INSPECTION ACTIVITY
Level 1 Level 2 Level 3
Selected Level of Inspection >
PRE-INSPECTION MEETING
DOCUMENTATION REVIEW
Vendor Quality Plan (To be submitted prior to Pre-Inspection Meeting)
Manufacturing Schedule
List of Major Sub-Orders
Material Substitution Requests
Material Test Reports
NDE Procedures
NDE Personnel Qualifications
Welding Procedures (WPS's & PQR's)
Welder Performance Qualifications
PWHT Procedures
Hydrostatic Test Procedure
Manufacturer's Data Report
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
SW
SW
SW/R
SW
SW
SW
SW
SW
SW
W/R
SW
SW
SW/R
SW
SW
SW
SW
SW
SW
SW/R
SW
SW
SW/R
SW
SW
SW
SW
SW
SW
R
R
W/R
W/R
W/R
W/R
W/R
W/R
W/R
W/R
W/R
R
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
SW/R
R
SW/R
SW/R
SW/R
R
SW/R
R
R
R
SW/R
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR SHOP FABRICATED PIPING
NO.
INSPECTION ACTIVITY
Level 1 Level 2 Level 3
Selected Level of Inspection >
W/R
H
H
SW/R
W
W
SW/R
SW/R
SW/R
W
H
H
W
H
H
SW
W
W
H
W
W
H
SW
SW
H
SW
SW
10
COMMENTS
If a discrepancy exists between this document and the applicable Engineering
drawings, the information listed on the Engineering documents shall take
precedent.
If discrepancies are detected during random sampling, additional inspection
shall be conducted to verify compliance.
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR SHOP FABRICATED PIPING
Level 4
N/A
R
R
R
R
R
N/A
N/A
R
R
N/A
R
R
N/A
R
N/A
N/A
SW
SW
SW
SW
N/A
R
R
R
R
R
R
R
R
R
R
R
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable
KBR
INSPECTION TEST PLAN FOR SHOP FABRICATED PIPING
Level 4
R
R
R
SW
SW
SW
SW
SW
SW
H
Note:
H = Hold Point
W = Witness Point
SW = Spot Witness
R = Review
N/A = Not Applicable