Sie sind auf Seite 1von 34

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN.

REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Caterpillar S.A.R.L.
Allied Engineering & Services LTD

CUSTOMER :
B

ORDER :

8120005215

PROJECT

Mazar - e - Sharif

ITEM :

10100

SWITCHGEAR NAME :

Switchgear 1

SWITCHGEAR TYPE :

UniSec 17.5kV / 50Hz -1250A - 25kA x 1s

DOCUMENT :

CIRCUIT DIAGRAM
=H01 =H04,=H18 =H21 GENERATORS

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

External doc. id.

Title

HEADING PAGE

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

A01

DCC
&ELH
Cont.

A02

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

INDEX OF SHEETS

REVISION

A01

HEADING PAGE

A02

INDEX OF SHEETS AND STANDARD REFERENCES

A03

REVISIONS LIST

A04

REFERENCE DESIGNATIONS

A05

REFERENCE DESIGNATIONS

A06

REFERENCE DESIGNATIONS

A07

REFERENCE DESIGNATIONS

D01

DISTRIBUTION OF AUXILIARY CIRCUITS

M01

CONTROL CIRCUITS

Q01

AVAILABLE CONTACTS

Q02

AVAILABLE CONTACTS

Q03

AVAILABLE CONTACTS

Q04

AVAILABLE CONTACTS

Q05

AVAILABLE CONTACTS

S01

MAIN CIRCUITS

S02

MAIN CIRCUITS

X01

TERMINAL BLOCK -XDA

X02

TERMINAL BLOCK -XDB1

X03

TERMINAL BLOCK -XDB1

X04

TERMINAL BLOCK -XDC1

X05

TERMINAL BLOCK -XDC1

X06

TERMINAL BLOCK -XDC4

X07

TERMINAL BLOCK -XDC5

X08

TERMINAL BLOCK -XDC8

X09

TERMINAL BLOCK -XDE

X10

TERMINAL BLOCK -XDI1

X11

TERMINAL BLOCK -XDI2

X12

TERMINAL BLOCK -XDI9

X13

TERMINAL BLOCK -XDT

X14

TERMINAL BLOCK -XDV

X15

TERMINAL BLOCK -XDX

X16

TERMINAL BLOCK -XDX1

Z01

MATERIAL LIST

Z02

MATERIAL LIST

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

STANDARD REFERENCES

DESCRIPTION

SHEET

THIS DRAWING IS IN COMPLIANCE WITH THE FOLLOWING INTERNATIONAL STANDARDS:


- IEC 60617: GRAPHICAL SYMBOLS FOR DIAGRAMS
- IEC 61082: PREPARATION OF DOCUMENTS USED IN ELECTROTECHNOLOGY
- IEC 81346: STRUCTURING PRINCIPLES AND REFERENCE DESIGNATIONS

THE DIAGRAM INDICATES COMPONENTS HAVING A MOVABLE PART IN THE FOLLOWING POSITION OR
OPERATIONAL STATE (IEC 61082-1 7.4.4.1):
- C.BREAKER OR CONTACTOR IN OPEN (OFF) AND SERVICE POSITION
- DISCONNECTORS AND EARTHING SWITCH IN OPEN POSITION
- WITHDRAWABLE VOLTAGE TRANSFORMERS IN CONNECTED POSITION
- CLOSING SPRINGS OF C.BREAKER IN DISCHARGED POSITION
- CONNECTOR OF C.BREAKER AUXILIARY CIRCUITS IN CONNECTED POSITION
- CIRCUITS IN DE-ENERGIZED STATE
- RELAYS IN NON-ACTUATED STATE
- GAS PRESSURE AT RATED SERVICE VALUE
- FUSES NOT OPERATED
- DOORS AND PRESSURE RELIEF FLAPS IN CLOSED POSITION

Title

2012-11-08

INDEX OF SHEETS AND STANDARD REFERENCES


Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

2012-11-08

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

A02

DCC
&EFS
Cont.

A03

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

REVISIONS LIST
A

DESCRIPTION

DATE

PREPARED

APPROVED

FIRST ISSUE

2012-11-08

TASCA

QUARENGHI

CUSTOMER COMMENTS

2012-11-19

TASCA

QUARENGHI

C
D
B

F
G
H
I
L

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

REVISIONS LIST

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

A03

DCC
&EFS
Cont.

A04

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

REFERENCE DESIGNATION OF OBJECTS IN


ELECTRICAL DOCUMENTS

(IN COMPLIANCE WITH STANDARD IEC 81346-2 AND ABB TECHNICAL STANDARD 2NBA000001)
DESIGNATION

DESCRIPTION

-BGB5

POSITION SWITCH OF CIRCUIT-BREAKER SIGNALLING UNDERVOLTAGE RELEASE ENERGIZED

-BGB6

POSITION SWITCH OF CIRCUIT-BREAKER SIGNALLING UNDERVOLTAGE RELEASE EXCLUDED


MECHANICALLY

-BGB7

POSITION SWITCHES OF CIRCUIT-BREAKER ON SWITCHGEAR

-BGB8...-BGB10

POSITION SWITCHES OF CIRCUIT-BREAKER

-BGB11

POSITION SWITCH OF CIRCUIT-BREAKER OPERATING FOR MANUAL OPENING

-AA

MULTIFUNCTION UNIT (CENTRAL UNIT)

-BGB12

PROXIMITY SWITCH SIGNALLING CIRCUIT-BREAKER IN OPEN POSITION

-BAD1,-BAD4

CAPACITIVE VOLTAGE DIVIDER LOCATED ON PHASE L1

-BGB13

PROXIMITY SWITCH SIGNALLING CIRCUIT-BREAKER IN CLOSED POSITION

-BAD2,-BAD5

CAPACITIVE VOLTAGE DIVIDER LOCATED ON PHASE L2

-BGD

POSITION SWITCH OF L.V. INSTRUMENT COMPARTMENT DOOR.

-BAD3,-BAD6

CAPACITIVE VOLTAGE DIVIDER LOCATED ON PHASE L3

-BGD1

POSITION SWITCH OF CIRCUIT-BREAKER COMPARTMENT DOOR

-BAR

VOLTAGE PROTECTION RELAY

-BGD2

POSITION SWITCH OF CABLE COMPARTMENT DOOR

-BAS1

VOLTAGE SENSOR LOCATED ON PHASE L1

-BGE1

POSITION SWITCHES SIGNALLING EARTHING SWITCH -QCE IN OPEN POSITION

-BAS2

VOLTAGE SENSOR LOCATED ON PHASE L2

-BGE2

POSITION SWITCHES SIGNALLING EARTHING SWITCH -QCE IN CLOSED POSITION

-BAS3

VOLTAGE SENSOR LOCATED ON PHASE L3

-BGE3

-BAT1

VOLTAGE TRANSFORMER LOCATED ON PHASE L1

POSITION SWITCHES SIGNALLING EARTHING SWITCH -QCE IN OPEN POSITION AND NOT IN OPERATION
(OPERATING LEVER NOT INSERTED)

-BAT2

VOLTAGE TRANSFORMER LOCATED ON PHASE L2

-BAT3

VOLTAGE TRANSFORMER LOCATED ON PHASE L3

-BAT4

VOLTAGE TRANSFORMER IN BUSBAR COMPARTMENT LOCATED ON PHASE L1

-BAT5

VOLTAGE TRANSFORMER IN BUSBAR COMPARTMENT LOCATED ON PHASE L2

-BAT6

VOLTAGE TRANSFORMER IN BUSBAR COMPARTMENT LOCATED ON PHASE L3

-BCD

DIFFERENTIAL PROTECTIVE RELAY

-BCF

FEEDER PROTECTION RELAY

-BCG

GENERATOR PROTECTION RELAY

-BCM

MOTOR PROTECTION RELAY

-BCN

NEUTRAL (RESIDUAL) CURRENT TRANSFORMER

-BGE4

POSITION SWITCHES OF OPERATION OF EARTHING SWITCH -QCE ACTUATED BY ELECTRIC MOTOR

-BGE5

POSITION SWITCHES OF OPERATION OF EARTHING SWITCH -QCE1 OR -QCE2 ACTUATED BY ELECTRIC


MOTOR

-BGE7

POSITION SWITCH SIGNALLING EARTHING SWITCH NOT IN MANUAL OPERATION

-BGE8

POSITION SWITCHES OF EARTHING SWITCH -QCE SUPPLIED TOGETHER WITH SWITCH- DISCONNECTOR
-QBS

-BGE11

POSITION SWITCHES SIGNALLING EARTHING SWITCH -QCE1 OR -QCE2 IN OPEN POSITION

-BGE12

POSITION SWITCHES SIGNALLING EARTHING SWITCH -QCE1 OR -QCE2 IN CLOSED POSITION

-BGE13

POSITION SWITCHES SIGNALLING EARTHING SWITCH -QCE1 OR -QCE2 IN OPEN POSITION AND NOT IN
OPERATION (OPERATING LEVER NOT INSERTED)

-BGE14, -BGE15

POSITION SWITCHES FOR OPERATION OF EARTHING SWITCH -QCE SUPPLIED TOGETHER WITH
SWITCH-DISCONNECTOR -QBS, ACTUATED BY ELECTRIC MOTOR
POSITION SWITCHES OF MEDIUM VOLTAGE FUSES

-BCP

TRANSFORMER PROTECTION RELAY

-BCR

CURRENT PROTECTION RELAY

-BCS1

CURRENT SENSOR LOCATED ON PHASE L1

-BGF

-BCS2

CURRENT SENSOR LOCATED ON PHASE L2

-BGI1

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD IN OPEN POSITION

-BCS3

CURRENT SENSOR LOCATED ON PHASE L3

-BGI2

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD IN CLOSED POSITION

-BCT1

CURRENT TRANSFORMER LOCATED ON PHASE L1

-BGI3

-BCT2

CURRENT TRANSFORMER LOCATED ON PHASE L2

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD IN OPEN POSITION AND NOT IN OPERATION
(OPERATING LEVER NOT INSERTED)
POSITION SWITCHES OF OPERATION OF DISCONNECTOR -QBD1 ACTUATED BY ELECTRIC MOTOR

-BCT3

CURRENT TRANSFORMER LOCATED ON PHASE L3

-BGI4

-BCT4,-BCT7

CURRENT TRANSFORMER LOCATED ON PHASE L1

-BGI5

POSITION SWITCHES OF OPERATION OF DISCONNECTOR -QBD2 ACTUATED BY ELECTRIC MOTOR

-BCT5,-BCT8

CURRENT TRANSFORMER LOCATED ON PHASE L2

-BGI6

-BCT6,-BCT9

CURRENT TRANSFORMER LOCATED ON PHASE L3

POSITION SWITCH SIGNALLING DISCONNECTOR (OR SWITCH-DISCONNECTOR) -QBD NOT IN EMERGENCY


MANUAL OPERATION

-BCZ

DISTANCE PROTECTION RELAY

-BGI7

POSITION SWITCH SIGNALLING DICONNECTOR (OR SWITCH-DISCONNECTOR) -QBD NOT IN MANUAL


OPERATION

-BGI8

POSITION SWITCHES OF SWITCH-DISCONNECTOR -QBS

-BGI9

POSITION SWITCHES OF OPERATION OF SWITCH-DISCONNECTOR -QBS ACTUATED BY ELECTRIC MOTOR

-BEF

FREQUENCY PROTECTION RELAY

-BER

SUPERVISION RELAYS

-BES

SYNCHRONIZING RELAY

-BET

THERMAL PROTECTION RELAY

-BGI11

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD1 IN OPEN POSITION

-BGA1

POSITION SWITCH FOR DETECTION OF INTERNAL ARCING IN CIRCUIT-BREAKER COMPARTMENT

-BGI12

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD1 IN CLOSED POSITION

-BGA2

POSITION SWITCH FOR DETECTION OF INTERNAL ARCING IN BUSBAR COMPARTMENT (SINGLE BUSBAR
SYSTEM) OR IN FRONT BUSBAR COMPARTMENT (DOUBLE BUSBAR SYSTEM)

-BGI13

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD1 IN OPEN POSITION AND NOT IN OPERATION
(OPERATING LEVER NOT INSERTED)

-BGA3

POSITION SWITCH FOR DETECTION OF INTERNAL ARCING IN CABLE COMPARTMENT

-BGI14, -BGI15

POSITION SWITCHES OF OPERATION OF DISCONNECTOR -QBD1 ACTUATED BY ELECTRIC MOTOR

-BGA4

POSITION SWITCH FOR DETECTION OF INTERNAL ARCING IN REAR BUSBAR COMPARTMENT (DOUBLE
BUSBAR SYSTEM)

-BGI21

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD2 IN OPEN POSITION

-BGI22

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD2 IN CLOSED POSITION

-BGI23

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD2 IN OPEN POSITION AND NOT IN OPERATION
(OPERATING LEVER NOT INSERTED)

-BGI24, -BGI25

POSITION SWITCHES OF OPERATION OF DISCONNECTOR -QBD2 ACTUATED BY ELECTRIC MOTOR

-BGB1...-BGB3

POSITION SWITCHES OF CIRCUIT-BREAKER

-BGB4

POSITION SWITCH OF CIRCUIT-BREAKER: PASSING CONTACT CLOSING MOMENTARILY WHEN THE


BREAKER OPENS

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

External doc. id.

Title

REFERENCE DESIGNATIONS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

A04

DCC
&EFS
Cont.

A05

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

-BGI31

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD3 IN OPEN POSITION

-CA

CAPACITORS

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD3 IN CLOSED POSITION

-CA1

CAPACITOR FOR FRONT VENTILATOR

-BGI33

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD3 IN OPEN POSITION AND NOT IN OPERATION
(OPERATING LEVER NOT INSERTED)

-CA2

CAPACITOR FOR REAR VENTILATOR

-EA1

LIGHTING LAMP LOCATED IN L.V. INSTRUMENT COMPARTMENT.

-BGI41...

POSITION SWITCHES SIGNALLING SWITCH-DISCONNECTOR -QBS CLOSED IN FEEDER POSITION

-EA2

LIGHTING LAMP LOCATED IN CABLE COMPARTMENT

-BGI42

POSITION SWITCHES SIGNALLING SWITCH-DISCONNECTOR -QBS IN OPEN POSITION

-BGI43...

POSITION SWITCHES SIGNALLING SWITCH-DISCONNECTOR -QBS CLOSED IN EARTH POSITION

-EA3

LIGHTING LAMP LOCATED IN OPERATING MECHANISM ENCLOSURE

-EA4

LIGHTING LAMP LOCATED IN CIRCUIT BREAKER COMPARTIMENT

-EB1

HEATER LOCATED IN CABLE COMPARTMENT

-EB2

HEATER LOCATED IN CIRCUIT-BREAKER COMPARTMENT

-BGI51

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD5 CLOSED IN FEEDER POSITION

-EB3

HEATER LOCATED IN MOTOR CABINET

-BGI52

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD5 IN OPEN POSITION

-EB4

HEATER FOR VENTILATION TEST

-BGI53

POSITION SWITCHES SIGNALLING DISCONNECTOR -QBD5 CLOSED IN EARTH POSITION

-EB5

HEATER LOCATED IN L.V. INSTRUMET COMPARTMENT.

-BGK

POSITION SWITCH OF KEY LOCK

-EB7

HEATERS LOCATED IN LEFT SIDE OF THE OPERATING MECHANISM ENCLOSURE


HEATERS LOCATED IN RIGHT SIDE OF THE OPERATING MECHANISM ENCLOSURE

POSITION SWITCH OF ELECTROMECHANICAL LOCK -RLE1

-EB8

-BGS1...-BGS4

POSITION SWITCHES OF CIRCUIT-BREAKER SPRINGS

-FA1

SURGE ARRESTER LOCATED ON PHASE L1

-BGS5

PROXIMITY SWITCH SIGNALLING SPRINGS IN CHARGED POSITION

-FA2

SURGE ARRESTER LOCATED ON PHASE L2

-BGT1

POSITION SWITCHES ON TRUCK SIGNALLING TRUCK IN SERVICE POSITION

-FA3

SURGE ARRESTER LOCATED ON PHASE L3

-BGT2

POSITION SWITCHES ON TRUCK SIGNALLING TRUCK IN TEST POSITION

-FCD

FUSE-DISCONNECTORS FOR PROTECTION OF AUXILIARY CIRCUITS

-BGT3

POSITION SWITCH ON TRUCK SIGNALLING TRUCK NOT IN ISOLATING TRAVEL POSITION

-FCF1

MEDIUM VOLTAGE FUSE LOCATED ON PHASE L1

-BGT4

POSITION SWITCHES ON SWITCHGEAR SIGNALLING TRUCK IN SERVICE POSITION

-FCF2

MEDIUM VOLTAGE FUSE LOCATED ON PHASE L2

-BGT5

POSITION SWITCHES ON SWITCHGEAR SIGNALLING TRUCK IN TEST POSITION

-FCF3

MEDIUM VOLTAGE FUSE LOCATED ON PHASE L3

-BGT6

POSITION SWITCHES SIGNALLING V.T. TRUCK IN SERVICE POSITION

-FCM1

-BGT7

POSITION SWITCHES SIGNALLING V.T. TRUCK IN TEST POSITION

MINIATURE CIRCUIT-BREAKER FOR PROTECTION OF SPRINGS CHARGING MOTOR ON MAIN


CIRCUIT-BREAKER

-FCM2...-FCM10

MINIATURE CIRCUIT-BREAKERS FOR PROTECTION OF AUXILIARY CIRCUITS

-BGT8

POSITION SWITCHES SIGNALLING EARTHING TRUCK IN SERVICE POSITION

-BGT11

PROXIMITY SWITCH SIGNALLING TRUCK IN SERVICE POSITION

-BGT12

-BGI32

-BGL1

PROXIMITY SWITCH SIGNALLING TRUCK IN TEST POSITION

-BGV1

POSITION SWITCH OF FRONT VENTILATOR

-BGV2

POSITION SWITCH OF REAR VENTILATOR

-BM

HYGROSTAT

-BPA4

PRESSURE SWITCH LOCATED IN CABLE COMPARTMENT FOR DETECTION OF INTERNAL ARCING

-BPA5

PRESSURE SWITCH LOCATED IN CIRCUIT-BREAKER OR IN UPPER VT COMPARTMENT FOR DETECTION OF


INTERNAL ARCING

-FCM11

MINIATURE CIRCUIT-BREAKER FOR PROTECTION OF VENTILATOR -MV1

-FCM12

MINIATURE CIRCUIT-BREAKER FOR PROTECTION OF VENTILATOR -MV2

-FCM13

MINIATURE CIRCUIT-BREAKER FOR PROTECTION OF VENTILATOR -MV3

-FCT

THERMAL OVERLOAD RELEASES

-GA

GENERATORS

-GQ1

FRONT VENTILATOR

-GQ2

REAR VENTILATOR

-GQ3

VENTILATOR LOCATED ON CIRCUIT-BREAKER TRUCK


AUXILIARY RELAY SIGNALLING LOW GAS PRESSURE

-BPA6

PRESSURE SWITCH LOCATED IN BUSBAR OR IN BUSBAR AND CIRCUIT-BREAKER COMPARTMENT FOR


DETECTION OF INTERNAL ARCING

-KFA1
-KFA2

AUXILIARY RELAY SIGNALLING INSUFFICIENT GAS PRESSURE

-BPA7

PRESSURE SWITCH LOCATED IN VOLTAGE TRANSFORMER ISOLATING COMPARTMENT FOR DETECTION OF


INTERNAL ARCING

-KFA3...-KFA9

AUXILIARY RELAYS OR CONTACTORS

-KFC

CLOSING RELAYS OR CONTACTORS

-BPS1

PRESSURE SWITCH LOCATED ON CIRCUIT-BREAKER OR ON POLE OF PHASE L1 OF CIRCUIT-BREAKER

-KFI

INTEGRATED CIRCUITS

-BPS2

PRESSURE SWITCH LOCATED ON CIRCUIT-BREAKER POLE OF PHASE L2

-KFL

LOCKOUT RELAY

-BPS3

PRESSURE SWITCH LOCATED ON CIRCUIT-BREAKER POLE OF PHASE L3

-KFM

MICROPROCESSORS
ANTIPUMPING RELAYS

-BR

FLAME DETECTORS, SMOKE DETECTORS

-KFN

-BT

THERMOSTAT

-KFO

OPENING RELAYS OR CONTACTORS

-BT1

THERMOSTAT FOR DE-ENERGIZATION OF VENTILATORS

-KFP

PROGRAMMABLE LOGIC CONTROLLERS (PLC)

-BT2

THERMOSTAT FOR ENERGIZATION OF VENTILATORS

-KFR

RECLOSING RELAYS

-BT3

THERMOSTAT SIGNALLING HIGH TEMPERATURE ALARM

-KFS

SYNCHRONIZING DEVICES

-BU

BUCHHOLZ RELAY

-KFT

AUXILIARY TIME RELAYS, DELAY ELEMENTS

-BX1

UNIT WITH SENSORS FOR DETECTION OF INTERNAL ARCING

-KFZ

CONTROLLERS

-BX2

ADDITIONAL CURRENT SENSING UNIT FOR DETECTION OF INTERNAL ARCING

-MBC

CLOSING RELEASE OF CIRCUIT-BREAKER

-BZ,-BZ4

MULTIFUNCTION SENSORS

-MAD

MOTOR FOR ELECTRICAL OPERATION OF DISCONNECTOR -QBD

-BZ1

COMBINED CURRENT AND VOLTAGE SENSOR, LOCATED ON PHASE L1

-MAD1

MOTOR FOR ELECTRICAL OPERATION OF DICONNECTOR -QBD1

-BZ2

COMBINED CURRENT AND VOLTAGE SENSOR, LOCATED ON PHASE L2

-MAD2

MOTOR FOR ELECTRICAL OPERATION OF DICONNECTOR -QBD2

-BZ3

COMBINED CURRENT AND VOLTAGE SENSOR, LOCATED ON PHASE L3

-MAD9

MOTOR FOR ELECTRICAL OPERATION OF SWITCH-DISCONNECTOR -QBS

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

External doc. id.

Title

REFERENCE DESIGNATIONS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

A05

DCC
&EFS
Cont.

A06

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

-MAE

MOTOR FOR ELECTRICAL OPERATION OF EARTHING SWITCH -QCE

-QBH

MANUAL CIRCUIT-BREAKERS

-MAE1

MOTOR FOR ELECTRICAL OPERATION OF EARTHING SWITCH -QCE1 OR -QCE2

-QBL

LINKS

-MAE8

MOTOR FOR ELECTRICAL OPERATION OF EARTHING SWITCH -QCE SUPPLIED TOGETHER WITH
SWITCH-DISCONNECTOR -QBS

-QBM

MINIATURE SWITCH-DISCONNECTORS

-QBS

SWITCH-DISCONNECTORS

MOTOR FOR CIRCUIT-BREAKER SPRINGS CHARGING

-QBT

TRUCK

-MAS

-MAT

MOTOR FOR ELECTRICAL OPERATION OF TRUCK RACKING-IN/OUT

-QCA

EARTHING SWITCH FOR ELIMINATION OF INTERNAL ARCING

-MBC

CLOSING RELEASE OF CIRCUIT-BREAKER

-QCE

EARTHING SWITCH

-MBC4

CLOSING RELEASE OF SWITCH-DISCONNECTOR -QBS

-QCE1

-MBO1

FIRST OPENING RELEASE OF CIRCUIT-BREAKER

EARTHING SWITCH OF BUSBARS (SINGLE BUSBAR SYSTEM) OR OF FRONT BUSBARS (DOUBLE BUSBAR
SYSTEM)

-MBO2

SECOND OPENING RELEASE OF CIRCUIT-BREAKER

-QCE2

EARTHING SWITCH OF REAR BUSBARS (DOUBLE BUSBAR SYSTEM)

-MBO3

OPENING SOLENOID FOR OVERCURRENT RELEASE OF CIRCUIT-BREAKER OR INDIRECT OVERCURRENT


RELEASE ON CIRCUIT-BREAKER

-QQ

CLUTCHES

-RAA

ANTIFERRORESONANCE RESISTOR

-MBO4

OPENING RELEASE OF SWITCH-DISCONNECTOR -QBS

-RAD

DIODES

-MBU

UNDERVOLTAGE RELEASE OF CIRCUIT-BREAKER

-RAI

INDUCTORS

-PFB

BLUE SIGNAL LAMPS

-RAR

RESISTORS

-PFF

FLAG RELAYS

-RF

FILTERS

-PFG

GREEN SIGNAL LAMPS

-RLE1

ELECTROMECHANICAL LOCK PREVENTING CIRCUIT-BREAKER CLOSING

-PFR

RED SIGNAL LAMPS

-RLE2

ELECTROMECHANICAL LOCK PREVENTING TRUCK RACKING-IN/OUT

-PFS

SHORT CIRCUIT INDICATORS

-RLE3

-PFV

VOLTAGE INDICATORS

ELECTROMECHANICAL LOCK PREVENTING INSERTION OF LEVER FOR CLOSING OPERATION OF EARTHING


SWITCH -QCE

-PFV1

VOLTAGE INDICATORS ON FEEDER SIDE

-RLE4

ELECTROMECHANICAL LOCK PREVENTING THE DOOR OPENING OPERATION

-PFV2

VOLTAGE INDICATORS ON BUSBAR SIDE

-RLE5

ELECTROMECHANICAL LOCK PREVENTING OPERATION OF DISCONNECTOR -QBD

-PFW

WHITE SIGNAL LAMPS

-RLE6

-PFX

CROSS INDICATORS, ELECTROMECHANICAL INDICATORS

ELECTROMECHANICAL LOCK PREVENTING INSERTION OF LEVER FOR CLOSING OPERATION OF


DISCONNECTOR -QBD1

-PFY

YELLOW SIGNAL LAMPS

-RLE7

-PGA

AMMETERS

ELECTROMECHANICAL LOCK PREVENTING INSERTION OF LEVER FOR CLOSING OPERATION OF


DISCONNECTOR -QBD2

-PGC

COUNTERS

-RLE8

ELECTROMECHANICAL LOCK PREVENTING INSERTION OF LEVER FOR CLOSING OPERATION OF EARTHING


SWITCH -QCE1 OR -QCE2

-PGF

FREQUENCYMETERS

-RLE9

-PGH

HOURMETERS

ELECTROMECHANICAL LOCK PREVENTING OPERATION OF SWITCH-DISCONNECTOR


-QBS

-PGI

PROTECTION AND CONTROL UNIT: HUMAN MACHINE INTERFACE

-RLE11

-PGI1

HUMAN MACHINE INTERFACE OF ELECTRONIC CONTROLLED CIRCUIT-BREAKER (ON CIRCUIT-BREAKER)

ELECTROMECHANICAL LOCK PREVENTING INSERTION OF LEVER FOR OPERATION OF DISCONNECTOR


-QBD4

-RLE12
-PGI2

HUMAN MACHINE INTERFACE FOR ELECTRONIC CONTROLLED CIRCUIT-BREAKER (ON SWITCHGEAR)

ELECTROMECHANICAL LOCK PREVENTING INSERTION OF LEVER FOR OPERATION OF DISCONNECTOR


-QBD5

-PGJ

ACTIVE ENERGY METERS

-SFA

AMMETRIC SWITCHES

-PGK

REACTIVE ENERGY METERS

-SFC

CONTROL SWITCHES, CLOSING PUSH-BUTTONS

-PGM

MULTIFUNCTION INDICATORS

-SFL

LOCKING CONTACTS

-PGP

POWER-FACTOR METERS

-SFO

OPENING PUSH-BUTTONS

-PGQ

VARMETERS

-SFR

RESET PUSH-BUTTONS

-PGS

SYNCHRONOSCOPES

-SFS

SELECTOR SWITCHES

-PGV

VOLTMETERS

-SFT

TEST PUSH-BUTTONS

-PGW

WATTMETERS

-SFU

UNLOCKING PUSH-BUTTONS

-PJ

ACOUSTICAL SIGNAL DEVICES (BELLS, SIRENS)

-SFV

VOLTMETRIC SWITCHES

-QAB

CIRCUIT-BREAKERS

-TA

POWER TRANSFORMERS

-QAC

CONTACTORS (FOR POWER)

-TB

CONVERTER

-QBD

DISCONNECTORS

-TB1

RECTIFIER FOR FIRST OPENING RELEASE

-QBD1

FRONT BUSBAR DISCONNECTORS (DOUBLE BUSBAR SYSTEM)

-TB2

RECTIFIER FOR SECOND OPENING RELEASE

-QBD2

REAR BUSBAR DISCONNECTORS (DOUBLE BUSBAR SYSTEM)

-TB3

RECTIFIER FOR CLOSING RELEASE

-QBD3

FEEDER DISCONNECTORS (DOUBLE BUSBAR SYSTEM)

-TB4

RECTIFIER FOR ELECTROMECHANICAL LOCK PREVENTING CIRCUIT-BREAKER CLOSING

-QBD4

TWO-WAY DISCONNECTOR

-TB5

RECTIFIER FOR ELECTROMECHANICAL LOCK PREVENTING TRUCK RACKING-IN/OUT

-QBD5

TWO-WAY DISCONNECTOR ON BUSBAR RISER

-TB6

RECTIFIER FOR UNDERVOLTAGE RELEASE

-TB7

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

ERECTIFIER FOR INDIRECT OVERCURRENT RELEASE ON CIRCUIT-BREAKER

External doc. id.

Title

REFERENCE DESIGNATIONS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

A06

DCC
&EFS
Cont.

A07

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

-TFA

ACTIVE POWER TRANSDUCERS

-XDI1

TERMINAL BLOCK FOR INTERCONNECTIONS OF CONTROL CIRCUITS

-TFC

CURRENT TRANSDUCERS

-XDI2

-TFF

FREQUENCY TRANSDUCERS

-TFJ

ACTIVE ENERGY TRANSDUCERS

TERMINAL BLOCK FOR INTERCONNECTIONS OF CIRCUITS OF MOTOR FOR CIRCUIT-BREAKER SPRINGS


CHARGING
TERMINAL BLOCK FOR INTERCONNECTIONS OF CIRCUITS OF MOTOR FOR SWITCH-DISCONNECTOR
OPERATION

-TFK

REACTIVE ENERGY TRANSDUCERS

-XDI4

TERMINAL BLOCK FOR INTERCONNECTIONS OF A.C. AUXILIARY CIRCUITS.

-TFM

MULTIFUNCTION TRANSDUCERS

-XDI6

TERMINAL BLOCK FOR INTERCONNECTION (CONNECTION BETWEEN PANELS) OF VOLTAGE CIRCUITS

-TFP

POWER-FACTOR TRANSDUCERS

-TFQ

REACTIVE POWER TRANSDUCERS

-XDI7

TERMINAL BLOCK FOR INTERCONNECTION OF MOD-BUS

-TFS

SIGNAL CONVERTERS

-XDJ

TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF DISCONNECTORS -QBD

-TFV

VOLTAGE TRANSDUCERS

-XDJ1

TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF SWITCH-DISCONNECTOR -QBS

-WA

BUSBARS

-XDM

TERMINAL BLOCKS FOR MEASURING TEST

-WBC

POWER CABLES

-XDS

CURRENT SOCKETS

-WE

EARTHING CABLES FOR L.V. INSTRUMENT COMPARTMENT.

-XDT

TERMINAL BLOCK FOR POSITION CONTACTS OF TRUCK AND OF CONNECTOR -XDB

-WGC

CONTROL CABLES

-XDU

CONNECTOR FOR ISOLATION OF CIRCUITS OF LOWER VOLTAGE TRANSFORMER TRUCK

-WGS

COMMUNICATION CABLES (SHIELDED TWISTED PAIRS)

-XDU1

TERMINAL BLOCK FOR CIRCUITS OF LOWER VOLTAGE TRANSFORMER TRUCK

-WH

OPTICAL FIBRES

-XDV

TERMINAL BLOCK FOR CIRCUITS OF VOLTAGE TRANSFORMERS

-XDA

TERMINAL BLOCK FOR CIRCUITS OF CURRENT TRANSFORMERS

-XDV1

CONNECTOR FOR CIRCUITS OF VOLTAGE TRANSFORMERS LOCATED ON PHASE L1

-XDA1

CONNECTOR FOR CIRCUITS OF CURRENT TRANSFORMERS LOCATED ON PHASE L1

-XDV2

CONNECTOR FOR CIRCUITS OF VOLTAGE TRANSFORMERS LOCATED ON PHASE L1

-XDA2

CONNECTOR FOR CIRCUITS OF CURRENT TRANSFORMERS LOCATED ON PHASE L1

-XDV3

CONNECTOR FOR CIRCUITS OF VOLTAGE TRANSFORMERS LOCATED ON PHASE L1

-XDA3

CONNECTOR FOR CIRCUITS OF CURRENT TRANSFORMERS LOCATED ON PHASE L1

-XDV4

CONNECTOR FOR CIRCUITS OF ANTIFERRORESONANCE RESISTOR

-XDA5

CONNECTOR FOR CIRCUITS OF NEUTRAL (RESIDUAL) CURRENT TRANSFORMER

-XDX

SUPPORT TERMINAL BLOCK

-XDB

CONNECTOR FOR ISOLATION OF CIRCUIT-BREAKER (OR UPPER VOLTAGE TRANSFORMER TRUCK)


AUXILIARY CIRCUITS

-XE1

EARTHING TERMINAL BLOCKS FOR LV COMPARTMENT, LEFT SIDE

-XE2

EARTHING TERMINAL BLOCKS FOR LV COMPARTMENT, RIGHT SIDE

-XDB1

CONNECTOR FOR AUXILIARY CIRCUITS OF CIRCUIT-BREAKER (OR UPPER VOLTAGE TRANSFORMER TRUCK)

-XE5

EARTHING TERMINAL BLOCKS FOR MV COMPARTMENT, VOLTAGE INDICATOR SIDE

-XE6

EARTHING TERMINAL BLOCKS FOR MV COMPARTMENT, REAR BOTTOM SIDE

-XDB2

CONNECTOR FOR ADDITIONAL AUXILIARY CIRCUITS OF CIRCUIT-BREAKER

-XE7

EARTHING TERMINAL BLOCKS FOR MV COMPARTMENT, LEFT SIDE

-XDB10...-XDB89

CONNECTOR FOR CIRCUIT-BREAKER INTERNAL CIRCUITS

-XE8

EARTHING TERMINAL BLOCKS FOR MV COMPARTMENT, FRONT BOTTOM SIDE

-XDB7

CONNECTOR FOR TRUCK POSITION CONTACTS

-XE9

EARTHING TERMINAL BLOCK FOR TRANSFORMERS IN BUSBAR COMPARTMENT

-XDB91

CONNECTOR FOR OPENING RELEASE CIRCUITS OF SWITCH-DISCONNECTOR

-XDB92

CONNECTOR FOR CLOSING RELEASE CIRCUITS OF SWITCH-DISCONNECTOR

-XDI3

-XDB93

CONNECTOR FOR POSITION SWITCHES OF SWITCH-DISCONNECTOR

-XDB95

CONNECTOR FOR CIRCUITS OF EARTHING SWITCH LOCKING MAGNET

-XDC

CUSTOMER TERMINAL BLOCK

-XDC1

CUSTOMER TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF CIRCUIT BREAKER

-XDC2

CUSTOMER TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF SWITCH-DISCONNECTOR

-XDC3

CUSTOMER TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF PROTECTION RELAY AND MULTIFUNCTION UNIT

-XDC4

CUSTOMER TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF VOLTAGE TRANSFORMERS

-XDC5

CUSTOMER TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF MINIATURE CIRCUIT BREAKER


TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF EARTHING SWITCH -QCE

-XDE1

TERMINAL BLOCK FOR INTERNAL CIRCUITS OF EARTHING SWITCH -QCE

-XDE2

TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF EARTHING SWITCH -QCE1 OR -QCE2

-XDE3

TERMINAL BLOCK FOR INTERNAL CIRCUITS OF EARTHING SWITCH -QCE1 OR -QCE2

-XDF

TERMINAL BLOCK FOR AUXILIARY CIRCUITS OF FORCED COOLING VENTILATORS

-XDF1

CONNECTOR FOR ISOLATION OF CIRCUITS OF FRONT VENTILATOR

-XDF2

CONNECTOR FOR REAR VENTILATOR CIRCUITS


CONNECTOR FOR FRONT VENTILATOR CIRCUITS

-XDH

TERMINAL BLOCK FOR VARIOUS CIRCUITS (HEATERS, POSITION SWITCHES DETECTING INTERNAL ARCING,
ETC.)

-XDI

TERMINAL BLOCK FOR INTERCONNECTION (CONNECTION BETWEEN PANELS)


Based on
Customer

Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

-XDF3

Scale

-XDE

2012-11-08

REFERENCE DESIGNATIONS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

A07

DCC
&EFS
Cont.

D01

AUXILIARY POWER SUPPLY 110VDC

CIRCUIT BREAKER SPRING CHARGING MOTOR


110VDC

A
-XDI1

-XDI1

-XDI1

-XDI1

-XDI2

-XDI2

-XDI2

-XDI2

-FCM2
I>

I>

C
-XDX

13

21

14

22

-FCM3
I>

13

21

14

22
/Q04.3B

/Q04.2B

/Q04.2B

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

I>

11

-QAB

-XDB1

25

-XDB

25

-BGS1
E

E
-MAS M

/M01.1A
/M01.1F

-XDB

35

-XDB1

35

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

DISTRIBUTION OF AUXILIARY CIRCUITS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

D01

DCC
&EFS
Cont.

M01

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

2
CIRCUIT BREAKER
EMERGENCY OPENING

3
CIRCUIT BREAKER
EXTERNAL OPENING

4
CIRCUIT BREAKER
EXTERNAL CLOSING

UNDERVOLTAGE
RELEASE

UNLOCKING RACKING IN/OUT CIRCUIT BREAKER

A
D01.2F/

-XDX1

-XDX1
-XDC1

-XDC1

-XDC1

-XDC1

-XDB1

-XDB

B
16

18

-KFT2
/M01.6E

31

15

-BGB2
/S01.2B

-XDC1

-XDC1

-XDC1

-XDC1

-XDB

18

-XDB1

18

10

-XDE
-XDC1

-XDC1

32

-XDC1

11

13
14

-BGE1
/S02.1D

-XDC1

-XDC1

-XDC1

12

-XE1
-XDB1

1
1

-XDB1

41

31

43

45

-XDB

-XDB

41

31

43

45

-XDE

-XDI9

EARTHING SWITCH
SAME BUSBAR
OPEN

-QAB
-BGB2

11

14

13

-XDI9

14
3

-MBO1

-MBC

-MBU

-SFU2

-RLE2

-XDB

40

-XDB

30

14

44

46

-XDB1

40

-XDB1

30

14

44

46

A1

Y1

-KFT2
A2

18

-XE1

15 /M01.5B
16

D01.2F/

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

CONTROL CIRCUITS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

M01

DCC
&EFS
Cont.

Q01

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

CIRCUIT BREAKER
SPRINGS CHARGED

CIRCUIT BREAKER AUXILIARY CONTACTS

CIRCUIT BREAKER
SPRINGS DISCHARGED

-XDC1

15

-XDB1

-XDB

-XDC1

17

-XDC1

19

-XDC1

21

28

-XDB1

-XDB1

28

-XDB

-XDB

13

-BGB1
/S01.1B

-XDB

31

-BGB1
14

/S01.1B

15

53

-BGB1
32

38

/S01.1B

-XDB

17

-XDB

43

-BGB1
54

-XDC1

/S01.1B

-XDB

23

13

-XDB

-XDC1

27

29

23

29

21
/S01.2B

25

23

53

-BGB2
44

-XDC1

-BGB2
/S01.2B

22

41

-BGB2
54

33

/S01.2B

16

13

-BGB3
42

39

-XDB

/S01.1B

32

-XDB1

24

11

27

32

-XDB

24

19

-XDB

43

-BGB3
22

/S01.1B

-XDB

22

31

-BGB3
44

/S01.1B

21

32

/S01.2B

37

42

-XDB

-BGS2
3

-XDB

26

-BGS2
54

31

26

53

-BGB3

-XDC1

27

21
/S01.1B

29

11

-BGB3
14

-XDC1

34

-XDB

36

-XDB1

15

-XDC1

16

-XDC1

38

-XDB1

17

-XDB1

13

18

-XDC1

20

-XDC1

22

33

-XDC1

24

16

-XDC1

26

39

-XDC1

19

22

21

37

28

42

-XDB1

34

-XDC1

30

36

-XDC1

32

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

AVAILABLE CONTACTS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

Q01

DCC
&EFS
Cont.

Q02

CIRCUIT BREAKER
CIRCUIT
CIRCUIT BREAKER
IN SERVICE
BREAKER IN TEST
IN SERVICE
POSITION
POSITION
POSITION

CIRCUIT BREAKER
IN TEST POSITION

CIRCUIT BREAKER
IN SERVICE
POSITION

CIRCUIT BREAKER
IN TEST POSITION

-XDC1

34

-XDC1

37

-XDB1

49

-XDB1

52

-XDB

49

-XDB

52

44

-BGT1
/S01.5A

-XDB

44

-BGT2
43

51

/S01.5B

-XDB

23

-BGT1
43

/S01.5A

-XDB

50

-XDC1

54

-XDB

-XDB

23
/S01.5B

-XDI9

55

55

57

-XDB

53

-BGT2
24

39

-BGT1
/S01.5A

24

53

-BGT2
54

-XDB

53

57

56

/S01.5B

54

-XDB

58

-XDB1

51

-XDB1

50

-XDB1

54

-XDC1

33

-XDC1

35

-XDC1

36

53

-XDC1

56

-XDC1

38

40

58

-XDI9

TO UNIT BME SAME BUSBAR


FOR LOCKING MAGNET -RLE3

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

AVAILABLE CONTACTS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

Q02

DCC
&EFS
Cont.

Q03

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

CIRCUIT BREAKER IN SERVICE POSITION

CIRCUIT BREAKER IN TEST POSITION

-XDC8

-XDC8

-XDC8

-XDT

-XDT

-XDT

12

-BGT4
/S01.6B

22

32

-BGT4
11

/S01.6B

-BGT4
/S01.6B

21

42

-BGT4
31

/S01.6B

52

-BGT4
41

/S01.7B

-XDC8

12
/S01.7B

-XDT

-XDT

-XDT

-XDC8

-XDC8

-XDC8

-BGT5
/S01.8B

11

-XDT

12

13

22

-BGT5
51

-XDT

11

-XDC8

32

-BGT5
21

/S01.8B

42

-BGT5
31

/S01.8B

52

-BGT5
41

/S01.8B

51

14

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

AVAILABLE CONTACTS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

Q03

DCC
&EFS
Cont.

Q04

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER

-XDC5

-XDC5

-XDC5

-XDC5

11

-XDC5

13

13

-FCM2
/D01.2C

21

-FCM2
14

/D01.2C

21

21

-FCM3
22

/D01.4C

-FCM7
/S02.7B

22

21

-FCM6
22

/S02.7D

22

-XDC5

-XDC5

-XDC5

-XDC5

12

-XDC5

14

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

AVAILABLE CONTACTS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

Q04

DCC
&EFS
Cont.

Q05

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

EARTHING SWITCH OPEN

EARTHING SWITCH CLOSED

-XDC8

-XDC8

-XDE

-XDE

24

-BGE1
/S02.1D

11

-XDE

-XDC8

10

-XDE

34

-BGE1
21

-XDC8

/S02.1D

-XDE

-XDC8

13

44

-BGE1
31

12

-XDE

/S02.1D

-XDE

-XDC8

15

-XDC8

17

-XDC8

19

-XDE

11

-XDE

13

-XDE

15

54

14

-BGE1
41

-XDC8

/S02.1D

-XDE

-BGE2
/S02.2D

51

10

14

24

34

-BGE2
11

/S02.2D

-XDE

-BGE2
/S02.2D

21

17

44

-BGE2
31

-XDE

12

-XDE

14

-XDE

16

-XDC8

16

-XDC8

18

-XDC8

20

-XDE

/S02.2D

-XDE

19

54

-BGE2
41

18

/S02.2D

-XDE

51

20

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

AVAILABLE CONTACTS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

Q05

DCC
&EFS
Cont.

S01

31

43

21

31

41

53

22

32

42

54

/Q03.5B
/Q03.5B
/Q03.6B
/Q03.6B
/Q03.6B

TEST

12
22
32
42
52

12
22
32
42
52

SERVICE

-BGT4

SERVICE

-BGT5

11
21
31
41
51

WITHDRAWING DIRECTION

-QAB

TEST

WITHDRAWING DIRECTION

WITHDRAWING DIRECTION

/Q01.6C

54
/Q01.5C

44
/Q01.6C

/Q01.5C

32

SERVICE
43
43
24
24
54
54

BGB2
14

TEST

-BGT2

/Q01.3C

/Q01.4C

/Q01.3C

53

/M01.6B

/Q01.2C

/Q01.2C

/Q01.1C

/Q01.1C

-BGT1

/Q03.2B
/Q03.3B
/Q03.3B
/Q03.4B
/Q03.4B

44
44
23
23
53
53

11
21
31
41
51

L3

13

/Q02.2C
/Q02.1C
/Q02.3C
/Q02.3C
/Q02.4C
/Q02.4C

L2

-BGB1

17,5kV - 1250A - 25kA x 1"

L1

/Q01.4C
13

21

31

43

53

14

22

32

44

54

BGB3
P2

P2

P2

-XDA

-XDA1
1S1
1S2

-BCT1

1
2

1
2

-XDA2
1S1
1S2

-BCT2

1
2

3
4

-XDA3
1S1
1S2

-BCT3

1
2

5
6
7
1

-XE2
D

D
-XDA

-XDA1
2S1
2S2

-BCT1

3
4

8
9

-XDA2
2S1
2S2

-BCT2

3
4

10
11

-XDA3
2S1
2S2

-BCT3

3
4

12
13
14

L1

L2

L3

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

S02.3A/

P1

S02.3A/

P1

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

S02.3A/

-XE2
P1

S02.3A/

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

2012-11-08

MAIN CIRCUITS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

S01

DCC
&EFS
Cont.

S02

L1

/S01.4E

/S01.4E

/S01.3E

/S01.3E

L2

L3

-FCM7
-XDC4
7N

I>

A
N

a
n
da
dn

-BAT2
A
N

A
N

1
2
3
4

1
2

-XDV2

a
n
da
dn

-BAT3
C

-XDV

-XDV1

1
2
3
4

3
4

I>

I>

-BAT1

8N

21

22 /Q04.3B

13

14

-XDV3

a
n
da
dn

1
2
3
4

5
6

7
3

-XE2

/M01.6C
/Q05.1B
/Q05.2B
/Q05.2B
/Q05.3B

/Q05.4B
/Q05.5B
/Q05.5B
/Q05.6B
/Q05.6B
14
24
34
44
54

-BGE1

L1

-QCE

-BCT1

CK
L2

-BCT2

-BGE2

-FCM6

-XE5

-XDC4

PE 1

3N

11
21
31
41
51

-BCT3

CK

-XDV4
9
10
11

-FA1

1
x1

-RAA

12
13

-FA2

L3

4N

CK
I>

14
24
34
44
54

-PFV1

11
21
31
41
51

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

21

22 /Q04.4B

13

14

x2

1
14

-FA3

15

L1

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

L2

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

-XE2

L3

2012-11-08

MAIN CIRCUITS

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

S02

DCC
&EFS
Cont.

X01

/S01.5E

/S01.5E

/S01.5E

/S01.5E

/S01.5E

/S01.5D

/S01.5D

/S01.5D

/S01.5D

/S01.5D

/S01.5C

/S01.5C

/S01.5C

/S01.5C

14

13

12

11

10

D
1

-XDA

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

TERMINAL BLOCK -XDA

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

X01

DCC
&EFS
Cont.

X02

F
Scale

Project no.
Customer

Project name

1
2

Based on

Caterpillar S.A.R.L.
Mazar - e - Sharif

3
Work order id.

8120005215

Prepared

TASCA

Approved

QUARENGHI
2012-11-08

ITABB PPMV PS-PMEL


4
Resp. (division/department)

2012-11-08

Title

CIRCUIT DIAGRAM
6

TERMINAL BLOCK -XDB1


Ref. designation

Document kind
Document id.

1VCE012062T0100
7

41

40

39

/M01.2D

/M01.1E

/Q01.4C

/Q01.1C

/Q01.6C

/Q01.8C

/D01.3F

/Q01.7C

/Q01.3C

38

37

36

35

34

33

/Q01.6B

/M01.3D

/M01.3E

/Q01.4B

/Q01.1B

/Q01.6B

32

31

30

29

28

27

/Q01.8B

/D01.3D

/Q01.7B

/Q01.3B

/Q01.5C

/Q01.5C

26

25

24

23

22

21

/Q01.4C

/M01.6C

/Q01.2C

/Q01.3C

/Q01.1C

/M01.3E

/Q01.2C

19

18

17

16

15

14

13

/Q01.5B

/Q01.4B

/M01.6B

/Q01.2B

/Q01.3B

/Q01.1B

/M01.3D

/Q01.2B

/M01.1D

11

-XDB1

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

1
7
8

A
A

B
B

C
C

D
D

E
E

External doc. id.

Rev.
Lang.

B
en

Page

8
X02

DCC
&EFS
Cont.

X03

/Q02.4C

/Q02.4B

/Q02.4C

/Q02.4B

/Q02.3C

/Q02.3C

/Q02.3B

/Q02.1C

/Q02.2C

/Q02.2B

/M01.5E

/M01.5D

/M01.4E

/M01.4D

/Q01.6C

58

57

56

55

54

53

52

51

50

49

46

45

44

43

D
42

-XDB1

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08
2012-11-08
Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

TERMINAL BLOCK -XDB1

Ref. designation

Document kind

Document id.

CIRCUIT DIAGRAM
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

X03

DCC
&EFS
Cont.

X04

F
Scale

Project no.
Customer

Project name

1
2

Based on

Caterpillar S.A.R.L.
Mazar - e - Sharif

3
Work order id.

8120005215

Prepared

TASCA

Approved

QUARENGHI
2012-11-08

ITABB PPMV PS-PMEL


4
Resp. (division/department)

2012-11-08

Title

CIRCUIT DIAGRAM
6

TERMINAL BLOCK -XDC1


Ref. designation

Document kind
Document id.

1VCE012062T0100
7

37

36

35

CIRCUIT BREAKER EXTERNAL CLOSING


CIRCUIT BREAKER EXTERNAL CLOSING
CIRCUIT BREAKER EXTERNAL CLOSING
CIRCUIT BREAKER EXTERNAL CLOSING
CIRCUIT BREAKER EXTERNAL CLOSING
CIRCUIT BREAKER EXTERNAL CLOSING
CIRCUIT BREAKER EXTERNAL CLOSING
UNLOCKING RACKING IN/OUT CIRCUIT BREAKER
UNLOCKING RACKING IN/OUT CIRCUIT BREAKER
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER AUXILIARY CONTACTS
CIRCUIT BREAKER SPRINGS CHARGED
CIRCUIT BREAKER SPRINGS CHARGED
CIRCUIT BREAKER SPRINGS DISCHARGED
CIRCUIT BREAKER SPRINGS DISCHARGED
CIRCUIT BREAKER IN SERVICE POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN SERVICE POSITION
CIRCUIT BREAKER IN TEST POSITION

/M01.3C
/M01.3C
/M01.3D
/M01.4B
/M01.4C
/M01.4C
/M01.4D
/M01.5C
/M01.5D
/Q01.1B
/Q01.1D
/Q01.1B
/Q01.1D
/Q01.2B
/Q01.2D
/Q01.2B
/Q01.2D
/Q01.3B
/Q01.3D
/Q01.3B
/Q01.3D
/Q01.4B
/Q01.4D
/Q01.7B
/Q01.7D
/Q01.8B
/Q01.8D
/Q02.1D
/Q02.2B
/Q02.2D
/Q02.3D
/Q02.3B

34

33

32

31

30

29

CIRCUIT BREAKER EXTERNAL CLOSING

/M01.3B

28

27

26

25

24

23

CIRCUIT BREAKER EXTERNAL OPENING

/M01.3C

22

21

20

19

18

17

CIRCUIT BREAKER EXTERNAL OPENING

/M01.3B

16

15

14

13

12

11

10

CIRCUIT BREAKER EMERGENCY OPENING

/M01.2C

CIRCUIT BREAKER EMERGENCY OPENING

/M01.2B

-XDC1

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

1
7
8

A
A

B
B

D
D

E
E

External doc. id.

Rev.
Lang.

B
en

Page

8
X04

DCC
&EFS
Cont.

X05

CIRCUIT BREAKER IN SERVICE POSITION


/Q02.4D

CIRCUIT BREAKER IN SERVICE POSITION

/Q02.4B

CIRCUIT BREAKER IN TEST POSITION

/Q02.3D

40

39

D
38

-XDC1

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08
2012-11-08
Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

TERMINAL BLOCK -XDC1

Ref. designation

Document kind

Document id.

CIRCUIT DIAGRAM
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

X05

DCC
&EFS
Cont.

X06

WYE VOLTAGE SIGNAL

WYE VOLTAGE SIGNAL

OPEN DELTA SIGNAL

OPEN DELTA SIGNAL

/S02.8B

/S02.8D

/S02.8D

/S02.8B

WYE VOLTAGE SIGNAL

/S02.8B

WYE VOLTAGE SIGNAL

/S02.8B

D
1

-XDC4

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08
2012-11-08
Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

TERMINAL BLOCK -XDC4

Ref. designation

Document kind

Document id.

CIRCUIT DIAGRAM
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

X06

DCC
&EFS
Cont.

X07

F
Scale

Project no.
Customer

Project name

1
2

Based on

Caterpillar S.A.R.L.
Mazar - e - Sharif

3
14

AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER


AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER
AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER
AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER
AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER
AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER
AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER
AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER
AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER

/Q04.2C
/Q04.2B
/Q04.2C
/Q04.3B
/Q04.3C
/Q04.3B
/Q04.3C
/Q04.4B
/Q04.4C

13

12

11

AUXILIARY CONTACTS OF MINIATURE CIRCUIT BREAKER

/Q04.2B

-XDC5

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

1
3
4

Prepared

TASCA

Approved

Work order id.

QUARENGHI

8120005215

2012-11-08

Resp. (division/department)

2012-11-08

ITABB PPMV PS-PMEL


4
5

Title

CIRCUIT DIAGRAM
6

TERMINAL BLOCK -XDC5


Ref. designation

Document kind
Document id.

1VCE012062T0100
7

A
A

B
B

D
D

E
E

External doc. id.

Rev.
Lang.

B
en

Page

8
X07

DCC
&EFS
Cont.

X08

F
Scale

Project no.
Customer

Project name

1
2

Based on

Caterpillar S.A.R.L.
Mazar - e - Sharif

3
Work order id.

8120005215

Prepared

TASCA

Approved

QUARENGHI
20

19

18

17

CIRCUIT BREAKER IN SERVICE POSITION


CIRCUIT BREAKER IN SERVICE POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN TEST POSITION
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED

/Q03.3B
/Q03.3C
/Q03.5B
/Q03.5C
/Q03.5B
/Q03.5C
/Q05.1B
/Q05.1C
/Q05.2B
/Q05.2C
/Q05.2B
/Q05.2C
/Q05.4B
/Q05.4C
/Q05.5B
/Q05.5C
/Q05.5B
/Q05.5C

16

15

14

13

12

11

10

CIRCUIT BREAKER IN SERVICE POSITION

/Q03.2C

CIRCUIT BREAKER IN SERVICE POSITION

/Q03.2B

-XDC8

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

1
4
5

2012-11-08

Resp. (division/department)

2012-11-08

ITABB PPMV PS-PMEL


4
5

Title

CIRCUIT DIAGRAM
6

TERMINAL BLOCK -XDC8


Ref. designation

Document kind
Document id.

1VCE012062T0100
7

A
A

B
B

D
D

E
E

External doc. id.

Rev.
Lang.

B
en

Page

8
X08

DCC
&EFS
Cont.

X09

F
Scale

Project no.
Customer

Project name

1
2

Based on

Caterpillar S.A.R.L.
Mazar - e - Sharif

3
Work order id.

8120005215

Prepared

TASCA

Approved

QUARENGHI
20

19

18

17

EARTHING SWITCH OPEN


EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH OPEN
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED
EARTHING SWITCH CLOSED

/Q05.1B
/Q05.1C
/Q05.2B
/Q05.2C
/Q05.2B
/Q05.2C
/Q05.3B
/Q05.3C
/Q05.4B
/Q05.4C
/Q05.5B
/Q05.5C
/Q05.5B
/Q05.5C
/Q05.6B
/Q05.6C
/Q05.6B
/Q05.6C

16

15

14

13

12

11

10

BINARY INPUTS REF615 AVAILABLE

/M01.6D

BINARY INPUTS REF615 AVAILABLE

/M01.6C

-XDE

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

1
4
5

2012-11-08

Resp. (division/department)

2012-11-08

ITABB PPMV PS-PMEL


4
5

Title

Document kind

TERMINAL BLOCK -XDE


CIRCUIT DIAGRAM
6

Document id.

1VCE012062T0100
7

A
A

B
B

D
D

E
E

External doc. id.

Ref. designation
Rev.
Lang.

B
en

Page

8
X09

DCC
&EFS
Cont.

X10

AUXILIARY POWER SUPPLY 110VDC

AUXILIARY POWER SUPPLY 110VDC

/D01.1A

/D01.8A

AUXILIARY POWER SUPPLY 110VDC

/D01.8A

AUXILIARY POWER SUPPLY 110VDC

/D01.1A

D
1

-XDI1

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08
2012-11-08
Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

TERMINAL BLOCK -XDI1

Ref. designation

Document kind

Document id.

CIRCUIT DIAGRAM
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

X10

DCC
&EFS
Cont.

X11

F
Scale

Project no.
Customer

Project name

1
2
4

CIRCUIT BREAKER SPRING CHARGING MOTOR 110VDC


CIRCUIT BREAKER SPRING CHARGING MOTOR 110VDC
CIRCUIT BREAKER SPRING CHARGING MOTOR 110VDC
CIRCUIT BREAKER SPRING CHARGING MOTOR 110VDC

/D01.1B
/D01.8B
/D01.1B
/D01.8B

-XDI2

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

1
2
3

Based on

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

Work order id.

QUARENGHI

8120005215

2012-11-08

Resp. (division/department)

2012-11-08

ITABB PPMV PS-PMEL


4
5

Title

CIRCUIT DIAGRAM
6

TERMINAL BLOCK -XDI2


Ref. designation

Document kind
Document id.

1VCE012062T0100
7

A
A

B
B

D
D

E
E

External doc. id.

Rev.
Lang.

B
en

Page

8
X11

DCC
&EFS
Cont.

X12

CIRCUIT BREAKER IN TEST POSITION

CIRCUIT BREAKER IN TEST POSITION

/Q02.4B

/Q02.4D

EARTHING SWITCH SAME BUSBAR OPEN

/M01.6D

EARTHING SWITCH SAME BUSBAR OPEN

/M01.6D

D
1

-XDI9

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08
2012-11-08
Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

TERMINAL BLOCK -XDI9

Ref. designation

Document kind

Document id.

CIRCUIT DIAGRAM
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

X12

DCC
&EFS
Cont.

X13

F
Scale

Project no.
Customer

Project name

1
2
14

13

12

11

CIRCUIT BREAKER IN SERVICE POSITION


CIRCUIT BREAKER IN SERVICE POSITION
CIRCUIT BREAKER IN SERVICE POSITION
CIRCUIT BREAKER IN SERVICE POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN TEST POSITION
CIRCUIT BREAKER IN TEST POSITION

/Q03.2B
/Q03.2C
/Q03.3B
/Q03.3C
/Q03.5B
/Q03.5C
/Q03.5B
/Q03.5C

-XDT

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

1
2
3

Based on

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

Work order id.

QUARENGHI

8120005215

2012-11-08

Resp. (division/department)

2012-11-08

ITABB PPMV PS-PMEL


4
5

Title

Document kind

TERMINAL BLOCK -XDT


CIRCUIT DIAGRAM
6

Document id.

1VCE012062T0100
7

A
A

B
B

D
D

E
E

External doc. id.

Ref. designation
Rev.
Lang.

B
en

Page

8
X13

DCC
&EFS
Cont.

X14

/S02.6E

/S02.6E

/S02.6E

/S02.6E

/S02.6D

/S02.6D

/S02.6D

/S02.6D

/S02.6C

/S02.6C

/S02.6C

/S02.6C

/S02.6C

/S02.6B

/S02.6B

15

14

13

12

11

10

D
1

-XDV

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

TERMINAL BLOCK -XDV

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

X14

DCC
&EFS
Cont.

X15

/D01.2C

/D01.2C

11

D
1

-XDX

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

TERMINAL BLOCK -XDX

2012-11-08

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

CIRCUIT DIAGRAM
6

Ref. designation
Document id.

1VCE012062T0100
7

Rev.

Lang.

en

Page

X15

DCC
&EFS
Cont.

X16

/M01.6B

/M01.1A

D
1

-XDX1

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08
2012-11-08
Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

TERMINAL BLOCK -XDX1

Ref. designation

Document kind

Document id.

CIRCUIT DIAGRAM
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

X16

DCC
&EFS
Cont.

Z01

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

PARTS LIST
A

DESIGNATION
-BAT1

CLASS

CHARACTERISTICS
Frequency :

50Hz

-BAT2

Voltage transformers (MV)

First winding burden :

50VA CL. 0,5

-BAT3

First winding: rated voltage :

100/V3

Second winding: burden :

50VA CL. 6P

Second winding: rated voltage :

100/3

Rated primary voltage :

15000/V3

Fuses ratio :

0,5A

Frequency :

50Hz

-BCT2

Rated primary current :

400A

-BCT3

First core: rated current :

5A

-BCT1

C. T. (MV)

-FA1

First core: rated burden :

10VA / cl. 0,5 Fs 5

Second core: rated current :

5A

Second core: rated burden :

10VA / cl. 5P10

Ambient temperature :

55

Surge arrester

Type :

MWD 15kV

Miniature breakers

Type :

S282 UC - C1,6

Number of poles of M.C.B. :

CODE

AMOUNT

SUPPLIER

.....

ABB

.....

ABB

76095

ABB

3WCA022097P0073

ABB

-FA2
-FA3

-FCM2

Miniature breakers accessories.


-FCM3

Miniature breakers
Miniature breakers accessories.

-FCM6

Miniature breakers
Miniature breakers accessories.

-FCM7

Miniature breakers
Miniature breakers accessories.

-KFT2

Aux. relays (time-delaying)

-PFV1

Voltage indicators

-QAB

Circuit breaker

Type of M.C.B. accessories :

ABB S2-H11

3WCA022097P0014

ABB

Type :

S282 UC - C1

3WCA022097P0072

ABB

Number of poles of M.C.B. :

Type of M.C.B. accessories :

ABB S2-H11

3WCA022097P0014

ABB

Type :

S201M-C2 NA

3WCA022097P0024

ABB

Number of poles of M.C.B. :

1+N

Type of M.C.B. accessories :

ABB S2C-H11L

3WCA022097P0013

ABB

Type :

S203M-C2 NA

3WCA022097P0056

ABB

Number of poles of M.C.B. :

3+N

Type of M.C.B. accessories :

ABB S2C-H11L

3WCA022097P0013

ABB

Voltage supply :

24...240V DC/AC

3WDA014819P0001

ABB

Time-delaying aux.relay type :

TIMETRON

3WCA023400P0002

ABB

ABB

Time-delaying aux.relay series :

CT-MFE

Version aux. relay :

STANDARD

Type :

VPIS ANDA DXN5-T

M.V. Circuit breaker ABB type Vmax 17.12.25 withdrawable version

with operating mechanism EL,


according to circuit diagram 1VCD400054:

fig. 01 (-MAS) Spring charging motor


fig. 02 (-MBC) Closing release
fig. 05 (-MBU) Minim voltage coil
fig. 07 (-MBO1) Opening release
fig. 08 (-RLE2) Locking magnet on racking in/out
fig. 26 (-BGS2) Contact signaling springs charged/discharged
fig. 34 (-BGB1, -BGB2, -BGB3) Auxiliary contacts of c. break
fig. 52 (-BGT1, -BGT2) Position contacts of the truck

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

MATERIAL LIST

2012-11-08

Ref. designation
Document id.

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

MATERIAL LIST
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

Z01

DCC
&EPA
Cont.

Z02

WE RESERVE ALL RIGHTS IN THIS DOCUMENT AND IN THE INFORMATION CONTAINED THEREIN. REPRODUCTION, USE OR DISCLOSURE TO THIRD PARTIES WITHOUT EXPESS AUTHORITY IS STRICTLY FORBIDDEN.

PARTS LIST
A

DESIGNATION

CLASS

-QCE

Earthing switch

-RAA

Resistors

-SFU2

Pushbuttons

-XDA

Terminals

CHARACTERISTICS

CODE

AMOUNT
1

ABB

3WCA022716P0001

MC CALLONI

Earthing switch
Type of resistors :

450W, 100V, 22 Ohm

SUPPLIER

Type of pushbutton :

CP1-10L-10

3WDA008620P0003

ABB

Isolating terminal blocks :

M6/8.ST1.IP20, EN011597110

3WCA022254P0001

29

ABB

-XDV

-XDB1

Connectrors

7,62 mm ADO connectror, 4 pole male plug :

code 1SSA367204R1100

3WCA022253P0012

ABB

-XDB1

Connectrors

5,08mm ADO connectror, 10 pole male plug :

code 1SSA365210R1100

3WCA022253P0005

ABB

-XDB1

Connectrors

5,08mm ADO connectror, 12 pole male plug :

code 1SSA365212R1100

3WCA022253P0006

ABB

-XDE

Connectrors

5,08mm ADO connectror, 10 pole male plug :

code 1SSA365210R1100

3WCA022253P0005

ABB

-XDT

Connectrors

5,08 mm ADO connectror, 8 pole male plug :

code 1SSA365208R1100

3WCA022253P0004

ABB

-XDX

Terminals

ADO-ADO terminal blocks :

D1/5.ADO, EN019956324

3WCA022099P0001

ABB

Terminals

ADO-screw terminal blocks :

D2.5/5.ADO, EN019955423

3WCA022102P0001

80

ABB

Terminals

ADO-screw terminal blocks :

D6/8.ADO, EN019904225

3WCA022102P0002

ABB

-XDX1
-XDC1
-XDC4
-XDC5
-XDC8
-XDI9

-XDI1

-XDI2

Based on

Scale

Customer
Project no.

Project name

Caterpillar S.A.R.L.
Mazar - e - Sharif

Prepared

TASCA

Approved

QUARENGHI

Work order id.

8120005215
1

2012-11-08

MATERIAL LIST

2012-11-08

Ref. designation
Document id.

Document kind

Resp. (division/department)

ITABB PPMV PS-PMEL


4

External doc. id.

Title

MATERIAL LIST
6

1VCE012062T0100
7

Rev.

Lang.

en

Page

Z02

DCC
&EPA
Cont.

Das könnte Ihnen auch gefallen