicable

Facsimile, E-mail
The
Deputy
Municipal
Commissioner (Engineering),
Municipal
Corporation
of
Greater Mumbai, 1st Floor,
Engineering Hub Building, Dr.
E. Moses Road, Near Worli
Naka, Worli, Mumbai 400 018
The Chief Engineer (Mumbai
Sewage
Disposal
Project)
Municipal
Corporation
of
Greater Mumbai, 2nd Floor,
Engineering Hub Building,
Dr. E. Moses Road, Near Worli
Naka, Worli, Mumbai 400 018

for

Conditions of Contract

Page 2

Municipal Corporation of Greater Mumbai


FIDIC Gold
Book (General
Conditions)
Provision
1.4
1.4
1.4
2.1

4.2

4.2

5.1
6.5
8.2
9.2
9.6
9.6

10.6a
10.6b
10.7

10.7
10.7
13.5

Description of Item

Data

Contract shall be governed by the India


law of:
Ruling language:
English
Language for communications:
English
After receiving the Letter of 28 Days
Acceptance, the Contractor shall
be given right of access to all or
part of the Site within:
Performance
Security
(Performance
Bank
Guarantee)
(as percentages of that portion of the Accepted Contract Amount
attributable to the Design-Build of the Works in Currency):
Percent:
10 %
Currency:
Indian Rupees
Reduction in Performance Security (Performance Bank Guarantee)
at the end of the Retention Period: 0% (for greater certainty, the
Performance Security shall remain at 10% of that portion of the
Accepted Contract Amount attributable to the Design-Build of the
Works, in Indian Rupees, following the Retention Period)
Period for notification of errors, 56 days
faults and other defects is:
Normal working hours on the Site:
08:00 to 18:00
Period of the Operation Service:
15 years
Time for Completion of Design- 36
months
(inclusive
of
Build:
monsoon)
Delay damages (amount per day of INR 500,000
delay):
Maximum
amount
of
delay 10%
damages (percent of portion of the
final Contract Price associated with
the Design-Build of the Works):
Maximum compensation payable INR 500,000,000
by Contractor:
Maximum compensation payable INR 250,000,000
by Employer:
Performance damages: Refer to
Volume 3 Schedule of Payments,
Section 12.
Rights of Employer if failure As per Clause 10.7 of
continues for more than 84 days:
Conditions of Contract
Minimum
production
outputs As per Volume 2 Employers
required:
Requirements
Percentage rate to be applied to 5%
Provisional Sums:

Bhandup Wastewater Treatment Facility

Conditions of Contract

Page 3

Municipal Corporation of Greater Mumbai


FIDIC Gold
Book (General
Conditions)
Provision
14.2

14.3
14.3

Description of Item
Amount of Advance Payment:

Percentage of Retention:
Limit of Retention Money:

14.6(c)(i)

Plant and Materials for payment


when delivered to the Site:

14.7(b)

Minimum Amount of Interim


Payment Certificate:
Financing charges for delayed
payment:
Currencies for payment of Contract
Price:
Proportions of Local and Foreign
Currencies are:
Maximum Amount of Maintenance
Retention Fund:
Operation of forces of nature
allocated to the Contractor:
Total Liability of the Contractor
shall not exceed:

14.9
14.17
14.17
14.19
17.1
17.8

Bhandup Wastewater Treatment Facility

Conditions of Contract

Data
10% of that portion of the
Accepted Contract Amount
attributable to the Design-Build
of the Works
5%
5% of that portion of the
Accepted Contract Amount
attributable to the Design-Build
of the Works
As per Form for Plant and
Materials for payment when
delivered to site if included in
the
Tender
Submission
Extracts.
INR 50,000,000
8% simple interest
INR (Indian Rupee)
Not Applicable
No Limit
None
125% of that portion of the
Accepted Contract Amount
attributable to the Design-Build
of the Works for the period
extending until 5 years after
the date of issue of the
Commissioning Certificate, at
which point the Total Liability of
the Contractor shall reduce to
50% of the Accepted Contract
Amount attributable to the
Design-Build of the Works until
Contract Completion.