Sie sind auf Seite 1von 30

CONSTRUCTION ACTIVITIES LIST

CODE
LEVEL2

CODE
LEVEL3

AAI
AAI 110
A AI 210
AAI 310
A Al 410
AAI 510
A A2
AA21 11
A A2 112
A A2 120
A A2 130
A A2 140
A A2 200
A A2 300
A A3
AA3 110
A A3 120
AA3 21 0
A A3 220
A A3 310
A A3 410
A A4
A A4 I I 0
A A4 210
A A4 3 10
A A4 410
A A4 420
ABO
A BO 100
A BO 200
AC1
A C1 110
A Cl 120
A C2

DESCRIPTION
EARTH MOVEMENT AND SITE PREPARATION
Clearing of plant areas, by machine grubbing and scraping, included transports to dumping area
within the factory
Earth moving and backfliling for plant areas levelling by machine
Filling and levelling of plant area with dredged sand by hydraulic sucking machine (dredgers)
General excavation bv machine in soil from ground level to any design elevation including transport
to disposal area within the factory
General backfilling bv machine with material coming from disposal area or borrow pits within the
factory
PILES AND GROUND IMPROVEMENT WORKS
Casting in situ of r.c. bored piles with recoverable sleeves (Ref.Diam. 0.5 M)
Casting- in situ of r.c. bored piles with lost sleeves (Ref. Dia. 0.5 M)
Casting in situ of r.c. piles "franki" type (Ref Diam. 0,5 M)
Ramming of precast r.c. piles
Drilling and pouring of small diameter r.c. piles
Jet grouting
Vibroflotation
LIMITED SECTION EXCAVATION AND BACKFILLING
Limited section excavation and backfilling by machine up to -1,5 M
Limited section excavation and backfilling by hand up to -1,5 M
Limited section excavation and backfilling by machine under -1.5 M
Limited section excavation and backfilling by hand under
Use of slieet pilina for carrying out limited excavation by machine
Constfuctions of concrete retaining wall for limited excavation by machine
EARTH WORKS FOR ROADS, TANK FOUNDATIONS, EARTH DIKES AND CONCRETE
PANIING
Embankment for roads and yards sub-base and base courses by, machine
Embankment for tank foundations b\, machine
Embankment for earth dikes of tank basins by machine
Sub base of concrete paved area by machine
Sub base of concrete paved area by hand
PLANT AREA FENCING
Construction of fencing in metal wire netting including gates (Ref.H 2,5 M)
Construction of fencing with precast reinforced concrete panels including gates (Ref.H 0,25 M)
CONCRETE PREPARATION
Concrete production by the use of fixed industrial plants (batching plants)
Concrete production by, the use of movable mechanical plants (concrete mixers)
CASTING IN SITU OF CONCRETE UNITS

MEAS.
UNIT

STD HOURLY
OUTPUT

18

m
m

5.5
40

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

0.8
0.7
0.7
0.5
2.5
1.7
0.9
1.2
1.2
1.8
0.3
1.2
0.2
1.9
0.3

2.3

m
m
m
m
m
m
m
m
m
m
m
m

3
4.5
2
2.5
1.2
0.7
0.8
0.5
1.9
2.3
0.8
0.11

ADAPTATION
FACTOR "W"

yes
yes
yes

yes
yes
yes

yes
yes
yes
yes

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3

MEAS.
UNIT

STD HOURLY
OUTPUT

0.15

A C2 220
A C2 230

Casting of lean concrete (Ref.T.KS = O.l M)


Casting of reinforced concrete for foundations. walls. Structures underground and up to +1 M above
ground inclusive of formwork and reinforcing steel, etc.
As above for units higher than + 1 M up to +7M
As A C2 21 0 for units higher than +7M

m
m

1
0.06

A C2 300

As A C2 21 0 for U/g basins, pits and trench du-cts with wall (Ref.TKS=< 20 CM actual volume)

0.08

A C2 400
A C2 500

As A C2 21 0 for foundations of small supports for piping or other plants units


As A C 2 210 for paving of plant areas (Ref.TKS 0.20 M)
CONCRETE UNITS CASTING AND ERECTION OF PRECAST UNITS
Casting of r.c. units: volume up to 0.4 CM
Casting of r.c.units: volume above 0,4 CM
Erection of precast r.c. foundations and sleepers
Erection of precast r.c. columns, beams and slabs
Erection of precast r.c. pits and sumps
EMBEDDING OF STEEL ITEMS
Embedding of anchor bolts in concrete foundations, paving or slabs
Embedding of metal inserts and frames for pit covers

m
m
m
m
m
m
m
m
Kg
Kg
Kg

0.04
1.4
0.15
0.2
0.3
0.5
0.35
0.25
5.5
6
4

ANCHORAGE GROUTING OF EQUIPMENT, MACHINERY, STEEL STRUCTURES, ETC.

0.006

0.006

m
m
m
m
m
m
m
m
m
Kg
Kg
Kg
Kg
Kg
Kg
m

0.43
0.8
1
1.2
0.4
0.5
0.9
0.35
0.2
12
I2
16
9.5
4.2
12.5
1

A C2 100
A C2 210

A C3
A C3 I 10
A C3 120
A C3 210
A C3 220
A C3 230
A C4
A C4 100
A C4 200
A C5
A C5 000
A C6
AC6 111
A C6 112
A C6 113
AC6 121
AC6 122
AC6 123
AC 6210
A C6 220
A DI
A DI 413
A DI 421
A DI 431
A DI 443
A DI 452
A DI 462

DESCRIPTION

Grouting/levelling with mortar anchorage of equipment.machinery,steel structures machinery, steel


structures
FIRE PROOFING AND ACID PROTECTION COATING
Fire proofing on equipment skirts with concrete cast in situ
As above with gunned concrete
As A C6 I 11 with the use of retardant painting
Fire proofing on steel structures with concrete cast in situ
As above with gunned concrete
As A C6 121 with the use of retardant painting
Acid protection of surfaces bv antiacid plastering or coating.,
As above bv antiacid tiling
UNDERGROUND PIPING AND SEWER SYSTEM
Lay down underground c.s. piping, in pressure or not (,Ref. NPS 8")
As above for internal mortar lined piping in pressure (Ref .NPS 10")
As A DI 413 for internal resin lined piping in pressure (Ref NPS 6")
As A DI 413 for resin piping, in pressure or not (Ref .NPS 6")
As A DI 413 for plastic piping not in pressure (Ref..NPS 6")
As A D 1 41 3 for concrete piping not in pressure (Ref ID 0 3 M avg. I Joint/M)

ADAPTATION
FACTOR "W"

yes
yes

yes
yes
yes
yes
yes
yes

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3
A DI 472
A DI 482

A D2
A D 2 100
A D2 200
A D3
AD3 1 IO
A D3 120
A D3 210
A D3 220
A D3 300
A D4
A D4 100
A D4 200
A El
A El 100
A El 200
A El 300
A El 400
A E2
A E2 000
A Fl
A F1 100
A Fl 200
A F2
A F2 I 10
A F2 120
A F2 210
A F2 220
A F2 300
A F3
A F3 100
A F3 200
A F3 300
AGI
A GI 100

MEAS.
UNIT

STD HOURLY
OUTPUT

ADAPTATION
FACTOR "W"

As A DI 413 for gres piping not in pressure (Ref.ID 0 3 M avg. I Joint/M)


As A DI 413 for cast iron piping not in pressure (Ref. ID 0,3 M avg. I Joint/M)
UNDERGROUND PIPING AND SEWER SI'STEMS HYDROTEST
U/g pressure piping, hydrotest
U/g piping not in pressure and sewer systems Gravity hydrotest
UNDERGROUND WORKS FOR ELECTRICAL AND INSTRUMENTATION SYSTEMS

m
m
Kg
Kg
Kg

1.2
0.8
90
100
60

yes
yes

4.2

Casting- of concrete cable bundles with Pvc pipe-sleeves


As above steel piping
Lay down of Pvc cable conduits
Lay down of galvanized steel cable conduits
Lay down of earthing cables
PROTECTION OF BURIED PIPES AND CABLES
Protection of buried pipes and cables by sand
As above by slabs or bricks already fabricated
ROADS, YARDS, TANK FOUNDATIONS AND DIKES FINISHING
Bitumenous binder and wearing courses for roads and yards
Tank foundation asphalting
Earth dikes and road shoulders emulsion spreading
Yards gravelling (ballasting)
RAILWAYS CONNECTING BRANCHES
Construction of railway branches within factory
STEEL STRUCTURES FABRICATION
Fabrication of meduim and heavy weight steel structures
Fabrication of light weight steel structures
ERECTION OF STEEL STRUCTURES FOR PROCESS UNITS AND RACKS
Erection of medium and heavy weight items with bolted connections
As above with welded connections
Erection of light weight items. ladders, platforms, etc. with bolted connections
As above with welded connections
Erection of corrugated sheets, panels for roofing and wailing
ERECTION OF INDUSTRIAL BUILDINGS WITH STEEL STRUCTURE FRAME
(TOTAL VOLUME)
Excavations and casting of concrete foundations and paved floors
Erection of steel items of main frame
Roofs,walls and general finishing (covered area)
ERECTION OF INDUSTRIAL BUILDINGS WITH R.C. FRAIME (TOTAL VOLUME)
Excavations and casting of reinforced concrete foundations and paved floors

m
m
m
m
m

Kg
Kg
Kg
Kg
m

2
2.5
2.5
3
8
0.75
1.25
0.25
12
15
6
120
8
0.18
0.18
18
22
10
24
36
30
15
12
1.2

m
m
Kg
m
m
m

0.45
0.17
24
0.8
0.3
0.17

DESCRIPTION

m
m
m
m
m
m
m
m
m
Kg
Kg
Kg

yes

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3
A GI 210
A GI 220
A GI 300

A G2
A G2 010
A G2 020
A G3

BA1

B A2

STD HOURLY
OUTPUT

Casting of r.c. concrete units for the main frame


Erection of precast items of main frame
Roofs. walls and general finishing (lighting svstem etc.) (covered area)
CONSTRUCTION OF REINFORCED CONCRETE ELECTRICAL SUBSTATIONS
(TOTAL VOLUME)
Excavations and casting of reinforced concrete foundations. main frame. transformer's pits and walls
Finishing works (roofs, walls. doors. windows. floors plastring, painting, electrical and sanitary)
(covered area)

m
m
m

0.3
0.35
0.8

m
m

0.25
0.17

0.05

CONSTRUCTION OF REINFORCED CONCRETE CIVIL BUILDINGS (TOTAL VOLUME)

0..18

0.17

m
m
m
Kg
Nbre
m

0.08
0.04
0.1
10
0.002
0.45

0.55

m
m
Nbre
m
m
m
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

0.7
5.00
0.25
0.3
0.35
1
1.1
12.5
9
10
8.5
10
6
9.7
9.5
7
7.5

Excavation and casting of reinforced concrete foundations and main frame of office buildings,
control room and laboratories
A G3 120 External finishing (roofs, outside walls, doors, windonvs and plastering)(total floor areas)
A G3 130 Internal finishing (floors. partition walls, doors plastering, ceiling and painting)
A G3 140 Hydro/sanitary and electrical systems installation
A G3 150 HVAC system installation
A G3 160
Elevators installation
DEMOLITION OF CIVIL WORKS
Demolition of underground reinforced concrete Units by hydraulic hammer or other mechanical
A TO 100
means included transport to dumping area within the factory and cleaning of environment
A TO 200 Demolition of above ground r.c. units as above
A TO 300 Demolition of civil structure buildings as A TO I 00 (total volume)
A TO 400 Demolition of r.c. pile heads as A TO 100
A TO 500 Demolition of r.c.paved areas and pits as A TO 100
A TO 600 Demolition of asphalted roads and yards as A TO 100
A TO 700 Underground piping and conduits as A TO I 00
BA1
LARGE BORE STEEL PIPING PREFABRICATION
B Al 0 1 A Prefabrication of c.s. piping >= 2" (ref.NPS 4") in spools inclusive of branch connections
B Al OIB
Prefabrication of s.s. piping >= 2" (ref.NPS 4") as above
B Al 0 IC Prefabrication of alloy/monel piping >= 2" (ref. N PS >= 4") as B Al 0 1 A
B Al 0 ID Prefabrication of partial jacketing piping in c.s./s.s. >= 2" (ref NPS 5") as B Al 0 I A
B Al 0 IE
Prefabrication of internal mortar lined piping c.s. >= 2" (ref.NPS I 0") as B Al 0 i A
BAI0 IF
Prefabrication of internal resin lined piping c.s. >= 2" (refNPS 4") as B Al 0 I.A
LARGE BORE STEEL PIPING ERECTION
B A2 I I .A Erection of c.s. piping >= -2" (rel-.NPS 4") on site
BA21 I B Erection of s.s. piping >= 2" (ref.NPS 4") oil site
BA21 IC
Erection of alloy /monel piping >= 2" (ref.NPS 4") on site
A G3 I I 0

A TO

MEAS.
UNIT

DESCRIPTION

ADAPTATION
FACTOR "W"

yes

yes
yes
yes
yes
yes
yes
yes
yes
yes

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3

DESCRIPTION

MEAS.
UNIT

STD HOURLY
OUTPUT

ADAPTATION
FACTOR "W"

BA21 I H

Erection of pneumatic haulage piping supplied prefabricated (s.s. or aluminium) (ref. N PS I 0") on
site

Kg

yes

B A2 I IG

Erection of threaded galvanized steel including pipe cutting and threading >= 2" (ref.NPS 4") on site

Kg

yes

B A2] ID
B A2 11 E
BA211F

Erection of partial jacketing piping in c.s./s.s. >= 2"(ref.NPS 5") on site


Erection of internal mortar lined piping c.s.>= 2" (ref.NPS 10") on site
Erection of internal resin lined piping c.s. >= 2" (ref.NPS 4") on site
Erection of instument elements on line i.e.PSV, Control valves, motorized valves and similar >= 2"
(ref.NPS 4") on site
.
Erection of c.s.piping >= 2 (Ref.NPS4.) Field run
Erection of s.s. piping >= 2" (ref.NPS 4") field run
Erection of alloy/monel piping >= 2" (ref..NPS 4") field run
Erection of pneumatic haulage piping supplied (s.s. or aluminuim) (ref.NPS 10") field run
Erection of threaded galvanized steel >= 2" (ref.NPS 4") field run
Erection of partial jacketing piping in c.s./s.s. >= 2" (ref.NPS 5") field run
Erection of internal mortar lined piping c.s. >= 2" (ref.NPS 10") field run
Erection of internal resin lined piping c.s. >= 2" (ref.NPS 4") field run
Erection of instrument elements on line i.e. PSU, Control Valves. motorized valves and similar >= 2"
(ref.NPS 4") field run
Erection of c.s. pipings >= 2" (ref.NPS 4") interconnecting
Erection of s.s. piping >= 2" (ref.NPS 4") interconnecting
Erection of',alloy /'monel piping, >=2 (ref.NPS 4") interconnecting
Erection of partial .jacketing piping in c.s./s.s. >=2 (ref. NPS 5) interconnecting
Erection of pneumatic haulage piping, supplied prefabricated (s.s. or aluminiuni) (ref.NPS I 0")
interconnecting

Kg
Kg
Kg

10
16
10

yes
yes
yes

Kg

12

yes

kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

12
9
9.5
10
9
12.5
20
12.5

yes
yes
yes
yes
yes

Kg

12

y'es

Kg
Kg
kg
Kg

14
10.5
1.1
15

yes
yes
yes

BA2 11 N
B A221A
B A2 21B
B A2 21C
B A2 21H
B A2 2IG
B A2 21D
B A2 21E
B A2 21 F
B A2 21 N
B A2 31A
B A2 31B
B A2 31C
B A2 31 D
B A2 31 H

B A2 3 1 G Erection of threated galavanized steel inculding pipe Including pipe cutting and threading, >=2
(ref.NPS 4") interconnecting
B A2 31E Erection of internal mortar lined piping c.s. >= 2" (ref.NPS 10") interconnecting
Erection of instrument elements on line. i.e.PSU, Control valves,motorized valves and similar >= 2"
B A2 31F
(ref.NPS 4)
B A2 31N
BA3
B A3 12A
B A3 12B
B A3 12C
B A3 12G
B A3 12M

Erection of instrument elements on line i.e. PSU. Control Valves, motorized valves and similar >= 2"
(ref.NPS 4")
SMALL BORE STEEL PIPING PREFABRICATION AND ERECTION
Prefabrication and erection of c.s. piping- <2 on site
Prefabrication and erection of s.s. piping <2 on site
Prefabrication and erection of alloy/monel s.piping < 2" on site
Prefabrication and erection of galvanized steel piping < 2" on site
Prefabrication and erection of steam tracing piping on site

Kg

1.0

yes
yes

yes

kg

10.5

yes

Kg

20

Kg

12.5

yes

Kg

12

yes

kg
kg
kg
kg
kg
kg

2.6
2.5
2
1.8
2
2

yes

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

B A4
BBO

BCO

B DO

CODE
DESCRIPTION
LEVEL3
B A3 22A
Prefabrication and erection of c.s. piping < 2" field run
B A3 22B
Prefabrication and erection of s.s. piping <2" field run
B A3 22C
Prefabrication and erection of alloy/monel steel piping < 2" field run
B A3 22G
Prefabrication and erection of galvanized steel piping < 2" field run
BA3 22M
Prefabrication and erection of steam tracing piping field run
B A3 32A
Prefabrication and erection of s.s. interconnecting <2" field run
B A3 22B
Prefabrication and erection of s.s. piping <2" interconnecting
B A3 22C
Prefabrication and erection of alloy/monel steel piping < 2" interconnecting
B A3 22G
Prefabrication and erection of galvanized steel piping < 2" interconnecting
BA3 22M
Prefabrication and erection of steam tracing piping interconnecting
STEEL PIPING PRESSURE TEST
BA4 400
Pressure test of erected piping
RESIN AND PLASTIC PIPING PREFABRICATION AND ERECTION
B BO OOR
Prefabrication and erection of fiberglass piping. pressure testing included (Ref.NPS 6")
B BO OOS
Prefabrication and erection of plastic piping (PVC, PP, PE) pressure test included (Ref.NPS 6")
STEEL PIPING SUPPORTS
B CO 100 Prefabrication of steel piping supports
B CO 211 Erection of steel supports for piping >= 2" on site
B CO 212 Erection of steel supports for piping < 2" On site
B CO 221 Erection of steel supports for pipin2 >= 2" field run
B CO 222 Erection of steel supports for piping < 2" field run
B CO 231 Erection of steel supports for piping>= 2" interconnecting
B CO 232 Erection of steel supports for piping <2 interconnecting
STATIC EQUIPMENT ERECTION
B DO A1O Erection of towers and columns in one part
B DO A20 Erection of tower and columns in two parts
B DO B1O Erection of reactor in one part
B DO B40 Erection of tubular reactor and similar items to be bolted
B DO C1O Erection heat exchangers
B DO D1O Erection of vessels, drums in one part
B DO D20 Erection of vessels, drums in two parts
BDO E1O Erection of silos in one part
B DO E20 Erection of silos in two parts
B DO E32 Assembly and erection of s.s. silos supplied in loose parts to be welded
B DO E34 Assembly and erection of aluminium silos supplied as above
B DO F1O Erection of filters and pots
Erection and bolting of light steel structures stairs ladders. platforms and handrail relevant to the
B DO G40
above equipments

MEAS.
UNIT

STD HOURLY
OUTPUT

kg
kg
kg
kg
kg
kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
kg
Kg
Kg
kg
Kg
Kg
Kg
Kg
Kg

3.5
3
2.5
3
2.5
4
3.5
3
4
3
90
90
5
4
12
2.4
4
6
4.5
7
5
8
1.5
65
90
70
90
50
100
90
40
35
30
20
18
50

Kg

12

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3

MEAS.
UNIT

STD HOURLY
OUTPUT

B DO H40 Erection and bolting of internals and trays

Kg

10

B DO POO Hydraulic pressure test of static equipment

Kg

300

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

45
45
35
55
35
70
35
70
35
12
30
35
150
30
25
20
30
18
40
50
30

Kg

20

Kg
Kg
Kg
kg

30
30
50
45

B GO A31
B GO A32

PACKAGES ERECTION
Erection of packages skid mounted and accessories in one part
Erection of packages skid mounted and accessories In more parts
Erection of assembled air coolers
Erection of air coolers supplied in loose parts
Erection of assembled boilers
Erection of boilers supplied in loose parts
Erection of assembled heaters (furnaces and incinerators) (ref. weight of metallic part)
Erection of heaters (furnaces and incinerators) supplied in loose parts (ref. weight of metallic part)
Erection of ausiliar service structures for boilers. heaters and air coolers
Erection of prefabricated air and fumes ducts supplied in loose parts
Erection of prefabricated stacks supplied
Hydraulic pressure test of air coolers. boilers and heaters In loos parts
ROTATIVE EQUIPMENT ERECTION
Erection of assembled machinery (pumps and motors)
Erection of machinery to be assembled (pumps and motors)
Erection of fans. blowers and similar
Erection of mixers and agitators
Erection of separators and vibrators
Erection of assembled compressors
Erection of compressors to be assembled
Assembly and erection of belt conveyors and machinery for distribution and reclaiming of bulk
products
Assembly and erection of bagging and pelletizing systems
Assembly and erection of rotary feed systems and scales
Assembly and erection of hoists. Cranes and similar systems
Assembly and erection of extruders
TANKS AND SPHERES ASSEMBLY AND ERECTION
Assembly and erection of c.s fixed roof storage tanks and accessories (ref.capacity cu.m. 5.000)
Assembly and erection of s.s. silos and storage tanks and accessories (ref.capacity, cu.m. 1.000)

Kg
Kg

26
19

yes
yes

B GO B31

Assembly, and erection of c.s. floating roof storage tanks and accessories (ref.capacity, cu.m. 10.000)

Kg

16

yes

Kg
Kg
Kg

16
18
1000

yes
yes

B EO
B EO A1O
B EO A50
B EO B20
B EO B50
B EO C20
B EO C50
B EO D20
B EO D50
B EO F50
B EO G50
B EO H40
B FO POO
BFO
B FO A1O
B FO A20
B FO B1O
B FO C1O
B FO D1O
B FO E1O
B FO E50
B FO F50
6 FO G50
B FO H40
B FO L50
BFO M150

BGO

DESCRIPTION

B GO C30 Assembly and erection of spheres and accessories (ref. capacity,, cu.m. 1.000)
B GO D30 Assembly and erection of dome cryogenic tanks and accessories (ref.capacitn I cu.m. 5.000)
B CO POO
Hydraulic test of tanks and spheres

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3

BHI
B HI 100
B H1 200
B H2
B H2 110
B H2 120
B H2 210
B H2 220
B H2 300
BTO
B TO 100
B TO 200
B TO 300
CAO
CAO 110
C AO 120
C AO 210
C AO 220
C,AO 300
CBI
C BI 100
C BI 200
C BI 300
C BI 400
C BI 500
C B2

DESCRIPTION
STEEL STRUCTURES FABRICATION
Fabrication of medium and heavy weight steel structures
Fabrication of light weight steel structures
ERECTION OF STEEL STRUCTURES FOR PROCESS UNITS AND RACKS
Erection of medium and heavy weight items With bolted connections
As above with welded connections
Erection of light weight items ladders. platforms etc. with bolted connections
As above with welded connections
Erection of corrugated sheets, panels for roofin- and walling
PLANT DISMANTLING
Dismantling of equipment and machinery, and trasporting to lay down area in factory
Dismantling of piping (Ref. NPS 4") as above
Dismantling of steel structure as B TO 100
INSTALLATION OF H.V. LINES CONNECTING ELECTRICAL SUBSTATIONS WITHIN
FACTORY
Installation of H.V. above ground lines with stranded conductors on poles including civil ( Ref. Poles
H=10 M cables Dia.15 mm)works
As above for lines with three core armoured cables on cable trays (Ref cable <=240 Snm sect.)
As above for u.g. lines on trenches (Ref. cables sect. <= 240 MM)
Civil works for u.g. lines on trenches (Ref'. trench sect.: 3.0 SM. walls THS: 0,.2 M)
Test of H.V. lines
INSTALLATION OF OUTDOOR H.V. ELECTRICAL SUBSTATIONS
Installation of HV/LV oil immersed power Transformers (Ref. unit weight <= 22 Tons)
Installation of HV metal clad switchgears (Ref unit weight <=800 Kg)
Installation of HV bus ways (Ref unit weight <= 800 Kg)
Installation of emergency diesel generator sets. no-break groups and similar electrical equipment (Ref.
total weight <= 6 Tons)
Checks and tests
INSTALLATION OF MV/LV SWITCHGEARS, SWITCHBOARDS AND OTHER
EQUIPMENT IN ELECTRICAL SUBSTATIONS

Installation of MV main switchgears in substation supplied in two or more parts


(Ref. unit weight = 12 Tons)
C B2 120 As above for LV main switchgears (Ref. Unit weight = 4,2 tons)
C B2 210 Installation of panels. supplied in one piece in Substations
C B 2 220 As above for panels outdoors in plant areas
C B2 300 Installation of,MV/'L.V bus ways supplied in tow or more pieces (Ref. units weight <= 800 Kg)
C B2400
As per C B2 I IO for D.C. distribution boards in one piece (Ref. units weight<= 800 Kg)

MEAS.
UNIT

Kg
Kg
kg
Kg
Kg
Kg
Kg
K2
m
Kg
Kg
Kg
Kg

STD HOURLY
OUTPUT

18
22
10
24
36
3.0
15
12
1.2
45
100
18
40

m
m

1.4

m
m
m
m
Kg
Kg
Kg
Kg

3
2.5
0.05
30

Kg

45

Kg

300

80
25
30

Kg

C B2 I 10

Kg
kg
Kg
Kg
Kg
Kg

23
20
25
3O
18
20

ADAPTATION
FACTOR "W"

yes

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3
C B2 500
C B2 600
C B2 700

CCI I
CCI 110
CCl 120
C Cl 211
C Cl 212
C Cl 221
C Cl 222
C Cl 230
C Cl 310
C C 321
C Cl 322
C Cl 400
C C2
C C2 100
C C2 210
C C2 220
C C2 300
C C2 400
C C3
C C3 100
C C3 210
C C3 220
C C3 300
C C3400
C DI
C DI 100
C DI 210
C DI 220
C DI 300
C DI 400
C DI 500
C D2

DESCRIPTION
Installation of MV/LV distribution transformers supplied in one part (Ref. KVA 1250. Units weight =
4 Tons)
Installation of storage batteries and capacitor sets on racks
Checks and tests
ELECTRICAL CABLES INSTALLATION, JOINTING AND TERiNlINATIONS
Laying of MV multicore cables. u.g. buried or in cable-ducts for power distribution
As above for a.g. cables on trays or conduits
Laving of LV multicore cables with section <= 35 Smm, u.g. buried or in cable-ducts for power
distribution
As above for u.g. cables with sect. > 35 Smm
As per C C 1 21 1 for a.g. cables on trays or conduits with sect. <= 35 Smm
As per C Cl 21 1 for a.g. cables on trays or conduits with sect. > 35 Smm
As per C Cl 221 for a.g. cables clamped to structures
Terminations and connections of MV multicore cables
Terminations and connections of 'LV multicore cables with sect. <= 35 Smm
Terminations and connections of LV multicore cables with sect. > 35 Smm
Checks and tests (Ref. lenght of' cables installed)
CABLE TRAN'S, CONDUITS AND NIISCELLANEA ASSEMBLING, PREFABRICATION
AND ERECTION
Assemling and erection of cable trays on existing structures (Ref. weight 10 Kg/M)
Prefabrication and erection of buried conduits
Prefabrication and erection of clamped conduits
Prefabrication and erection of steel supports for cable trays, conduit and similar
Sealing of cable entry openings in substations or other building walls
INSTALLATION OF CONTROL STATIONS, RECEPTACLES AND MISCELLANEA
Installation of push-botton stations (Ref. n stations)
Intallation of industrial type receptacles (sockets-outlets etc.)
As above for civil type receptacles in plant Areas (sockets-outlets etc.)
Installation of.junction boxes for general use in plant areas
Checks and mecanical tests
ERECTION OF ROADS AND YARDS LIGHTING
Erection of poles and lighting fixtures (Ref. nof poles)
Erection of lighting masts (Ref. H 15 M weight 1500 Kg)
Erection of floodlights on masts (Ref. units for lamp 500 W)
Erection of lighting control devices
Laying down buried feeding cables (Ref. cable sect. I 0 Smm, dist. of poles 30 M)
Checks and tests (Total n of lighting fixtures)
ERECTION OF INDUSTRIAL LIGHTING

MEAS.
UNIT

STD HOURLY
OUTPUT

Kg

200

Kg
Kg

20
400

m
m

3.5
1.5

20

m
m
m
m
Nbre
Nbre
Nbre
Nbre

10
12
7
6
0.09
0.6
0.25
200

Kg
Kg
Kg
Kg
m
Nbre
Nbre
Nbre
Nbre
Nbre
Nbre
Nbre
Nbre
Kg
Nbre
Nbre
m
Nbre

10
2.75
2
2.5
0.7
0.15
0.25
0.3
0.4
1.0
0.15
50
0.15
0.4
4
1.75

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3
C D2 100
C D2 200
C D2 300
C D2 410
C D2 420
C D2 500
C D2 600

CEO
CEO 110
C EO 120
CEO 200
C EO 300
C FO
CFO I 10
C FO 120
C FO 200
C FO 300
CGO
C GO 100
C GO 200
C GO 310
C GO 320
C GO 330
C GO 400
C HO

DESCRIPTION
Erection of stanchions and lighting fixtures in plant areas
Assembling and, erection of cable, trays for lighting systems
Prefabrication and erection of clamped conduits
Laying of LV feeding cables on cable trays or conduits
As above for cables clamped on structures
Feeding cable terminations in each terminal box
Checks and tests (Ref, tot. n' of lighting fixtures)
EARTHING AND LIGHTNING SYSTEMS INSTALLATION
Laying down buried stranded earthing conductors
As above for earthing steel strips
Istallation of accessories of earthing systems (plates, rods ect)
Checks and tests (Ref. total lenght of earthing conductors)
ELECTRIC HEATING SYSTEMS INSTALLATION
Laying of LV feeding cables
Laying of mineral insulated heating cables including tert-ninations and connections
Installation of heating systems accessories (heating kits, junction boxes, thermostats etc.)
Checks and tests (Ref. total lenght of heating cables)
CATHODIC PROTECTION SYSTEMS INSTALLATION
Laying of electric cables for cathodic protection
Installation of electric generators, cathodic feeders. field switchboards
Installation of sacrificial alloy anodes on steel structures
Installation of current dischargers, electrodes. reference cells
Installation of measure and junction boxes
Clieck-c, and tests (Rer. total jenght of cables)

MEAS.
UNIT

STD HOURLY
OUTPUT

Nbre
Kg
m
m
Nbre
Nbre
Nbre
m
m
m
Nbre
m

0.13
5
0.7
7
3
8
2.5
3
2.5
0.15
250
6
3
0.25
100

m
m
Nbre
Nbre
Nbre
Nbre
m

4.5
0.05
0.5
0.5
0.25
25

Nbre
Nbre
m
m
Nbre

0.25
0.3
15
6
1

Kg

25

Nbre

Kg
Kg
Kg

6
10
50

TELECOMMUNICATION, FIRE ALARM AND AUXILIARY SYSTEM INSTALLATION


CHO 110
C HO 120
C HO 210
C HO 220
C HO 300
C HO 400
C HO 500

CTO
C TO 100
C TO 200
C TO 300

Installation of equipment outdoor in field


As above inside industrial buildings
Laving of buried multicables including joints
As above on cable tray,s
Multicables termination and connections
Installation of switchboards and storage batteries inside electrical substations (Ref units weight <=
400 Kg)
Checks and tests (Ref. total quantity of C HO 110 / CHO 120)
DISMANTLING OF ELECTRICAL WORKS
Dismantling and transport of electrical cables
Dismantling of field electrical devices and supports as above
Dismantling of substations equipment as C TO 100

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3

DAI
D Al 100
D Al 200
D A1 310
D AI 320
D Al 400
D Al 500
D Al 600
D Al 700
D Al 800
D A2
D A2 100
D A2 200
D A2 300

DESCRIPTION

MEAS.
UNIT

INSTALLATION AND CALIBRATION OF FIELD INSTRUMENTS


Installation of pressure instruments with relevant accessory and supports (Ref. avg. weight of supports
= 5 Kg each instrurnent)
Installation of flow instruments as above (Ref. as D Al 1 00)
Installation of level instruments flanged on equipment as per D Al I 00 (Ref. as D Al I 00
Installation of Level instruments on storage tanks as per D Al I 00 (Ref. avg. weight of supports = 25
2 each instrument)
Installation of temperature instruments as per D Al 100 (Ref. as [).AI I 00)
Installation of'detectors as per D Al 100 (Ref. as D Al I 00)
Prefabrication and erection of instruments primary piping (Ref. thr. piping Dia. 1/2" and distance from
process piping: 5 M

Nbre

Installation of tubing or cables connecting- the accessories of control and motorized valves
accessories of control and motorized valves
Pneumatic/electric tests and calibration of instruments (Ref. total N' of instruments)
INSTALLATION, AND CALIBRATION OF FIELD ANALIZERS AND SINIILARS IN
CABINETS
Field installation of analyzers. Chromatographs Sampling systems etc. already, installed in assembled
cabinets (Ref. Avg. Weight 500 Kg)
As above for analyzers with in line cell holders (Ref. Avg. weight.- 100 Kg)
Assembling and erection of field cabinets for analyzers or instruments- supplied in prefabricated
panels (Ref. avg. weight 300 Kg)

D A2 500

Prefabrication and erection of primary piping and relevant supports (Ref. pipe Dia. IO MM avg.
lenght: 70 M)
Test of primary connections and analyzers calibration
INSTALLATION OF,IUNCTION BOXES IN FIELD WITH RELEVANT SUPPORTS AND
SECONDARY" CONNECTIONS

D BO 100

Installation of electric/pneumatic junction boxes and relevant supports (Ref. box for I 0 users,
supports Weight = I 0 K2 each box)

D BO 200

Prefabrication and erection of secondary tubing connecting.junction boxes with users (Ref. box for IO
users tube length 30 M each user)

D A2 400

D BO

D BO 300
D BO 400
DCO
D CO I 10
D CO 120

Laying of electric cables for secondary connections of junction boxes with users (Ref. box for IO
users cable length 40 M each user)
Pneumatic/electric tests of piping and cables (Ref. total N' of junction boxes)
ERECTION OF CABLES AND TUBING ROUTES AND PROTECTIONS IN FIELD
Erection of main -galvanized cable-trays. And covers (Ref. total \x eight of tra) s and covers .avg.: 7
Kg/M)
As above for reinforced fiberglass cable-trays and covers (Ref. total weight of trays and covers. avg.:
7 Kg/M)

STD HOURLY
OUTPUT

Nbre

0.2

Nbre
Nbre

0.08
0.06

Nbre

0.02

Nbre
Nbre

0.6
0.5

Nbre

0.7

0.9
0.15

Nbre
Nbre

0.04

Nbre

0.25

Kg

1.0

1.8

Nbre

0.05

0.25
2
10
0.2
kg
kg

kg

10

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3

MEAS.
UNIT

STD HOURLY
OUTPUT

D CO 210

As D CO I I 0 for galvanized cable-trays and covers for secondary connections (Ref. total \\eight of
trays and covers.avg.: 3 Kg/M)

kg

2.5

D CO 220

As D CO I I 0 for reinforced fiberglass cable-trays and covers for secondary connections (Ref
total \\;eight of trays and covers. avg. 2 Kg/M)

D CO 300

Prefabrication and erection of conduits and relevant supports (Ref. supports I Kg, for 2 ',\4 conduit)

1.2

D DO

INSTALLATION OF MAIN INTERCONNECTIONS BETWEEN FIELD


Installation of multicables and-multitubes underground on site. Between junction boxes in field and
control rooms (Ref M/C and MIT with 6 pairs of cables or 12 tubes)
As above for multicables and multitubes. u/g field run/interconnecting (Ref. as D DO I I 0)
As D DO I IO for multicables and mutitubes above ground on site (Ref. as D DO I I 0)
As D DO I I 0 for multicables and multitubes a/g field run/interconnecting (Ref. as D DO I I 0)
Installation of earthing net-work for instrumentation
Electric and pneumatic test of multicables and multitubes (Ref. N' of junction boxes in field)
INSTALLATION OF INSTRUMENT AIR SYSTEMS
Prefabrication and installation of piping for instruments air systems with manifolds (Ref. No of
pneumatic users with distance: 15 Ml and pipe Dia. 3/4",)

D DO I 10
D DO 120
DD0210
D DO 220
D DO 300
D DO 400
D EO
D EO I 10
D EO 120
D EO 200
D FO
D FO 100
D FO 200
D FO 300
D FO 400
DGI
D GI 100
D GI 200
D GI 300
D GI 400
D GI 500
D G2

DESCRIPTION

As above for instrument air systems consisting of piping only, (Ref. pipe Dia. 3/4" and avg. distance
of pneumatic users -20 M
Pneumatic sealing test of systems (Ref. No of air users)
FIELD INSTRUMENTS HEATING SYSTEMS INSTALLATION
Laving of electrical tracing cables for instrument and primary connections heating and accessories
(Ref. 20 M of feeding cable and 15 M of tracing cable for each instrument)
Installation of copper or s.s. tubing tracing- for instruments and primary connections steam/ hot water
heating and accessories (Ref. 15 M of tubina Dia. 8 MM for each instrument)
Installation of protection boxes on existing supports including instruments inside boxes and their
adjustment with connections
Checks and tests (Ref. total quantity of heating, users)
INSTALLATION OF PANELS. BOARDS , DCS STATIONS AND CABLE TRAYS IN
CONTROL ROOM
Installation of- panels. boards and similar in control room (Ref. units weight 500 Kg / each section)
As above for consoles, desks of DCS systems (Ref. Units weight 300 Kg, / each section)
As per D GI I 00 for Ups systems. Boards and storage battery shelters (Ref units weight 300 Kg / each
section)
Installation of instruments in cases onto cabinets
Installation of cable trays in control room
INSTALLATION OF MULTICABLES AND MULTITUBES,WIRING AND CONNECTIONS
IN CONTROL ROOM

6
9
5
1.0
6
0.25
Nbre
Nbre

0.02

Nbre

0.3

Nbre
Nbre

0.8

0.3

Nbre

0.4

Nbre

kg
kg
kg

75
25

kg

30

Nbre
Kg

0.4
1.5

Nbre

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3
DG2 100
D G2 200
D G2 300

D HO
D HO I 10
D HO 120
D HO 200
D HO 300
D HO 400
D HO 500
D HO 600
D HO 700
D LO
D LO 100
D LO 200
D LO 300
D LO 410
D LO 420
D LO 500
DTO
D TO 100
D TO 200
D TO 300
EAI
EAI 111
E Al 112
E Al 121
E Al 122
E Al 211
E A2
E A2 100
E A2 200
E A2 300
EBI
E BII 10
E BI 120

DESCRIPTION
Laying of interconnecting multcables and multitubes in control room (Ref 0,4 m of cables for each
connection)
boards. Consoles in control room (Ref no of conductors with lugs)
As above for pneumatic tubing and connections (Ref. no of pneumatic terminations)
FUNCTIONALITY' TESTS OF LOOPS AND SYSTEMS
Functionality tests of analogic and digital loops (Ref. n' of loops)
As above for pneumatic signal loops (Ref. n' of loops)
Functionality tests of trip and shut down systems (Ref. number of input signals)
Functionality tests of alarm systems (Ref. as D HO 200)
Functionality tests of control systems (Ref. as D HO 200)
Functionality tests of data logger systems (Ref. as D HO 200)
Functionality tests of feeders (Ups) systems (Ref as D HO 200)
Functionality tests of computer and TV System (Ref as D HO 200)
PREFABRICATION AND ERECTION OF STEEL SUPPORTS AND MISCELLANEA FOR
INSTRUMENTATION
Prefabrication and erection of steel supports for instruments and relevant cables/tubing
As above for earthing plates and other small steel items
Sealing of cables/tubes entries in control room Walls
Excavation, backfilling of soil for u.g. cables/tubes bv machine
As above by hand
Sand filling or removing for u.g. cables/tubes protection by, hand
DISMANTLING OF INSTRUMENTATION WORKS
Dismantling and transport of cables and tubing
Dismantling of field instruments and supports as above
Dismantling of equipment in control rooms as D TO 100
INSULATION OF HOT OR TRACED PIPING
Insulation of hot piping NPS < 2" on site/ field run (Ref THK = 30 MM)
As above for traced piping NPS < 2" on site/ field run (Ref THK = 3 0 MM)
As per E Al I I I for hot piping NPS >= 2" on site/field run (Ref THK = 50 MM)
As above for traced piping NPS >= 2" on site/ field run (Ref. THK=50 MM)
Insulation of hot piping NPS <2 interconnecting (Ref. THK 30 MMl)
INSULATION OF HOT AND TRACED EQUIP,,NIENT AND SINIILARS
Insulation of hot and traced equipment. Smoke ducts etc. (Ref. THK = 70 MMsingle layer)
Insulation of hot and traced tanks (Ref. THK = I 00 MM. single layer)
Insulation of boilers. desalters etc. (Ref. THK = 70 MM, single layer)
INSULATION OF COLD PIPING
Insulation of cold piping NPS < 2" on site/ field run (Ref. preshaped material THK = 40 MM)
As above for cold piping NPS >= 2" on site/ field run (Ref. poured material THK = 60 MM)

MEAS.
UNIT

STD HOURLY
OUTPUT

Nbre
Nbre

3
5.5

Nbre
Nbre
Nbre
Nbre
Nbre
Nbre
Nbre
Nbre

0.1
0.08
0.25
0.5
0.25
0.5
0.3
0.2

kg
kg
kg
m
m
m
m
kg
kg
kg
kg
m
m
m
m
m
m
m
m
m
m
m
m
m

2.5
0.5
0.7
1.8
0.3
0.1
5
8
35
0.6
0.2
0.15
0.35
0.3
0.4
0.8
0.5
0.1
0.3

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3
E BI 210
E BI 220

E B2
E B2 100
E B2 200
E B2 300
E TO
ETO 1 10
E TO 120
FA1
F Al 100
F Al 210
F Al 220
F Al 230
F Al 300
FA2
F.A2 I IO
F A2 120
F A2 130
F A2 200
FA3
F A3 100
F A3 200
F A3 300
F BI
FBI 110
FBI 120
F BI 130
F B2
F B2 100
F B2 200

DESCRIPTION
Insulation of cold piping NPS < 2" interconnecting (Ref. preshaped material THK = 40 MM)
As above for cold pipina NPS >= 2" interconnecting (ref. Preshaped material THK=60MM)
TANKS AND SPHERES
Insulation of cold equipment (Ref preshaped,material THK= 80 MM)
Insulation of cold (cryogenic) tanks (Ref. sprayed material THK = 80 MM)
Insulation of cold spheres (Ref. sprayed material THK = 40 MM)
DISMANTLING OF INSULATION WORKS
Dismantling of hot/cold insulation of piping
Dismantling of hot/cold insulation of equipment
SAND BLASTING, CLEANING AND PRIMING OF PIPING
Sand blasting and priming of straight piping in tunnel with suitable equipment (Ref. Sa 2.5. priming
THK = 75 microns)
Sand blasting and priming by hand of c.s./a.s. piping prefabricated in spools with NPS <= 1/2" (Ref.
as F Al 100)
As above for piping with NPS between 2" - 6" (Ref. as F Al 100)
As F Al 21 0 for piping with NPS >= 8" (Ref as F Al 100)
Cleaning with solvent and priming of ss piping by hand (Ref. NPS=4". one coat of primer)
SAND BLASTING AND PRIMING OF STEEL STRUCTURES COMPONENTS AND
SUPPORTS
Sand blasting, and priming, of steel structures components (beams/pillars) in tunnel (Ref as F Al I 00)
Sand blasting and priming by hand of steel structure components having a weight <= 10 Kg/M (Ref.
as F Al 100)
As above for steel components having a weight> 10 Kg/M (Ref. as F Al I 00)
As F A2 120 for steel piping supports (Ref. as F Al I 00)
SAND BLASTING, CLEANING AND PRIMING OF EQUIPMENT, TANKS AND SPHERES,
STACKS ETC.
Sand blasting and priming of c.s. equipment, furnaces. boilers. stacks etc. by hand
As above c for tanks and spheres by hand
Cleaning with solvent and priming of s.s. equipment and other apparatuses
TOUCH - UPS AND FINISHING COATS OF PIPING
Touch - Ups and finishing coats of piping with NPS <= 1/2" (Ref. 2 coats of paints and including
preparation of erection welded joints)
As above for piping with NPS between 2" - 6" (Ref. as F BI 1 10)
As F BI 1 1O for piping with NPS >= 8" (Ref as F BI 1 10)
TOUCH - UPS AND FINISHING COATS OF STEEL STRUCTURES AND SUPPORTS
Touch - Ups and finishing coats of medium/ heavy steel structures components (Ref. as F B I I I 0)
As above for light steel structures components and piping supports

MEAS.
UNIT

STD HOURLY
OUTPUT

m
m

0.15
0.5

m
m
m
m
m
m
m

D.3
0.4
0.7
3.5
4'. 2

m
m
m

1.5
2
3

m
m

m
m

2
0.6

m
m
m
m
m

3
3.5
5

0.5

m
m
m
m
m

3
5
3
0.5

ADAPTATION
FACTOR "W"

QUANTITY

CONSTRUCTION ACTIVITIES LIST


CODE
LEVEL2

CODE
LEVEL3

F B3
F B3 100
F B3 200
F B3 300

DESCRIPTION
TOUCH - UPS AND FINISHING COATS OF STATIC AND ROTATIVE EQUIPMENT AND
OTHER APPARATUSES
Touch - Ups and finishing coats of columns. vessels. stacks etc. (Ref. as F B I 1 10)
As above for tanks and spheres (Ref as F BI 1 10)
As F B3 100 for machines and other moving/ lifting apparatuses

MEAS.
UNIT

STD HOURLY
OUTPUT

m
m
m
m

4
4.5
0.3

ADAPTATION
FACTOR "W"

QUANTITY

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

on site

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S

STANDARD
MANHOUR
S