Beruflich Dokumente
Kultur Dokumente
Perhitungan Alat EW
Perhitungan Alat EW
Coal Density
OB Density
Effective Working Time
Stockpile-Port Distance
(southern direction)
1.3 ton/m3
2.7 ton/m3
4000 hours/year
12 km
JAM KERJA
Jumlah hari/tahun
Hari libur dan hilang/tahun
Kehilangan hari kerja lain-lain/tahun
Hari kerja/tahun
Shift/hari
Jam/shift
Kehilangan jam kerja/hari (pergantian shift dll)
Jam kerja efektif/hari
Efisiensi waktu
Jam kerja efektif/tahun
365
333
Production Scheduling
Year
1
2
3
4
5
6
7
8
Total
EW - Akumulasi
Overburden (m3)
Seam Coal (ton)
2269619
469,154
6324085
1,125,184
13783724
2,273,507
7352836
1,024,090
12232532
2,028,426
17489492
2,944,303
24683088
4,018,297
30156963
5,016,295
114,292,339.78
18,899,256.00
Productivity
Year
1
2
3
4
5
6
7
8
Overburden (bcm/hour)
567.40
1,013.62
1,864.91
1,941.98
1,219.92
1,314.24
1,798.40
1,368.47
64.97
108.62
163.63
103.77
74.96
77.45
109.30
150.38
6
7
8
Stripping Ratio
Material
Overburden
Seam Coal
Stripping Ratio
m3
45,196,739.00
ton
7,289,802
6.20
17
15
2.0
16
83%
SR
4.84
5.62
6.06
7.18
6.03
5.94
6.14
6.01
6.05
TOTAL
TOTAL
TOTAL
415091
299848
309799
437214
601535
2529499 14.6
6758580 14.6
14438241 17.6
469154 2.74
1125184 2.62
2273507 3.14
365 hari/tahun
17 hari/tahun
15 hari/tahun
333 hari/tahun
2 shift/hari
9 jam/shift
2.0 jam/hari
16.0 jam/hari
83%
4,422 jam/tahun
7,289,802.00
2529499
6758580
14438241
2529499
4229081
7679661
Topsoil
SR
259,880
4.84
434,495
6.18
654,517
6.50
415,091
7.59
299,848
4.86
309,799
5.74
437,214
6.70
601,535
5.48
3,412,377.67
6.08
PC300LC-7***
1.9
0.85
17
1.20
0.85
15
1
0.85
0.9
187.27
Backhoe Needs
Year
1
2
3
4
5
6
7
8
PC400LC-7***
0.41
0.58
1.01
0.90
0.88
0.80
0.94
0.88
Backhoe Scenario
Year
1
2
3
4
5
6
7
8
Total
PC300LC-7***
0.48
0.67
1.18
1.05
1.03
0.94
1.10
1.02
PC750SE-7
0.9050383473
1.6167681162
2.9746223964
3.0975559862
1.9458385172
2.0962771557
2.868534469
2.1827746674
PC600LC-7 ( ROM-Stockpile)
PC750SE-7
Bucket Cap (m3)
Bucket Factor
Cycle Time (sec)
Conversion Factor
Job Efficiency
Swell Factor
Productivity (bcm/hour)
PC600LC-7
0.2325054984
0.3251183665
0.569091197
0.5075232351
0.4977334569
0.4538945386
0.5322548891
0.4945924417
3.2
0.8
19.000
1
0.8
0.8
388.04
PC300LC-7***
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
PC600LC-7
Bucket Cap (m3)
0.9 Bucket Factor
18.000
Cycle Time (sec)
1 Conversion Factor
0.9
Job Efficiency
Swell Factor
0.9
626.94 Productivity (bcm/hour)
4.3
PC750SE-7 vs HD465-7
n
PC750SE-7
cms
Speed Factor
v (full)
v (empty)
Average v (full)
HD465-7
Average v (empty)
Dumping Time
Spot and Delay Time
7.00
0.30
0.85
333.33
416.67
283.33
354.17
1.25
1.11
Year
Backfill IPD 1
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
Distance (m)
Cycle Time (min)
Truck Needs
Scenario
times
min
m/min
m/min
m/min
m/min
min
min
PC400LC-7*** vs TZA520KDN
n
cms
Speed Factor
v (full)
v (empty)
Average v (full)
Average v (empty)
Dumping Time
Spot and Delay Time
Overburden
Coal
ROM Stockpile-Port
HD465-7 TZA520KDN
CGB45THN
550.00
550.00
12,000.00
7.96
5.64
30.33
3.03
2.28
5.87
3
2
6
550.00
550.00
12,000.00
7.96
5.64
30.33
6.06
2.28
8.21
6
2
8
550.00
550.00
12,000.00
7.96
5.64
30.33
9.09
2.28
14.38
9
2
14
1,077.22
1,077.22
12,000.00
11.31
8.29
30.33
12.92
3.34
12.82
13
3
13
1,077.22
1,650.00
12,000.00
11.31
11.17
30.33
8.61
4.50
12.57
9
5
13
1,077.22
2,000.00
12,000.00
11.31
12.92
30.33
12.92
5.21
11.47
13
5
11
1,077.22
2,000.00
12,000.00
11.31
12.92
30.33
12.92
5.21
13.45
13
6
13
1,077.22
2,000.00
12,000.00
11.31
12.92
30.33
14.77
2.10
12.49
15
6
12
00LC-7*** vs TZA520KDN
7.00 times
0.28 min
0.90
416.67 m/min
500.00 m/min
375.00 m/min
425.00 m/min
0.70 min
0.20 min
0.80
n
cms
Speed Factor
v (full)
v (empty)
Average v (full)
Average v (empty)
Dumping Time
Spot and Delay Time
Distance
Cycle Time
Productivity
6.00 times
0.32 min
0.90
833.33 m/min
1,333.33 m/min
708.33 m/min
1,133.33 m/min
0.70 min
0.20 min
12000 m
30.33 min
15.36 m3/hour
Dozer
Year
1
2
3
4
5
6
7
8
Grader
Year
1
2
3
4
5
6
7
8
Grader
2
2
2
2
2
2
2
2
Water Truck
Year
1
2
3
4
5
6
7
8
6
7
8
8
7
8
8
8
Water Truck
2
2
2
2
2
2
2
2
Truck
Year
1
2
3
4
5
6
7
8
Compactor
Year
1
2
3
4
5
6
7
8
Overburden
Coal
ROM Stockpile-Port
HD465-7 TZA520KDN
CGB45THN
3
2
6
6
2
8
9
2
14
13
3
13
9
5
13
13
5
11
13
6
13
15
6+
Grader
1
1
1
1
1
1
1
1
Fuel Truck
Year
1
2
3
4
5
6
7
8
Grader
1
1
1
1
1
1
1
1
Tahun
1
2
3
4
5
6
7
8
2529499
4229081
7679661
Jumlah Topsoil
259880
434495
654517
415091
299848
309799
437214
601535