Beruflich Dokumente
Kultur Dokumente
Eligible Activities
Energy Efficiency Retrofits Subtotal Total
Kitsap County Courthouse Improvements/Upgrades
Window Replacement
Window demolition, aluminum, to 50 S.F. $16,200
Windows, aluminum sash, custom, grade HC, excl. glazing, min $212,160
Windows, aluminum sash, stock, grade C, for double glazing, add $71,880
Sheet metal flashing, aluminum, flexible, mill finish, .032" thick, including up to 4 bends $29,340
Misc Costs: Engineering $111,853
$478,536
Solar Water Heating Improvements
Install 64 s.f. of flat plate collectors
30 tube systems with a 120-150 gallon storage tanks
$35,000
Education/Outreach/Marketing $10,000 $10,000
#REF!
Kitsap Pavilion Improvements/Upgrades
Solar Water Heating
Install 4 32 s.f. of flat plate collectors
Tube systems with a 120-150 gallon storage tanks
$19,000
Energy Efficiency Lighting Upgrades
71-6 Tube T-8 fixture $ 15,549.00
19-4 Tube T-8 fixture $ 3,382.00
13-2 Tube T-8 fixture troff $ 1,105.00
89- 2 Tube T-8 retro kit (troff) $ 4,806.00
6-1 Tube T-8 retro ballast $ 204.00
6-2 Tube T-8 retro kit $ 324.00
11-1 Tube T-8 wall fixture $ 869.00
Misc-Labor, equipment rental, etc 44,481
$70,720