Beruflich Dokumente
Kultur Dokumente
2.1
Contract Data
FIDIC Gold
Book (General
Conditions)
Provision
1.1.24
1.1.26
1.1.32
Description of Item
Data
1.1.35
1.1.70
1.3 (c)
1.3 (d)
1.3 (d)
Address
of
Representative
communications:
1.3 (d)
Address
of
Contractor
communications1:
Employer's
for
5%
90 days
The
Deputy
Municipal
Commissioner (Engineering),
Municipal
Corporation
of
Greater Mumbai, 1st Floor,
Engineering Hub Building, Dr.
E. Moses Road, Near Worli
Naka, Worli, Mumbai 400 018
The
Chief
Engineer
(Mumbai Sewage Disposal
Project)
Municipal
Corporation
of
Greater Mumbai, 2nd Floor,
Engineering Hub Building Dr.
E. Moses Road, near Worli
Naka, Worli, Mumbai 400 018
Not Applicable
Facsimile, E-mail
The
Deputy
Municipal
Commissioner (Engineering),
Municipal
Corporation
of
Greater Mumbai, 1st Floor,
Engineering Hub Building, Dr.
E. Moses Road, Near Worli
Naka, Worli, Mumbai 400 018
The Chief Engineer (Mumbai
Sewage
Disposal
Project)
Municipal
Corporation
of
Greater Mumbai, 2nd Floor,
Engineering Hub Building,
Dr. E. Moses Road, Near Worli
Naka, Worli, Mumbai 400 018
for
Conditions of Contract
Page 2
4.2
4.2
5.1
6.5
8.2
9.2
9.6
9.6
10.6a
10.6b
10.7
10.7
10.7
13.5
Description of Item
Data
Conditions of Contract
Page 3
14.3
14.3
Description of Item
Amount of Advance Payment:
Percentage of Retention:
Limit of Retention Money:
14.6(c)(i)
14.7(b)
14.9
14.17
14.17
14.19
17.1
17.8
Conditions of Contract
Data
10% of that portion of the
Accepted Contract Amount
attributable to the Design-Build
of the Works
5%
5% of that portion of the
Accepted Contract Amount
attributable to the Design-Build
of the Works
As per Form for Plant and
Materials for payment when
delivered to site if included in
the
Tender
Submission
Extracts.
INR 50,000,000
8% simple interest
INR (Indian Rupee)
Not Applicable
No Limit
None
125% of that portion of the
Accepted Contract Amount
attributable to the Design-Build
of the Works for the period
extending until 5 years after
the date of issue of the
Commissioning Certificate, at
which point the Total Liability of
the Contractor shall reduce to
50% of the Accepted Contract
Amount attributable to the
Design-Build of the Works until
Contract Completion.
Page 4