Beruflich Dokumente
Kultur Dokumente
COS-ISO-00-OIN/GEN/004
Rev. No. : 0 July 2004
GUIDELINES FOR
CONDUCTING TECHNICAL
AUDIT
GUIDELINES FOR
CONDUCTING TECHNICAL
AUDIT
Approved for
Implementation by ..
ED (OS)
Date: ..
Enquiries to: Head of Corp. Operation Services
Page No.
1.0
Preamble
2.0
Superseded Documents
3.0
Objectives
4.0
Deliverables
5.0
Scope
6.0
7.0
8.0
9.0
Maintenance System
11.0 Overhauling
15.0 Housekeeping
20.0 Benchmarking
21.0 General
22.0 Review
10
11
12
15
16
17
18
20
21
26
Page No.
34
42
54
59
66
73
78
85
88
Page - 1
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
PREAMBLE
Technical Audit of NTPC stations shall bring out problems in equipments and
deviations in systems and processes, a time bound corrective action plan
depicting responsibility and implementation of the same to achieve reduced
forced outage, optimized O&M cost, quality maintenance & overhauling,
efficiency enhancement and full system compliance leading to safe, efficient
& reliable power generation.
2.0
SUPERSEDED DOCUMENTS
Nil
3.0
OBJECTIVES
The objectives of technical Audit shall be as per the targeted objectives shown
in the matrix in annexure - 1a which include the following:
4.0
a)
b)
c)
System compliance
d)
e)
f)
g)
h)
DELIVERABLES
MIS to management
Audit report
Page - 2
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
5.0
SCOPE
5.1
Technical Audits will be carried out by Operation Services and will monitor
the following:a)
All relevant statutory requirements that apply to the plant areas listed
in Appendix I of this document.
All Procedures and Instructions issued by Corporate Operation
Services Division and other Corporate Functions which are applicable
to Plant O&M functions.
The approved recommendations contained in Enquiry Committee
Reports, Investigation Reports, Trip Analysis Reports and O&E
inspections.
All Technical Compliance documents, within the formal Operation and
Maintenance Management Systems.
O&M problems including major repetitive failures and maintenance
preparedness of the station
Performance and outage analysis
Healthiness of the equipment.
O&M cost reduction measures
Safety aspects of Plant & Equipments
Commercial aspects of unit operation
Plant efficiency deviations and corrective actions taken.
Any other areas, at the discretion of the Management.
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
5.2
The Technical Audit should be able to bring out / deliver the following points
5.3
5.4
Full load generation constraints, partial loading and the reasons thereof.
National Thermal Power Corporation Ltd.
Page - 3
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
6.0
b.
c.
d.
e.
Site to be audited shall be selected, as per the Annual Plan finalized at the
beginning of each financial year, or as per the requirements of the
management.
7.2
7.3
Head of O&M of the site shall be informed with a copy to GM (site) & ED
(Region), about the audit schedule and scope, as per enclosed format in
appendix 2.
7.4
7.5
7.6
Station may request Corporate OS for minor rescheduling of audit to cater for
special exigencies to ED (OS) / GM (OS), the competent authority to approve
such minor changes in schedule. Any long term deferment from the schedule
or cancellation of audit plan will have to be approved by Director (O).
7.7
7.8
The audit team shall be briefed about the methodology of the Audit, use of
check list, the area of concern requiring special attention emerging from ORT,
Trip Analysis and major failures by the Team Leader. A meeting shall be held
before the departure for audit where above points shall be discussed.
National Thermal Power Corporation Ltd.
Page - 4
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
7.9
7.10
The findings of the audit shall be summarized in the format given in appendix
3A and presented during the closing meeting.
7.11
7.12
7.13
The report shall be sent to Head of O&M of the site for making action plan,
and copies shall be sent to the Regional ED, Head of OS, Head of the Project
and Head of Regional OS. A copy shall be given to the ORT coordinator for
necessary follow-up.
7.14
An action plan is to be prepared for the non conformities raised during the
audit by the station within two weeks of the receipt of the Audit report. The
action plan should fix the responsibilities and time frame for different
proposed actions to rectify the audit findings. The action plan should be made
as per the format given in appendix 3B and put on Station LAN. Copies of the
same should be sent to Head of Corp. & Regional OS, ED of Region and the
Team Leader of the Audit. A copy shall be given to the ORT coordinator for
necessary follow-up.
7.15
The action plan available on Station LAN should be updated by the concerned
persons every month. The updated status report as per the format given in
appendix 4 should be sent to Head of Corp. OS and Head of Region. A copy
should be given to ORT coordinator for review during the ORT. A database of
the action Plan is to be maintained by the station.
7.16
The ORT Coordinator shall review the status of action plan every month and
discuss the points which are not complied. This should be recorded in the ORT
minutes.
7.17
The head of OS shall review the action plan once in 4 months or as and when
desired.
7.18
The MIS of audit to D (O) / Management should be in power point and should
include the following:
7.19
Executive Summary in line with the Targeted Operation Matrix as per the
format in appendix 4. This will be made ready by the Team Leader after
the receipt of the action plan from the site.
Major areas requiring management action and intervention along with area
of concern or neglect.
Meeting of D(O), Corp. OS and GM station along with team for discussion on
critical issues to be scheduled if required
Page - 5
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
8.0
8.1
8.2
8.3
Where irregularities are found, ask for further samples to be examined. Do not
make a judgment on the basis of a single finding or an isolated incident
provided the implications of any single incident / record are not crucial, report
the finding as an observation / deviation. Formal discrepancy should be
reported on the basis of a fully representative sample where a significant
proportion of the sample taken was found to contain discrepancy.
8.4
8.5
9.0
Maintenance System
9.1
9.2
9.3
Page - 6
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
9.4
9.5
9.6
9.7
9.8
10.0
Partial Loss Review Analysis as brought out in ORT reports and checking
the efforts made by the stations to improve the loss due to partial loading.
National Thermal Power Corporation Ltd.
Page - 7
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
10.1
Forced Outages since the last audit and their analysis. Action plan to
achieve the target of <1.0% in the financial year. Recommendations made
by Corp. OS in the annual trip analysis to be checked for compliance.
All instances of multi unit trippings to be analysed in detail and the efforts
made by the station to avoid recurrences to be checked
11.0
Overhauling
11.1
Review a sample report of the recent overhauling, and study it for the
following points. Record deviations and action plan thereof.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.2
Check the records of the system for identification of activities not possible
during plant operation or short shutdowns, and inclusion of these activities
during overhauling.
11.3
The following points should also be seen / discussed during the audit
1. Adequacy of scope and preparedness / plan of previous years O/H and the
next two years O/H.
National Thermal Power Corporation Ltd.
Page - 8
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
2. Analyse all O/H deferment and / or extension of overhauling. In case of
extension whether it was due to increase in scope of work or lack of
planning or other reasons.
3. List out all forced outages / causes of unit trips within 6 months of
overhauling and identify the reasons of outages with corrective action.
Specific learnings to be recorded and actions thereof may be taken
appropriately.
12.0
Maintenance Preparedness
12.1
12.2
12.3
13.0
Spares Availability
13.1
Identification of critical spares, their quality and spares having high failure rate
along with reasons for failure.
Verify availability of spares/service, by inspecting records of inventory,
consumption of spares and consumables, purchase indents and orders, etc.
This should be done for at least critical spares.
Examine the spares identified for spares pool within NTPC for the Station.
Check for storage condition and preservation of these spares.
Check for spares development programme at the station and audit the present
and future plans.
Healthiness of Installed Equipment
13.2
13.3
13.4
13.5
14.0
14.1
14.2
14.3
14.4
15.0
Housekeeping
As a minimum check for the following:
Dust on the floor and the equipments, and inside the enclosures/tracks.
Spilled oil and garbage on the floor.
Spillage of fuel oil.
Water logging.
Presence of bird nests, particularly on the switchyard gantries, storage tank
breather / vents etc.
National Thermal Power Corporation Ltd.
Page - 9
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Check for any source of dust ingress and actions taken to suppress the
same in plant area.
Presence of disposable cups and foodstuffs on the floor and in the
enclosures/racks.
16.0
17.0
18.0
19.0
Check whether safety appliances for safety of men are being used extensively.
Special focus should be on fire hazard and corrective actions taken. Records
of fire calls may be checked.
MoU Targets
Check for all the MoU Targets. Record deviations and the recovery plan to
achieve the MOU Target.
20.0
Benchmarking
During the audit the following should also be addressed.
21.0
General
21.1
Describe any other specific problem of the station; along with reasons, effect /
implication and sites action plan.
National Thermal Power Corporation Ltd.
Page - 10
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
21.2
21.3
22.0
Inform the team leader regarding any major discrepancy, any controversial
issue, persistent non cooperation from the auditee or any necessary resource
which is not being provided to you.
Commercial aspects of operating in CERC / ABT Regime may also be
examined.
Review
The Head of Corporate Operation Services will be responsible for reviewing
this document on a yearly basis or as necessary.
Page - 11
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix - 1A
Targeted objectives of the technical audit will be to achieve the following matrix through necessary corrective actions for the
deviations found.
Technical Audit Matrix
No. of
forced
outage
bet. OH
Tube Fail
Generic
Failure
Trippings
Multi unit
Trippings
Overhauling
Maximize
Red. In
scope of
OH
work of
duration
OH
Increase in
meantime
bet. OH
O&M
Cost
Efficiency
Reduction enhancement
Spares
Chemical
Staff
Tours
OH
Contract
labour
Boiler Eff
Turbine Fff
Unit Eff
Losses
Condenser Vac
Steam Pressure
Steam Temp
FG Exit temp
Others
Compliance
of all NTPC
systems
ORT
O&E
TC
Anurakshan
MMS
Others
Accidents
MOU
TargetTarget
0%
Target Actual
Fire
T&P
Safety
others
Temp Excursion
Steam
Metal
ABT Policy
Major
UI
DC SG
failures maxi
mizat
ion
AG
Page - 12
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
APPENDIX 1B
TECHNICAL AUDIT PLANT AREAS
PLANT AREA 1 (TURBINE & AUXILIARIES)
1.0
1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
Turbine
Main Turbine
TG Lubricating Oil System/Bearings
TG Rotors/Cylinders
Steam Chests / Valvegear /Governors
Turbine Supervisory Equipment
HP Steam Pipework
2.0
2.1
2.2
2.3
2.4
2.5
3.0
1.1
1.2
1.3
1.4
Boiler Plant
Gas Passes
Fans and APH
Electro Static Precipitators
2.0
2.1
2.2
1.2
3.0
Milling System
3.1
3.2
4.0
Page - 13
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
PLANT AREA 3 OFFSITES
1.0
FUEL MANAGEMENT
1.1
1.2
1.3
1.5
2.0
ASH PLANT
2.1
2.2
2.3
2.4
3.0
3.1
3.2
4.0
CW PLANT
4.1
4.2
4.3
4.4
5.0
5.1
5.2
6.0
GENERATORS
1.1
1.2
1.3
2.0
ELECTRICAL SYSTEM
2.1
2.2
2.3
2.4
2.5
Switchgear
Transformers
Batteries, DC Systems & DG Sets etc.
Station Earthing Systems
Station Lightning Arrestors
National Thermal Power Corporation Ltd.
Page - 14
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
2.6
2.7
2.8
2.9
2.10
H.T. Motors
Switchyards Equipments & PLCC
Relays and Protection
Cable Galleries and Fire fighting Equipments
Gas Turbine starting system
3.0
UPS
DDCMIS
Analysers
Lab
FSSS
Local instruments
Hp / LP Bypass
ATRS / ATT
Protections
Storage of C&I Items
Gas Turbines
Compressors
Air Intake Systems
Fuel Burners / Combustion System (both liquid and gas)
Fuel Firing Systems (both liquid and gas)
WHRB
Other Related Areas / Equipments
Page - 15
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
APPENDIX - 2
TIME
9.00 AM
to
9.30 AM
9.30 AM
to
5.30 PM
PROGRAMME
Meeting with Head of Project and Head of O&M along with all
section heads for introduction of the team, and briefing about scope
and methodology of conducting the Technical Audit. Coordinators
from different areas are to be identified.
Team leader will oversee the conductance of the audit and resolve
any issue causing hindrance / constraint in the audit.
Other team members will meet the respective section heads/area
engineers regarding equipment, systems & practices pertaining to
their sections as envisaged in the scope and system for Technical
audit in this document. They will also discuss the tentative action
plan for the deviations found with the section HOD.
<Date>
<Date/s
>
<Date>
9.00 AM
to
5.30 PM
9.00 AM
to
4.00 PM
4.30 PM
to
6.30PM
-Do-DoMeeting of the team with Head of Project, Head of O&M along with
all section heads, to indicate the summary of major observations /
exceptions along with tentative action plan. Critical Issues are to be
identified along with action plan identifying the responsibility and
target dates for flagging to D(O).
Page - 16
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix-3A
Format for Reporting the Findings of Technical Audit of <Station> from <date> to <date>
Deviations / Non
Conformities
Number
Equipments /
Sub-systems
Checked
Area Audited
Observations / Findings
(Technical / System Related)
Page - 17
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix-3B
Format for Action Plan / Implementation on Findings of Technical Audit of <Station>
from <date> to <date>
Sl. No. Deviations /
NC of Audit
(No.)
Observation /
Deviation
Responsibility
1
2
3
4
5
6
7
8
9
10
The next Review of the action plan will be held on <date> at <venue>
The report is to be sent to Head of OS, Regional OS and put on station LAN
Target Date
Present Status
Page - 18
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix - 4
Executive Summary of Technical Audit of <Project> From <Date> To <Date>
1)
S. No.
2)
Forced outages
since last
technical audit
Partial loading
since last
technical audit
Exceptions
recorded
Reasons of partial
Action plan to reduce partial
Loading categorized loading
as per ORT format
Responsibility
with date
Analysis of
exceptions
Responsibility
with date
Responsibility
with date
MoU Targets
5)
Responsibility
with date
Quality of Overhaul
Unit
No.
4)
Unit
No.
3)
Reasons of forced
outages
Status of
Achievement of the
targets
System
Exceptions
Responsibility with
date
Page - 19
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
6)
7)
Responsibility
with date
Installed Capacity
Capacity
achieved
Constraints in
achieving stretched
target
UI Optimisation
Station Target to
achieve 101% of
DC in MUs
11)
Reasons of the
trippings
Unit No.
10)
Responsibility
with date
Efficiency Exceptions
Exception details
emerging from the detail
check list
9)
8)
Constraints being
faced by the station
Shortfall in MUs
Responsibility
with date
Area / unit
Deviation /
exception observed
Page - 20
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
12) Any Other Issue
Page - 21
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix - 5
MATRIX OF MAINTENANCE SYSTEM
S.No.
1
2
3
4
5
6
7
8
9
10
11
Description
Status
Reason for
Deviation
Work Control
System Operation
Job Planning
A. Preventive Maintenance
B. Break Down Maintenance
PM SCHEDULE
a. Work Specification Review.
b. Frequency Review
Work Order Card
a. Priority of work(E,A,B.C)
b. Registration
c. Filling of cards
c. History of Equipments
d. Cost Calculation
Lubrication Schedule
MIS Reports Generation
PDM
Techniques in Use
PTW SYSTEM
a.
Type of PTW
PFW,SFT,LWC,ROMP, Hot Work
PTW
b. Lock out Box System ,Use of
Danger Tag
c. Cross Permit System
d. Filling of PTW
e. Cancellation of PTW
f. Process of Operation
Equipment Change over Schedule
Overhauling
a. Preparation of Five year Rolling Plan
b. Preparation of scope of work.
c. Preparation
of
Engineering
declaration
d. Prepared ness for next two overhaul
e. Readiness for spares, consumables,
contracts
f. Schedule/Durations ,delay if any
g. Quality checks
h. Critical checks of Equipments
i. Protocol s Preparation
j. Efficiency before and after overhaul
12
13
Action Plan
Page - 22
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
14
Page - 23
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix-6a
ELECTRICAL CHECK LIST FOR TECHNICAL AUDIT
STATION
PERIOD OF AUDIT
S.No.
Area/System/Sub-Sytem
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
2.0
2.1
2.2
Status
OK/Not OK
Pl. give details
OK/Not OK
Yes /No
OK/Not OK
OK/Not OK
OK/Not OK
OK/Not OK
OK/Not OK
OK/Not OK
Done/ Not done
Yes /No
Yes /No
OK/Not OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
Action Plan
(For Not Ok)
Page - 24
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
Area/System/Sub-Sytem
Status
2.3
OK/NOT OK
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
3.0
3.1
3.2
3.3
3.4
Yes /No
Yes /No
Yes /No
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
Yes /No
OK/NOT OK
OK/NOT OK
Yes /No
Yes /No
Yes /No
OK/NOT OK
Yes /No
OK/NOT OK
Yes /No
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
Action Plan
(For Not Ok)
Page - 25
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
3.12
3.13
4.0
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
5.0
5.1
5.2
5.3
5.4
5.5
5.6
5.7
Area/System/Sub-Sytem
Inlet pressure / inlet temp
Outlet pressure /outlet temp in limits
Hydrogen pressure and purity.
Availability/readiness of both stator water
and seal oil pump.
DC SYSTEM & DG SET
Smoke and gas detection sensor in battery
room installed and working.
Trial run of DC auxiliaries is being taken
regularly for checking healthiness.
Physical checking of battery room.
a) Ventilation system.
b) Cleanliness .
c) Wash basin in battery room.
Physical checking of battery.
a) Level of electrolyte.
b) Vent plug cleanliness (clogging).
c) Support insulator (crack).
All cells are in service (no by pass cell)
Checked DC earth fault at DC board and
found.
Battery terminals coated with petroleum
jelly
Cell voltage and Sp gravity of all cells
checked and recorded properly.
PM/OH/testing of all DCDB have done as
per schedule.
All trickle/boost charger are in service.
Trial run of DG set daily and recorded.
Checking of auto start of DG set checked
every day.
DG set battery sp. Gravity and voltage
checking regularly.
CABLE GALLARIES
Sufficient illumination available.
Emergency DC light available and
checking done every day.
Water logging water dripping checked in
wall way and found.
All cable entries are sealed.
Cable dressing/mounting found.
Smoke detector function checked and
found.
Water sprinklers in service and simulation
carried out regularly.
Status
OK/NOT OK
OK/NOT OK
Yes /No
Yes /No
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
Yes /No
Yes /No
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
Yes /No
OK/NOT OK
OK/NOT OK
Yes /No
Action Plan
(For Not Ok)
Page - 26
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
Area/System/Sub-Sytem
Status
5.8
OK/NOT OK
6.0
6.1
6.2
6.3
6.4
6.5
7.0
7.1
7.2
7.3
8.0
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
8.10
Yes /No
Yes /No
OK/NOT OK
OK/NOT OK
Yes /No
Yes /No
Yes /No
OK/NOT OK
OK/NOT OK
OK/NOT OK
Yes /No
OK/NOT OK
Yes /No
OK/NOT OK
OK/NOT OK
Yes /No
OK/NOT OK
OK/NOT OK
Action Plan
(For Not Ok)
Page - 27
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
Area/System/Sub-Sytem
8.11
8.12
9.0
9.1
9.2
9.3
9.4
9.5
9.6
Status
Yes /No
OK/NOT OK
OK/NOT OK
OK/NOT OK
OK/NOT OK
Yes /No
OK/NOT OK
OK/NOT OK
OK/NOT OK
Action Plan
(For Not Ok)
Page - 28
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure 6 b
C&I CHECK LIST FOR TECHNICAL AUDIT
Description
CMC
2.
Drum Level
3.
Furnace Pressure
4.
Air Master
5.
Oxygen correction
6.
Fuel Master
7.
8.
9.
PA Header Pressure
10.
Deaerator Level
11.
Hotwell Level
12.
Auxiliary steam
13.
HP Bypass
14.
LP Bypass
15.
16.
Auxiliary PRDS
17.
18.
19.
Status
Remarks/Action plan
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
# Any other loop not covered in the list and specific to the unit being audited
National Thermal Power Corporation Ltd.
Page - 29
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Drum Level Hi Hi
2.
Drum Level Lo Lo
3.
Furnace pressure Hi Hi
4.
Furnace pressure Lo Lo
5.
6.
Loss of Flame
7.
Loss of Fuel
8.
Reheater protection
9.
11.
12.
Loss of FD fans
13.
14.
15.
16.
Axial Shift
17.
18.
19.
10.
Description
Status
Remarks/Action Plan
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
In service/Out of
service
20. #
# Any other protection not included in above list but specific to the unit being audited
In case of field initiated trips the healthiness of the intiating device to be checked.
Page - 30
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Description
Status
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Remarks/Action PLan
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Page - 31
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Status
Ok/not ok
Ok/not ok
Ok/not ok
Remarks/Action plan
Ok/not ok
deg C
Ok/not ok
Ok/not ok
Ok/not ok
# Any other point not covered in the list and specific to the unit being audited
Description
Status
Remarks/Action plan
Ok/not ok
Ok/not ok
Ok/not ok
Page - 32
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Sl
No
13.
14.
15.
16.
17.
18.
19.
20.
Description
synchronizer
Load shedding relay
Turbine expansion
measurements
Turbine pedestal vibration
measurements
Turbine shaft vibration
measurements
Eccentricity measurement
Key phasor measurement
Speed Measurement
#
Status
Remarks/Action plan
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
# Any other point not covered in the list and specific to the unit being audited
Description
Status
UCB temperature
CER temperature
Dust ingress
Panel bottom sealing
Large video screen
CRT/Keyboard(OWS)
Printers
Recorders
Panel cooling fans
Indicators
Annunciation System
General cleanliness
Healthiness of Power
supplies
Healthiness of indication
lamps
#
.Deg C
.Deg C
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Remarks/Action Plan
Ok/not ok
# Any other point not covered in the list and specific to the unit being audited
Page - 33
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Sl
No
1.
Description
Status
Ok / Not ok
4.
5.
Feedwater Ph Analyser
Ok / Not ok
6.
Ok / Not ok
7.
Ok / Not ok
11.
12.
Condensate Dissolved
Oxygen Analyser
Feedwater Dissolved
Oxygen Analyser
Pressure gauges
Leakage in sampling
panels
Availability of samples
Chiller units
13.
Primary coolers
Ok / Not ok
14.
Secondary coolers
Ok / Not ok
15.
Rotameters
Ok / Not ok
16.
Cleanliness
Ok / Not ok
17.
Corrosion in sampling
table and analyser Panels
Ok / Not ok
18.
2.
3.
8.
9.
10.
Remarks/Action plan
Ok / Not ok
Ok / Not ok
Ok / Not ok
Ok / Not ok
Ok / Not ok
Ok / Not ok
Ok / Not ok
Ok / Not ok
# Any other analyser/point not covered in the list and specific to the unit being audited
Exceptions in status of other analysers not covered above to be recorded separately
Page - 34
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
21.
22.
23.
Description
Status
LIE sealing
Dust/moisture ingress in
LIE
Leakages in impulse
piping/valves/transmitters
inside LIEs
Availability of purging air
Condition of purge
rotameter
Availability of instrument
identification
Lighting inside LIE
JB sealing
JB identification
Special identification for
trip related field devices
Condition of cable glands
Cable dressing
General condition of
copper tubing
General housekeeping
Condition of local gauges
ID/FD/PA lub oil systems
Healthiness of Sealing air
for Mill/ Feeders
Availability of scanner
cooling air
Check for dryness of
instrument air
Sealing
tightness/cleanliness of
Positioners/EP
converters/Feedback
transmitter
Healthiness of solenoids
Healthiness of electrical
actuators(C&I area)
#
Ok/not ok
Ok/not ok
Remarks/Action Plan
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
Ok/not ok
# Any other point not covered in the list and specific to the unit being audited
Any specific exceptions noticed to be recorded on a separate annexure
National Thermal Power Corporation Ltd.
Page - 35
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
8.
9.
10.
11.
12.
13.
Description
Availability of
electrostatic proof test
benches
Pneumatic test bench
Dead weight testers
Standard test multimeters
Signal sources
Temperature bath
Electronic test Jigs
a)..
Status
Ok/Not ok
Ok/Not ok
Ok/Not ok
Ok/Not ok
Ok/Not ok
Ok/Not ok
Ok/Not ok
b)..
Ok/Not ok
c)
Ok/Not ok
In circuit IC tester
Calibration records
System for component
storage
Provision of tags on
instruments
Instrument handling and
storage
#
Remarks/Action Plan
Ok/Not ok
Ok/Not ok
Ok/Not ok
Ok/Not ok
Ok/Not ok
# Any other point not covered in the list and specific to the unit being audited
GENERAL POINTS
Sl
No
1.
2.
3.
Description
Check recommissioning
protocols
Review of card failure
analysis records of C&I
lab
Review of C&I trip
analysis and check for
implementation of
recommendations
Status
Remarks/Action Plan
Ok/Not ok
Ok/Not ok
Ok/Not ok
Page - 36
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix 6c
OPERATION CHECKLIST FOR TECHNICAL AUDIT
STATION:
DATE:
STAGE:
UNIT:
A.
B.
Description
Action Plan
Status
(Ref: Technical Audit Reports, Peer Audit Reports, Surprise Audit reports etc.)
S.N.
Description
Action Plan
Status
1.
C.
(Ref: Status pertaining to operation area of various reports like, Efficiency reports, Enquiry
committee reports etc.)
National Thermal Power Corporation Ltd.
Page - 37
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.N.
Description
Action Plan
Status
1.
D.
D1.
S.N.
1.
Description
b)
c)
d)
e)
f)
3.
4.
D2.
S.N.
1.
2.
3.
4.
Remarks /
Action Plan
2.
Status
Status
Remarks /
Action Plan
Page - 38
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.N.
5.
6.
D3.
S.N.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Description
Status
Remarks /
Action Plan
Status
Remarks /
Action Plan
Turbine protective devicesValves testingStatus of actual over speed test of main turbine
and TD BFPs.
Record of routine checking of cable galleries.
LOGGING / MONITORING:
(Ref: Concerned records)
Description
Availability and filling up of local log sheets.
- Details of cross checking by UCE/SCE.
Availability and filling-up of UCB log sheets.
Adequacy and completeness of data in log books
(should cover deviations w.r.to. loading, Sp. Oil
consumption, Aux. Power consumption,
equipment healthiness etc.) of SCE/UCE/desk
engineer etc. check for counter signature by
superior at random.
Availability of updated chemical analysis data,
with details of water analysis, oil analysis, PF
fineness analysis, coal analysis, ash analysis etc.
Regular monitoring of systems like SADC,
burner tilt etc.
Details of monitoring of boiler tube metal
temperature and furnace temp (Refer metal temp
excursion logs / DAS records).
Start-up monitoring. Record of boiler start-up
and turbine rolling parameters for each start-up.
Availability and usage of start-up check lists.
Monitoring of Heat Rate related parameters
- Steam parameters
- Condenser vacuum
- Air heater outlet temp.
- Unburnt carbon in bottom ash and fly ash
- Mill rejects
- HP heaters availability
- Make-up water consumption
(Details of exceptions, defect raising and followup)
10.
11.
Page - 39
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.N.
Description
Status
Remarks /
Action Plan
Management system.
D4.
S.N.
1.
2.
3.
D5.
S.N.
Description
1.
2.
3.
4.
5.
6.
7.
8.
Remarks /
Action Plan
Status
Remarks /
Action Plan
Page - 40
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
D6.
S.N.
1.
2.
3.
4.
SYSTEM HEALTHINESS
E1.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Remarks /
Action Plan
Status
Remarks /
Action Plan
E.
S.N.
Status
Page - 41
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
E2.
S.N.
EQUIPMENT HEALTHINESS:
(Ref: Records and discussions)
Description
1.
2.
4.
5.
6.
7.
3.
E3.
S.N.
Description
Deviation of major parameters from rated
values, if any.
1.1
1.2
1.3
S.N.
1.
Remarks /
Action Plan
MAJOR PARAMETERS:
(Ref: Records and actual verification of unit and equipment parameters)
1.
E4.
Status
Status
Remarks /
Action Plan
Status
Remarks /
Action Plan
2.
3.
Page - 42
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
F.
S.N.
Description
1.
2.
3.
4.
5.
Status
Remarks /
Action Plan
Status
Remarks /
Action Plan
2.
3.
Page - 43
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
H.
MISCELLANEOUS
(To be compiled by discussion with selected O&M staff)
H1.
Any other specific technical problem / constraints being faced by station (w.r.t full load,
reliability, efficiency), its reasons & actions taken thereof:
Formulate recommendations and Action plan for the identified problems.
H2.
Incidents or occasions where due to vigilant Operation staff, a major failure / outage /
tripping was averted, reasons, analysis and learning thereof for the benefit of other stations.
-
DATE:
SIGNATURE:
Page - 44
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Appendix 6d
BALANCE OF PLANT CHECK LIST FOR TECHNICAL AUDIT
AVAILABILITY OF EQUIPMENTS (A.H.S.)
S.NO. DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Scraper Conveyor A
Conveyor-B
Standby Scrapper Conveyor
Clinker Grinder 1A/1B/2A/2B
Healthiness of Nozzles
Hydro Ejectors
Gate Operating Mechanism
BA.SP. Series A/B/C/D/E
Booster Pumps A/B/C/D/E
Sump Level Switchs
Disposal Ash Pipe Line 1/2/3/4/5
A.P.N./Econ. Hopper Flushing arra
ngement
P/H Drainage Pump A/B/C/D
PIT Isolating Gate Availability
ESP Flushing Boxes
Dry Ash Silo 1/2/3/4
Vacuum Pumps
U-1 A/B/C/D
U-2
Trans. Air Comp.
1A/1B/1C
2A/2B/2C
Ins.Air Comp.
1A/1B/1C
2A/2B/2C
Buffer Hopper Areation Blower
1A/1B/1C
2A/2B/2C
Silo Areation Blower
U-1/2/3/4
U-2
Air Drying Plant
1A/1B/1C
Fly Ash Extraciton Line Isolation
Valves Population
Fly Ash Extraction Line
Seggrating Valves Population
AVAILABILITY
STATUS
Avl/N.Avl.
REMARKS/ ACTION
PLAN
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Page - 45
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
22
23
24
25
AVAILABILITY
STATUS
Avl/N.Avl.
REMARKS/ ACTION
PLAN
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Compressors
1
2
3
1
2
3
4
5
6
7
1
2
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Page - 46
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
2
3
4
5
6
7
8
1
2
AVAILABILITY
STATUS
Avl/N.Avl.
REMARKS/ ACTION
PLAN
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Page - 47
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
3
4
5
6
7
8
9
AVAILABILITY
STATUS
Avl/N.Avl.
REMARKS/ ACTION
PLAN
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
Avl/N.Avl.
STATUS
Avl/ Not.Avl.
2
3
4
5
6
7
8
9
10
11
12
13
14
REMARKS/
ACTION PLAN
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Avl/ Not.Avl.
Yes/No
Yes/No
Page - 48
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
STATUS
15
Yes/No
16
17
18
REMARKS/
ACTION PLAN
___ Nos/
___ No.
___ Kg./Cm2
___ Kg/Cm2
Transformers
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Yes/No
Yes/No
Yes/No
Avl./N.A.
Yes/No
Cable Galleries
Whether All Cable Galleries Are
Covered By Smoke Detection And
Lhsc System
Whether All Cable Galleries Are
Covered By Water Spray System
System Kept In Auto
Whether Cable Galleries Are Inspected
Jointly Daily (Protocols To Be Seen)
Whether Cable Galleries Are Properly
Lighted And Free From Dust, Debries,
Stagnant Water Etc.
Whether Entry Points To Cable
Galleries From
Tg/Boiler/Switchgear/Cr/Cer Are
Properly Sealed
Whether Inter-Unit Fire Walls Provided
Whether Fire Rating Doors Provided In
Cable Galleries
Whether All Isolating Valves Are
Outside Cable Galleries
Whether Proper Drainage/Pumping
Arrangements Are In Place To Drain
Out Water In Case Spray System Is
Energised
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Page - 49
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
2
3
4
5
6
7
STATUS
REMARKS/
ACTION PLAN
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Page - 50
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
STATUS
1
2
Yes/No
Yes/No
3
4
5
6
7
8
9
REMARKS/
ACTION PLAN
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
2
3
4
5
6
7
8
9
10
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Operation
Check system of issue of work orders
to maintenance section identifying
defects which require rectification
Whether all equipments are daily
In Place/Not In
Place
Yes/ No
Page - 51
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
2
3
4
7
8
B
1
2
3
4
5
6
7
8
9
STATUS
REMARKS/
ACTION PLAN
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Avl/ Not Avl
Page - 52
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
STATUS
10
Yes/ No
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
REMARKS/
ACTION PLAN
Yes/ No
Avl./ Not Av.
Avl./ Not Av.
Avl./ Not Av.
Avl./ Not Av.
Avl./ Not Av.
Yes/ No
Yes/ No
Yes/ No
Avl./ Not Avl.
Yes/ No
Yes/ No
Avl. /Not Avl.
Yes/ No
Yes/ No
Avl. /Not Avl.
Avl./ Not Avl.
Avl./ Not Avl.
Avl./ Not Avl.
Avl./ Not Avl.
Avl./Not Avl.
Page - 53
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
STATUS
32
33
34
Avl./Not Avl.
Avl./Not Avl.
Avl./Not Avl.
Availability Of Elevators
Availability Of Flap Gates/Rpgs
Availability Of Sump Pumps
Availability Of Hoists
Implementation Of Lmi
Conveyor Galleries, Underground
Conveyor Tunnels Are Free From Coal
Dust, Debries, Belt Pieces Etc.
Floors Of Transfer Points, Crusher
House, Bunker Floor Are Free From
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
REMARKS/
ACTION PLAN
Avl./Not Avl.
Avl./ Not Avl.
Avl./ Not Avl.
Avl./ Not Avl.
Avl./ Not Avl.
Avl./ Not Avl.
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
___MT
____HR
______MT/Hr.
______MT/Hr
___MU
Yes/ No
Avl./ Not Av.
Avl./ Not Av.
Yes/ No
Page - 54
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
STATUS
REMARKS/
ACTION PLAN
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Page - 55
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. DESCRIPTION
77
STATUS
REMARKS/
ACTION PLAN
Yes/ No
COOLING TOWER
1
2
3
4
Avl./Not Av.
In Order/ Not In
Order
In Order/ Not In
Order
In Order/ Not In
Order
In Order/ Not In
Order
In Order/ Not In
Order
In Order/ Not In
Order
Yes/ No
Page - 56
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure-6e
STEAM TURBINE CHECK LIST FOR TECHNICAL AUDIT
Part-A
*Normally status should be positive , if otherwise, Explain its reason
there it self
Sl.
No.
Sub Area
Check point
Status*/
Readings
Main
turbine
Yes/No
Yes/No
Yes/No
Normal /
Abnormal
Normal /
Abnormal
Yes/No
Yes/No
Yes/No
OK/
N. OK
Yes/No
Yes/No
Reason
for
Deviation
Action
Plan
Page - 57
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Sl.
No.
Sub Area
Check point
Status*/
Readings
Yes/no
Yes/No
Yes/No
Yes/No
Yes/No
and
frequency
Yes/No
Yes/No
Yes/No
Normal/A
bnormal
Yes/No
Yes/No
Yes/No
Yes/No
Y/N
Yes/No
Yes/No
Yes/No
Reason
for
Deviation
Action
Plan
Page - 58
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Sl.
No.
Sub Area
Check point
Status*/
Readings
Yes/No
Common
General
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
OK/N.OK
Reason
for
Deviation
Action
Plan
Page - 59
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Sl.
No.
Sub Area
Check point
Status*/
Readings
Reason
for
Deviation
Action
Plan
Page - 60
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Aspects
1.
Effectiveness of
recent Overhaul
2.
Maintenance
cost
Optimization
3.
Reliability
4.
Efficiency
Safety
Station Best
Practice (if any)
Any other
applicable
7.
Observation
Deviation
Action
Plan
Part-C
S.N.
Description
Details
Incidents or occasions where due to
vigilant Operation staff, a major failure /
outage / tripping was averted, reasons,
analysis and learning thereof for the benefit
of other stations.
Design Modifications done by site in the
system /Equipment (To be listed and
observed)
Page - 61
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure-6f
CHEMISTRY CHECK LIST FOR TECHNICAL AUDIT
STATION :
PERIOD OF AUDIT:
S.NO. AREA/SYSTEM/SUB-SYSTEM
1.
1.1
Chemical House
Alum tanks
Alum tanks agitators
Alum tanks level indicators
Alum dosing pumps/gravity dosing
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
Clariflocculators
1.3
STATUS
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
PT Chlorination plant
Chlorinator
Lifting arrangement for cylinders
OK/ Not OK
OK/ Not OK
ACTION PLAN
(for Not OK)
Page - 62
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. AREA/SYSTEM/SUB-SYSTEM
1.4
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
Backwash frequency
Backwash water requirement
Level indicator
Blower
Filter water pump
Instruments (LOH/ROF)
Media availability for top up
Performance of filtration plant
House keeping
2.
2.1
Chemical House
Alum tanks
Alum tanks agitators
Alum tanks level indicators
Alum dosing pumps/gravity dosing
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
STATUS
OK/ Not OK
OK/ Not OK
OK/ Not OK
Clariflocculators
National Thermal Power Corporation Ltd.
ACTION PLAN
(for Not OK)
Page - 63
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. AREA/SYSTEM/SUB-SYSTEM
2.3
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
CW Chlorination plant
2.4
STATUS
Chlorinator
Evaporator
Lifting arrangement for cylinders
Weighing arrangement for cylinders
Safety kit
Cl2 leak absorption system
Leak detectors/Alarms
Control panel
Exhaust fans
Display of safety instructions
House keeping
Backwash frequency
Backwash water requirement
Level indicator
Blower
Filter water pump
Instruments (LOH/ROF)
Media availability for top up
Performance of filtration plant
House keeping
3.
DM PLANT
3.1
DM Streams
National Thermal Power Corporation Ltd.
ACTION PLAN
(for Not OK)
Page - 64
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. AREA/SYSTEM/SUB-SYSTEM
Internal inspection (once/2-years):
1. ACF
2. WAC
3. SAC
4. DG
5. WBA
6. SBA
7. MB
ACF/Resins testing (once/year)
Spare ACF/Resins availability
Spare resin storage conditions
Stream output/Quality
Instrumentation in DM stream
Press./DP gauges in DM stream
Flow meters in DM stream
Degasser performance
3.2
3.3
STATUS
Integrators
Analyzers
Alarms
Mimic
Regeneration mode
(Auto, semi-auto, manual)
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
Used/ Not used
Regeneration system
ACTION PLAN
(for Not OK)
Page - 65
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. AREA/SYSTEM/SUB-SYSTEM
3.4
STATUS
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
Neutralization pit
3.5
Pit condition
pH meter
Effluent disposal pumps
Recirculation/mixing system
4.
SOFTENING PLANT
4.1
Softener Streams
Internal inspection of exchanger
vessels (once/2-years):
OK/ Not OK
OK/ Not OK
Stream output/Quality
OK/ Not OK
OK/ Not OK
ACTION PLAN
(for Not OK)
Page - 66
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. AREA/SYSTEM/SUB-SYSTEM
4.2
STATUS
OK/ Not OK
Flow meters
OK/ Not OK
4.3
Integrators
Analyzers
Alarms
Mimic
Regeneration mode
(Auto, semi-auto, manual)
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
ACTION PLAN
(for Not OK)
Page - 67
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. AREA/SYSTEM/SUB-SYSTEM
5.
5.1
STATUS
OK/ Not OK
OK/ Not OK
Regeneration system
6.
STEAM-WATER CYCLE
MONITORING
6.1
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
Yes/ No
ACTION PLAN
(for Not OK)
Page - 68
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.NO. AREA/SYSTEM/SUB-SYSTEM
Other online instruments provided
a
b
c
d
e
.
.
.
Inter comparison with lab testing
Sample temperature
7.
8.
STATUS
.
.
.
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
CHEMICAL LABORATORY
9.
10.
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
OK/ Not OK
LMI STATUS
LAST AUDIT POINTS STATUS
STATION:
PERIOD OF AUDIT:
ACTION PLAN
(for Not OK)
Page - 69
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure-6g
EFFICIENCY CHECK LIST FOR TECHNICAL AUDIT
1.0
Date :
Unit
:
Parameter
Design
value
Actual
value
Deviation in
Parameter
Deviation in Turbine
heat rate from design
(Kcal/KWH)
Design
Actual
Difference
Page - 70
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Dry flue gas loss (%)
Wet flue gas loss (%)
Unburnt carbon loss (%)
Page - 71
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
2.0
Boiler
Boiler
Design Actual
(1)
Dry flue gas loss (%)
(2)
(3)
Actual
corrected for
design coal
quality and
design
ambient
temperature
(4)
(4-2)
(6)
(4-3)
(7)
Turbine :
Parameter
(1)
Condenser
back
pressure
Design
actual
(3)
(4)
(5)
(6)
(7)
Uncontrol
lable loss
in T.H.R
(Kcal/KW
h)
(8)
Page - 72
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
3.0
A.
Date :
Unit :
Parameter
Reason
Yes/No
Main
steam
temp. S/H spray more than required
lower than design (oC)
Low heat transfer in S/H zone
Other
Main steam pressure Less coal firing
lower than design
Poor coal quality
Other
Hot reheat temp. lower More than required R/H spray
than design
flow
Lower mills in service
Poor coal quality
Burner tilts negative
Other
F.W. temp.
before Heater out of service
economizer lower than
design
Air entrapped in heater
Heater level not optimum
Drip cooler zone problem
Heater tubes fouled
Many tubes plugged
Heater
bypass
valve
open/passing
Other
Superheater spray flow Passing of spray valve
higher than design
Problem in spray control circuit
More heat absorption in S/H
Other
Reheater spray flow
Passing of spray valve
Problem in spray control circuit
More heat absorption in R/H
Other
National Thermal Power Corporation Ltd.
Action plan
for
improvement
Page - 73
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Parameter
Reason
Yes/No
Action plan
for
improvement
Page - 74
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Date :
Unit :
Higher than design
dry F.G loss
High O2 in F.G at
APH exit
Reason
Yes/No
Action Plan
Page - 75
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
4.0
Whether site is carrying out periodic efficiency tests of following equipment/ systems of
Units. Random checking of the reports of the efficiency tests carried out by site.
1. Routine Test
EFFICIENCY TEST
RECOMMENDED
ACTUAL DONE - UNITS Y/N
SCHEDULE
1
2
3
4
5
Mill fineness
All the mills of one unit
once in a week.
Clean air flow test
At the time of major mill
overhaul.
Dirty air flow test
Once in 6 months
APH Seal leakage
Once in 15 days
APH gas side efficiency
Once in 15 days
Boiler efficiency test
Once in 3 months
Condenser performance Whenever
vacuum
test
deteriorates from target
value.
Turbine
cylinder Once in 6 months
efficiency & Pressure
survey
FW heaters performance Once in 6 months
test
1. Pre & Post O/H tests
EFFICIENCY TEST
Page - 76
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Checking the actions taken for reducing Heat Rate deviation as detailed in
ORT.
Page - 77
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure 6h
GT & AUXILIARIES CHECK LIST FOR TECHNICAL AUDIT
I)
Sl. No.
Description
1
Operation log book recording (Based on present and
past date)
3
4
5
6
7
8
9
10
11
12
Status
Remarks
Page - 78
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Sl. No.
13
14
II)
Description
down stream of air intake filter
Checking healthiness of Fire sensor in GT compartment
and associated areas.
Frequency of online/offline compressor wash and its
optimization.
Status
Remarks
Status
Remarks
Sl. No.
Description
1
Compressor efficiency
2
3.
4
5
6
7
8
III)
Sl. No.
Description
1
Site preparation in respect of spares and T&P for
combustion chamber inspection, HGPI and major
overhaul
2
Action plan of various inspections
3
Work as per Quality overhaul norms & FQA involvement
in it
4
Adherence to manufacturers guidelines and NTPC
directives
5
Air intake filter stock position and date of last replacement
6
Bypass damper position and reliability analysis
7
Equipment performance data history and dearation
analysis
8
Engineering declaration document issue before overhaul
9
Check deposits on IGV for oil / grease (fouling) and
compressor washing during A&B inspections.
10
Review of records of healthiness of various control valve
settings of governing system
11
Assessment report of inspections for hot gas bath
Status
Remarks
Page - 79
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Sl. No.
Description
Status
Remarks
Status
Remarks
components.
IV)
Sl. No.
Description
1
Check the report of OEM of previous overhauls and
ensure NTPCs comments have been sent to OEM and
obtained recommendations.
2
Check whether earlier recommendations were
incorporated in overhaul
V)
S.N
DESCRIPTION
VI)
ANALYSIS REWNAL
SOLUTION
Sl. No.
Description
1
Major equipment failure records checking and capturing
from ORT, root cause analysis, recommendations and
action taken
2
Refurbishment plan of used Hot Gas Path components
and blades / vanes and action taken for recoating/repairs
and their availability emergency revival.
3
Vanes/Buckets replacement plan
4
Hot gas path parts requirement for next overhaul
alongwith the status of stock
5
Awareness of technical compliance system and ensuring
its availability at work station.
6
Status of refurbishing as per contract
VII)
Status
Remarks
Status
Remarks
Sl. No.
Description
1
Checking of the weight of all CO2 cylinders of main and
standby headers
2
Checking of local alarm (hooter)
3
Checking of alarm window on local and CCR.
4
Checking of healthiness of nozzles on MOT and
combustion chambers
Page - 80
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
VIII) ANALYSIS OF LUBE OIL SYSTEM (GT AREA), LIQUID FUEL AND GAS
WITH ESPECT TO GCV, TRACE METAL AND CONDENSATE
Sl. No.
Description
1
Fuel oil, gas and lubricants chemical analysis and
comparision with design.
2
Lube oil consumption per month / hr. and its trend
3
Date of last centrifuging of MOT oil & date of last
changing of oil
4.
Settlement time being observed in liquid fuel, tanks before
firing.
IX)
Sl. No.
1
2
3
4
5
6
XI)
Sl. No.
1
2
3
4
5
6
7
8
9.
10.
Remarks
Status
Remarks
Sl. No.
Description
1
House keeping around GT area & its healthiness
2
Checking of oil pits and its schedule for removal.
3
Checking of levels in condensate separator of fuel gas line
X)
Status
Status
Remarks
Status
Remarks
WALKDOWN CHECKS
Description
Temperature in GT enclosures
Leakage of any gas / liquid fuel pipeline
Foundations of pipelines and equipment
Insulation
Sound level around GT area
Painting of pipes and vessels
Air intake filter conditions
Expansion joint healthiness
Illumination
Availability of operators record keeping and preparedness
to handle emergency.
Page - 81
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
XII)
S.N
1.
2.
3.
4.
STATUS
REMARKS
DESCRIPTION
STATUS
1.
2.
REMARKSTraining
needs
XV)
SOLUTION
IMPLEMENTED
ADAPTABILITY
TO
OTHER
STATIONS
Fine dust Use of socks in Yes
and carbon first row
deposits
on
top Change of filter
of 1st row
layer
Page - 82
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure 5i
Check List of Quality Management System for Technical Audit
Area to be audited : Quality Management System Implementation at the Plants
different areas.
S.No.
01
02
03
04
05
06
Description
Remarks
Whether manual on Quality Management in Maintenance
Yes/No
(OGN:018:2002 and Vol. I, IIA, IIB are available at Site with different
deptts. I.e. FQA, MTP, Maintenance Groups.
Whether the above mentioned documents are being followed at Site
Yes/No
during O/H and Preventive Maintenance works.
Whether detailed work plan to be taken up during O/H has been drawn
Yes/No
by Site and copies are available with MTP and other maintenance
groups.
Whether protocols as per guidelines given in Vol. IIB, Quality
Yes/No
Management in maintenance/overhauling (OGN:018:2002) are being
maintained and signed by FQA and Maintenance representative.
Whether FQA set up at Site is adequate.
Yes/No
Extent of involvement in O/H and other Preventive Maintenance work. Adequate /
Not Adequate
(Copy of FQA organization chart with brief details of work being done by them to be
collected).
S.No.
07
08
Description
Whether FQA group is being strengthened during O/H by placing
executives from other O&M Deptts. particularly in Boiler and Auxiliaries
area.
Check for the adequacy of following Inspection and Testing Facilities
available at FQA laboratory:
i)
Radiography (source and film developing facilities
ii)
Ultrasonic Testing machine with trained operator (make and
capacity of machine
iii)
Whether trained manpower is available for handling radioactive source and ultrasonic testing machine
iv)
Magnetic Particle Inspection facilities (MPI) with trained
Manpower
v)
Dye Penetrate Test facilities (DPT) with trained manpower
vi)
Universal testing machine for Mechanical Testing with
trained operator
vii)
Hardness and Impact Testing machine
with trained operator
viii) Testing facilities for civil items i.e. cement, aggregate, concrete
cubes, bitunum, etc. with trained manpower
National Thermal Power Corporation Ltd.
Remarks
Yes/No
(Y/N)
(Y/N)
(Y/N)
Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
Page - 83
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
Description
Check whether FQA group is being involved in Boiler
Tube leakage and other failure analysis
x)
Check whether FQA and Maintenance Personnel are sent
regularly for training in the Welding, NDT and other
specialized functional areas
xi) Check the system of ensuring for testing of pressure
vessels, tools and tackles at required intervals as indicated
in tech. compliance documents. Copy of the list covering
all the items to be tested as per statutory norms with latest
status of testing to be enclosed. Random verification to
be done and exception to be recorded.
xii) Whether checks as per guidelines are conducted for high
rise structures, chimney, spring mounted foundation,
floating mills foundation, concrete foundations, and
necessary corrective measure initiated.
(In case of any discrepancy time bound action plan for
corrective measures to be made available)
xiii) Whether site has storage and preservation procedure for
critical spares and other important materials. How this is
being implemented. Role of third party for surveillance of
implementation status is there or not
xiv) Whether FQA is involved in plant betterment implementation
xv)
a) Compliance of FQA system manual (new) in the different
areas of Plant. (Status / Remarks).
b) Verify compliance of FQA manual procedure No.P-10 for
material procurement (O&M Spare), records of few sample
items to be verified.
( c) Verify compliance of FQA manual procedure No.P-11
for site contracts and role of FQA during O&M Phase of the
plant.
(d) Verify compliance of FQA manual procedure No.P-12 for
overhauling and maintenance role of FQA.
FQA involvement needed in all areas (Mech, Elect, C&I).
FQA involvement in Predictive Maintenance of Equipment
FQA lab instruments calibration being done as per required frequency.
Preparation of QA sheet before overhaul as per overhaul type
( Filling of the details in the formats to be verified)
ix)
09
10
11
12
Remarks
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
Status/
Remark
(Y/N)
Status/
Remark
Status/
Remark
Status/
Remark
(Y/N)
Y/N)
Y/N)
Y/N)
Page - 84
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
4.
5.
6.
7.
(i) Description
Is station work control system functioning as per NTPC
maintenance management guidelines?
What type of system station is following?
Equipment history is maintained. If yes, select randomly 3
nos. major equipments and check.
Does the short term planning (STP) liaison with operation
for the planning of defect rectification and apprise them
about maintenance work and delays?
Feed back from operation department on STP involvement.
Is the STP coordinating with maintenance section and
apprise them about plant report for start of maintenance
work?
Feed back from all maintenance section on STP involvement.
Does STP liaison with operation for PTW?
Feed back from Operation dept. On STP involvement.
Does STP review and improve methods of maintenance,
equipment and staff-skill and crew size?
Remarks
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
PREVENTIVE MAINTENANCE
S.No.
1.
2.
3.
4.
(ii) Description
Remarks
Do all standby equipments covered under preventive Yes/No
maintenance schedule?
Do all other equipments which do not have standby are Yes/No
taken under preventive maintenance during annual O/H.
Choose 2/3 equipments and check the above.
Do changeover schedule of standby equipments is matching Yes/No
with the preventive maintenance schedule?
Pick up 2/3 equipments and check the above.
Do the frequency and duration of the PM schedules is Yes/No
reviewed?
If yes, pick up equipments and check.
Do all columns of the WORK ORDER CARD are filled up Yes/No
National Thermal Power Corporation Ltd.
Page - 85
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
(ii) Description
properly by area engineer after the job is completed?
Remarks
through LAN?
Do materials department review & update the stock of Yes/No
material and inform MTP?
What is the periodicity of updating?
6.
Yes/No
PREDICTIVE MAINTENANCE
S.No.
1.
(a)
(b)
( c)
(d)
(e)
(f)
(g)
2.
3. (a)
(b)
4.
5.
6.
7.
8.
Description
Whether following Condition Monitoring techniques are employed
i.e.
Vibration Analysis
Thermography
Wear Debris Analysis
DGA
Acoustic (including SPM, Partial Discharge)
Motor current Analysis
Noise
Which are the Condition Monitoring technique outsourced.
Type and no. of equipments covered under Condition Monitoring
plan (Check viz-a-viz OS guidelines).
If Yes, are these techniques employed as per predecided
frequency/schedule (Check viz-a-viz OS guidelines).
Whether the maintenance is acting on the advice of Condition
Monitoring (check randomly).
How many cases, Condition Monitoring helped in optimizing the
P/M schedule?
Whether the PDM coordinator is integrating the reports from various
condition monitoring specialists and generating a comprehensive
report on equipment basis, to help the management in taking
maintenance decision.
Does the frequency of Condition Monitoring technique is reviewed
periodically (If yes, what is the periodicity)?
What is the ratio of PM/Predictive/break down WOCs.
National Thermal Power Corporation Ltd.
Remarks
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Nos.
Nos.
Yes/No
Yes/No
Nos.
Yes/No
Yes/No
Ratio
Page - 86
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
9.
10.
11.
12.
Description
Study trend of major equipment forced outage/ reliability.
Any constraint in implementation of Condition Monitoring
Techniques through computers including assistance from IT.
Any new technique or concept being applied for reliability centered
maintenance.
Effectiveness of condition monitoring/predictive maintenance in
optimizing maintenance cost, if not satisfactory, suggest measures.
Remarks
Status
Status
Status
Status
(iii) Description
Do the work order cards clearly indicate the following?
a) Designation & location of plant or equipment concerned
and equipment code.
b) Details of the defect being recorded (or work being
requisitioned).
c) Degree of urgency with which repairs are required (i.e.
Priority E/A/B/C).
d) Indication of condition under which work can be carried
out, i.e. load reduction, off load, etc.
Remarks
Yes/No
Yes/No
Yes/No
Yes/No
Does the Unit Control Engineer sign the E Priority job Yes/No
cards?
Pick up at random job cards and check.
LUBRICATION SCHEDULE
S.No.
1.
2.
(iv) Description
Does Master Lubrication Schedule available?
How they are maintaining lubricating schedule (oil top up)
and quantity?
Remarks
Yes/No
Page - 87
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
2.
3.
4.
5.
(v) Description
What are the different types of PTW being used in the
station:
a)ROMP (b)SANCTION FOR TEST (c)LWC
(d)P.T.W.(ELECT.) (e)P.T.W.(Mech.)
Do all the different columns of all types of P.T.W. are
properly filled up?
Pick up 2/3 and check.
HOT WORK SAFETY PERMIT
Does the shift charge engineer sign all the hot work safety
permits?
Pick up 2/3 & check.
Does safety ensured during the work?
Is Site following the lock out box philosophy?
If yes,
Check the lock out box in U.C.B. and verify the P.T.W.
issued with box no. issued.
6.
Cross Permit
How cross permits are issued and confirmed the return of all
the permits before trial run is taken.
7.
Danger Tag
Is the danger tag is put on isolated Bkr., or any system?
Remarks
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Pick up the P.T.W. and identify the equipment and find out
the BKR and check that danger tag is fixed or not.
OVERHAULING
S.No.
1.
(vi) Description
Availability of five-year rolling plan with current year.
2.
Is scope of work finalized before the overhaul and made part of Yes/No
the contract.
3.
4.
5.
for
ensuring
availability
Remarks
Yes/No
of Yes/No
Page - 88
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
(vi) Description
Remarks
Availability of engineering declaration before 02 months of unit
Yes/No
overhaul.
Are all points available in Engineering declaration as mentioned
Yes/No
in letter given by OS referring overhaul management book
Vol.2A?
Does overhaul report contain the details given below?
Yes/No
All areas of work.
Yes/No
Spares/consumables used.
Yes/No
Cost of spares/consumables/contract.
Yes/No
Signed protocols of all area.
Yes/No
Areas of improvement in current overhauls from previous
Yes/No
overhaul.
Efficiency reports before/after overhaul.
Yes/No
Vib. Reading before/after overhaul.
Yes/No
Recommissioning details (like current, vib. Etc.) of equipments.
Yes/No
Availability of recommissioning group/check list before unit goes
Yes/No
out of bar.
Availability/ checking of lifting tools (like chain pulley, hoist,
Yes/No
EOT crane, lift, etc.)
Cost benefit analysis of the present overhaul
Yes/No
Whether O/H has been started as per scheduled plan
Yes/No
If deferred , the reason for it and whether the approval of
Yes/No
competent authority has been taken
Fresh program / planning to undertake the O/H of the works
Yes/No
deferred earlier
Whether O/H has been completed as per schedule
Yes/No
If completed beyond scheduled time, the reason for it and
Yes/No
whether the approval of competent authority has been taken
If completed before schedule time, it may be mentioned whether
Yes/No
all the jobs completed or some portion have been left out, if left
out, then the reason for it and whether the approval of competent
authority has been taken
In case some jobs have been left out then, whether any fresh
Yes/No
schedule has been made for these jobs
What system is followed for ensuring zero accident in the plant
Yes/No
during routine maintenance and also during the Overhaul ? If the
system exists, review the same
No. of accidents in the plant during last one year and corrective Mention
measures initiated for avoiding recurrence
brief status
Status of compliance to statutory norms by the plant in %
Date :
Page - 89
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure 6j
Check List of Boiler for Technical Audit
S.No. AREA/ SYSTEM/ SUB-SYSTEM
1
RECORDS
Records of tube thickness survey of all units
Safety valve floating protocol & boiler renewal
document
Checking of cold & hot readings of pipe supports &
hangers protocol
C1, C2 & C3 forms of each BTF
BTF analysis reports from R&D and its
implementation
Clean air test & dirty pitot test
Boiler metal temperature excursion
Lub oil analysis reports for fans & mills
Unit overhaul report
Air heater & mills performance report
Availability of LMI with concerned Engineers & its
awareness
History of all equipments
STATUS
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Yes/ no
Yes /no
Yes/no
Yes/ no
Done/ not
done
Yes /no
Done/ not
done
Done / not
done
Yes /no
ACTION
PLAN
Page - 90
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No. AREA/ SYSTEM/ SUB-SYSTEM
STATUS
Yes/ no
Yes/no
Yes/ no
Av./ not av
Av./ not av.
Av./ not av.
Yes/no
Yes /no
Av./ not av.
Available/ not
av.
Yes/no
Yes/ no
Yes/no
Yes/no
Yes/no
Yes/no
Yes/no
----deg.C
ACTION
PLAN
Page - 91
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No. AREA/ SYSTEM/ SUB-SYSTEM
Mill DP
Availability of hoist for mill maint.
Availability of critical spares
Checking of correct PA flow to the mill by hot K
calibration
FANS, AIR HEATER DUCTS DAMPERS
FANS
Availability of standby lub oil pumps
Availability of hoist for fan maintenance
AIR HEATER
Availability of fire detection system
Availability of standby lub oil pumps
Availability of ALCS
Availability of APH soot blowers
7
8
9
10
11
12
STATUS
Yes/ no
Yes/no
Yes /no
Available/ not
av.
Available/ not
av.
Available/ not
av.
Available/ not
av.
Available/ not
av.
Available/ not
av.
Yes /no
Yes/ no
Yes / no
Available/ not
av.
Available/ not
av.
Available/ Not
Av.
ACTION
PLAN
Page - 92
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
Annexure 6k
Check List of Waste Heat Recovery Boiler for Technical Audit
S.No. AREA/ SYSTEM/ SUB-SYSTEM
1
RECORDS
Records of tube thickness survey of all units (Those
location where thickness measurement is possible, like
bends etc)
Safety valve floating protocol & boiler renewal
document
Checking of cold & hot readings of pipe supports &
hangers protocol
C1, C2 & C3 forms of each BTF
BTF analysis reports from R&D and its
implementation
Boiler metal temperature excursion
Lub oil analysis reports for HP & LP CC pump
Unit overhaul report - Job carried out and next O/H
preparedness
Availability of LMI with concerned Engineers & its
awareness
History of all equipments
Any Modification done
Maintenance Practices
Tools & Tackles
All failed tube samples being sent to OS (CC) for
analysis
WHRB TUBE FAILURE
No. of BTF in each unit
Adequacy of tube thickness survey depending upon
approach
Replacement of tubes whose thickness is less than
recommended
Involvement of FQA during thickness survey
Cleaning of tube for better heat transfer
Analysis by site BTF committee
Implementation of OS guidelines / action plan during
OH for BTF reduction
Mapping of Boiler tube failures
STATUS
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Available/not
av.
Yes/ no
Yes /no
Yes/no
Yes/ no
Yes/ no
Done/ not
done
Yes /no
Done/ not
ACTION
PLAN
Page - 93
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No. AREA/ SYSTEM/ SUB-SYSTEM
DPT & random radiography of Stub joints during O/H
STATUS
done
Done / not
done
Yes /no
Yes/ no
Yes/ no
Available/ not
av.
Available/ not
av.
Yes /no
Yes/ no
ACTION
PLAN
Page - 94
COS-ISO-00-OGN/GEN/004
Rev. No.: 0
Guidelines for Conducting Technical Audit
S.No. AREA/ SYSTEM/ SUB-SYSTEM
Availability of gates/dampers in operating condition
STATUS
Yes / no
ACTION
PLAN
Rihand
2. General Manager
Vindhyachal
3. General Manager
Kahalgaon
4. General Manager
Farakka
5. General Manager
6. General Manager
Unchahar
7. General Manager
Korba
8. General Manager
Ramagundam
9. General Manager
Badarpur
Talcher Kaniha
Anta
Kawas
Simhadri
Singrauli
Auraiya
Talcher Thermal
Jhanor Gandhar
Tanda
Kayamkulam
Faridabad
UNCONTROLLED
II Regional Head Quarters
21. Executive Director (NR), Lucknow
22. Executive Director (SR), Hyderabad
23. Executive Director (WR), Mumbai
24. Executive Director (ER), Patna
25. Executive Director (NCR), New Delhi
IV
Head of O&M
36. Singrauli
37. Korba
40. Ramagundam
41. Farakka
40. Vindhyachal
41. Rihand
42. Kahalgaon
43. Dadri(Coal)
44. Unchahar
47.Talcher Thermal
47. Badarpur
48. Simhadri
49. Auraiya
50. Anta
51. Kawas
54. Kayamkulam
55. Faridabad