Manufacturing Process Plan (MPP)


(EM-SRC-0002)

MPP - No

Current Revision

Revision Date

Author

Document Changes

Part Number

MPP Date of Issue

Part Name
Drawing Number

MPP approved by
GE Approval Date

1.) Specification
GE Specifications:

Specification Number

Revision

Revision Date

Document Title

Supplier Specifications (workinstructions etc):

Specification Number

Revision

Revision Date

Document Title

2.) Special Processes and Inspection


Special Processes:
(EM-SRC-0002)

Visual Weld Inspection Procedure

Process

Purpose

Procedure Number

Revision

Revision Date

Applicable (Yes/No)

Procedure Name

Procedure Number

Revision

Revision Date

Certificate Number

Certification Date

(EM-SRC-0004)
Non-Destructive Testing:
(EM-SRC-0003)

Inspection Procedure

Testing Personnel :

Inspector Name

Procedure No.

Inspection Procedure

Revision

Date of Rev.

Level

Certifying Organization

3.) Component Parts and Sources


Sub-Supplier Name

Critical Qualified Sub-suppliers:

Service/Material Supplied

Sub-Supplier Address

Date of Last Supplier Audit

4.) Detail of Operations


Step

Operation

Description

Equipments

Supplier Document

Depart Name

Involvement of GEA
Quality Dept

Inspection Point from AI


Documentation Method
ASME