Sie sind auf Seite 1von 11

1

10

11

12

13

14

15

16

Private
Facility

ERN

Cable
Containment

Stop Shunt
Balise

Entry and
Exit Stop
Board

D
DPS
(Train Creep
speed Control)

GSM-R
Radio

STOP

MSN

WIM
AXLE
COUNTER

STOP

UTX

DED

SWITCH
MACHINE

SCADA
RTU

MSN
SWITCHES

Material
Handling
system

RFID
Reader

Train Ready to
depart plunger

Interface
Panel

ER Wayside Equipment
Case

MSN

APS
Controller

GSM-R
Voice / Data
Comms

Catch point
Indicator

HVAC
Cable
containment

Train Ready to depart

Cable
Containment

GSM-R
Dispatcher
&
FTS

Catch point No.1 (normal)

SCS Control
Equipment

Catch point No.1 (reversed)


Catch point No.2 (normal)
Catch point No.2 (reversed)
DED Alarm

Tower
Control
System

DCS

Tower Antenna

foundations
Cable
containment

Wayside Equipment
Foundations

Foundation

Facility
Control
Room

GSM-R BTS

Cable
containment

Key
Label

RSK
Contractor

Label

EPC
Contractor

Label

Label

E0001
Systems
Contractor
L

Civil
Contractor

Notes

REV DATE

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.
4. The Interfaces shown do not apply to Jebel Ali Port Private Freight Facility.

Drwn Chkd Appr DRAWN

DESCRIPTION

AA 30-1-12 FIRST ISSUE


AB 21-3-12 REVISED IN LINE WITH CRS

SAA SNG SAA DATE


CHECKED
SAA SNG IAA

AC 30-3-12 REVISED FOLLOWING CRS CLOSE-OUT MEETING

IAA SAA MS

AD 10-4-12 REVISED FOLLOWING QA CHECK

IAA MS

AE 24-06-12 UPDATED TO CRS COMMENTS

Foundation

IAA

10

KW

MS KW

IAA
24-06-2012
MDS

24-06-2012
DATE
APPROVED
KW
DATE

PROJECT

CONSULTANT

DRAWING No
WS ATKINS & PARTNERS OVERSEAS

12

PRIVATE FREIGHT FACILITY


(BULK) INTERFACE DIAGRAM

SCALE
SHEET No
ORIGINAL SIZE
NTS
1 OF 1
A3
PROJECT STAGE
DOCUMENT STATUS
STAGE 2
FOR APPROVAL

CLIENT

24-06-2012

11

DRAWING TITLE

ETIHAD RAIL NETWORK

13

14

X0103-S02-ERS-SK-00845

15

16

REVISION

AE

10

11

12

13

14

15

16

Private
Facility

ERN

Stop Shunt
Balise

GSM-R
Radio

STOP

Entry & Exit


Stop Boards

Cable
Containment

MSN

WIM

F
AXLE
COUNTER

STOP

UTX

DED

SWITCH
MACHINE

MSN
SWITCHES

MSN

Train Ready Catch point


to depart
Indicator
plunger

RFID
Reader

APS
Controller

Interface
Panel

ER Wayside Equipment
Building / Case

SCADA
RTU

HVAC

Cable
containment

Train Ready to depart

Cable
Containment

GSM-R
Dispatcher
&
FTS

Catch point No.1 (normal)

SCS Control
Equipment

Catch point No.1 (reversed)


Catch point No.2 (normal)
Catch point No.2 (reversed)
DED Alarm

GSM-R BTS
Facility
Control Room

Key

Label

Cable
containment

Wayside Equipment
Foundations

Label

GSM-R
Voice / Data
Comms

Cable
containment

RSK
Contractor

Foundation

E0001Systems
Contractor

Label

Civil
Contractor

Label

EPC
Contractor

REV DATE

Notes
M

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.
4. The Interfaces shown do not apply to Jebel Ali Port Private Freight Facility.
1

Drwn Chkd Appr DRAWN

DESCRIPTION

AA

31-1-12 FIRST ISSUE


AB 30-3-12 Updated to CRS close-out meeting comments

24-06-2012
DATE
DMS
IAA SAA MS CHECKED

AC 10-4-12 REVISED FOLLOWING QA CHECK

IAA MS

KW

AD 24-06-12 UPDATED FOLLOWING CRM

IAA MS

KW

24-06-2012
DATE
APPROVED
KW
DATE

IAA

PROJECT

DRAWING TITLE

ETIHAD RAIL NETWORK

SAA SNG SAA

10

SCALE

CLIENT
1 OF 1

WS ATKINS & PARTNERS OVERSEAS

12

13

ORIGINAL SIZE
A3

NTS

PROJECT STAGE
DOCUMENT STATUS
STAGE 2
FOR APPROVAL
REVISION
DRAWING No
X0103-S02-ERS-SK-00846
AD

CONSULTANT

24-06-2012

11

PRIVATE FREIGHT FACILITY


(CONTAINER) INTERFACE DIAGRAM

14

15

16

10

11

12

13

14

15

16

ERN

ER Facility

Stop Shunt
balise

MSN

Cable
Containment

DPS
(Train Creep
speed Control)

STOP

Exit and
Entry Stop
Board

RFID
Tag

UTX

TRANSFER TRACK

WIM

E
STOP

SWITCH
MACHINE

APS
Controller

DED

AXLE
COUNTER

SWITCH
MACHINE

RFID
Reader

UTX

GSM-R
Voice / Data
Comms

AXLE
COUNTER

Facility Control Room

Cable Containment

Facility SCER

Local
Control
Workstation
Material
Handling
system

Facility
SCS Control
Equipment

MSN

Cable
Containment

GSM-R
Radio

Wayside Equipment
Case

Communications
Equipment

DCS

Tower
Control
System

SCADA
RTU

BMIS
Terminal

Cable Containment

foundations

MSN
SWITCH
Train Ready to depart

CC

Catch point No.1 (normal)

SCS Control
Equipment

Catch point No.2 (normal)

Foundation

Cable
Containment

Catch point No.1 (reversed)

Catch point No.2 (reversed)


DED Alarm

foundations
Cable Containment

GSM-R BTS

BMIS (FACILITY)
LAN

Key
Label

Foundation

RSK
Contractor

Label
Label

E0001Systems
Contractor
Civil
Contractor

REV DATE

Notes
M

Drwn Chkd Appr DRAWN

DESCRIPTION

AA

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.
4. The Interfaces shown will apply to Jebel Ali Port Private Freight Facility.

31-1-12 FIRST ISSUE


AB 30-3-12 Updated to CRS Close-out meeting comments

SAA SNG SAA


IAA SAA MS

IAA MS

AD 25-06-12 UPDATED FOLLOWING CRM

IAA

PROJECT

DRAWING TITLE

ETIHAD RAIL NETWORK

KW

MS KW

25-06-2012
DATE
APPROVED
KW

10

ORIGINAL SIZE
A3

NTS

PROJECT STAGE

DOCUMENT STATUS
FOR APPROVAL
REVISION
DRAWING No
X0103-S02-ERS-SK-00847
AD

CONSULTANT

25-06-2012

11

ER FREIGHT FACILITY (BULK)


INTERFACE DIAGRAM
SCALE

CLIENT
1 OF 1

AC 10-4-12 REVISED FOLLOWING QA CHECK

DATE

IAA

DATE
25-06-2012
CHECKED
DMS

WS ATKINS & PARTNERS OVERSEAS

12

13

14

15

16

10

11

12

13

14

15

16

ERN

ER Facility

C
Stop Shunt
balise

MSN

Cable
Containment

AXLE
COUNTER
STOP

Exit and
Entry Stop
Board

GSM-R
Radio

UTX

D
RFID
Tag

AXLE
COUNTER

WIM

TRANSFER TRACK

UTX
STOP

DED
SWITCH
MACHINE

RFID
Reader

APS
Controller

AXLE
COUNTER

AXLE
COUNTER

MSN

Cable
Containment

Cable Containment

Facility SCER

CC

GSM-R
Voice / Data
Comms

Facility Control Room

Facility
SCS Control
Equipment

Facility
Communications
Equipment

Local
Control
Workstation

SCADA
RTU

BMIS
Terminal

Cable Containment

foundations

MSN
SWITCH
Train Ready to depart
Catch point No.1 (normal)

SCS Control
Equipment

Cable
Containment

Catch point No.1 (reversed)


Catch point No.2 (normal)
Catch point No.2 (reversed)

DED Alarm

foundations
Wayside Equipment
Case

Cable Containment

BMIS (FACILITY)
LAN

GSM-R BTS

Label
Label

Foundation

Key
Label

RSK
Contractor

System
Earthing

E0001Systems
Contractor

Civil
Contractor

REV DATE

Notes
M

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.
4. The Interfaces shown will apply to Jebel Ali Port Private Freight Facility.

Drwn Chkd Appr DRAWN

DESCRIPTION

AB 30-3-12 Updated to CRS close-out meeting comments


AC 10-4-12 REVISED FOLLOWING QA CHECK

IAA MS

AD 24-06-12 REVISED FOLLOWING CRM

IAA MS KW

31-1-12 FIRST ISSUE

KW

24-06-2012
DATE
APPROVED
KW
DATE

IAA

SAA SNG SAA DATE


24-06-2012
CHECKED
DMS
IAA SAA MS

AA

10

PROJECT

ER FREIGHT FACILITY (CONTAINER)


INTERFACE DIAGRAM
SCALE

CLIENT
1 OF 1

WS ATKINS & PARTNERS OVERSEAS

12

13

ORIGINAL SIZE
A3

NTS

PROJECT STAGE
DOCUMENT STATUS
STAGE 2
FOR APPROVAL
REVISION
DRAWING No
X0103-S02-ERS-SK-00848
AD

CONSULTANT

24-06-2012

11

DRAWING TITLE

ETIHAD RAIL NETWORK

14

15

16

10

11

12

13

14

15

16

RSK Facility,
Marshalling Yard,
Musaffah Depot

ERN
B

GSM-R
Voice / Data
Comms

Stop Shunt
balise

Exit and
Entry Stop
Board

DED

ETCS HMI

ETCS
RACK

RFID
Tag

STOP

MSN

GSM-R
Radio

Switch
Indicator

UTX

Transfer Track
STOP

Exit and
Entry Stop
Board

GSM-R BTS
APS
Controller

AXLE
COUNTER

RFID
Reader

Switch
Indicator

AXLE
COUNTER

MSN

Cable Containment

Cable Containment

Foundation
Cable Containment

Cable Containment

Wayside Equipment
Building / Case

F
SCS Control
Equipment

CC

SCADA
RTU

FACILITY / MY / DEPOT
CONTROL ROOM

FACILITY / MY / DEPOT SCER

Foundation
G

HVAC

HVAC

Local Control
Workstations

BMS

SCS Control
Equipment

Communication
Systems

SCADA
RTU

H
Cable Containment

Cable Containment

BMIS LAN

Foundation
J

Key
K

Label
Label

Label

RSK
Contractor

E0001Systems
Contractor
Civil
Contractor
L

DRAWING TITLE

Notes

REV DATE

Drwn Chkd Appr DRAWN

DESCRIPTION

AB 10-04-12 REVISED FOLLOWING QA CHECK

IAA MS

DATE
24-06-2012
DMS
KW CHECKED

AC 13-05-12 REVISED FOLLOWING CRS COMMENTS

SAA IAA

KW

AD 24-06-12 UPDATED TO CLIENTS COMMENTS

IAA MS

KW

24-06-2012
DATE
APPROVED
KW
DATE

PROJECT

ETIHAD RAIL NETWORK

SAA SNG SAA

AA 08-02-12 FIRST ISSUE

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.

IAA

10

SCALE

CLIENT

PROJECT STAGE
STAGE 2

CONSULTANT

DRAWING No

WS ATKINS & PARTNERS OVERSEAS

12

ORIGINAL SIZE
A3

NTS

1 OF 1

24-06-2012

11

DEPOT, ROLLING STOCK


FACILITY AND MARSHALLING
YARD INTERFACE DIAGRAM

13

14

15

DOCUMENT STATUS
FOR APPROVAL
REVISION
X0103-S02-ERS-SK-00854
AD

16

10

11

12

13

14

15

16

A
POWER
COMMUNICATIONS &

SIGNALLING CABLE
CONTAINMENT

PLAN

C
L

C
L

SECOND
E

CONTRACTOR

FIRST
CONTRACTOR

STATIC
GAUGE

INTERFACE
SECTION
MODIFIED

PLATE H

ELEVATION

SCALE 1:100

PLATE L

2.5%

2.5%

POWER

POWER

COMMUNICATIONS &

COMMUNICATIONS &

SIGNALLING CABLE

SIGNALLING CABLE

CONTAINMENT

CONTAINMENT

LEGEND:

DOUBLE TRACK
1:50

FIRST CONTRACTOR

TI
M ESTAM P 26/
06/
2012

11:
19:
37

SECOND CONTRACTOR
SYSTEMS CONTRACTOR E0001
ROLLING STOCK CONTRACTOR

REV

NOTES:
1. FOR INSTALLATION REQUIREMENTS, REFER TO X0103-S02-ERT-SP-46700. (TRACK TECHNICAL SPECIFICATION)

DATE

Drwn Chkd Appr

DESCRIPTION

00 28-06-12 ISSUED FOR TENDER

KBS IAA DMS

2. FOR TECHNICAL SPECIFICATIONS AND OTHER MANDATORY DOCUMENTS, REFER TO EXHIBIT D PART 2.
a8521
USER NAM E bal

FI
LENAM E P:
\
AEAUA\
5100396 -Uni
onRai
lSt
ages 2 & 3\
Techni
cal
\
CAD\
03_SKETCHES\
X0103UAEEGESK0058500.
dgn

W ALKW AY

W ALKW AY

DRAWN

DRAWING TITLE

PROJECT

ETIHAD RAIL NETWORK

INTERFACE CROSS-SECTION

KBS
DATE

28-06-12

SHEET No

CLIENT

CHECKED

3. THE PRINCIPLE OF THE INTERFACE IS SHOWN. THE ACTUAL DESIGN OF THE EMBANKMENT CROSS-SECTION

IAA

INCLUDING LOCATION AND NUMBER OF DUCTS SHALL BE AS PER FINAL DESIGN.

DATE

28-06-12

1:100

A1

PROJECT STAGE

DOCUMENT STATUS

STAGE 2 - TENDER

ACCEPTED

CONSULTANT

APPROVED

4. BUILDING STRUCTURAL, EARTHWORKS, ROADS AND OTHER CIVIL ITEMS TO BE DONE BY CIVIL CONTRACTOR.

ORIGINAL SIZE

SCALE

DRAWING No
M

5. TURNING CHAMBER LOCATIONS TO BE COORDINATED WITH PROVISIONS FOR DRAINAGE.

10

REVISION
M

DMS
DATE

28-06-12
11

X0103-UAE-EGE-SK-00585

WS ATKINS & PARTNERS OVERSEAS


12

13

14

15

00
16

10

11

12

13

14

15

16

BOUNDARY FENCE

BOUNDARY FENCE

AE
C

TURNING
CHAMBER

TOP DUCTS

BOTTOM DUCTS

TO WAYSIDE
EQUIPMENT

TO WAYSIDE
EQUIPMENT
AE

RUNNING LINE

RUNNING LINE

DUCTS

DUCTS

LEGEND:
J

FIRST CONTRACTOR
SECOND CONTRACTOR
SYSTEMS CONTRACTOR E0001

TI
M ESTAM P 26/
06/
2012

11:
23:
24

TO WAYSIDE
EQUIPMENT

AE

REV

NOTES:
1. FOR INSTALLATION REQUIREMENTS, REFER TO X0103-S02-ERT-SP-46700. (TRACK TECHNICAL SPECIFICATION)

AE

AA

2. FOR TECHNICAL SPECIFICATIONS AND OTHER MANDATORY DOCUMENTS, REFER TO EXHIBIT D PART 2.
a8521
USER NAM E bal

FI
LENAM E P:
\
AEAUA\
5100396 -Uni
onRai
lSt
ages 2 & 3\
Techni
cal
\
CAD\
03_SKETCHES\
X0103UAEEGESK00586AE.
dgn

DATE

Drwn Chkd Appr

DESCRIPTION

KBS
CAD JVA KWIDATE

24-01-12 FIRST ISSUE

INCLUDING LOCATION AND NUMBER OF DUCTS SHALL BE AS PER FINAL DESIGN.

DRAWING TITLE

PROJECT

UNDER TRACK CROSSING INTERFACE


SCHEMATIC

ETIHAD RAIL NETWORK


24-06-12

SHEET No

CLIENT

CHECKED

AB

06-02-12 REVISED TO INCLUDE CLIENTS COMMENTS

CAD JVA KWI

AC

29-03-12 REVISED TO INCLUDE CLIENTS COMMENTS

JVA
KBS JVA KWIDATE

AD

10-04-12 REVISED TO INCLUDE CLIENTS COMMENTS

KBS JVA KWI

24-06-12 REVISED TO INCLUDE CLIENTS COMMENTS

KWI
KBS JVA KWIDATE

3. THE PRINCIPLE OF THE INTERFACE IS SHOWN. THE ACTUAL DESIGN OF THE EMBANKMENT CROSS-SECTION

4. BUILDING STRUCTURAL, EARTHWORKS, ROADS AND OTHER CIVIL ITEMS TO BE DONE BY CIVIL CONTRACTOR.

DRAWN

ORIGINAL SIZE

SCALE

1:25

PROJECT STAGE

A1
DOCUMENT STATUS

24-06-12

CONCEPT DESIGN

FOR APPROVAL

CONSULTANT

APPROVED

DRAWING No
M

5. TURNING CHAMBER LOCATIONS TO BE COORDINATED WITH PROVISIONS FOR DRAINAGE.


1

AE
4

10

REVISION
M

24-06-12
11

12

13

AE

X0103-UAE-EGE-SK-00586

WS ATKINS & PARTNERS OVERSEAS


14

15

16

10

11

12

13

14

15

16

STAGE 1

STAGE 2

Radio Coverage

Radio Coverage

Foundation

Foundation

MSN

Cable
Containment

Cable
Containment

BALISE

BALISE

Mirfa SCER
SCS
CE

SCADA
CE
SCS
Interlocking

Wayside
Equipment Case

Interlocking

Interlocking

SCS
CE

Communications CE

Cable
Containment

Communications CE

Cable
Containment

SCADA
CE

Musaffah SCER

AXLE
COUNTER

AXLE
COUNTER

SCS
Interlocking

J
SCS Control
Equipment

See
Note
4

Key

SCS Control
Equipment

Foundation

Label

Stage 1
Contractor

Label

E0001Systems
Contractor

Label

Stage 2 Civil
Contractor

MSN

Cable
Containment

REV DATE

Notes

Drwn Chkd Appr DRAWN

DESCRIPTION

AA 09-02-12 FIRST ISSUE

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
M requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.
4. Stage 1 Equipment to be replaced or re-configured by the E0001 Contractor for stage 2 (Where required).
2

SAA

AB 10-4-12 REVISED FOLLOWING QA CHECK

24-06-2012
SAA SNG SAA DATE
IAA
IAA MS KW CHECKED

AC 24-06-12 REVISED FOLLOWING CRM

IAA

MS KW

24-06-2012
DATE
APPROVED
KW
DATE

Cable
Containment

10

PROJECT

STAGE 1 SYSTEMS INTERFACE


DIAGRAM
SCALE

CLIENT
1 OF 1

WS ATKINS & PARTNERS OVERSEAS

12

13

ORIGINAL SIZE
A3

NTS

PROJECT STAGE
DOCUMENT STATUS
FOR APPROVAL
STAGE 2
DRAWING No X0103-S02-ERS-SK-00857 REVISION

CONSULTANT

24-06-2012

11

DRAWING TITLE

ETIHAD RAIL NETWORK

14

15

16

AC

10

11

12

13

14

15

16

STAGE 2

STAGE 3

Radio Coverage

Radio Coverage

Radio Coverage

Radio Coverage

Foundation

Foundation

MSN

Cable
Containment

BALISE

BALISE

Cable
Containment

Wayside
Equipment Case

AXLE
COUNTER

AXLE
COUNTER

Interlocking

Interlocking

SCS Control
Equipment

SCS Control
Equipment

Cable
Containment

Key

Cable
Containment

Label

Stage 3
Systems
Contractor(s)

Label

E0001Systems
Contractor

Label

C0306 Civil
Contractor

Label

Stage 3 Civil
Contractor
(s)

Foundation

MSN

Cable
Containment

REV DATE

Notes
M

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.

Drwn Chkd Appr DRAWN

DESCRIPTION

AA 07-02-12 FIRST ISSUE

SAA SNG IAA

AB 10-4-12 REVISED FOLLOWING QA CHECK

IAA MS

KW

AC 24-06-12 REVISED FOLLOWING CRS

IAA MS

KW

10

IAA

24-06-2012
DATE
CHECKED
DMS
24-06-2012
DATE
APPROVED
KW
DATE

K
Cable
Containment

PROJECT

STAGE 3 SYSTEMS INTERFACE


DIAGRAM
SCALE

CLIENT
PROJECT STAGE
STAGE 2

CONSULTANT

DRAWING No

WS ATKINS & PARTNERS OVERSEAS

12

ORIGINAL SIZE
A3

NTS

1 OF 1

24-06-2012

11

DRAWING TITLE

ETIHAD RAIL NETWORK

13

14

15

DOCUMENT STATUS
FOR APPROVAL
REVISION
X0103-S02-ERS-SK-00858
AC

16

10

11

12

13

14

15

16

Cross-Over / Junction Control


and switch protection
B

Lineside Power

MSN

Cable Containment
SWITCH
MACHINE

UTX

AXLE
COUNTER

DEDs

11 KV Lineside
Power

2 km

AXLE
COUNTER

AXLE
COUNTER

APS
Controller
SCS
Local
Equipment

CCT

DEDs

SWITCH
AXLE
MACHINE COUNTER

APS
Controller

11 KV Lineside Power

Cable Containment

MSN

Cable Containment

AXLE
COUNTER

2 km

MSN

LV

PAD MOUNTED
TRANSFORMER

Cable Containment
D

WSCER

Cable
Containment
Transition Piece

GSM-R
BTS

GSM-R
BTS

GSM-R
BTS

GSM-R
BTS

GSM-R
BTS

APS Sites

Cross-Over

WSER

WSER

400m

Lineside Power
WSER

GSM-R
BTS

GSM-R
BTS

MSN

11KV Lineside Power

GSM-R
BTS

Turn-Back

Cable Containment

Cable Containment

GSM-R
BTS

Cable Containment

Cable Containment

WSER
Workshops

BMIS LAN

Mainline Overview

BMIS LAN

Offices /
Control
Room

Facility
SCER

O&M Facility
J

Key
K

Label

E0001Systems
Contractor

Label

Civil 1
Contractor

Label

Civil 2
Contractor

REV DATE

Notes
M

Drwn Chkd Appr DRAWN

DESCRIPTION

AA 09-02-12 FIRST ISSUE

1. Systems Architecture is illustrative and does not reflect the final design.
2. Please refer to Exhibit D Part 2 [Technical Specifications and other Mandatory Documents] for information on equipment, locations, site specific details and technical/functional
requirements.
3. Please refer to Appendix B [Interface Responsibility Matrices] for specific Interface responsibilities.

AB 21-03-12 Updated to CRS comments


AC 28-03-12 FIRST ISSUE

SAA SNG MS

AD 10-4-12 REVISED FOLLOWING QA CHECK

IAA MS

AE 12-05-12 REVISED FOLLOWING CRM

IAA

SAA SNG SAA DATE


25-06-2012
IAA SAA MS CHECKED
DMS

IAA

10

KW

MS KW

25-06-2012
DATE
APPROVED KW
DATE

PROJECT

LINE OF ROUTE INTERFACE


DIAGRAM
SCALE

CLIENT
1 OF 1

WS ATKINS & PARTNERS OVERSEAS

12

13

ORIGINAL SIZE
A3

NTS

PROJECT STAGE
DOCUMENT STATUS
FOR APPROVAL
STAGE 2
REVISION
DRAWING No
X0103-S02-ERS-SK-00860

CONSULTANT

25-06-2012

11

DRAWING TITLE

ETIHAD RAIL NETWORK

14

15

16

AE

Das könnte Ihnen auch gefallen