Sie sind auf Seite 1von 5

Weekly Time Sheet

The three time sheet worksheets in this template provide the option to track
your time weekly, in two week increments, or monthly. Other than length of
time tracked, the sheets are the same.

Workforce\Kleos Advisory

Use the instructions on this sheet for working with any of the three time
sheets.

17 Olatoye Ogundana Street, Graceland Estate, Ajah, Lagos

Contractor:
Contractor phone:
Contractor e-mail:
Client:

Day

Week Start:
Hourly Rate:
Minimum Hours:

Workforce

Date

Project

Billable
Hours

12/15/2016
$50.00
0.25

Non-Billable
Hours

When you enter the start date, the days and


dates in the time tracking table update
automatically.

Total

Err:508

12/15/2016 Workforce Way

0.20

Err:501

Err:508

12/16/2016 Project 1

0.25

Err:501

Err:508

12/17/2016 Project 2

0.50

Err:508

12/18/2016 Project 2

70.00

Err:508

12/19/2016 Project 2

80.00

Err:501

Err:508

12/20/2016 Project 1

65.00

Err:501

Err:508

12/21/2016 Project 1

50.00

Err:501

Err:501
5

Err:501

Total

Enter your hourly rate and minimum number of


hours to bill in this table and they are
automatically calculated in the time tracking
table below.

The Client and Project fields are


lookup lists. Edit the available
options in these lists on the Lookup
Lists worksheet.

Err:508
Easily apply your own branding to this template. This template is formatted using
themes that enable you to apply fonts, colors, and graphic formatting effects
throughout the workbook with just a click.

Contractor Initials

Date

Company Initials

Date

Find themes on the Home tab, in the Themes group. Select from dozens of built-in
themes available in the Themes gallery or find options to change just the theme fonts
or theme colors.

Bi-Weekly Time Sheet


Workforce\Kleos Advisory
17 Olatoye Ogundana Street, Graceland Estate, Ajah, Lagos

Contractor:
Contractor phone:
Contractor e-mail:
Client: Workforce

Day

Date

Period Start:
Hourly Rate:
Minimum Hours:

Project

Billable
Hours

12/15/2016
8

Non-Billable
Hours

Total

Err:508

12/15/2016 Project 1

8.00

Err:501

Err:508

12/16/2016 Project 1

8.00

Err:501

Err:508

12/17/2016 Project 2

8.00

Err:501

Err:508

12/18/2016 Project 2

8.00

Err:508

12/19/2016 Project 2

8.00

Err:501

Err:508

12/20/2016 Project 1

8.00

Err:501

Err:508

12/21/2016 Project 1

8.00

Err:501

Err:508

12/22/2016

8.00

Err:501

Err:508

12/23/2016

8.00

Err:501

Err:508

12/24/2016

8.00

Err:501

Err:508

12/25/2016

8.00

Err:501

Err:508

12/26/2016

8.00

Err:501

Err:508

12/27/2016

8.00

Err:501

Err:508

12/28/2016

8.00

Err:501

5.00

Err:501

Total

Err:508

Contractor Initials

Date

Company Initials

Date

Monthly Time Sheet


[Client\Company Name]
[Street Address] [Street Address 2] [City, ST ZIP code]

Contractor:
Contractor phone:
Contractor e-mail:
Client: Client 1

Day

Date

Month Start:
Hourly Rate:
Minimum Hours:

Project

Billable
Hours

4/1/2016
$50.00
0.25

Non-Billable
Hours

Total

Err:508

4/1/2016

Project 1

0.20

Err:501

Err:508

4/2/2016

Project 1

0.25

Err:501

Err:508

4/3/2016

Project 2

0.50

Err:501

Err:508

4/4/2016

Project 2

70.00

Err:508

4/5/2016

Project 2

80.00

Err:501

Err:508

4/6/2016

Project 1

65.00

Err:501

Err:508

4/7/2016

Project 1

50.00

Err:501

Err:508

4/8/2016

Err:501

Err:508

4/9/2016

Err:501

Err:508

4/10/2016

Err:501

Err:508

4/11/2016

Err:501

Err:508

4/12/2016

Err:501

Err:508

4/13/2016

Err:501

Err:508

4/14/2016

Err:501

Err:508

4/15/2016

Err:501

Err:508

4/16/2016

Err:501

Err:508

4/17/2016

Err:501

Err:508

4/18/2016

Err:501

Err:508

4/19/2016

Err:501

Err:508

4/21/2016

Err:501

Err:508

4/22/2016

Err:501

Err:508

4/23/2016

Err:501

Err:508

4/24/2016

Err:501

Err:508

4/25/2016

Err:501

Err:508

4/26/2016

Err:501

Err:508

4/27/2016

Err:501

Err:508

4/28/2016

Err:501

Err:508

4/29/2016

Err:501

Err:508

4/30/2016

Err:501

Err:508

Err:501

Err:501

Total

Err:508

Contractor Signature

Date

Company Signature

Date

Project Lookup
Workforce Way
Project 2

Client Lookup
Workforce
Client 2

These lists populate the options that


appear in the Project and Client
lookup lists on the time sheet
worksheets. Edit the existing values
as needed. To add additional values,
begin typing in the cell directly
beneath the last existing entry and
the list will automatically expand.

he options that
and Client
e sheet
xisting values
itional values,
l directly
ing entry and
ally expand.

Das könnte Ihnen auch gefallen