Introduction
For the objectives to complete a sound public safety
and disaster prevention system, to improve emergency
medical service, promote professional fire prevention and
fighting service, enhance disaster rescue efficiency and
protect civilian life,, p
p
property
p y and safety,
y, "National Fire
Agency Ministry of Interior" was established on
March 1, 1995 to be responsible for fire prevention,
disaster rescue and emergency medical service.
Introduction
Internal Units
Planning Department
Disaster Management Department
Hazardous Material Management Department
Civilian Coordination Department
National Firefighting
Training Center
March 1, 1995
National Fire Agency establish
August, 1995
Promulgation of the modificatory Fire
Services Act
July 19, 2000
Promulgation of the Disaster Prevention
and Relief Act
Fire Prevention
Disaster Management
Statistics of Fire
Fire
ti
times
1999200020012002200320042005200620072008 Year
Statistics of Fire
Death of the fire
People
199920002001200220032004200520062007 2008
Year
Statistics of Fire
Reason
It
Item
Year
R
Reason
off Fi
Fire
Total
Sweep
Gas
Cigarette
Electric
Other
Machinery Cooking
Artificial
Tomb Explosion
Butts
Equipment
2008
1,016
385
222
91
134
47
28
963
2,886
2007
1,122
419
334
127
197
79
39
1,075 3,392
Growth
Count
-106
106
-34
34
-112
112
-63
63
-63
63
-32
32
-11
11
-112
112
Growth
Rate ((%))
-9.4
-8.1
-33.5
-28.3
-32.0
-40.5
-28.2
-506
506
-10.4 -14.9
Statistics of Fire
Place
Item
Year
Building
Commercial
Housing Factory
Building
Non-building
Total
Other
2008
1,171
264
95
355
1885
506
257
21
217
2,886
2007
,
1,341
309
126
424
2200
546
356
26
264
3,392
,
Growth
Count
-170
-45
-31
-69
-315
-40
-99
-5
-47
-506
Growth
Rate (%)
-12.7
-14.6
-24.6
-16.3
-14.3
-7.3
Trainingg
Chu Shan Fire-Protection Training Center
The Area is 109 hectares and the wide is 7
kilometers. Include six training bases in the
center.
t This
Thi centre
t is
i the
th mostt complete
l t
training centre of Southeast Asia .
Training
Facility - Hardware
A. Multi-functional area
All-round building, Teaching building,
Dormitory, Refectory, and etc.
B. Precaution and rescue disaster training
g center
Operate and monitor tower, Physical stamina
and ability training center, particular rescue
training
g center, and etc.
Facility - Software
A. Operating system in the training center
B. The computer operating system of precaution
and rescue disaster training center
C. Information system
Training
Introduction
In July 1999, the National Fire
A
Agency
off the
th Ministry
Mi i t off the
th Interior
I t i
helped Chinese Fire Protection Safety
Center(CFS) to establish . The center
is non-profit establishment.
The purpose of assisting firefighting
authorities carries out firefighting and
fire safety duties.
Approved
pp
Operation
p
Process Diagram
g
National Fire Agency of the
Ministry of the Interior
Standard Approval
C tifi t
Certificate
User
Approval
pp
Item
Equipment
Equipment
l.l Fire
Fi Al
Alarm C
Control
t l and
d IIndicating
di ti
equipment
c. Deluge Valve
e. Escape Sling
q Smoke Damper
q.
h. Fire Hoses
r. Fire Pump
i. Exit Indicating Lamp and Refuge s. Fire Alarm Manual Call Points, Fire
Direction Indicating Lamp
Alarm Bell and Fire Alarm Lights
j. Emergency Light
t. Fire-Retardant Cables
Foam Sprinkler
examine
Leakage conformation
Test of Sprinkler
Deluge
g Valve
inside
conformation
Pulled
Test
of Escape
p Sling
g examine
Transients
T
i t Test
T t off Fire
Fi Alarm
Al
equipment
i
t
Chinese Fire Protection Safety Center
Approval Label
A. According
g to the fire-protection
p
machine
and equipment approval label method and
specification.
pp
label has
B. From June 1,, 2004 , the approval
increased 8 numbers. The first and second
number are means year. Other six numbers
express the serial number.
C. Covert anti-piracy
If use the UV lamp to shine, the label will
reveal CFS
D. Serial Number of Individual Approval Label
Inquiry of Net surfing.
www.cfs.org.tw
www cfs org tw
Business of approve the water system and the equipment for refuge
Introduction
CFS established a testing laboratory about water system and
relevant apparatus of take refuge. The laboratory is approve
by
y the Taiwan Accreditation Foundation ((TAF).
) Provide testing
g
service include eight items of fire protection equipment.
Testing Item
a. Close Sprinkler Head
b. Foam Sprinkler Head
c. Deluge Valve
d. Water Flow Detector
e. Escape Sling
f. Metal Escape Ladder
g. Fire Hose Connector
h. Fire Hoses
i. Other
Sprinkler
Operation
Foaming
Assembly
rate
Test
Load
Test
of Water
Test
of Foam
and
Flow
Strength
Sprinkler
Detector
of Frame Test
Smoke/Heat
Detector
Sensitivity
Tunnel
Illumination
Audibility
Test
Test
of Exit
of
Indicating
SpeakerTest
Lamp
Smoke Detector Sensitivity Test Tunnel
Chinese Fire Protection Safety Center
Conclusion
The fundamental
Th
f d
t l task
t k off the
th CFS is
i to
t see
to the upgrade of fire safety equipment
quality and the efficient management of
LPG safety
y matters,, thereby
y ensuringg the
safety of the community. It should be able
to guide the local fire safety industry
towards a new direction and assist the
government in implementing national
firefighting projects. Furthermore, the CFS
should lead the nation in achieving the
standards of developed
p nations.