Estimated Cost
:- Rs. 87.39 Crores
Construction Period
: 1 Year 6 Months
Concession Period
: 20 Years 0 Months 0 Days
Submitted to :-
RSRDCC Ltd.
Unit, Udaipur.
MAIN REPORT PART - II
TECHNICAL DATA & FINANCIAL
Consultant :-
VULUME II
SECTION 1
PART 1
Improvement of Mangalwar - Nimbahera Road km 0/000 to 40/000 (MDR-11A) under BOT Annuity
Scheme
PAVEMENT DESIGN
DAT
A
1
2
3
4
5
6
Length of Road
Traffic intensity as worked out as in May 2010
Growth rate of traffic (assumed)
Total Period of Construction
Design C.B.R. of Subgrade Soil
Design Period of the Road
40.00
1045
5.00%
1
7.00%
10
km
CV / Day Average
Year
Years
Where:
A = Traffic in the year of completion of construction CV
/ Day
P = Traffic at last Count in May 2010
r = Annual growth rate of traffic
x = Number of years between the last census and the
year of completion of construction
A =1044.85714285714 x ( 1 + 0.05)x1
8 Vehicle Damage Factor ( V.D.F.)
1097 CV / Day
3.5 Standard Axle per CV
9 Design Calculation:
Initial traffic in design lane = Initial traffic x
Distribution factor
=1097 x 0.75
N = [365 x {( 1+r) x - 1} x A x F] / r
=365 x[{( 822.75( 1 +0.05)^10-1}x3.5]/0.05
Say
822.75 CV / Day
13.22 msa
13.00 msa
590 mm
Total Thickness
12 Structural Section:
Bituminous Surfacing = 40 mm BC + 70 mm DBM
Granular Base=
250 mm
Granular Sub-Base=
230 mm
Improvement of Mangalwar - Nimbahera Road km 0/000 to 40/000 (MDR-11A) under BOT Annuity
Scheme
PAVEMENT DESIGN
DAT
A
1
2
3
4
5
6
Length of Road
Traffic intensity as worked out as in May 2010
Growth rate of traffic (assumed)
Total Period of Construction
Design C.B.R. of Subgrade Soil
Design Period of the Road
40.00
1045
5.00%
1
7.00%
25
km
CV / Day Average
Year
Years
Where:
A = Traffic in the year of completion of construction CV
/ Day
P = Traffic at last Count in May 2010
r = Annual growth rate of traffic
x = Number of years between the last census and the
year of completion of construction
A =1044.85714285714 x ( 1 + 0.05)x1
8 Vehicle Damage Factor ( V.D.F.)
1097 CV / Day
3.5 Standard Axle per CV
9 Design Calculation:
Initial traffic in design lane = Initial traffic x
Distribution factor
=1097 x 0.75
N = [365 x {( 1+r) x - 1} x A x F] / r
=365 x[{( 822.75( 1 +0.05)^25-1}x3.5]/0.05
Say
822.75 CV / Day
50.16 msa
50.00 msa
650 mm
Total Thickness
12 Structural Section:
Bituminous Surfacing = 40 mm BC + 130 mm DBM
Granular Base=
250 mm
Granular Sub-Base=
230 mm
Improvement of Mangalwar - Nimbahera Road km 0/000 to 40/000 (MDR-11A) under BOT Annuity
Scheme
PAVEMENT DESIGN
DAT
A
1
2
3
4
5
6
Length of Road
Traffic intensity as worked out as in May 2010
Growth rate of traffic (assumed)
Total Period of Construction
Design C.B.R. of Subgrade Soil
Design Period of the Road
40.00
1045
5.00%
1
3.00%
10
km
CV / Day Average
Year
Years
Where:
A = Traffic in the year of completion of construction CV
/ Day
P = Traffic at last Count in May 2010
r = Annual growth rate of traffic
x = Number of years between the last census and the
year of completion of construction
A =1044.85714285714 x ( 1 + 0.05)x1
8 Vehicle Damage Factor ( V.D.F.)
1097 CV / Day
3.5 Standard Axle per CV
9 Design Calculation:
Initial traffic in design lane = Initial traffic x
Distribution factor
=1097 x 0.75
N = [365 x {( 1+r) x - 1} x A x F] / r
=365 x[{( 822.75( 1 +0.05)^10-1}x3.5]/0.05
Say
822.75 CV / Day
13.22 msa
13.00 msa
760 mm
Total Thickness
12 Structural Section:
Bituminous Surfacing = 40 mm BC + 90 mm DBM
Granular Base=
250 mm
Granular Sub-Base=
380 mm
Improvement of Mangalwar - Nimbahera Road km 0/000 to 40/000 (MDR-11A) under BOT Annuity
Scheme
PAVEMENT DESIGN
DAT
A
1
2
3
4
5
6
Length of Road
Traffic intensity as worked out as in May 2010
Growth rate of traffic (assumed)
Total Period of Construction
Design C.B.R. of Subgrade Soil
Design Period of the Road
40.00
1045
5.00%
1
3.00%
15
km
CV / Day Average
Year
Years
Where:
A = Traffic in the year of completion of construction CV
/ Day
P = Traffic at last Count in May 2010
r = Annual growth rate of traffic
x = Number of years between the last census and the
year of completion of construction
A =1044.85714285714 x ( 1 + 0.05)x1
8 Vehicle Damage Factor ( V.D.F.)
1097 CV / Day
3.5 Standard Axle per CV
9 Design Calculation:
Initial traffic in design lane = Initial traffic x
Distribution factor
=1097 x 0.75
N = [365 x {( 1+r) x - 1} x A x F] / r
=365 x[{( 822.75( 1 +0.05)^15-1}x3.5]/0.05
Say
822.75 CV / Day
22.68 msa
25.00 msa
790 mm
Total Thickness
12 Structural Section:
Bituminous Surfacing = 40 mm BC + 120 mm DBM
Granular Base=
250 mm
Granular Sub-Base=
380 mm
Improvement of Mangalwar - Nimbahera Road km 0/000 to 40/000 (MDR-11A) under BOT Annuity
Scheme
PAVEMENT DESIGN
DAT
A
1
2
3
4
5
6
Length of Road
Traffic intensity as worked out as in May 2010
Growth rate of traffic (assumed)
Total Period of Construction
Design C.B.R. of Subgrade Soil
Design Period of the Road
40.00
1045
5.00%
1
3.00%
25
km
CV / Day Average
Year
Years
Where:
A = Traffic in the year of completion of construction CV
/ Day
P = Traffic at last Count in May 2010
r = Annual growth rate of traffic
x = Number of years between the last census and the
year of completion of construction
A =1044.85714285714 x ( 1 + 0.05)x1
8 Vehicle Damage Factor ( V.D.F.)
1097 CV / Day
3.5 Standard Axle per CV
9 Design Calculation:
Initial traffic in design lane = Initial traffic x
Distribution factor
=1097 x 0.75
N = [365 x {( 1+r) x - 1} x A x F] / r
=365 x[{( 822.75( 1 +0.05)^25-1}x3.5]/0.05
Say
822.75 CV / Day
50.16 msa
50.00 msa
830 mm
Total Thickness
12 Structural Section:
Bituminous Surfacing = 40 mm BC + 160 mm DBM
Granular Base=
250 mm
Granular Sub-Base=
380 mm
PART 2
Design of Overlay
Mangalwar - Nimbahera
SH -61
2/100 to 122/000
2010
7
1045
432
5.00%
1
15
0.97
days
CVPD
mm per annnum
Year
Years
mm
DESIGN CALCULATIONS :
1 Initial Traffic in the Year of Completion of Construction
P n = P o ( 1 +r)
Where:
Pn = Traffic in the year of completion of construction CV / Day
Po = Traffic at last Count in Nov. 2001
r = Annual growth rate of traffic
n= Number of years between the last census and the year
of completion of construction
Pn =1044.85714285714 x ( 1 + 0.05)^1
1097 CV / Day
2 Vehicle Damage Factor ( V.D.F.)
3.50
0.75
=1097 x 0.75
822.75 CV / Day
Ns =[365 x A x ( 1+r) - 1} x F] / r
=365 x[{( 1097( 1 +0.05)^15-1}x3.5]/0.05
Say
5 Characterstic Deflection =
22.68 msa
25.00 msa
8
0.97 mm
75 mm
DBM
15 mm
15 mm
BC
40 mm
Base Course
Surfacing
8 Thickness Combination Block
Bituminous Concrete BC40mm
PART 3
Design of CC Road
Step -2
Step -3
Design Parameters:
(a) Location of Pavement
th
(b) Design Axle load (98 Percentile Axle Load) =
: Rajasthan
:
:
:
3
5.5 kg/cm
3
38.9 kg/cm
2
300 kg/cm
2
38.34 kg/cm
:
:
:
:
5%
3.50 metres
5.00 metres
33.00 cms.
:
for L/l =
CL =
o
15.8 C
69.72 cms.
5.020
0.724
for W/l =
CW =
1.038
C max
1.038
300000 kg/cm
0.15
o
0.00001 / C
Step -4
10.2 tonnes
8000 kg
1045 CVPD
2
8 kg/cm
7.172
2
24.60 kg/cm
2
13.74 kg/cm
Step -6
26.51 cms
Where
S = C/c distance between two tyres =
2
2 1/2
b= (1.60 a + h )
31 cms
-0.675h
sle =
Step -7
24.77 cms.
2
11.71 kg/cm
Step -8
1.17 O.K.
2
11.57 kg/cm
< fR O.K.
Step-9
2772 CVPD
F
0.00 cms.
33.00 cms.
DESIGN OF JOINTS:
2 DESIGN OF DOWEL:
2.1 Design Parameters :
Design Wheel Load (P)
Design load transfer =
Slab Thickness =
Joint width (z) =
Radius of relative stiffness (l) =
Permissible flexural stress in dowel bar =
Permissible shear stress in dowel bar =
Permissible bearing stress on concrete =
Fb = (10.16 -b)f ck / 9.525
K value on sub base =
8000
40%
33.00
20
69.72
kg
cms.
mm
cms.
2
1400 kg/cm
2
1000 kg/cm
2
219.2126 kg/cm
38.9 kg/cm3
Step 1 :
3.2 cm
40.47
34.98
36.98
37.00
Say
Step 2 :
8038.4 kg
1744.97 kg
P in bearing = f cr d/(12.5x(r+1.5z)) =
1807.97 kg
P in bending = 2d fc/(r+8.8z)
2
Hence design P =
Step 3 :
1744.97 kg
Step 4 :
cms
cms
cms
cms
3200.00 kg
1.83
125.49 cm
=
Which is larger than required capacity of 1.83
Hence adopt dowel spacing =
Hence provide 500mm long 32mm dia dowel bars 300mm c/c.
3 DESIGN OF TIE BARS:
3.1 Design Parameters
Slab Thickness (h) =
Slab Width (b) =
No of lanes to be tied =
Coefficient of friction between pavment and subgrade (f)=
2.47
30 cms
33.00 cms.
5 metres
2
1.5
Step 2 :
825 kg
2
1400 kg/cm
17.5 kg/cm
24 kg/cm
825 kg
2
4.420 cm /m
10 mm
2
78.54 mm
31.42 mm
5.63 and
17.77 cm
45 cms
400.00 mm
291.67 mm
450.00 mm
341.67 mm
At km 5/000
VDF
Year
2010-2011
3.5
Distribution factor
2A Truck 3A Truck
316
140
0.75
MSA
Design
MSA
LCV
277
MAV
239
Tractor
43
Trailer
82
0.40
0.30
2011-2012
332
147
291
251
45
86
0.86
0.65
2012-2013
349
155
305
264
48
90
1.39
1.04
2013-2014
366
162
321
277
50
95
2.00
1.50
2014-2015
384
170
337
291
52
99
2.69
2.02
2015-2016
403
179
354
305
55
104
3.48
2.61
2016-2017
424
188
371
320
58
110
4.37
3.28
2017-2018
445
197
390
336
61
115
5.38
4.04
2018-2019
467
207
409
353
64
121
6.52
4.89
2019-2020
490
217
430
371
67
127
7.81
5.86
2020-2021
515
228
451
390
70
133
9.27
6.95
2021-2022
541
240
474
409
74
140
10.90
8.18
2022-2023
568
252
497
429
77
147
12.74
9.56
2023-2024
596
264
522
451
81
154
14.80
11.10
2024-2025
626
277
548
473
85
162
17.11
12.83
2025-2026
657
291
576
497
90
170
19.70
14.77
2026-2027
690
306
605
522
94
178
22.59
16.94
2027-2028
725
321
635
548
99
187
25.82
19.37
2028-2029
761
337
667
576
104
197
29.44
22.08
2029-2030
799
354
700
604
109
206
33.46
25.10
2030-2031
839
372
735
635
114
217
37.96
28.47
2031-2032
881
390
772
666
120
228
42.96
32.22
2032-2033
925
410
810
700
126
239
48.54
36.40
2033-2034
971
430
851
735
133
251
54.75
41.06
2034-2035
1020
452
893
771
139
264
61.65
46.24
2035-2036
1071
475
938
810
146
277
69.32
51.99
2036-2037
1124
498
985
850
153
291
77.85
58.39
At km 35/825
VDF
Year
2010-2011
3.5
Distribution factor
2A Truck 3A Truck
364
168
0.75
MSA
Design
MSA
LCV
277
MAV
308
Tractor
104
Trailer
301
0.56
0.42
2011-2012
383
177
291
323
109
316
1.20
0.90
2012-2013
402
185
305
339
115
332
1.93
1.45
2013-2014
422
195
321
356
121
348
2.77
2.08
2014-2015
443
204
337
374
127
366
3.73
2.80
2015-2016
465
215
354
393
133
384
4.82
3.62
2016-2017
488
225
371
412
140
403
6.06
4.55
2017-2018
513
237
390
433
147
423
7.47
5.60
2018-2019
538
248
409
455
154
445
9.05
6.79
2019-2020
565
261
430
477
162
467
10.84
8.13
2020-2021
594
274
451
501
170
490
12.86
9.64
2021-2022
623
288
474
526
178
515
15.13
11.34
2022-2023
654
302
497
553
187
540
17.67
13.26
2023-2024
687
317
522
580
196
567
20.53
15.40
2024-2025
722
333
548
609
206
596
23.74
17.80
2025-2026
758
350
576
640
217
625
27.33
20.50
2026-2027
796
367
605
672
227
657
31.34
23.51
2027-2028
835
385
635
705
239
690
35.83
26.87
2028-2029
877
405
667
741
251
724
40.84
30.63
2029-2030
921
425
700
778
263
760
46.43
34.82
2030-2031
967
446
735
816
276
798
52.66
39.49
2031-2032
1015
468
772
857
290
838
59.61
44.70
2032-2033
1066
492
810
900
305
880
67.34
50.51
2033-2034
1119
516
851
945
320
924
75.95
56.96
2034-2035
1175
542
893
992
336
970
85.53
64.14
2035-2036
1234
569
938
1042
353
1019
96.17
72.13
2036-2037
1296
598
985
1094
370
1070
108.01
81.01
SECTION 2
PART 1
Nimbhera-mangalwar
Saturday-Sunday
26.06.2010 / 27.06.2010
Wheelers
Three
Car
Road
Time
Weather GOOD
2-Axle
Truck
3-Axle
26
38
93
16
5.30 To 6.30
AM
72
36
6.30 To 7.30
AM
46
29
10
7.30 To 8.30
AM
46
17
TIME
(Hourly)
Two
10.30 To
11.30 AM
71
11.30 To
12.30 AM
82
12.30 To
1.30 AM
Bus
LCV
MDR -11A
10.30 AM
Jeep
Mini
Full
34
19
83
18
1.30 To 2.30
AM
87
22
2.30 To 3.30
AM
85
3.30 To 4.30
AM
80
4.30 To 5.30
AM
Tractor
Slow moving vechile
Multi With TrailorWithout Cycle Ricksha Animal Others
Axle
Trailor
w
s/
Carts
8.30 To 9.30
AM
31
18
9.30 To
10.30 AM
12
13
10.30 To
11.30 AM
11.30 To
12.30 AM
12.30 To
1.30 AM
1.30 To 2.30
AM
2.30 To 3.30
AM
15
3.30 To 4.30
AM
4.30 To 5.30
AM
15
5.30 To 6.30
AM
20
11
6.30 To 7.30
AM
37
11
7.30 To 8.30
AM
80
16
8.30 To 9.30
AM
95
40
13
9.30 To
10.30 AM
80
26
Total
1149
13
404
32
45
121
35
42
85
32
30
38
Road
Time
Weather
Bus
LCV
Mini
Full
2-Axle
Truck
3-Axle
MDR 11A
10.30 AM
Good
Tractor
Slow moving vechile
Multi With TrailorWithout Cycle Ricksha Animal Others
Axle
Trailor
w
s/
Carts
10.30 To
11.30 AM
88
30
11.30 To
12.30 AM
66
24
12.30 To
1.30 AM
65
20
1.30 To 2.30
AM
38
20
2.30 To 3.30
AM
53
26
3.30 To 4.30
AM
40
22
4.30 To 5.30
AM
57
50
5.30 To 6.30
AM
58
20
6.30 To 7.30
AM
17
7.30 To 8.30
AM
41
14
8.30 To 9.30
AM
65
27
12
9.30 To
10.30 AM
50
17
10.30 To
11.30 AM
14
11.30 To
12.30 AM
11
12.30 To
1.30 AM
13
1.30 To 2.30
AM
12
2.30 To 3.30
AM
3.30 To 4.30
AM
10
4.30 To 5.30
AM
5.30 To 6.30
AM
15
12
6.30 To 7.30
AM
52
13
7.30 To 8.30
AM
79
31
10
8.30 To 9.30
AM
123
27
11
9.30 To
10.30 AM
101
23
1017
17
452
47
11
77
90
46
38
100
26
19
29
G.Total
Nimbhera-mangalwar
Monday to Tuesday
28.06.2010 / 29.06.2010
Wheelers
Three
Car
Road
MDR -11A
Time
10.30am
Weather GOOD
2-Axle
Truck
3-Axle
10
30
14
16
30
22
22
35
10
12
145
48
10
15
5.30 To 6.30
AM
105
55
6.30 To 7.30
AM
52
25
7.30 To 8.30
AM
120
15
TIME
(Hourly)
Two
10.30 To
11.30 AM
69
11.30 To
12.30 AM
120
12.30 To
1.30 AM
Bus
LCV
Jeep
Mini
Full
19
45
25
110
60
17
1.30 To 2.30
AM
2.30 To 3.30
AM
100
3.30 To 4.30
AM
105
4.30 To 5.30
AM
Tractor
Multi With Trailor With
Trailor
Axle
8.30 To 9.30
AM
90
22
13
16
21
33
9.30 To
10.30 AM
135
24
16
17
24
12
27
10.30 To
11.30 AM
47
31
22
33
11.30 To
12.30 AM
15
33
41
12.30 To
1.30 AM
25
53
1.30 To 2.30
AM
16
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
12
6.30 To 7.30
AM
34
14
7.30 To 8.30
AM
48
19
8.30 To 9.30
AM
67
19
9.30 To
10.30 AM
54
22
1371
17
542
175
14
75
114
179
104
320
37
15
16
G.Total
Nimbhera-mangalwar
Tuesday-Wednesday
29.06.2010/30.06.2010
Wheelers
Three
Car
Road
MDR -11A
10.30am
Time
Weather GOOD
2-Axle
Truck
3-Axle
10
13
11
21
21
12
15
57
22
5.30 To 6.30
AM
60
6.30 To 7.30
AM
77
13
7.30 To 8.30
AM
23
12
TIME
(Hourly)
Two
10.30 To
11.30 AM
93
11.30 To
12.30 AM
100
12.30 To
1.30 AM
Bus
LCV
Jeep
Mini
Full
37
36
82
22
1.30 To 2.30
AM
90
33
2.30 To 3.30
AM
91
3.30 To 4.30
AM
4.30 To 5.30
AM
Tractor
Multi With Trailor With
Trailor
Axle
8.30 To 9.30
AM
38
17
9.30 To
10.30 AM
27
10
10.30 To
11.30 AM
11
11.30 To
12.30 AM
12.30 To
1.30 AM
1.30 To 2.30
AM
14
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
12
6.30 To 7.30
AM
49
14
7.30 To 8.30
AM
188
11
8.30 To 9.30
AM
75
10
15
9.30 To
10.30 AM
77
18
1147
37
321
75
27
85
103
66
113
111
43
21
30
G.Total
Road
MDR -11A
Time
10.30am
Weather GOOD
Bus
2-Axle
Truck
3-Axle
LCV
Min
Full
Tractor
Slow moving vechile
Multi With TrailorWithout Cycle Ricksha Animal Others
Axle
Trailor
w
s/
Carts
10.30 To
11.30 AM
81
20
11.30 To
12.30 AM
51
17
12.30 To
1.30 AM
43
11
1.30 To 2.30
AM
47
13
2.30 To 3.30
AM
45
17
3.30 To 4.30
AM
49
13
4.30 To 5.30
AM
41
11
5.30 To 6.30
AM
74
19
10
6.30 To 7.30
AM
66
17
7.30 To 8.30
AM
29
8.30 To 9.30
AM
32
22
9.30 To
10.30 AM
21
18
10.30 To
11.30 AM
18
12
11.30 To
12.30 AM
16
12.30 To
1.30 AM
15
1.30 To 2.30
AM
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
24
13
6.30 To 7.30
AM
55
7.30 To 8.30
AM
84
11
13
8.30 To 9.30
AM
72
20
11
9.30 To
10.30 AM
68
17
916
318
62
17
52
89
50
74
87
34
32
43
G.Total
Nimbhera-mangalwar
Thrusday to Friday
1.07.2010/02.07.2010
Wheelers
Three
Car
Road
MDR -11A
Time
10.30am
Weather GOOD
2-Axle
Truck
3-Axle
13
15
64
15
5.30 To 6.30
AM
73
20
6.30 To 7.30
AM
51
13
11
7.30 To 8.30
AM
48
15
TIME
(Hourly)
Two
10.30 To
11.30 AM
55
11.30 To
12.30 AM
76
12.30 To
1.30 AM
Bus
LCV
Jeep
Mini
Full
11
21
55
1.30 To 2.30
AM
55
12
2.30 To 3.30
AM
43
3.30 To 4.30
AM
35
4.30 To 5.30
AM
Tractor
Slow moving vechile
Multi With TrailorWithout Cycle Ricksha Animal Others
Axle
Trailor
w
s/
Carts
8.30 To 9.30
AM
47
12
10
9.30 To
10.30 AM
47
12
13
15
10.30 To
11.30 AM
43
11.30 To
12.30 AM
53
12
13
12.30 To
1.30 AM
25
1.30 To 2.30
AM
10
2.30 To 3.30
AM
15
10
3.30 To 4.30
AM
20
4.30 To 5.30
AM
25
5.30 To 6.30
AM
17
6.30 To 7.30
AM
30
10
7.30 To 8.30
AM
48
8.30 To 9.30
AM
73
12
9.30 To
10.30 AM
74
15
10
1082
43
244
64
24
64
111
32
65
118
62
22
63
G.Total
Nimbhera-mangalwar
Friday - Saturday
2.07.2010/03.07.2010
Wheelers
Three
Car
Road
MDR -11A
Time
10.30am
Weather GOOD
2-Axle
Truck
3-Axle
11
12
34
5.30 To 6.30
AM
45
6.30 To 7.30
AM
79
13
7.30 To 8.30
AM
49
10
TIME
(Hourly)
Two
10.30 To
11.30 AM
66
11.30 To
12.30 AM
72
12.30 To
1.30 AM
Bus
LCV
Jeep
Mini
Full
14
19
63
12
1.30 To 2.30
AM
60
20
2.30 To 3.30
AM
58
3.30 To 4.30
AM
74
4.30 To 5.30
AM
Multi
Axle
Tractor
Slow moving vechile
With Without Cycle Ricksha Animal Others
Trailor Trailor
w
s/
Carts
8.30 To 9.30
AM
38
18
9.30 To
10.30 AM
33
14
10.30 To
11.30 AM
23
16
11.30 To
12.30 AM
23
12.30 To
1.30 AM
12
1.30 To 2.30
AM
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
13
5.30 To 6.30
AM
13
6.30 To 7.30
AM
14
7.30 To 8.30
AM
18
8.30 To 9.30
AM
55
14
9.30 To
10.30 AM
64
19
851
39
278
68
67
75
47
48
76
39
22
31
G.Total
MDR 11A
Road
Time
Weather Good
Nimbahera -Mangalwar
FARIDAY-SATURDAY
26.06.2010/03.07.2010
Wheelers
Three
Car
Bus
TIME
(Hourly)
Two
PCU
0.5
1.5
1.5
4.5
4.5
1.5
0.5
26.6.10/
27.6.10
1149
13
404
32
45
121
35
42
85
32
30
38
27.6.10/
28.6.10
1017
17
452
47
11
77
90
46
38
100
26
19
29
28.6.10/
29.6.10
1371
17
542
175
14
75
114
179
104
320
37
15
16
29.6.10/
30.6.10
1147
37
321
75
27
85
103
66
113
111
43
21
30
30.6.10/
1.7.10
916
318
62
17
52
89
50
74
87
34
32
43
1.7.10/
2.7.10
1082
43
244
64
24
64
111
32
65
118
62
22
63
851
39
278
68
67
75
47
48
76
39
22
31
7533
1076
171
24
2559
366
523
75
111
16
465
66
703
100
455
65
484
69
897
128
273
39
161
23
250
36
12
2
5
1
17
2
2.7.10/
3.7.10
Total
Average
Jeep
Mini
Full
Abstract at km 5/000
Truck
Tractor
Slow moving vechile
LCV 2-Axle 3-Axle Multi Axle
With Trailor
Without Trailor
Cycle Rikshaw Animals Others
/ Carts
1076
24
366
75
16
66
100
65
69
128
39
23
36
1086
13
400
94
18
73
97
54
71
111
43
20
37
2163
4127
37
766
168
34
139
197
119
498
0.12067
140
239
82
43
73
0.5
1081.5
1
37
1
766
1
168
1.5
51
3
417
1.5
295.5
3
357
3
420
4.5
1075.5
4.5
369
1.5
64.5
0.5
36.5
8
16
6
30
Nimbaded
a to
Mangalwa
d
Mangalwar
to
Nimbaheda
G. Total
Motor
Nimbahera to Mangalwad
Wheelers
THREE
Car
TIME
(Hourly)
TWO
10.30 To
11.30 AM
75
11.30 To
12.30 AM
81
12.30 To
1.30 AM
Bus
Truck
Tractor
Slow moving vechile
2-AXLE 3-AXLE MULTI With Without CYCLE Rikshaw Animal OTHE
AXLE Trailor Trailor
s/
RS
CARTS
Jeep
Mini
Full
LCV
24
26
72
22
1.30 To 2.30
AM
54
17
2.30 To 3.30
AM
68
19
3.30 To 4.30
AM
55
21
4.30 To 5.30
AM
70
21
5.30 To 6.30
AM
70
23
6.30 To 7.30
AM
54
16
7.30 To 8.30
AM
51
11
8.30 To 9.30
AM
49
19
9.30 To
10.30 AM
46
14
10.30 To
11.30 AM
16
13
11.30 To
12.30 AM
13
10
10
12.30 To
1.30 AM
1.30 To 2.30
AM
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
13
10
6.30 To 7.30
AM
37
12
7.30 To 8.30
AM
75
16
8.30 To 9.30
AM
80
20
9.30 To
10.30 AM
74
20
Total
1077
25
363
73
15
68
101
67
70
126
37
23
34
Mangalwad_Nimbaheda Complete(TOLL)
Wheelers
TIME
TWO THREE
Car
Jeep
(Hourly)
Bus
Mini
Full
LCV
Truck
Tractor
Slow moving vechile
2-AXLE 3-AXLE MULTI With Without CYCLE Rikshaw Animal OTHE
AXLE Trailor Trailor
s/
RS
CARTS
10.30 To
11.30 AM
146
43
11.30 To
12.30 AM
156
43
11
17
12.30 To
1.30 AM
141
46
13
10
11
14
1.30 To 2.30
AM
104
29
2.30 To 3.30
AM
129
40
10
3.30 To 4.30
AM
112
40
4.30 To 5.30
AM
156
50
11
13
10
5.30 To 6.30
AM
148
51
6.30 To 7.30
AM
137
43
11
7.30 To 8.30
AM
116
47
8.30 To 9.30
AM
97
40
11
12
11
14
9.30 To
10.30 AM
78
29
10
13
21
10.30 To
11.30 AM
38
27
12
11.30 To
12.30 AM
23
21
10
14
12.30 To
1.30 AM
16
15
12
1.30 To 2.30
AM
18
15
2.30 To 3.30
AM
14
13
3.30 To 4.30
AM
15
10
4.30 To 5.30
AM
21
13
5.30 To 6.30
AM
35
21
6.30 To 7.30
AM
70
27
7.30 To 8.30
AM
122
27
8.30 To 9.30
AM
137
39
13
19
14
9.30 To
10.30 AM
134
36
12
Total
2163
35
765
166
35
141
198
120
141
236
80
43
70
Road
MDR - 11A
Abstract at km 5/000
Wheelers
Three
Car
Bus
Truck
Tractor
Slow moving vechile
With Trailor
Without Trailor
Cycle Rikshaw Animals Others
3-Axle Multi Axle
TIME
(Hourly)
Two
PCU
0.5
1.5
1.5
4.5
4.5
1.5
0.5
26.6.10/27.
6.10
2264
33
825
98
16
80
264
65
89
198
57
40
77
15
27.6.10/28.
6.11
2098
29
932
115
25
146
195
113
95
216
57
37
47
28.6.10/29.
6.12
2722
24
1121
357
30
152
211
262
160
484
74
30
44
29.6.10/30.
6.13
2158
52
627
152
56
143
182
139
223
202
87
42
60
30.6.10/1.7.
14
1861
10
643
141
28
108
164
82
166
197
82
48
104
1.7.10/2.7.1
5
2249
65
519
173
60
132
201
96
140
234
139
51
104
1786
46
693
142
20
215
162
77
108
143
76
54
75
15138
2162.57
259
37.00
5360
765.71
1178
168.29
235
33.57
976
139.43
1379
197.00
834
119.14
981
140.14
1674
239.14
572
81.71
302
43.14
511
73.00
12
1.71
12
1.71
33
4.71
0.5
1081
1
37
1
766
1
168
1.5
50
3
418
1.5
296
3
357
3
420
4.5
1076
4.5
368
1.5
65
0.5
37
2
3
8
14
6
28
2.7.10/
3.7.16
Total
Average
Jeep
Mini
Full
LCV
2-Axle
/ Carts
Direction of Traffic
Day
Date
Sheet No.
Mangalwar-Nimbahera
Saturday-Sunday
26.06.2010/27.06.2010
Wheelers
Three Car
Jeep
Bus
Mini
Full
LCV
Truck
2-Axle 3-Axle
MDR -11A
10.30 AM
GOOD
Tractor
Multi With Trailor Without
Trailor
Axle
TIME
(Hourly)
Two
10.30 To
11.30 AM
66
13
11.30 To
12.30 AM
65
12.30 To
1.30 AM
49
19
1.30 To 2.30
AM
75
17
2.30 To 3.30
AM
84
21
3.30 To 4.30
AM
76
17
4.30 To
5.30 AM
75
26
5.30 To 6.30
AM
48
31
6.30 To 7.30
AM
95
35
12
7.30 To 8.30
AM
86
36
8.30 To 9.30
AM
50
22
9.30 To 10.30
AM
15
16
10.30 To
11.30 AM
15
11.30 To
12.30 AM
11
10
12.30 To 1.30
AM
1.30 To 2.30
AM
2.30 To 3.30
AM
10
11
3.30 To 4.30
AM
17
4.30 To 5.30
AM
23
5.30 To 6.30
AM
25
18
10
11
6.30 To 7.30
AM
40
27
7.30 To 8.30
AM
41
10
8.30 To 9.30
AM
71
21
10
9.30 To 10.30
AM
86
30
Total
1115
20
421
66
35
143
30
47
113
25
10
39
LCV
Truck
2-Axle 3-Axle
MDR 11A
1:00
Good
Tractor
Multi With Trailor Without
Trailor
Axle
10.30 To
11.30 AM
100
34
16
11.30 To
12.30 AM
72
17
12.30 To
1.30 AM
76
37
11
1.30 To 2.30
AM
33
20
2.30 To 3.30
AM
54
38
3.30 To 4.30
AM
43
19
10
4.30 To
5.30 AM
80
40
13
5.30 To 6.30
AM
69
23
6.30 To 7.30
AM
115
54
10
7.30 To 8.30
AM
90
14
8.30 To 9.30
AM
61
21
9.30 To 10.30
AM
26
15
10.30 To
11.30 AM
13
12
11.30 To
12.30 AM
18
19
12.30 To 1.30
AM
12
11
1.30 To 2.30
AM
18
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
21
10
6.30 To 7.30
AM
27
7.30 To 8.30
AM
55
16
8.30 To 9.30
AM
71
19
9.30 To 10.30
AM
69
13
1081
12
480
68
14
69
105
67
57
116
31
18
18
G.Total
Direction of Traffic
Day
Date
Sheet No.
Mangalwar-Nembahera
Sunday to munday
28 06.2010/29.06.2010
Wheelers
Three Car
Jeep
Bus
Mini
Full
LCV
Truck
2-Axle 3-Axle
Tractor
Multi With Trailor With
Trailor
Axle
TIME
(Hourly)
Two
10.30 To
11.30 AM
49
20
11.30 To
12.30 AM
115
45
15
21
12.30 To
1.30 AM
115
53
25
13
1.30 To 2.30
AM
2.30 To 3.30
AM
85
30
3.30 To 4.30
AM
100
28
4.30 To
5.30 AM
205
63
20
17
14
5.30 To 6.30
AM
105
61
13
6.30 To 7.30
AM
56
19
7.30 To 8.30
AM
105
47
21
8.30 To 9.30
AM
62
51
20
13
17
9.30 To 10.30
AM
75
22
33
58
10.30 To
11.30 AM
50
15
11.30 To
12.30 AM
25
11
12.30 To 1.30
AM
15
1.30 To 2.30
AM
50
15
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
6.30 To 7.30
AM
16
7.30 To 8.30
AM
16
10
8.30 To 9.30
AM
60
34
9.30 To 10.30
AM
50
12
1351
579
182
16
77
97
83
56
164
37
15
28
G.Total
Direction of Traffic
Day
Date
Sheet No.
Mangalwar-Nimbahera
Tuesday-Wednesday
29.06.2010/30.06.2010
Wheelers
Three Car
Jeep
Bus
Mini
Full
LCV
Truck
2-Axle 3-Axle
MDR -11A
10.30 AM
GOOD
Tractor
Multi With Trailor Without
Trailor
Axle
TIME
(Hourly)
Two
10.30 To
11.30 AM
92
32
11.30 To
12.30 AM
80
12.30 To
1.30 AM
75
26
1.30 To 2.30
AM
87
19
2.30 To 3.30
AM
77
21
3.30 To 4.30
AM
28
17
4.30 To
5.30 AM
70
19
5.30 To 6.30
AM
76
22
6.30 To 7.30
AM
105
30
7.30 To 8.30
AM
39
17
8.30 To 9.30
AM
47
9.30 To 10.30
AM
24
10.30 To
11.30 AM
15
11.30 To
12.30 AM
12.30 To 1.30
AM
1.30 To 2.30
AM
10
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
17
6.30 To 7.30
AM
32
7.30 To 8.30
AM
41
8.30 To 9.30
AM
60
20
9.30 To 10.30
AM
42
14
1011
15
306
77
29
58
79
73
110
91
44
21
30
G.Total
LCV
Truck
2-Axle 3-Axle
MDR -11A
10.30 AM
GOOD
Tractor
Multi With Trailor without
Trailor
Axle
10.30 To
11.30 AM
69
11
11.30 To
12.30 AM
53
17
12.30 To
1.30 AM
48
18
1.30 To 2.30
AM
37
11
2.30 To 3.30
AM
42
13
3.30 To 4.30
AM
52
12
4.30 To
5.30 AM
51
15
10
5.30 To 6.30
AM
93
22
6.30 To 7.30
AM
96
23
10
7.30 To 8.30
AM
53
8.30 To 9.30
AM
40
17
9.30 To 10.30
AM
26
21
10.30 To
11.30 AM
29
18
11.30 To
12.30 AM
18
12.30 To 1.30
AM
12
1.30 To 2.30
AM
2.30 To 3.30
AM
11
3.30 To 4.30
AM
4.30 To 5.30
AM
5.30 To 6.30
AM
28
6.30 To 7.30
AM
39
10
7.30 To 8.30
AM
58
14
8.30 To 9.30
AM
44
11
9.30 To 10.30
AM
62
13
11
G.Total
945
325
79
11
56
75
32
92
110
48
16
61
Direction of Traffic
Day
Date
Sheet No.
Nimbhera-mangalwar
Thursday to Friday
1.06.2010/02.07.2010
Wheelers
Three Car
Jeep
Bus
Mini
Full
LCV
Truck
2-Axle 3-Axle
MDR -11A
10.30 AM
GOOD
Tractor
Multi With Trailor Without
Trailor
Axle
TIME
(Hourly)
Two
10.30 To
11.30 AM
69
12
11.30 To
12.30 AM
82
23
12.30 To
1.30 AM
55
1.30 To 2.30
AM
58
2.30 To 3.30
AM
36
3.30 To 4.30
AM
30
20
10
4.30 To
5.30 AM
59
22
5.30 To 6.30
AM
90
20
10
6.30 To 7.30
AM
43
14
7.30 To 8.30
AM
37
12
8.30 To 9.30
AM
33
12
9.30 To 10.30
AM
25
10
10.30 To
11.30 AM
24
11.30 To
12.30 AM
12.30 To 1.30
AM
48
1.30 To 2.30
AM
50
18
12
2.30 To 3.30
AM
52
3.30 To 4.30
AM
54
12
4.30 To 5.30
AM
47
5.30 To 6.30
AM
55
12
6.30 To 7.30
AM
52
17
13
7.30 To 8.30
AM
62
8.30 To 9.30
AM
52
11
45
9.30 To 10.30
AM
45
1167
22
275
109
36
68
90
64
75
116
77
29
41
G.Total
Direction of Traffic
Day
Date
Sheet No.
Nimbhera-mangalwar
Friday - Saturday
2.06.2010/03.07.2010
Wheelers
Three Car
Jeep
Bus
Mini
Full
LCV
Truck
2-Axle 3-Axle
Multi
Axle
MDR -11A
10.30 AM
GOOD
Tractor
With
Without
Trailor
Trailor
TIME
(Hourly)
Two
10.30 To
11.30 AM
52
12
11.30 To
12.30 AM
61
12.30 To
1.30 AM
67
1.30 To 2.30
AM
57
2.30 To 3.30
AM
50
18
3.30 To 4.30
AM
70
19
4.30 To
5.30 AM
60
21
5.30 To 6.30
AM
64
16
6.30 To 7.30
AM
69
14
7.30 To 8.30
AM
46
117
8.30 To 9.30
AM
40
13
9.30 To 10.30
AM
33
15
10.30 To
11.30 AM
28
14
11.30 To
12.30 AM
23
12.30 To 1.30
AM
1.30 To 2.30
AM
2.30 To 3.30
AM
3.30 To 4.30
AM
4.30 To 5.30
AM
13
5.30 To 6.30
AM
10
6.30 To 7.30
AM
33
20
7.30 To 8.30
AM
58
17
8.30 To 9.30
AM
44
15
98
9.30 To 10.30
AM
63
21
G.Total
935
415
74
11
148
87
30
60
67
37
32
44
Direction of Traffic
Day
Date
Sheet No.
Wheelers
Three Car
Jeep
Bus
Mini
Full
Abstract at km 5/000
Truck
Tractor
Slow moving vechile
LCV 2-Axle 3-AxleMulti Axle
With Trailor
Without Trailor Cycle
Ricksha Animals Others
w
/ Carts
TIME
(Hourly)
Two
PCU
0.5
1.5
1.5
4.5
4.5
1.5
0.5
26.6.10/27.6.
10
1115
20
421
66
35
143
30
47
113
25
10
39
27.6.10/28.6.
11
1081
12
480
68
14
69
105
67
57
116
31
18
18
28.6.10/29.6.
12
1351
579
182
16
77
97
83
56
164
37
15
28
29.6.10/30.6.
13
1011
15
306
77
29
58
79
73
110
91
44
21
30
30.6.10/1.7.1
4
945
325
79
11
56
75
32
92
110
48
16
61
1.7.10/2.7.15
1167
22
275
109
36
68
90
64
75
116
77
29
41
2.7.10/ 3.7.16
935
415
74
11
148
87
30
60
67
37
32
44
Total
Average
7605
1086
88
13
2801
400
655
94
124
18
511
73
676
97
379
54
497
71
777
111
299
43
141
20
261
37
10
1
7
1
16
2
Mangalwar - 1086
Nimbahera
13
400
94
18
73
97
54
71
111
43
20
37
Magalwar to Nimbaheda
TIME
(Hourly)
Wheelers
TWO THREE Car
Jeep
Bus
Mini
Full
LCV
Truck
23MULTI
AXLE AXLE AXLE
Tractor
With
Without
Trailor
Trailor
10.30 To
11.30 AM
71
19
11.30 To
12.30 AM
75
17
12.30 To
1.30 AM
69
24
1.30 To 2.30
AM
50
12
2.30 To 3.30
AM
61
21
3.30 To 4.30
AM
57
19
4.30 To
5.30 AM
86
29
5.30 To 6.30
AM
78
28
6.30 To 7.30
AM
83
27
7.30 To 8.30
AM
65
36
8.30 To 9.30
AM
48
21
9.30 To 10.30
AM
32
15
12
10.30 To
11.30 AM
22
14
11.30 To
12.30 AM
10
11
12.30 To 1.30
AM
11
1.30 To 2.30
AM
16
10
2.30 To 3.30
AM
3.30 To 4.30
AM
11
4.30 To 5.30
AM
13
5.30 To 6.30
AM
22
11
6.30 To 7.30
AM
33
15
7.30 To 8.30
AM
47
11
8.30 To 9.30
AM
57
19
16
9.30 To 10.30
AM
60
16
Total
1086
10
402
93
20
73
97
53
71
110
43
20
36
Car
Jeep
Mini
Full
Total
PCU
LCV
2-Axle
3-Axle
Multi Axle
With Trailor
Without
Trailor
Cycle
Rikshaw
Animals/
Carts
Others
Total
PCU
G. Total
Total PCU
Non Motorised
Slow moving vechile
Three
PCU
Two
PCU
1.00 To 2.00
2.00 To 3.00
3.00 To 4.00
PM
4.00 To 5.00
PM
5.00 To 6.00
PM
6.00 To 7.00
PM
7.00 To 8.00
PM
8.00 To 9.00
PM
9.00 To 10.00
PM
10.00 To 11.00
PM
11.00 To 12.00
AM
12.00 To 1.00
AM
1.00 To 2.00
2.00 To 3.00
3.00 To 4.00
AM
4.00 To5.00
AM
0.5
146
156
141
1
1
2
1
1
43
43
46
1
9
11
13
1.5
4
2
3
3
8
8
8
211
222
212
156
161
159
1.5
7
8
10
3
4
6
4
3
3
4
11
4.5
9
17
14
4.5
5
5
7
1.5
2
2
3
30
42
49
97.5
144
159
0.5
5
6
4
2
0
0
0
8
0
0
0
6
0
0
0
5
6
4
2.5
3
2
246
270
265
256
308
320
104
29
144
102.5
29
93
175
196.5
129
40
186
140.5
10
38
120
1.5
227
262
112
40
170
127
35
108
1.5
209
236.5
156
50
11
232
173
13
10
39
112.5
1.5
274
287
148
51
218
159
26
79.5
250
241.5
137
43
196
138
11
36
109.5
238
250.5
116
47
178
128.5
36
109.5
216
239
97
40
11
156
118
12
11
14
53
166.5
213
286.5
78
29
120
87.5
10
13
21
57
190.5
179
279
38
23
16
3
2
1
27
21
15
9
4
3
1
0
1
5
3
3
83
53
39
74.5
47.5
37.5
8
7
4
5
10
8
6
6
4
12
14
12
2
2
2
0
1
0
33
40
30
108
132
105
2
2
1
0
0
0
0
0
0
0
0
0
2
2
1
1
1
0.5
118
95
70
183.5
180.5
143
18
15
41
40
24
82.5
65
122.5
5.00 To 6.00
14
1
13
AM
6.00 To 7.00
15
1
10
AM
7.00 To 8.00
21
1
13
AM
8.00 To 9.00
35
1
21
AM
70
2
27
9.00 To 10.00
AM
10.00 To 11.00
122
2
27
AM
11.00 To 112.00 137
1
39
PM
12.00 To 1.00
134
2
36
PM
ADT
2163
35
765
%age Share
51.6% 0.8% 18.2%
34
31
24
76.5
58
107.5
34
33.5
22
66
56
99.5
42
38.5
20
60
62
98.5
66
57
32
97.5
0.5
99
155
107
81
31
96
1.5
141
178.5
165
121
27
81
2.5
197
204.5
13
19
210
180
14
34
87
2.5
249
269.5
186
131.5
12
31
85.5
2.5
223
219.5
70
2
0
0
72
35
1.7% 0.0% 0.0% 0.0% 1.7%
4195
5125
166
35
141 3305 2523
4.0% 0.8% 3.4% 78.8%
198
120 141 236
80
43
818 2567
4.7% 2.9% 3.4% 5.6% 1.9% 1.0% 19.5%
PCU
Total
Total
Animals /
Carts
6
15
92 129 4121
4546
2098
29
932
115
25
146
3345 2600.5
195
113
95
216
57
37
713 2201
47
60 95.5 4118
4897
2722
24
1121
357
30
152
4406 3364
211
262
160
484
74
30
1221 4139
44
46 36
5673
7539
2158
52
627
152
56
143
3188 2423
182
139
223
202
87
42
875 2723
60
62 42
4125
5188
1861
2249
1786
15138
2163
1081
10
65
46
259
37
37
0.5
1081
1
37
2090.5
2367.5
2449
17647
2521
2318
2765
1865
18074
2582
Others
2.9%
Cycle
4.7%
Animals /
Carts
Rikshaw
Without Trailor
3-Axle
With Trailor
2-Axle
739
861
620
5742
820
1.5
3
3
4.5
4.5
1.5
295.5 357.4 420.4 1076 367.7 64.71
LCV
Full Bus
1
1
1.5
3
765.7 168.29 50.36 418.3
164
82 166 197
82
48
201
96 140 234 139
51
162
77 108 143
76
54
1379 834 981 1674 572 302
197 119 140 239
82
43
295.5 357.4 420.4 1076 367.7 64.71
Multi Axle
Jeep
643
141
28 108 2791
519
173
60 132 3198
693
142
20 215 2902
5360
1178 235 976 23146
766
168
34 139 3307
765.7 168.29 50.36 418.3
0.0%
0.0%
104
104
75
511
73
36.5
5
0
5
1
1
5
3
4
1
12
12
33
2
2
5
3.43 13.71 28.29
0.5
36.5
2
8
6
3.43 13.71 28.29
PCU
8
0
Others
2
0
Mini Bus
30.6.10/1.7.14
1.7.10/2.7.15
2.7.10/ 3.7.16
Total
ADT
ADT PCU
Rikshaw
0.5
77
Cycle
18
713 2066
PCU
Without
Trailor
1.5
40
Jeep
29.6.10/30.6.13
Total
With
Trailor
4.5
57
Car
28.6.10/29.6.12
Multi Axle
4.5
198
3-Axle
3
89
2-Axle
3
65
LCV
1.5
264
PCU
3316 2352
Full
3
80
Mini
1.5
16
Car
1
98
Three
1
825
Three Wheeler
27.6.10/28.6.11
Non Motorised
Slow moving vechile
1
33
Two
26.6.10/27.6.10
0.5
2264
Two Wheeler
PCU
Total
Direction of
Mangalwar - Nimbahera
Traffic
Date :
18.05.2010 to 25.05.2010
Day
07 days
Abstract at km 5/000
Motorised Pasenger Vehicle
Wheelers
Bus
Day (24 Hour)
114 82 3644
111 90 4170
83 75.5 3605
568 550 29456
81
79 4208
4490
5222
4389
36270
5181
26.6.10/27.6.10
28.6.10/29.6.12
30.6.10/1.7.14
3000
2000
1000
0
2.7.10/ 3.7.16
12.00 To 1.00 PM
11.00 To 112.00 PM
10.00 To 11.00 AM
9.00 To 10.00 AM
8.00 To 9.00 AM
7.00 To 8.00 AM
6.00 To 7.00 AM
5.00 To 6.00 AM
4.00 To5.00 AM
3.00 To 4.00 AM
2.00 To 3.00 AM
1.00 To 2.00 AM
12.00 To 1.00 AM
11.00 To 12.00 AM
10.00 To 11.00 PM
9.00 To 10.00 PM
8.00 To 9.00 PM
7.00 To 8.00 PM
6.00 To 7.00 PM
5.00 To 6.00 PM
4.00 To 5.00 PM
3.00 To 4.00 PM
2.00 To 3.00 PM
1.00 To 2.00 PM
350
300
250
200
150
100
50
Total Nos.
0
PCUs
6000
5000
4000
1.9%, 2%
Mangalwar - Nimbahera (Complete)
1.0%, 1% 1.7%, 2%
0.0%, 0% 0.0%,
0.0%, 0%
0%
Two Wheeler
5.6%, 6%
3.4%, 3%
Three Wheeler
Car
2.9%, 3%
Jeep
4.7%, 5%
Mini Bus
Full Bus
3.4%, 3%
0.8%, 1%
LCV
51.6%, 52%
4.0%, 4%
2-Axle
3-Axle
18.2%, 18%
Multi Axle
With Trailor
Without Trailor
0.8%, 1%
Cycle
2 Wheeler
140
3 Wheeler
120
Car
Jeep
100
Mini Bus
80
Bus
60
LCV
40
2-Axle
3-Axle
20
Multi Axle
0
0
Total Nos.
180
Mangalwad to Nimbahera
Road
MDR 11A
Day
Saturday
Time
1.00 PM
Date
26&27/06/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To 2.00
PM
42
12
2.00 To 3.00
PM
37
19
3.00 To 4.00
PM
60
30
15
4.00 To 5.00
PM
125
33
5.00 To 6.00
PM
75
6.00 To 7.00
PM
105
7.00 To 8.00
PM
Truck
Tractor
2-Axle
3-Axle
Multi Axle
10
18
10
14
13
14
12
10
42
18
12
100
24
8.00 To 9.00
PM
92
35
9.00 To
10.00 PM
40
10
10.00 To
11.00 PM
TIME
(Hourly)
Rickshaw
Animals/
Carts
Others
17
20
15
15
13
20
12
23
10
22
10
11
11.00 To
12.00 AM
12.00 To
1.00 AM
1.00 To 2.00
AM
2.00 To 3.00
AM
10
35
38
23
3.00 To 4.00
AM
20
50
12
26
44
34
4.00 To 5.00
AM
40
41
18
15
10
26
43
5.00 To 6.00
AM
6.00 To 7.00
AM
62
7.00 To 8.00
AM
60
10
10
16
8.00 To 9.00
AM
121
14
12
11
9.00 To
10.00 AM
105
29
11
11
10.00 To
11.00 AM
96
47
22
13
11
13
11.00 To
12.00 PM
80
16
27
24
20
26
11
30
33
12.00 To
1.00 PM
74
13
55
38
39
12
38
28
Total
1353
46
514
223
31
206
119
70
107
281
362
38
42
14
Mangalwad to Nimbahera
Road
MDR 11A
Day
Sunday
Time
1:00
Date
27&28/06/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To 2.00
PM
12
13
2.00 To 3.00
PM
15
23
10
3.00 To 4.00
PM
22
20
17
4.00 To 5.00
PM
40
18
5.00 To 6.00
PM
180
6.00 To 7.00
PM
160
7.00 To 8.00
PM
Truck
Tractor
2-Axle
3-Axle
Multi Axle
12
12
16
11
10
12
10
11
46
10
43
135
70
8.00 To 9.00
PM
10
9.00 To
10.00 PM
81
50
10.00 To
11.00 PM
70
11.00 To
12.00 AM
80
TIME
(Hourly)
Rickshaw
Animals/
Carts
Others
19
11
10
10
15
10
45
16
10
60
11
11
15
12.00 To
1.00 AM
67
50
20
1.00 To 2.00
AM
40
2.00 To 3.00
AM
53
3.00 To 4.00
AM
40
4.00 To 5.00
AM
48
5.00 To 6.00
AM
10
12
6.00 To 7.00
AM
60
15
11
10
7.00 To 8.00
AM
63
27
13
10
10
8.00 To 9.00
AM
100
35
12
12
11
9.00 To
10.00 AM
90
25
11
12
10.00 To
11.00 AM
40
22
11.00 To
12.00 PM
52
15
12.00 To
1.00 PM
52
23
1520
25
624
125
45
109
134
97
64
96
101
55
74
25
17
14
G.Total
Mangalwad to Nimbahera
Road
MDR 11A
Day
Sunday
Time
1:00
Date
28&29/06/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To 2.00
PM
30
15
2.00 To 3.00
PM
26
12
3.00 To 4.00
PM
22
32
21
4.00 To 5.00
PM
5.00 To 6.00
PM
85
6.00 To 7.00
PM
69
7.00 To 8.00
PM
Truck
Tractor
2-Axle
3-Axle
Multi Axle
12
43
17
8.00 To 9.00
PM
54
32
9.00 To
10.00 PM
57
13
10.00 To
11.00 PM
94
11.00 To
12.00 AM
43
TIME
(Hourly)
Rickshaw
Animals/
Carts
Others
13
17
10
10
13
13
13
22
12
17
15
18
12.00 To
1.00 AM
47
12
13
1.00 To 2.00
AM
13
14
10
10
2.00 To 3.00
AM
19
12
3.00 To 4.00
AM
12
13
13
13
4.00 To 5.00
AM
43
10
5.00 To 6.00
AM
56
76
6.00 To 7.00
AM
53
63
12
15
7.00 To 8.00
AM
135
52
15
8.00 To 9.00
AM
151
54
12
9.00 To
10.00 AM
59
16
11
13
16
10.00 To
11.00 AM
53
21
12
12
14
11.00 To
12.00 PM
52
13
16
11
10
12.00 To
1.00 PM
42
14
11
21
1220
16
521
58
40
114
108
110
105
226
152
49
28
16
G.Total
Mangalwad to Nimbahera
Road
MDR 11A
Day
Sunday
Time
1:00
Date
29&30/06/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To 2.00
PM
2.00 To 3.00
PM
3.00 To 4.00
PM
4.00 To 5.00
PM
14
5.00 To 6.00
PM
33
6.00 To 7.00
PM
44
7.00 To 8.00
PM
Truck
Tractor
2-Axle
3-Axle
Multi Axle
11
16
47
12
8.00 To 9.00
PM
62
14
9.00 To
10.00 PM
46
23
10.00 To
11.00 PM
17
11.00 To
12.00 AM
TIME
(Hourly)
Rickshaw
Animals/
Carts
Others
16
12
12.00 To
1.00 AM
1.00 To 2.00
AM
12
20
13
2.00 To 3.00
AM
29
18
3.00 To 4.00
AM
32
18
4.00 To 5.00
AM
97
29
10
14
5.00 To 6.00
AM
72
16
6.00 To 7.00
AM
105
17
7.00 To 8.00
AM
103
26
13
11
12
8.00 To 9.00
AM
88
28
9.00 To
10.00 AM
13
22
51
10.00 To
11.00 AM
11
17
11.00 To
12.00 PM
12.00 To
1.00 PM
814
14
378
93
50
84
64
72
144
80
91
14
42
17
G.Total
Mangalwad to Nimbahera
Road
MDR 11A
Day
Sunday
Time
1:00
Date
30&01/07/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To 2.00
PM
162
42
10
2.00 To 3.00
PM
140
35
3.00 To 4.00
PM
135
68
4.00 To 5.00
PM
40
5.00 To 6.00
PM
50
6.00 To 7.00
PM
35
7.00 To 8.00
PM
Truck
Tractor
2-Axle
3-Axle
Multi Axle
10
14
21
10
41
14
8.00 To 9.00
PM
42
16
9.00 To
10.00 PM
40
10.00 To
11.00 PM
11.00 To
12.00 AM
TIME
(Hourly)
Rickshaw
Animals/
Carts
Others
15
10
11
11
12
12
16
11
10
12
20
10
11
12.00 To
1.00 AM
1.00 To 2.00
AM
2.00 To 3.00
AM
3.00 To 4.00
AM
4.00 To 5.00
AM
13
5.00 To 6.00
AM
24
6.00 To 7.00
AM
29
7.00 To 8.00
AM
48
16
8.00 To 9.00
AM
64
21
9.00 To
10.00 AM
15
13
10.00 To
11.00 AM
14
12
11.00 To
12.00 PM
11
12.00 To
1.00 PM
10
940
347
58
25
61
105
93
78
118
90
44
37
20
14
27
G.Total
Mangalwad to Nimbahera
Road
MDR 11A
Day
Sunday
Time
1:00
Date
01&02/07/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To 2.00
PM
101
23
2.00 To 3.00
PM
95
26
3.00 To 4.00
PM
114
28
4.00 To 5.00
PM
122
12
5.00 To 6.00
PM
72
6.00 To 7.00
PM
95
7.00 To 8.00
PM
Truck
Tractor
2-Axle
3-Axle
Multi Axle
26
10
28
17
63
19
8.00 To 9.00
PM
37
19
9.00 To
10.00 PM
105
20
10.00 To
11.00 PM
122
11.00 To
12.00 AM
105
TIME
(Hourly)
Rickshaw
Animals/
Carts
Others
19
13
16
12
14
19
29
12
12
12.00 To
1.00 AM
97
27
13
1.00 To 2.00
AM
2.00 To 3.00
AM
11
3.00 To 4.00
AM
10
4.00 To 5.00
AM
22
13
5.00 To 6.00
AM
32
6.00 To 7.00
AM
23
7.00 To 8.00
AM
91
17
10
8.00 To 9.00
AM
84
16
10
9.00 To
10.00 AM
125
19
10.00 To
11.00 AM
132
20
11.00 To
12.00 PM
130
21
12
12.00 To
1.00 PM
124
34
1916
77
403
68
33
120
97
80
86
110
108
84
59
34
17
G.Total
Mangalwad to Nimbahera
Road
MDR 11A
Day
Sunday
Time
1:00
Date
02&03/07/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To 2.00
PM
112
10
2.00 To 3.00
PM
85
23
3.00 To 4.00
PM
114
25
4.00 To 5.00
PM
111
10
5.00 To 6.00
PM
45
6.00 To 7.00
PM
7.00 To 8.00
PM
Truck
Tractor
2-Axle
3-Axle
Multi Axle
With Trailor
Without
Trailor
Cycle
Rickshaw
Animals/
Carts
Others
19
14
12
10
20
14
11
11
20
10
14
12
40
14
12
11
10
8.00 To 9.00
PM
45
14
12
20
9.00 To
10.00 PM
35
10
11
10.00 To
11.00 PM
11.00 To
12.00 AM
TIME
(Hourly)
12.00 To
1.00 AM
1.00 To 2.00
AM
2.00 To 3.00
AM
10
3.00 To 4.00
AM
4.00 To 5.00
AM
10
5.00 To 6.00
AM
6.00 To 7.00
AM
7.00 To 8.00
AM
8.00 To 9.00
AM
9.00 To
10.00 AM
10.00 To
11.00 AM
11.00 To
12.00 PM
12.00 To
1.00 PM
630
21
164
35
16
65
77
76
59
79
52
40
19
G.Total
Mangalwad to Nimbahera
Road
MDR 11A
Day
Time
Date
Weather
Good
Abstract at km 35/825
Wheelers
TIME
(Hourly)
PCU
Bus
Truck
Tractor
Two
Three
Car
Jeep
Mini
Full
LCV
2-Axle
0.5
1.5
1.5
4.5
4.5
1.5
0.5
26.6.10/
27.6.10
1353
46
514
223
31
206
119
70
107
281
362
38
27.6.10/
28.6.10
1520
25
624
125
45
109
134
97
64
96
101
28.6.10/
29.6.10
1220
16
521
58
40
114
108
110
105
226
29.6.10/
30.6.10
814
14
378
93
50
84
64
72
30.6.10/
1.7.10
940
347
58
25
61
105
93
1.7.10/
2.7.10
1916
77
403
68
33
120
97
630
21
164
35
16
65
8393
1199
205
29
2951
422
660
94
196
28
1199
29
422
94
28
2.7.10/
3.7.10
Total
Average
Sadri to
Magalwar
Rickshaw
Others
Animals
/ Carts
8
42
14
55
74
25
17
14
152
49
28
16
144
80
91
14
42
17
78
118
90
44
37
20
14
27
80
86
110
108
84
59
34
17
77
76
59
79
52
40
19
725
104
724
103
590
84
571
82
1054
151
945
135
401
57
273
39
133
19
68
10
106
15
104
103
84
82
151
135
57
39
19
10
15
Magalwar to Nimbaheda
Wheelers
Bus
Truck
TWO
THREE
Car
Jeep
Mini
Full
1.00 To 2.00
PM
66
17
2.00 To 3.00
PM
58
20
3.00 To 4.00
PM
67
30
4.00 To 5.00
PM
65
5.00 To 6.00
PM
77
6.00 To 7.00
PM
Tractor
LCV
2-AXLE
3-AXLE
12
10
19
73
24
7.00 To 8.00
PM
67
24
8.00 To 9.00
PM
49
19
9.00 To
10.00 PM
58
10.00 To
11.00 PM
46
11.00 To
12.00 AM
Without
Trailor
CYCLE
Rickshaw
Animals/
CARTS
OTHERS
10
18
10
15
35
17
12.00 To
1.00 AM
32
12
1.00 To 2.00
AM
11
TIME
(Hourly)
2.00 To 3.00
AM
11
3.00 To 4.00
AM
12
15
4.00 To 5.00
AM
39
16
5.00 To 6.00
AM
29
17
6.00 To 7.00
AM
47
17
7.00 To 8.00
AM
71
21
8.00 To 9.00
AM
87
24
9.00 To
10.00 AM
58
18
12
10.00 To
11.00 AM
49
20
11.00 To
12.00 PM
47
13
12.00 To
1.00 PM
44
16
11
Total
1198
30
419
94
28
102
103
84
81
151
133
57
41
19
12
Road
MDR-11A
Day
Saturday to Sunday
Time
1:00 PM
Date
26-06-2010 to 27-06-2010
Weather
Good
Sheet No.
Wheelers
LCV
Bus
TIME
(Hourly)
Two
Three
Car
Jeep
Mini
Full
1.00 To
2.00 PM
35
12
2.00 To
3.00 PM
51
23
13
3.00 To
4.00 PM
70
19
4.00 To
5.00 PM
17
37
5.00 To
6.00 PM
76
6.00 To
7.00 PM
120
7.00 To
8.00 PM
Truck
Tractor
Multi AxleWith
2-Axle
3-Axle
12
10
10
10
10
10
12
27
31
11
16
16
100
20
8.00 To
9.00 PM
85
25
25
36
9.00 To
10.00 PM
25
23
11
11
16
10.00 To
11.00 PM
33
19
14
11.00 To
12.00 AM
27
12
TrailorWithout
Trailor
Cycle
Ricksha Animals/
w
Carts
Others
12.00 To
1.00 AM
14
20
20
1.00 To
2.00 AM
82
54
17
31
18
21
22
12
2.00 To
3.00 AM
63
47
25
3.00 To
4.00 AM
42
27
125
21
4.00 To5.00
AM
63
40
32
33
12
32
33
5.00 To
6.00 AM
6.00 To
7.00 AM
13
72
17
7.00 To
8.00 AM
75
8.00 To
9.00 AM
14
12
12
9.00 To
10.00 AM
100
16
20
10.00 To
11.00 AM
94
31
10
12
17
11.00 To
12.00 PM
85
46
25
21
20
45
18
12.00 To
1.00 PM
66
46
24
12
12
37
26
28
Total
1413
50
596
222
40
225
140
71
92
335
352
78
47
27
Nimbaheda To Magalwad
Road
MDR 11A
Day
Sunday to Monday
Time
1:00
Date
27-28/6/2010
Weather
Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To
2.00 PM
2.00 To
3.00 PM
3.00 To
4.00 PM
4.00 To
5.00 PM
5.00 To
6.00 PM
170
6.00 To
7.00 PM
145
7.00 To
8.00 PM
Truck
Tractor
2-Axle
3-Axle
10
13
50
13
10
10
13
21
38
12
125
105
10
25
8.00 To
9.00 PM
14
9.00 To
10.00 PM
96
67
13
11
11
10.00 To
11.00 PM
75
45
10
13
11.00 To
12.00 AM
12.00 To
1.00 AM
100
51
13
80
60
TIME
(Hourly)
Multi AxleWith
TrailorWithout
Trailor
Cycle
Ricksha Animals/
w
Carts
Others
1.00 To
2.00 AM
85
30
15
12
13
20
2.00 To
3.00 AM
70
56
11
17
3.00 To
4.00 AM
4.00 To
5.00 AM
90
60
12
16
15
90
16
80
10
11
16
31
20
11
5.00 To
6.00 AM
20
15
6.00 To
7.00 AM
55
7.00 To
8.00 AM
50
35
13
8.00 To
9.00 AM
95
56
9.00 To
10.00 AM
50
35
10.00 To
11.00 AM
61
26
11.00 To
12.00 PM
51
20
12.00 To
1.00 PM
65
26
1590
53
881
101
43
132
148
80
61
151
177
75
46
19
G.Total
Nimbaheda to Mangalwad
Road
MDR 11A
Day
Monday to Tuesday
Time
1.00 PM
Date
28-06-2010 to 29-06-2010
Weather Good
Sheet No.
Bus
Wheelers
LCV
TIME
(Hourly)
Two
Three
Car
Jeep
Mini
Full
1.00 To
2.00 PM
13
2.00 To
3.00 PM
3.00 To
4.00 PM
10
4.00 To
5.00 PM
20
13
5.00 To
6.00 PM
6.00 To
7.00 PM
63
7.00 To
8.00 PM
Truck
Tractor
Multi AxleWith
2-Axle
3-Axle
13
10
10
13
75
24
10
8.00 To
9.00 PM
70
25
13
9.00 To
10.00 PM
100
28
10
10.00 To
11.00 PM
78
42
10
11.00 To
12.00 AM
78
32
12.00 To
1.00 AM
92
40
10
10
Trailor With
Trailor
Cycle
Ricksha Animals/
w
Carts
Others
1.00 To
2.00 AM
87
14
10
18
10
2.00 To
3.00 AM
82
18
17
10
3.00 To
4.00 AM
89
23
12
13
4.00 To
5.00 AM
73
24
12
19
10
5.00 To
6.00 AM
140
54
6.00 To
7.00 AM
108
62
7.00 To
8.00 AM
115
55
8.00 To
9.00 AM
106
39
9.00 To
10.00 AM
84
23
18
11
10.00 To
11.00 AM
56
28
11
16
11.00 To
12.00 PM
43
23
13
12.00 To
1.00 PM
39
26
1619
15
632
31
34
64
52
93
106
135
141
53
37
10
G.Total
Nimbaheda to Mangalwad
Road
MDR 11A
Day
Tuesday To Wednesday
Time
1:00
Date
29/6/2010 -30/06/10
Weather Good
Sheet No.
Wheelers
Bus
LCV
Two
Three
Car
Jeep
Mini
Full
1.00 To
2.00 PM
2.00 To
3.00 PM
3.00 To
4.00 PM
11
4.00 To
5.00 PM
14
5.00 To
6.00 PM
34
6.00 To
7.00 PM
48
7.00 To
8.00 PM
Truck
Tractor
2-Axle
3-Axle
66
14
12
8.00 To
9.00 PM
100
18
9.00 To
10.00 PM
77
21
10.00 To
11.00 PM
103
23
11.00 To
12.00 AM
105
34
11
14
12.00 To
1.00 AM
80
25
10
TIME
(Hourly)
Multi AxleWith
TrailorWithout
Trailor
Cycle
Ricksha Animals/
w
Carts
Others
1.00 To
2.00 AM
108
34
14
2.00 To
3.00 AM
110
37
10
27
3.00 To
4.00 AM
95
33
16
4.00 To
5.00 AM
106
43
10
5.00 To
6.00 AM
6.00 To
7.00 AM
109
11
10
110
16
11
7.00 To
8.00 AM
106
28
11
8.00 To
9.00 AM
92
27
9.00 To
10.00 AM
38
20
10.00 To
11.00 AM
19
13
11.00 To
12.00 PM
12.00 To
1.00 PM
1549
29
428
48
17
80
100
78
84
134
111
14
G.Total
Nimbaheda to Mangalwad
Road
MDR 11A
Day
Wednesday To Thrusday
Time
1:00
Date
30-06 to 01/7/2010
Weather Good
Sheet No.
Wheelers
LCV
Bus
Two
Three
Car
Jeep
Mini
Full
1.00 To
2.00 PM
2.00 To
3.00 PM
11
3.00 To
4.00 PM
4.00 To
5.00 PM
14
5.00 To
6.00 PM
27
6.00 To
7.00 PM
41
7.00 To
8.00 PM
Truck
Tractor
2-Axle
3-Axle
11
76
22
8.00 To
9.00 PM
117
28
9.00 To
10.00 PM
120
13
10.00 To
11.00 PM
135
35
13
11.00 To
12.00 AM
120
41
12
12.00 To
1.00 AM
110
37
13
TIME
(Hourly)
Multi Axlewith
TrailorWithout
Trailor
Cycle
Ricksha Animals/
w
Carts
Others
1.00 To
2.00 AM
105
35
2.00 To
3.00 AM
98
32
10
11
3.00 To
4.00 AM
107
124
13
4.00 To
5.00 AM
129
39
15
5.00 To
6.00 AM
6.00 To
7.00 AM
113
11
86
19
11
7.00 To
8.00 AM
83
18
8.00 To
9.00 AM
36
20
9.00 To
10.00 AM
93
24
10.00 To
11.00 AM
104
52
12
17
11.00 To
12.00 PM
105
37
22
12.00 To
1.00 PM
120
23
10
1965
211
480
51
34
96
89
103
87
141
143
34
18
G.Total
Nimbaheda to Mangalwad
Road
MDR 11A
Day
Thrusday To Friday
Time
1:00
Date
01-02/7/2010
Weather Good
Sheet No.
Wheelers
LCV
Bus
TIME
(Hourly)
Two
Three
Car
Jeep
Mini
Full
1.00 To
2.00 PM
10
2.00 To
3.00 PM
3.00 To
4.00 PM
4.00 To
5.00 PM
17
11
5.00 To
6.00 PM
33
6.00 To
7.00 PM
26
7.00 To
8.00 PM
Truck
Tractor
Multi AxleWith
2-Axle
3-Axle
10
61
23
8.00 To
9.00 PM
85
19
9.00 To
10.00 PM
119
41
10.00 To
11.00 PM
99
44
11
11.00 To
12.00 AM
136
42
12.00 To
1.00 AM
109
27
12
TrailorWithout
Trailor
Cycle
Ricksha Animals/
w
Carts
Others
1.00 To
2.00 AM
2.00 To
3.00 AM
3.00 To
4.00 AM
4.00 To
5.00 AM
12
5.00 To
6.00 AM
20
6.00 To
7.00 AM
40
20
7.00 To
8.00 AM
25
28
10
8.00 To
9.00 AM
36
14
9.00 To
10.00 AM
45
36
10.00 To
11.00 AM
40
25
11.00 To
12.00 PM
25
23
46
12.00 To
1.00 PM
954
15
400
59
72
83
76
71
75
69
96
26
25
13
14
12
G.Total
Road
MDR 11A
Day
Monday to Tuesday
Time
1.00 PM
Date
02-07-2010 to 03-07-2010
Weather Good
Sheet No.
Wheelers
Bus
LCV
TIME
(Hourly)
Two
Three
Car
Jeep
Mini
Full
1.00 To
2.00 PM
15
2.00 To
3.00 PM
3.00 To
4.00 PM
4.00 To
5.00 PM
18
13
5.00 To
6.00 PM
6.00 To
7.00 PM
51
7.00 To
8.00 PM
Truck
Tractor
Multi AxleWith
2-Axle
3-Axle
13
10
10
13
70
24
10
8.00 To
9.00 PM
70
25
13
9.00 To
10.00 PM
100
27
10
10.00 To
11.00 PM
78
42
10
11.00 To
12.00 AM
78
36
12.00 To
1.00 AM
71
40
10
Trailor With
Trailor
Cycle
Ricksha Animals/
w
Carts
Others
1.00 To
2.00 AM
87
14
10
18
10
2.00 To
3.00 AM
82
18
14
10
3.00 To
4.00 AM
70
22
12
13
4.00 To
5.00 AM
73
24
12
19
10
5.00 To
6.00 AM
140
51
6.00 To
7.00 AM
120
25
7.00 To
8.00 AM
111
34
8.00 To
9.00 AM
106
39
9.00 To
10.00 AM
84
23
16
11
10.00 To
11.00 AM
60
28
11
15
11.00 To
12.00 PM
45
10
12.00 To
1.00 PM
40
23
1577
15
555
31
34
64
52
84
101
135
141
53
37
10
G.Total
Nimbahera to Mangalwad
Road
MDR 11A
Day
Tuesday to Wednesday
Time
Date
03-07-2010 to 04-07-2010
Weather Good
Sheet No.
Abstract at km 35/825
Wheelers
Bus
Truck
Tractor
TIME
(Hourly)
Two
Three
Car
Jeep
Mini
Full
LCV
2-Axle
PCU
0.5
1.5
1.5
26.6.10/
27.6.10
1413
50
596
222
40
225
140
71
92
335
352
78
47
27
27.6.10/
28.6.11
1590
53
881
101
43
132
148
80
61
151
177
75
46
19
28.6.10/
29.6.12
1619
15
632
31
34
64
52
93
106
135
141
53
37
10
29.6.10/
30.6.10
1549
29
428
48
17
80
100
78
84
134
111
14
30.6.10/
1.7.10
1965
211
480
51
34
96
89
103
87
141
143
34
18
1.7.10/
2.7.10
954
15
400
59
72
83
76
71
75
69
96
26
25
13
14
12
2.7.10/
3.7.10
1577
15
555
31
34
64
52
84
101
135
141
53
37
10
Total
Average
10667
1524
388
55
3972
567
543
78
274
39
744
106
657
94
580
83
606
87
1100
157
1161
166
328
47
224
32
38
5
35
5
53
8
Nimbaheda
to
Mangalwad
1524
55
567
78
39
106
94
83
87
157
166
47
32
Mangalwar
to
Nimbaheda
1199
29
422
94
28
104
103
84
82
151
135
57
39
10
15
G. Total
Motor
2723
5491
85
989
172
67
210
197
167
643
0.1171
168
308
301
104
71
15
23
0.5
1361.5
1
85
1
989
1
172
1.5
100.5
3
630
1.5
295.5
3
501
3
504
4.5
1386
4.5
1354.5
1.5
156
0.5
35.5
2
10
8
120
6
138
Nimbahera to Mangalwad
Wheelers
TIME
(Hourly)
TWO
THREE
Car
Bus
Jeep
Mini
Truck
Full
LCV
2-AXLE
3-AXLE
Tractor
MULTI
AXLE
With
Trailor
Without
Trailor
CYCLE
1.00 To
2.00 PM
13
2.00 To
3.00 PM
10
3.00 To
4.00 PM
14
4.00 To
5.00 PM
14
12
5.00 To
6.00 PM
50
17
6.00 To
7.00 PM
71
15
7.00 To
8.00 PM
82
33
8.00 To
9.00 PM
77
21
11
9.00 To
10.00 PM
91
31
10.00 To
11.00 PM
86
36
10
11.00 To
12.00 AM
92
35
12.00 To
1.00 AM
78
35
1.00 To
2.00 AM
80
26
10
12
2.00 To
3.00 AM
72
30
11
3.00 To
4.00 AM
70
20
24
26
4.00 To
5.00 AM
78
36
11
18
5.00 To
6.00 AM
79
22
6.00 To
7.00 AM
84
24
7.00 To
8.00 AM
81
30
8.00 To
9.00 AM
69
30
9.00 To
10.00 AM
71
25
10.00 To
11.00 AM
62
23
11.00 To
12.00 PM
51
24
10
12.00 To
1.00 PM
48
21
Total
1523
54
569
80
38
104
93
84
85
154
165
47
31
Mangalwad_Nimbaheda Complete
Wheelers
TIME
(Hourly)
TWO
THREE
Car
Bus
Jeep
Mini
Truck
Full
LCV
2-AXLE
3-AXLE
Tractor
MULTI
AXLE
With
Trailor
Without
Trailor
CYCLE
1.00 To
2.00 PM
79
22
2.00 To
3.00 PM
68
26
3.00 To
4.00 PM
81
38
12
10
4.00 To
5.00 PM
79
24
12
10
10
11
5.00 To
6.00 PM
127
36
12
14
11
6.00 To
7.00 PM
144
39
10
12
12
7.00 To
8.00 PM
149
57
15
16
8.00 To
9.00 PM
126
40
14
17
9.00 To
10.00 PM
149
49
13
18
10
10.00 To
11.00 PM
132
51
10
10
16
11.00 To
12.00 AM
127
52
11
13
12.00 To
1.00 AM
110
47
11
11
1.00 To
2.00 AM
91
33
10
13
14
2.00 To
3.00 AM
83
38
15
17
3.00 To
4.00 AM
82
21
39
10
35
17
4.00 To
5.00 AM
117
52
11
13
11
17
26
5.00 To
6.00 AM
108
39
6.00 To
7.00 AM
131
41
10
7.00 To
8.00 AM
152
51
10
11
8.00 To
9.00 AM
156
54
11
9.00 To
10.00 AM
129
43
11
11
17
10.00 To
11.00 AM
111
43
10
11
10
11.00 To
12.00 PM
98
37
12
14
10
13
16
12.00 To
1.00 PM
92
37
13
20
12
Total
2721
84
988
174
66
206
196
168
166
305
298
104
72
25
13
16
Mangalwad-Nimbaheda
Date :
26.06.2010 to 03.07.2010
Day
07 days
Road
SH-61
Abstract at km 35/825
Wheelers
Bus
Truck
Tractor
TIME
(Hourly)
Two
Three
Car
Jeep
Mini
Full
LCV
2-Axle
PCU
0.5
1.5
1.5
26.6.10/
27.6.10
2766
96
1110
445
71
431
259
141
199
616
714
116
89
41
27.6.10/
28.6.11
3110
78
1505
226
88
241
282
177
125
247
278
130
120
36
21
28.6.10/
29.6.12
2839
31
1153
89
74
178
160
203
211
361
293
102
65
10
16
29.6.10/
30.6.10
2363
43
806
141
23
130
184
142
156
278
191
100
28
20
30.6.10/
1.7.10
2905
217
827
109
59
157
194
196
165
259
233
78
55
14
31
1.7.10/
2.7.10
2870
92
803
127
105
203
173
151
161
179
204
110
84
13
31
21
2.7.10/
3.7.10
2207
36
719
66
50
129
129
160
160
214
193
93
56
10
Total
Average
19060
2723
593
84.71
6923
989.00
1203
171.86
470
67.14
1469
209.86
1381
197.29
1170
167.14
1177
168.14
2154
307.71
2106
300.86
729
104.14
497
71.00
38
5.43
103
14.71
159
22.71
0.5
1361
1
85
1
989
1
172
1.5
101
3
630
1.5
296
3
501
3
504
4.5
1385
4.5
1354
1.5
156
0.5
36
2
11
8
118
6
136
Car
Jeep
Mini
Full
Total
PCU
LCV
2-Axle
3-Axle
Multi Axle
With Trailor
Without
Trailor
Cycle
Rikshaw
Animals/
Carts
Others
Total
PCU
G. Total
Total PCU
Non Motorised
Slow moving vechile
Two
PCU
1.00 To 2.00 PM
2.00 To 3.00 PM
3.00 To 4.00 PM
0.5
79
68
81
1
0
3
1
1
22
26
38
1
6
5
12
1.5
2
1
2
3
8
5
10
117
108
144
94.5
84.5
124.5
1.5
7
7
6
3
8
7
6
3
6
7
5
4.5
8
8
9
4.5
6
8
9
1.5
7
2
6
42
39
41
126
127.5
132
0.5
1
1
4
2
0
1
1
8
0
0
1
6
0
1
1
1
3
7
0.5
6.5
16
160
150
192
221
218.5
272.5
4.00 To 5.00 PM
79
24
12
126
110.5
10
10
11
50
156
181
267.5
5.00 To 6.00 PM
127
36
184
136
12
14
11
54
178.5
6.5
240
321
6.00 To 7.00 PM
144
39
10
208
158
12
12
48
154.5
258
313.5
7.00 To 8.00 PM
149
57
222
166.5
15
16
61
211.5
287
385
8.00 To 9.00 PM
126
40
183
135
14
17
51
186
237
322
9.00 To 10.00
PM
10.00 To 11.00
PM
11.00 To 12.00
AM
12.00 To 1.00
AM
1.00 To 2.00
2.00 To 3.00
3.00 To 4.00
AM
4.00 To5.00 AM
149
49
217
159.5
13
18
10
62
204
1.5
282
365
132
51
10
202
156.5
10
16
53
178.5
21.5
262
356.5
127
52
200
156
11
13
48
162
6.5
250
324.5
110
47
176
136.5
11
11
46
148.5
20.5
227
305.5
91
83
82
1
4
21
33
38
39
5
4
8
2
2
6
10
9
10
142
140
166
117.5
117.5
148
8
6
7
4
5
3
5
9
4
13
15
35
14
17
17
4
6
7
48
58
73
166.5
204
276
6
5
3
2
1
0
0
2
0
0
0
0
8
8
3
3
18.5
1.5
198
206
242
287
340
425.5
117
52
11
13
202
171.5
11
17
26
71
250.5
10
17.5
283
439.5
5.00 To 6.00
AM
6.00 To 7.00
AM
7.00 To 8.00
AM
8.00 To 9.00
AM
9.00 To 10.00
AM
10.00 To 11.00
AM
11.00 To 112.00
PM
12.00 To 1.00
PM
ADT
%age Share
108
39
158
113
32
100.5
15
195
228.5
131
41
185
130
10
43
139.5
11
236
280.5
152
51
10
226
171.5
11
41
136.5
9.5
272
317.5
156
54
227
160
11
42
136.5
11
29.5
280
326
129
43
190
140.5
11
11
17
59
199.5
15.5
255
355.5
111
43
186
151.5
10
11
10
52
163.5
240
316
98
37
12
169
142.5
14
10
13
16
61
214.5
236
359
92
37
13
161
142
20
12
62
213
10
22.5
233
377.5
72
25
13
16
126 236
1.3% 0.4% 0.2% 0.3% 2.2%
5602
7725
2721
84
988
174
66
206 4239 3324
48.6% 1.5% 17.6% 3.1% 1.2% 3.7% 75.7%
196
168 166 305 298 104 1237 4166
3.5% 3.0% 3.0% 5.4% 5.3% 1.9% 22.1%
PCU
Total
4.5
616
4.5
714
1.5
116
18
2045 7568
0.5
89
2
1
8
2
6
41
3110
78
1505
226
88
241
5248 4219
282
177
125
247
278
130
1239 3887
120
36
21
179 474
2839
31
1153
89
74
178
4364 3338
160
203
211
361
293
102
1330 4578
65
10
16
PCU
Total
3
199
Others
Without
Trailor
3
141
Animals
/ Carts
With
Trailor
Rikshaw
Multi
Axle
1.5
259
Cycle
3-Axle
4919 4434
PCU
2-Axle
3
431
LCV
Total
1.5
71
PCU
Full
1
445
Mini
Jeep
1
1110
Three
Total
Non Motorised
Slow moving vechile
1
96
6666
8580
98 184.5 5792
8100
2363
43
806
141
23
130
3506 2596
184
142
156
278
191
100
1051 3431
28
20
4612
6217
2905
217
827
109
59
157
4274 3165
194
196
165
259
233
78
1125 3705
55
14
31
7196
2870
92
803
127
105
203
4200 3224
173
151
161
179
204
110
978 3084
84
13
31
21
149 416
5327
6724
2207
36
719
66
50
129
3207 2387
129
160
160
214
193
93
56
10
81 130
4237
5641
949 3125
8717 29376
1245 4197
Others
3.0%
Cycle
3.5%
497
38 103 159
71
5
15
23
35.5 10.86 117.7 136.3
0.5
2
8
6
35.5 10.86 117.7 136.3
Animals /
Carts
Rikshaw
Without Trailor
With Trailor
3-Axle
Multi Axle
1.5
3
3
4.5
4.5
1.5
295.9 501.4 504.4 1385 1354 156.2
2-Axle
LCV
Full Bus
1
1.5
3
172 100.7 629.6
Mini Bus
1
989
Jeep
0.5
1
1361.4 84.71
Car
19060 593
2723
85
1361.4 84.71
Three Wheeler
Total
ADT
ADT PCU
0.5
2766
Two
26.6.10
27.6.10
28.6.10
29.6.10
30.6.10
1.7.10
2.7.10
Two Wheeler
PCU
Car
Direction of
Manglwar - Nimbahera
Traffic
Date :
26.06.2010 to 03.07.2010
Day
07 days
Abstract at km 35/825
Motorised Pasenger Vehicle
Wheelers
Bus
Day (24 Hour)
0.2% 0.3%
55 190
26.6.10
27.6.10
28.6.10
29.6.10
30.6.10
1.7.10
4000
3000
2000
1000
0
2.7.10
12.00 To 1.00 PM
11.00 To 112.00 PM
10.00 To 11.00 AM
9.00 To 10.00 AM
8.00 To 9.00 AM
7.00 To 8.00 AM
6.00 To 7.00 AM
5.00 To 6.00 AM
4.00 To5.00 AM
3.00 To 4.00 AM
2.00 To 3.00 AM
1.00 To 2.00 AM
12.00 To 1.00 AM
11.00 To 12.00 AM
10.00 To 11.00 PM
9.00 To 10.00 PM
8.00 To 9.00 PM
7.00 To 8.00 PM
6.00 To 7.00 PM
5.00 To 6.00 PM
4.00 To 5.00 PM
3.00 To 4.00 PM
2.00 To 3.00 PM
1.00 To 2.00 PM
500
450
400
350
300
250
200
150
100
50
0
Total Nos.
PCUs
8000
7000
6000
5000
1.9%, 2%
1.3%, 1%
0.4%, 0%
0.2%, 0%
0.3%, 0%
5.3%, 5%
Two Wheeler
Three Wheeler
5.4%, 5%
Car
3.0%, 3%
Jeep
Mini Bus
3.0%, 3%
Full Bus
3.5%, 3%
48.6%, 49%
3.7%, 4%
LCV
2-Axle
1.2%, 1%
3.1%, 3%
3-Axle
Multi Axle
With Trailor
17.6%, 18%
Without Trailor
Cycle
1.5%, 1%
Rikshaw
140
3 Wheeler
120
Car
Jeep
100
Mini Bus
80
Bus
60
LCV
40
2-Axle
3-Axle
20
Multi Axle
0
0
Total Nos.
160
PART 2
OD Survey (~ 10%)