Project :
DATE : 24-Nov-10
REF NO :
CLIENT :

ANYER GEOTUBE PROJECT

Dimensioning of geotextile reinforced dune barriers


(Leichtweiss-Institute for hydrodynamics and coastal engineering, Technical University
Braunschweig, Germany, large scale model tests at the GWK in Hannover, Germany 2002)

Stability calculation for sand containers at the SLOPE


1. Calculation of required sand container length l [m]:

l=

H s 3 / 4 T1 / 2
1.74 ( E / W 1) sin 2

with
Hs = significant wave height [m]:
Tp = peak period [s]
E = density of sand containers [kg/m 3]
S = density of fill sand [kg/m 3]

results
input value
=
1.5 m
=
6s
= (1-n)* S+ W =
3
=
1900 kg/m

W = density of water [kg/m ]

n = pore size [-]


Rc = freeboard [m]
= slope angle []

=
=
=

Required sand container length l


=
Required sand container volume V
=
Used Volume of Sand Container ==>> =

**
**
1810

kg/m 3

**

1050 kg/m **
0.6 -0.5 m
45
2.64
1.19
40.00

**

m
m3
m 3/unit

OK!!

Limiting rules based on test conditions:


1. The shown design equations are based on large scale model tests at the GWK in Hannover, Germany,
TU Braunschweig
2. The tests have been determined with 1:1 inclined slope (45)
3: ratio of l/B = length / width of sand containers of 2:1 = l/B
4. fill volume rate of 80%
** = assumed
PT Karya Prima Anugerah
Mandiri

Reference :

Design by :
Checked by :

COPYRIGHT RESERVED

Confidential
Project :

ANYER GEOTUBE PROJECT

DATE : 24-Nov-10
REF NO :
CLIENT :

Dimensioning of geotextile reinforced dune barriers

(Leichtweiss-Institute for hydrodynamics and coastal engineering, Technical University


Braunschweig, Germany, large scale model tests at the GWK in Hannover, Germany 2002)

Stability calculation for sand containers at the CREST


2. Calculation of required sand container length l [m]:

l=
l=

H
H s 3 / 4 T1 / 2s

R
(1.74
)W
0
.179
) + sin
0.092
c
E / (
WE/ 1
Hs

Required sand container length l


Required sand container volume V

sin

=
=

3.86
3.73

m
m3

Used Volume of Sand Container ==>> =

40.00

m 3/unit

( E / W - 1 )=

0.72
0.76

Rc =
0 .79 + 0 .09 . H

sin =

OK!!

0.71

Limiting rules based on test conditions:


1. The shown design equations are based on large scale model tests at the GWK in Hannover, Germany,
TU Braunschweig
2. The tests have been determined with 1:1 inclined slope (45)
3: ratio of l/B = length / width of sand containers of 2:1 = l/B
4. fill volume rate of 80%

PT Karya Prima Anugerah


Mandiri

Reference :

Design by :
Checked by :

COPYRIGHT RESERVED

Confidential
Project :
DATE : 24-Nov-10
REF NO :
CLIENT :

ANYER GEOTUBE PROJECT

Stability calculation using Hudson Formula


Type of 1st armour material : Tetrapod
Calculation of required weight Wr (ton):

Wr =

rH

results
input value

K (S r 1) cot
3

with
H (significant wave height)
r (unit weight of shield material)

=
=

w (unit weight of sea water)

1.5 m
3
1810 kg/m
3
1050 kg/m

K (degree of interlocking)
Sr (relative density of shield material with water) r/water

=
=

2
1.724

(slope angle)

45

required weight W r =

8054.7 kg/unit

Used Volume of Geotube ==>> =


Used Weight of Geotube ==>> =

40.0 m 3/unit
72400.0 kg/unit

** = assumed
PT Karya Prima Anugerah
Mandiri
COPYRIGHT RESERVED

Reference :
Shore Protection Manual

**

Design by :
Checked by :

OK!!

Confidential
Project :
DATE : 24-Nov-10
REF NO :
CLIENT :

ANYER GEOTUBE PROJECT

Stability calculation for bed protection using OCDI (Japan Port Standard) Method
Type of armour material : Softrock 1.2m3
Calculation of required weight M (kg):

M =

r U

results
input value

48 g 3 y 6 ( S r 1) 3 (cos sin ) 3

with :
r (density of armour )

g (gravitational acceleration)

3
1900 kg/m
2
9.81 m/s

y (Ishbash's constant, 1.2 for embedded, 0.86 for exposed)


w (density of water)

=
=

0.86
3
1050 kg/m

(slope angle in the axial direction of the channel bed)


Sr (relative density of shield material with water) r/ water

=
=

25
1.810

U (flow velocity)

=
required minimum Mass of Armour (M) =
Used Volume of Sand Container ==>> =
Used Weight of Sand Container ==>> =

**

3.5 m/s

**

9969.7 kg/unit
40.0 m3/unit
76000.0 kg/unit

COPYRIGHT RESERVED

Reference :
Shore Protection Manual

**

** = assumed
PT Karya Prima Anugerah
Mandiri

**

Design by :
Checked by :

OK!!