Beruflich Dokumente
Kultur Dokumente
:Tarun Kumar
:15-02-1987
:H.No. 4556,Near Bal Vatika School
Vijay Nagar Noorwala Panipat(Hr.)
+917340979623
tarunkumar5410@gmail.com
Affix latest color
Summary About 5.11 years of experience working as a BTS Engineer responsibility for
operation and maintenance of Telecom Power equipments for providing Trouble free
services and Integration, Installation and Testing of BTS & Microwave sites.
And also fault diagnosis and rectification at cell sites.
Academic Record
Name of School /
College
Board /
University
From
Aug
YYYY
2005
MM
May
YYYY
2008
Diploma(ECE)
Full Time /
Part Time /
Distance
Learning
Full Time
May
2003
May
2004
Intermediate
Full Time
May
2001
May
2002
Matriculation
Full Time
MM
Govt.
Polytechnic
Nilokheri (Karnal)
S.D.
Sr.
Sec.
Scchool Panipat
Govt. High School
Tehsil
Camp
Paniapt
State Board of
Teachnical
Education
Chandigarh.
Haryana Board
of
School
Education
Haryana Board
of
School
Education
To
Degree Exam.
From
Employers Name
MM
Steelman Telecom
Ltd.(Calcutta)
Pvt.
OCT
To
YYY
Y
MM
YYYY
2010
APR
2016
Period
Total
Experience
(Duration
in Month)
66
Designation
BTS ENGINEER
Organizational Experience
Objectives:
Presently working as a Quality Engineer and Coordinator in Quality Department in
Samsung Electronics Ltd in Bhatinda (Punjab)
I have the responsibilities of to check the Quality of sites such as CDU Installation,
GSM Installation Rooting of cables Earthing of sites and find punch points and
cleared them by itself and other solpar teams, and Coordinate with our team and
Solpar teams, make tracker for those sites daily and mention Punch Points in tracker
report to our Area Manager.
Recently worked in Deployment Department with Samsung for Reliance(jio) project
in Bhatinda (Punjab) as ENB Engineer.
I have the responsibility to coordinate with teams, clearance of alarms,
installation, integration, ATP (11A, 11B) Closing of sites and finaly handover to
customer.
Recently worked with Steelman Telecom Pvt. Ltd for ZTE (AIRTEL 4G) Project.
Collect site ID from planning team and visit the site before start of work for
verifying the Workable Condition.
Start visiting sites as defined in QA Plan.
Determining the activities that do not meet the required specifications, standards
or the defined method
Correcting the deficiencies so as to reduce the cost and increase quality.
percentage acceptance level of the final product by the customer
Analyzing the problem areas and recommend the corrective actions wherever required.
Recommend changes wherever necessary
Start work according to drawing.
RF Survey of sites for Nokia ( Aircel Project )in New Delhi.
Worked as Site engineer for Nokia (TATA GSM Project) in Haryana.
Configuration and commissioning of NOKIA BTS, FLEXI BTS
Operation and maintenance of NOKIA ULTRA SITE EDGE BTS,FLEXI BTS
Additional Skill:
Company Confidential
Professional Profile
age 2 of 3
Pa ge 2 of 3
06-07-2016
DATE
Company Confidential
Panipat
PLACE
SIGNATURE OF EMPLOYEE
Professional Profile
age 3 of 3
Pa ge 3 of 3